Block 0208, lot 026
601 Montgomery St
- City’s use
- Commercial Office
- Built
- 1978
- Stories
- 20
- Units
- 1
- Building
- 245,733 sq ft
- Lot
- 14,953 sq ft
- Zoning
- C3O
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress issued Sep 2026 | 601 Montgomery St | Convergint Technologies Llc | renewal of expired permit 202108196716 for fire final inspectionDetails
renewal of expired permit 202108196716 for fire final inspection | |
| Jul 16, 2026 | In progress issued Sep 2026 | 601 Montgomery St | Wci-Gc Inc | 10/f: commercial interior tenant improvement for the expansion of an (e) office tenant space. also includes alterations to (e) multi-stall restrooms for cbc accessibility compliance. no structural work is included.Details
10/f: commercial interior tenant improvement for the expansion of an (e) office tenant space. also includes alterations to (e) multi-stall restrooms for cbc accessibility compliance. no structural work is included. | $450,000 |
| Jun 6, 2023 | In progress issued Oct 2023 | 601 Montgomery St | revision to 202104078075: reduction in scope. repair (e) emergency generator in basement to replace (e). transer switch w/ n in basement electrical rm. provide n rated eletrical rm e/ (e) basement storage rm & improvement to (e) conditions in (e) fire pump & emergency generator rm as reqDetails
revision to 202104078075: reduction in scope. repair (e) emergency generator in basement to replace (e). transer switch w/ n in basement electrical rm. provide n rated eletrical rm e/ (e) basement storage rm & improvement to (e) conditions in (e) fire pump & emergency generator rm as req | ||
| Feb 3, 2023 | Completed final sign-off Feb 2023 | 601 Montgomery St | Convergint Technologies Llc | 12/f-partial: f/a t.i. suite 1210, relocate (9) (e) speakers in sow area on (e) circuits, add (3) new speaker strobes on (e) circuits. ref bpa#202209212822Details
12/f-partial: f/a t.i. suite 1210, relocate (9) (e) speakers in sow area on (e) circuits, add (3) new speaker strobes on (e) circuits. ref bpa#202209212822 | $1,000 |
| Dec 8, 2022 | Completed final sign-off Jan 2023 | 601 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit; relocate 22 add 1 and delete 4 sprinklers in suite #1210. ref t.i. pa# 202209212822Details
fire sprinkler permit; relocate 22 add 1 and delete 4 sprinklers in suite #1210. ref t.i. pa# 202209212822 | $13,000 |
| Nov 1, 2022 | Never finaled issued Nov 2022, no final | 601 Montgomery St | Alpha Architectural Signs & Lighting | install exterior illuminated sign: "hsbc" 3' x 11'1"Details
install exterior illuminated sign: "hsbc" 3' x 11'1" | $6,000 |
| Nov 1, 2022 | Never finaled issued Nov 2022, no final | 601 Montgomery St | Alpha Architectural Signs & Lighting | install 1 illuminated wall sign: "hsbc" 19'6" x 4'Details
install 1 illuminated wall sign: "hsbc" 19'6" x 4' | $8,000 |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 601 Montgomery St | Deb Construction Llc | revision to pa 2022-0505-3643 relocateion of it rack. "meeting room" revised to "offices". revise floor power & signal plan. relocationg floor furniture & equipment planDetails
revision to pa 2022-0505-3643 relocateion of it rack. "meeting room" revised to "offices". revise floor power & signal plan. relocationg floor furniture & equipment plan | |
| Sep 21, 2022 | Completed final sign-off Mar 2023 | 601 Montgomery St | High Level Construction Co | commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele, plumbingDetails
commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele, plumbing | $405,570 |
| Sep 14, 2022 | Completed final sign-off Apr 2023 | 601 Montgomery St | Commercial Interior Builders Inc | 8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbingDetails
8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbing | $206,537 |
| May 17, 2022 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | replace existing outside airfan (sf-01) with new fan wall arrangement. remove existing shaft wall opening and patch wall to accomodate newshaft opening. associated electrical scope.Details
replace existing outside airfan (sf-01) with new fan wall arrangement. remove existing shaft wall opening and patch wall to accomodate newshaft opening. associated electrical scope. | $443,599 | |
| May 5, 2022 | Completed final sign-off Jan 2023 | 601 Montgomery St | Deb Construction Llc | 1st fl: tenant improvement on existing space. new finishes, existing office converted to meeting rooms, partial ext facade renovation, new partition & electrical work.Details
1st fl: tenant improvement on existing space. new finishes, existing office converted to meeting rooms, partial ext facade renovation, new partition & electrical work. | $510,000 |
| Feb 16, 2022 | Expired or cancelled withdrawn Mar 2022 | 601 Montgomery St | Crown Moing And Storage Company | ste 460: build 14 modular work stations.Details
ste 460: build 14 modular work stations. | $2,000 |
| Feb 15, 2022 | Never finaled issued Feb 2022, no final | 601 Montgomery St | Convergint Technologies Llc | as buildes fire alarm for fa pa# 202106102116. added interface relay for fsd's. all other work to remain. no matrix of operations changes.Details
as buildes fire alarm for fa pa# 202106102116. added interface relay for fsd's. all other work to remain. no matrix of operations changes. | |
| Oct 22, 2021 | Completed final sign-off Dec 2021 | 601 Montgomery St | Convergint Technologies Llc | fire alarm t.i. 4th flr suite 400. (9) new notification devices to be tied into the existing circuits. (9) new smoke detectors to be tied into the existing slc.Details
fire alarm t.i. 4th flr suite 400. (9) new notification devices to be tied into the existing circuits. (9) new smoke detectors to be tied into the existing slc. | $10,000 |
| Aug 19, 2021 | Never finaled issued Aug 2021, no final | 601 Montgomery St | Convergint Technologies Llc | fire alarm ti: existing bldg directory style fan/damper panel to be replaced with a new firefighter's smoke control panel with a graphic. new field imitating devices to be installed on existing mech smoke control equipment.Details
fire alarm ti: existing bldg directory style fan/damper panel to be replaced with a new firefighter's smoke control panel with a graphic. new field imitating devices to be installed on existing mech smoke control equipment. | $95,000 |
| Aug 2, 2021 | Never finaled issued Aug 2021, no final | 601 Montgomery St | Golden Gate Fire Protection Inc | fire sprinklers. relocate 9 pendent sprinklers and add 1 on the 4th floor. relocate 1 upright sprinkler. ti ref pa# 202104017773.Details
fire sprinklers. relocate 9 pendent sprinklers and add 1 on the 4th floor. relocate 1 upright sprinkler. ti ref pa# 202104017773. | $5,775 |
| Jun 10, 2021 | Completed final sign-off Feb 2022 | 601 Montgomery St | Convergint Technologies Llc | fire alarm t.i. 4th floor conference room - new notification to be tied into the existing circuits - (4) new smoke detectors to be tied into the nearest addressable circuit (4) new speaker strobes. ref t.i. pa 202012019892.Details
fire alarm t.i. 4th floor conference room - new notification to be tied into the existing circuits - (4) new smoke detectors to be tied into the nearest addressable circuit (4) new speaker strobes. ref t.i. pa 202012019892. | $10,000 |
| Jun 10, 2021 | Completed final sign-off Feb 2022 | 601 Montgomery St | Convergint Technologies Llc | fire alar, t.i. 4th floor common core -new notification to be tied into the existing circuits - (13) new smoke detectotrs to be tied into the nearest circuit 7 new speaker strobesDetails
fire alar, t.i. 4th floor common core -new notification to be tied into the existing circuits - (13) new smoke detectotrs to be tied into the nearest circuit 7 new speaker strobes | $10,000 |
| May 13, 2021 | Completed final sign-off Jun 2021 | 601 Montgomery St | R L H Fire Protection Inc | ti/upgrade of the existing fire sprinkler system 7 relocated pendent sprinklers ref #2020-1201-9893Details
ti/upgrade of the existing fire sprinkler system 7 relocated pendent sprinklers ref #2020-1201-9893 | |
| May 12, 2021 | Completed final sign-off Jul 2021 | 601 Montgomery St | R L H Fire Protection Inc | ti/upgrade of existing fire sprinkler system 7 relocated pendent sprinklers 1 additional pendent sprinkler 1 deleted pendent sprinkler ref. # 2020-1201-9892Details
ti/upgrade of existing fire sprinkler system 7 relocated pendent sprinklers 1 additional pendent sprinkler 1 deleted pendent sprinkler ref. # 2020-1201-9892 | |
| Apr 7, 2021 | Never finaled issued May 2022, no final | 601 Montgomery St | demo exterior windws & furred wall at merchant st façade &other, (e) items as req at bldg garage. remove (e) emrgncy generator in bsmnt. construct (n) rated rm emrgncy generator w/ rated partitions on (n) concrete curb, generator pad inclu req struct upgrades steel strctre below, (n) louvers & glazeDetails
demo exterior windws & furred wall at merchant st façade &other, (e) items as req at bldg garage. remove (e) emrgncy generator in bsmnt. construct (n) rated rm emrgncy generator w/ rated partitions on (n) concrete curb, generator pad inclu req struct upgrades steel strctre below, (n) louvers & glaze | $675,923 | |
| Apr 2, 2021 | Completed final sign-off Feb 2022 | 601 Montgomery St | Commercial Interior Builders Inc | 7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep.Details
7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep. | $338,903 |
| Apr 1, 2021 | Completed final sign-off Mar 2022 | 601 Montgomery St | Commercial Interior Builders Inc | 4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893.Details
4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893. | $308,451 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | High Level Construction Co | 4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit.Details
4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit. | $310,155 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | High Level Construction Co | 4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep.Details
4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep. | $289,203 |
| Sep 1, 2020 | Never finaled issued Nov 2020, no final | 601 Montgomery St | Vortex Industries Inc | to comply with the accessible business entrance program: install new power door operator at existing retail tenant entry, and lowering existing elevator support rail at accessible entry from garage.Details
to comply with the accessible business entrance program: install new power door operator at existing retail tenant entry, and lowering existing elevator support rail at accessible entry from garage. | $8,561 |
| Mar 3, 2020 | Completed final sign-off Aug 2020 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 12th suite 1212 - add 6 speaker strobes.Details
fire alarm ti on 12th suite 1212 - add 6 speaker strobes. | $3,800 |
| Feb 20, 2020 | Completed final sign-off Apr 2020 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | ref pa# 201912129293: relocate fire sprinklers for i.i. (17 relocates) 12th floorDetails
ref pa# 201912129293: relocate fire sprinklers for i.i. (17 relocates) 12th floor | $3,285 |
| Dec 12, 2019 | Completed final sign-off Jul 2020 | 601 Montgomery St | Commercial Interior Builders Inc | ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher naDetails
ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na | $254,249 |
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 3rd fl, ste 350 - fire alarm ti - add 2 speakers onlyDetails
3rd fl, ste 350 - fire alarm ti - add 2 speakers only | $1,200 |
| Oct 29, 2019 | Never finaled issued Oct 2019, no final | 601 Montgomery St | Golden Gate Fire Protection Inc | 3rd floor:fire sprinkler. relocate 6 sprinkler pendents on suite #350Details
3rd floor:fire sprinkler. relocate 6 sprinkler pendents on suite #350 | $3,000 |
| Oct 23, 2019 | Completed final sign-off May 2020 | 601 Montgomery St | Commercial Interior Builders Inc | suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a.Details
suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a. | $120,155 |
| Oct 15, 2019 | Completed final sign-off Nov 2019 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 6th fl add 6 speaker strobes. ref pa#201908209241Details
fire alarm ti on 6th fl add 6 speaker strobes. ref pa#201908209241 | $4,000 |
| Sep 20, 2019 | Completed final sign-off Oct 2019 | 601 Montgomery St | R L H Fire Protection Inc | ti upgrade of e fire sprinkler system. 2 relocate pendent sprinklers, 3 additional pendent sprinklers, delete pendent sprinklers ref 2019082092941Details
ti upgrade of e fire sprinkler system. 2 relocate pendent sprinklers, 3 additional pendent sprinklers, delete pendent sprinklers ref 2019082092941 | $5,300 |
| Aug 20, 2019 | Completed final sign-off Jul 2022 | 601 Montgomery St | High Level Construction Co | suite 675: commercial t.i. 6th flr which includes demo of non-structural partitions, doors, casework, lighting, finishes, construction includes non-structural partitions, glazing, doors, lighting, finishes, restrm accessibility upgrades includes mech, elect, & plmg. l/s, fire spk, f/a defrd.Details
suite 675: commercial t.i. 6th flr which includes demo of non-structural partitions, doors, casework, lighting, finishes, construction includes non-structural partitions, glazing, doors, lighting, finishes, restrm accessibility upgrades includes mech, elect, & plmg. l/s, fire spk, f/a defrd. | $320,497 |
| Jun 13, 2019 | Completed final sign-off Jun 2019 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm as-built drawing for pa #201904188386, per sffd field inspector's requirement. 4th flDetails
fire alarm as-built drawing for pa #201904188386, per sffd field inspector's requirement. 4th fl | |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm ti 4th fl add 14 speakers, 9 speaker strobes, 1 duct detector for fsds with control relay, 2 smoke det for door holder, 1 control relay for security interface, ref 201903054375Details
fire alarm ti 4th fl add 14 speakers, 9 speaker strobes, 1 duct detector for fsds with control relay, 2 smoke det for door holder, 1 control relay for security interface, ref 201903054375 | $16,000 |
| Mar 26, 2019 | Completed final sign-off May 2019 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | 4th flr - add 1 relocate 16 and plug 5Details
4th flr - add 1 relocate 16 and plug 5 | $4,125 |
| Mar 5, 2019 | Completed final sign-off Aug 2019 | 601 Montgomery St | Commercial Interior Builders Inc | suite 400 -deferred: life safety/fire sprinkler & alarm. 4th flr ti -demo includes non structural partitions, doors, casework, lighting & finishes. construction - non structural partitions, glazing, doors, lighting finishes & restroom accessibility upgrades and mepDetails
suite 400 -deferred: life safety/fire sprinkler & alarm. 4th flr ti -demo includes non structural partitions, doors, casework, lighting & finishes. construction - non structural partitions, glazing, doors, lighting finishes & restroom accessibility upgrades and mep | $488,049 |
| Jan 18, 2019 | Completed final sign-off Feb 2019 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite 350: fire alarm ti on 3rd fl - add 7 ceiling speaker strobes, remove (e) 2 smoke detectors & 1 door holder, remove 2 duct detectors for deleted fsd's. remove 1 smoke detector for return fsd & 1 smoke detector at copy/breakroom. ref 201811155941.Details
suite 350: fire alarm ti on 3rd fl - add 7 ceiling speaker strobes, remove (e) 2 smoke detectors & 1 door holder, remove 2 duct detectors for deleted fsd's. remove 1 smoke detector for return fsd & 1 smoke detector at copy/breakroom. ref 201811155941. | $6,000 |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 601 Montgomery St | Priority Architectural Graphics Dba Prio | 82 evacuation for sffd review only floors b, 1, garage, 3,4,5,6, 7, 8,9,10,11,12,14,16,17, 18,19,20,roofDetails
82 evacuation for sffd review only floors b, 1, garage, 3,4,5,6, 7, 8,9,10,11,12,14,16,17, 18,19,20,roof | $32,800 |
| Nov 15, 2018 | Completed final sign-off Apr 2019 | 601 Montgomery St | Rossi Builders Inc. | suite 350; commercial t.i. which includes demo. of non-structural partitons, casework, lighting and finishes, construction of non-structural partitons, glazing and finishes, includes mechanical, electrical and plumbing. 3rd fl restrooms ref# 201706169579. n/a maherDetails
suite 350; commercial t.i. which includes demo. of non-structural partitons, casework, lighting and finishes, construction of non-structural partitons, glazing and finishes, includes mechanical, electrical and plumbing. 3rd fl restrooms ref# 201706169579. n/a maher | $349,571 |
| Oct 10, 2018 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | replace extg hot water boilers with 2 high efficiency condensing boiler units. n/a for maherDetails
replace extg hot water boilers with 2 high efficiency condensing boiler units. n/a for maher | $200,000 | |
| May 8, 2018 | Completed final sign-off Jun 2018 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite 1150: add 1 new ceiling speaker strobe, add 1 new ceiling strobe, replace 2 e speakers with new speakers, ref 201710181573. maher n/a.Details
suite 1150: add 1 new ceiling speaker strobe, add 1 new ceiling strobe, replace 2 e speakers with new speakers, ref 201710181573. maher n/a. | $5,000 |
| May 7, 2018 | Completed final sign-off May 2018 | 601 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 4 pendents for grube, brown & geidt exp on suite #1150 on the 11th fl. red #201710181573. maher naDetails
fire sprinkler only - relocate 4 pendents for grube, brown & geidt exp on suite #1150 on the 11th fl. red #201710181573. maher na | $1,000 |
| Apr 13, 2018 | Completed final sign-off Oct 2021 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | make existing voice panel new facu for building w/1 for 1 device replacement. 348 smokes, 39 detectors. 57 pull stations. 4 loop controlers , 109 input modules, 99 relays, 2 sync modules. existing fa system ul cert#: s24361; entry 5556445 maher naDetails
make existing voice panel new facu for building w/1 for 1 device replacement. 348 smokes, 39 detectors. 57 pull stations. 4 loop controlers , 109 input modules, 99 relays, 2 sync modules. existing fa system ul cert#: s24361; entry 5556445 maher na | $50,000 |
| Feb 16, 2018 | Completed final sign-off Mar 2018 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 7th floor: add 2 new ceiling speaker strobes. n/a for maher ref app#201709087313Details
7th floor: add 2 new ceiling speaker strobes. n/a for maher ref app#201709087313 | $2,000 |
| Jan 17, 2018 | Completed final sign-off Jan 2018 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | unit 120: add 1 new ceiling mount speaker strobe at lobby deli. ref pa 2017-1114-3932 and ref pa 201706169579, no work scoped for 3rd floor, work on 1st floor onlyDetails
unit 120: add 1 new ceiling mount speaker strobe at lobby deli. ref pa 2017-1114-3932 and ref pa 201706169579, no work scoped for 3rd floor, work on 1st floor only | $3,000 |
| Nov 21, 2017 | Completed final sign-off Dec 2017 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 7th flr: add 3 new ceiling mount speaker strobes ref 201709087313Details
7th flr: add 3 new ceiling mount speaker strobes ref 201709087313 | $2,500 |
| Nov 14, 2017 | Completed final sign-off Jun 2018 | 601 Montgomery St | Rossi Builders Inc. | suite 120 - revision to pa #201706169579: add grease trap. n/a maher ordinanceDetails
suite 120 - revision to pa #201706169579: add grease trap. n/a maher ordinance | |
| Oct 20, 2017 | Completed final sign-off Dec 2017 | 601 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler only, relocate 13 sprinkler pendents for suite 770, 7th fl. ref 2017-0908-7313.Details
fire sprinkler only, relocate 13 sprinkler pendents for suite 770, 7th fl. ref 2017-0908-7313. | $3,250 |
| Oct 18, 2017 | Never finaled issued Apr 2018, no final | 601 Montgomery St | Rossi Builders Inc. | 11th fl - commercial tenant improvement - includes demo of non-structural partitions, lighting and finishes. construction of non-structural partitions includes accessibility upgrades, mechanical and electricalDetails
11th fl - commercial tenant improvement - includes demo of non-structural partitions, lighting and finishes. construction of non-structural partitions includes accessibility upgrades, mechanical and electrical | $156,000 |
| Oct 17, 2017 | Never finaled issued Oct 2017, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | elevator upgrade: add 4 new smoke detectors. add 4 new addressable control/relays. add one new conventional heat detector with monitoring modules. n/a for maherDetails
elevator upgrade: add 4 new smoke detectors. add 4 new addressable control/relays. add one new conventional heat detector with monitoring modules. n/a for maher | $10,000 |
| Sep 28, 2017 | Never finaled issued Sep 2017, no final | 601 Montgomery St | Structural & Refrigeration Mechanicalref | roof: change out old cooling towers - install new heat exchange & 2 pumps. maher naDetails
roof: change out old cooling towers - install new heat exchange & 2 pumps. maher na | $899,000 |
| Sep 8, 2017 | Completed final sign-off Jul 2018 | 601 Montgomery St | Rossi Builders Inc. | 7/f partial floor spec suite #770- commercial t.i. to include demo non-structural partitions, lighting and finishes. construction of non-structural partitions includes mep. n/a ordinance #155-13. ref pa 201704285167 for rated corridor to meet exit separation reqts, fire under separate permit(s)Details
7/f partial floor spec suite #770- commercial t.i. to include demo non-structural partitions, lighting and finishes. construction of non-structural partitions includes mep. n/a ordinance #155-13. ref pa 201704285167 for rated corridor to meet exit separation reqts, fire under separate permit(s) | $40,000 |
| Aug 11, 2017 | Never finaled issued Oct 2017, no final | 601 Montgomery St | Rossi Builders Inc. | mep scope for limited food service (deli). suite 120. ref pa #201706169579. maher naDetails
mep scope for limited food service (deli). suite 120. ref pa #201706169579. maher na | $5,000 |
| Aug 8, 2017 | Completed final sign-off Sep 2017 | 601 Montgomery St | R L H Fire Protection Inc | 7th floor - fire sprinkler permit relocate 12 pendent sprinklers on the 7th floor. ti 2017-0428-5167. n/a maherDetails
7th floor - fire sprinkler permit relocate 12 pendent sprinklers on the 7th floor. ti 2017-0428-5167. n/a maher | $3,000 |
| Aug 3, 2017 | Completed final sign-off Sep 2017 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm t.i for 7th fl. add (5) speaker strobes & (1) control relay for security interface. ref pa #201704285169. maher naDetails
fire alarm t.i for 7th fl. add (5) speaker strobes & (1) control relay for security interface. ref pa #201704285169. maher na | $3,100 |
| Jul 27, 2017 | Never finaled issued Jul 2017, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite 750: f/a: add (6) ceiling speakerstroves. add (7) ceiling speakers. ref. ti #201704285169. maher naDetails
suite 750: f/a: add (6) ceiling speakerstroves. add (7) ceiling speakers. ref. ti #201704285169. maher na | $5,000 |
| Jun 26, 2017 | Completed final sign-off Sep 2017 | 601 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit - relocate 22, add 6 and delete 4 pendent sprinklers on the 7th floor, maher naDetails
fire sprinkler permit - relocate 22, add 6 and delete 4 pendent sprinklers on the 7th floor, maher na | $7,500 |
| Jun 16, 2017 | Never finaled issued Oct 2017, no final | 601 Montgomery St | Rossi Builders Inc. | 1st & 3rd floors, commercial ti which includes electrical work for commercial appliances. includes accessibility upgrades. limited food service, non cooking facilityDetails
1st & 3rd floors, commercial ti which includes electrical work for commercial appliances. includes accessibility upgrades. limited food service, non cooking facility | $179,000 |
| May 9, 2017 | Completed final sign-off Aug 2017 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 8th floor, ste 810 add 3 new ceiling speaker strobes and 1 new ceiling strobeDetails
8th floor, ste 810 add 3 new ceiling speaker strobes and 1 new ceiling strobe | $2,000 |
| Apr 28, 2017 | Never finaled issued Jun 2017, no final | 601 Montgomery St | High Level Construction Co | 7th floor, common areas : commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing.Details
7th floor, common areas : commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing. | $150,000 |
| Apr 28, 2017 | Never finaled issued Jun 2017, no final | 601 Montgomery St | High Level Construction Co | 7th floor unit 750 srs: commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing.Details
7th floor unit 750 srs: commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing. | $300,000 |
| Jan 6, 2017 | Never finaled issued Jan 2017, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 14th flr suite 1475 - fire alarm add 6 speaker/strobes, 1 smoke detector in tc closet, 1 control relay for security access control, relo 6 spkrs, remove 4 smoke det. ref 2016-0929-9206 maher naDetails
14th flr suite 1475 - fire alarm add 6 speaker/strobes, 1 smoke detector in tc closet, 1 control relay for security access control, relo 6 spkrs, remove 4 smoke det. ref 2016-0929-9206 maher na | $4,000 |
| Nov 29, 2016 | Completed final sign-off Dec 2016 | 601 Montgomery St | R L H Fire Protection Inc | fire sprinkler ti. relocate 8 pendent sprinklers, delete 1 pendent sprinklers on the 14 th flDetails
fire sprinkler ti. relocate 8 pendent sprinklers, delete 1 pendent sprinklers on the 14 th fl | $9,964 |
| Oct 28, 2016 | Completed final sign-off Feb 2017 | 601 Montgomery St | Evans & Son Inc | 12th floor: install step down transformer, 1 switch, 4 receptacles. and cr/ac unit in it room ref pa 2016-0226-0661. maher naDetails
12th floor: install step down transformer, 1 switch, 4 receptacles. and cr/ac unit in it room ref pa 2016-0226-0661. maher na | $5,000 |
| Oct 21, 2016 | Never finaled issued Oct 2016, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite 800: fire alarm t.i. add 4 ceiling speaker strobes, , remove 6 extg wall mount strobes. remove 1 extg speaker and relocate 1 speaker per plan. ref app#201609278926Details
suite 800: fire alarm t.i. add 4 ceiling speaker strobes, , remove 6 extg wall mount strobes. remove 1 extg speaker and relocate 1 speaker per plan. ref app#201609278926 | $2,000 |
| Oct 17, 2016 | Completed final sign-off Nov 2016 | 601 Montgomery St | Principal Builders Inc. | ti on 19th fl to install new lighting and power. ref 201609299206. maher not reqDetails
ti on 19th fl to install new lighting and power. ref 201609299206. maher not req | $112,000 |
| Oct 14, 2016 | Never finaled issued Nov 2016, no final | 601 Montgomery St | High Level Construction Co | commercial tenant improvement which includes demo of non-structural partitions, lighting, and finshes. construction of non-structural partitions. includes mep.Details
commercial tenant improvement which includes demo of non-structural partitions, lighting, and finshes. construction of non-structural partitions. includes mep. | $375,600 |
| Oct 4, 2016 | Completed final sign-off Nov 2016 | 601 Montgomery St | R L H Fire Protection Inc | 8th floor partial floor suite 800 fire sprinkler ti - relcoate 31 & delete 1 pendent sprinklers. ref t.i #201609278926. n/a maher ordinanceDetails
8th floor partial floor suite 800 fire sprinkler ti - relcoate 31 & delete 1 pendent sprinklers. ref t.i #201609278926. n/a maher ordinance | $6,300 |
| Sep 29, 2016 | Completed final sign-off Nov 2016 | 601 Montgomery St | Principal Builders Inc. | construction of new partitions, millwork and finishes. mep, life safety, sprinklers on sep permitDetails
construction of new partitions, millwork and finishes. mep, life safety, sprinklers on sep permit | $300,000 |
| Sep 27, 2016 | Never finaled issued Oct 2016, no final | 601 Montgomery St | Rossi Builders Inc. | #800- commercial t.i. includes demolition of non structural partitions, lighting and finishes, construction of non structural partitions includes mechanical, electrical and plumbing. n/a ordinance #155-13Details
#800- commercial t.i. includes demolition of non structural partitions, lighting and finishes, construction of non structural partitions includes mechanical, electrical and plumbing. n/a ordinance #155-13 | $300,000 |
| Sep 26, 2016 | Completed final sign-off Nov 2016 | 601 Montgomery St | Principal Builders Inc. | 19th floor: minor demo work of partition, door, millwork, and finishes. space to remain unoccupied until future t.i. with ada permit is issued. n/a for maherDetails
19th floor: minor demo work of partition, door, millwork, and finishes. space to remain unoccupied until future t.i. with ada permit is issued. n/a for maher | $6,000 |
| Sep 9, 2016 | Completed final sign-off Sep 2016 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 14th floor:suite#1450 : fire alarm t.i. to add 3 new speaker strobes, 1 strobe, 1 smoke detector and 1 control relay. ref app#201607152460. n/a for maherDetails
14th floor:suite#1450 : fire alarm t.i. to add 3 new speaker strobes, 1 strobe, 1 smoke detector and 1 control relay. ref app#201607152460. n/a for maher | $3,200 |
| Sep 2, 2016 | Never finaled issued Sep 2016, no final | 601 Montgomery St | Gci, Inc | 17th flr: demo of ceiling hung dividing panels and construction of new partial ht parttions, furniture relocation, new ele and finishes. space is currently occupied. sprinkler system modification as reqd is under sep permit. mech & elec is design build with deff submittal maher naDetails
17th flr: demo of ceiling hung dividing panels and construction of new partial ht parttions, furniture relocation, new ele and finishes. space is currently occupied. sprinkler system modification as reqd is under sep permit. mech & elec is design build with deff submittal maher na | $65,000 |
| Sep 1, 2016 | Completed final sign-off Sep 2016 | 601 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 5 pendents; add 2 pendents (7 total) for suite #1450 (14th floor). maher ref pa 2016-0715-2460Details
fire sprinkler only - relocate 5 pendents; add 2 pendents (7 total) for suite #1450 (14th floor). maher ref pa 2016-0715-2460 | $3,675 |
| Jul 25, 2016 | Completed final sign-off Oct 2016 | 601 Montgomery St | Rossi Builders Inc. | barrier removal including upgrades to be accessibleDetails
barrier removal including upgrades to be accessible | $15,000 |
| Jul 15, 2016 | Completed final sign-off Oct 2016 | 601 Montgomery St | Rossi Builders Inc. | #1450 - commercial tenant improvement which includes demolition of non-structural partitions, lighting, & finishes. construction of non-structural partitions includes mechanical, electrical & plumbing.Details
#1450 - commercial tenant improvement which includes demolition of non-structural partitions, lighting, & finishes. construction of non-structural partitions includes mechanical, electrical & plumbing. | $259,690 |
| May 4, 2016 | Never finaled issued May 2016, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 9th floor: add new 2 way emergency communication station to security desk phone from 9th floor elevator lobby.Details
9th floor: add new 2 way emergency communication station to security desk phone from 9th floor elevator lobby. | $5,000 |
| Apr 20, 2016 | Completed final sign-off Apr 2016 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | as built for pa 2016-0302-0948, added 1 smoke detector for fsd. compliance with maher ordinance 155-13 not required.Details
as built for pa 2016-0302-0948, added 1 smoke detector for fsd. compliance with maher ordinance 155-13 not required. | |
| Mar 18, 2016 | Completed final sign-off Jul 2016 | 601 Montgomery St | Rossi Builders Inc. | 9th floor - installation of (1) emergency push button & (1) two-way communication device at elevator lobby. upgrades to accessibility. no mechanical or plumbing work. electrical work only.Details
9th floor - installation of (1) emergency push button & (1) two-way communication device at elevator lobby. upgrades to accessibility. no mechanical or plumbing work. electrical work only. | $12,000 |
| Mar 2, 2016 | Completed final sign-off Apr 2016 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | add 19 new speaker/strobes, 10 new smk det, 7 new speakers. 1 new control relay for fsd shutdown. replace 4 door holders with new at elevatory lobby. office t.i. maher naDetails
add 19 new speaker/strobes, 10 new smk det, 7 new speakers. 1 new control relay for fsd shutdown. replace 4 door holders with new at elevatory lobby. office t.i. maher na | $5,000 |
| Feb 26, 2016 | Completed final sign-off Feb 2017 | 601 Montgomery St | Evans & Son Inc | 12th floor: barrier removal at (e) office space in (e) building. reverse door swing at both entries to office and provide accessible clearances. maher not reqDetails
12th floor: barrier removal at (e) office space in (e) building. reverse door swing at both entries to office and provide accessible clearances. maher not req | $5,000 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 601 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit add 23 pendent sprinklers; relocate 50 pendent sprinklers on the 14th floor ti, 2016-0122-7732 & 2016-0121-7587. maher naDetails
fire sprinkler permit add 23 pendent sprinklers; relocate 50 pendent sprinklers on the 14th floor ti, 2016-0122-7732 & 2016-0121-7587. maher na | $22,975 |
| Jan 22, 2016 | Completed final sign-off Apr 2016 | 601 Montgomery St | Clune Construction Company L P | #1400 -commercial t.i. includes demolition, new non-structural partitions, lighting, electrical, millwork and finishes. f/a sprinkler under separate permit. n/a ordinance #155-13Details
#1400 -commercial t.i. includes demolition, new non-structural partitions, lighting, electrical, millwork and finishes. f/a sprinkler under separate permit. n/a ordinance #155-13 | $762,841 |
| Jan 21, 2016 | Completed final sign-off Jun 2016 | 601 Montgomery St | Clune Construction Company L P | 14th floor - scope of work includes new 1-hr rated corridor linking future proposed suites & ada restroom upgrade. work includes 1-hr rated full height partition, elevator lobby ceiling & finishes.Details
14th floor - scope of work includes new 1-hr rated corridor linking future proposed suites & ada restroom upgrade. work includes 1-hr rated full height partition, elevator lobby ceiling & finishes. | $231,516 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | add (4) speaker strobes. maher naDetails
add (4) speaker strobes. maher na | $7,000 |
| Dec 16, 2015 | Completed final sign-off Jan 2016 | 601 Montgomery St | R L H Fire Protection Inc | 18th floor: fire sprinkler permit. relocate 4 pendent heads, add 1 pendent head on the 18th floor suite 1830. t.i. #201511193075Details
18th floor: fire sprinkler permit. relocate 4 pendent heads, add 1 pendent head on the 18th floor suite 1830. t.i. #201511193075 | $4,990 |
| Nov 19, 2015 | Completed final sign-off Apr 2016 | 601 Montgomery St | High Level Construction Co | suite # 1830: commercial t.i. which includes new non-structural partitions, lighting, plumbin, mechnical, electrical, millwork and finishes. n/a for maher.Details
suite # 1830: commercial t.i. which includes new non-structural partitions, lighting, plumbin, mechnical, electrical, millwork and finishes. n/a for maher. | $214,420 |
| May 29, 2015 | Completed final sign-off Jun 2015 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | 12th flr: relocate fire sprinklers per tenant improvements (12 relocate) 12th flr, ref. 201307121676; maher n/aDetails
12th flr: relocate fire sprinklers per tenant improvements (12 relocate) 12th flr, ref. 201307121676; maher n/a | $6,168 |
| May 8, 2015 | Completed final sign-off May 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm 18th flr: relocate 1 speaker, add 1 wall strobe, add 1 relay for card reader. maher na ef pa 201503231646Details
fire alarm 18th flr: relocate 1 speaker, add 1 wall strobe, add 1 relay for card reader. maher na ef pa 201503231646 | $1,500 |
| May 4, 2015 | Completed final sign-off Jul 2016 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | 10th floor fire sprinkler t.i.: add (1) and relocate (9) sprinklers to conform to new wall/ceiling layout. ref pa #2014.0528.6822. n/a maher ordinanceDetails
10th floor fire sprinkler t.i.: add (1) and relocate (9) sprinklers to conform to new wall/ceiling layout. ref pa #2014.0528.6822. n/a maher ordinance | $5,140 |
| Apr 27, 2015 | Never finaled issued Apr 2015, no final | 601 Montgomery St | R L H Fire Protection Inc | #1825: fire sprinkler tenant improvement, relocate 7 and add 2, total 9 sprinklers, ref. to pa# 201503231646. n/a ordinance #155-13Details
#1825: fire sprinkler tenant improvement, relocate 7 and add 2, total 9 sprinklers, ref. to pa# 201503231646. n/a ordinance #155-13 | $4,570 |
| Apr 10, 2015 | Completed final sign-off May 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 7th flr; suite 700: fire alarm ti. adding 1 speaker/strobe, 1 speaker and 1 strobe to (e) system. ti # 2015 0226 9384Details
7th flr; suite 700: fire alarm ti. adding 1 speaker/strobe, 1 speaker and 1 strobe to (e) system. ti # 2015 0226 9384 | $1,500 |
| Mar 23, 2015 | Completed final sign-off Aug 2015 | 601 Montgomery St | High Level Construction Co | 18th floor; suite 1825 - partial interior only demo demising of (e) suite 1825. partition construction, new lights & finishes throughout. restrooms; reconfiguration of (e) 18th flr rr to provide accessible stalls & urinal locations. nistallation of vertical acuation bars. maher - not req'dDetails
18th floor; suite 1825 - partial interior only demo demising of (e) suite 1825. partition construction, new lights & finishes throughout. restrooms; reconfiguration of (e) 18th flr rr to provide accessible stalls & urinal locations. nistallation of vertical acuation bars. maher - not req'd | $250,000 |
| Mar 18, 2015 | Completed final sign-off May 2015 | 601 Montgomery St | R L H Fire Protection Inc | fire sprinkler ti suite 700 relocate 3 fire srprinklers ref 201502269384Details
fire sprinkler ti suite 700 relocate 3 fire srprinklers ref 201502269384 | $1,950 |
| Feb 26, 2015 | Completed final sign-off Aug 2015 | 601 Montgomery St | High Level Construction Co | #700- partial interior only, non-structural ti includes demo of walls betweens 3 (e) private offices to provide for a new conference room. demo of (e) ceiling grid and lights, install (n) grid & lights. new sink cabinet at breakroom. restroom- relocate tp dispenser toilet, install vertical actuationDetails
#700- partial interior only, non-structural ti includes demo of walls betweens 3 (e) private offices to provide for a new conference room. demo of (e) ceiling grid and lights, install (n) grid & lights. new sink cabinet at breakroom. restroom- relocate tp dispenser toilet, install vertical actuation | $298,000 |
| Feb 13, 2015 | Completed final sign-off Mar 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 10th floor suite 1000 fire alarm t.i. consisting of adding (3) ceiling mounted speaker/strobes & (1) speaker to existing fire alarm system. ref t.i. #2014.0528.6822. n/a maher ordinanceDetails
10th floor suite 1000 fire alarm t.i. consisting of adding (3) ceiling mounted speaker/strobes & (1) speaker to existing fire alarm system. ref t.i. #2014.0528.6822. n/a maher ordinance | $2,500 |
| Feb 4, 2015 | Completed final sign-off Jun 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 10th flr: add 5 ceiling mount speaker strobes to existing fa system, relocate one existing strobe, t.i. 201405286822; maher n/aDetails
10th flr: add 5 ceiling mount speaker strobes to existing fa system, relocate one existing strobe, t.i. 201405286822; maher n/a | $2,500 |
| Feb 4, 2015 | Completed final sign-off Jun 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 12th flr: add 5 ceiling mount speaker strobes and 2 door holders to existing fa system, t.i. 201307121676; maher n/aDetails
12th flr: add 5 ceiling mount speaker strobes and 2 door holders to existing fa system, t.i. 201307121676; maher n/a | $2,500 |
| Jan 30, 2015 | Completed final sign-off Feb 2015 | 601 Montgomery St | R L H Fire Protection Inc | fire sprinklers ti- 10th flr, ste 1000: fire sprinklers - delete 2; relocate 12 and add 1 total 13 heads, ref. permit 201411212184; maher n/aDetails
fire sprinklers ti- 10th flr, ste 1000: fire sprinklers - delete 2; relocate 12 and add 1 total 13 heads, ref. permit 201411212184; maher n/a | $6,900 |
| Jan 21, 2015 | Completed final sign-off Feb 2015 | 601 Montgomery St | Golden Gate Fire Protection Inc | 6th floor suite 650 fire sprinkler only - relocate 3 pendent sprinkler heads, due to lights for market bridge. ref #2014.1121.2203. n/a maher ordinanceDetails
6th floor suite 650 fire sprinkler only - relocate 3 pendent sprinkler heads, due to lights for market bridge. ref #2014.1121.2203. n/a maher ordinance | $1,500 |
| Dec 31, 2014 | Completed final sign-off Jan 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | ste 650: fire alarm ti 201411212203; relocate one speaker, add one speaker; maher n/aDetails
ste 650: fire alarm ti 201411212203; relocate one speaker, add one speaker; maher n/a | $4,000 |
| Dec 4, 2014 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite #1206:renew extg fire alarm permit #201308295568. fire alarm t.i. add 5 new speaker and 4 strobes. n/a for the maher.Details
suite #1206:renew extg fire alarm permit #201308295568. fire alarm t.i. add 5 new speaker and 4 strobes. n/a for the maher. | $4,500 |
| Dec 3, 2014 | Completed final sign-off Dec 2014 | 601 Montgomery St | R L H Fire Protection Inc | 11th flr: fire sprinkler permit, relocate 16 pendant sprinkelrs on the 11th flr, t.i. #201410279915; maher n/aDetails
11th flr: fire sprinkler permit, relocate 16 pendant sprinkelrs on the 11th flr, t.i. #201410279915; maher n/a | $8,224 |
| Nov 21, 2014 | Completed final sign-off Aug 2015 | 601 Montgomery St | Rossi Builders Inc. | 6th floor: partial interior non-structural demolition to extg suite 650. proposed interior partition construction only. new finishes, lighting, electrical as noted. 6th floor restroom upgrades to extg restrooms. n/a for the maher ordinance.Details
6th floor: partial interior non-structural demolition to extg suite 650. proposed interior partition construction only. new finishes, lighting, electrical as noted. 6th floor restroom upgrades to extg restrooms. n/a for the maher ordinance. | $364,205 |
| Nov 21, 2014 | Completed final sign-off Apr 2015 | 601 Montgomery St | High Level Construction Co | suite 1000: partial interior only demolition to (e) suite 1000, proposed interior only, new finishes, cabinetry and electrical as noted. maher n/aDetails
suite 1000: partial interior only demolition to (e) suite 1000, proposed interior only, new finishes, cabinetry and electrical as noted. maher n/a | $269,765 |
| Oct 27, 2014 | Completed final sign-off Mar 2015 | 601 Montgomery St | High Level Construction Co | #1110- partial interior only demolition to (e) suite. new construction includes new sidelights at private offices. new lights and new ceiling grid throughout. install new suite entry doors. new lowered cabinet casework and accessible sink. n/a ordinance #155-13Details
#1110- partial interior only demolition to (e) suite. new construction includes new sidelights at private offices. new lights and new ceiling grid throughout. install new suite entry doors. new lowered cabinet casework and accessible sink. n/a ordinance #155-13 | $225,000 |
| Oct 15, 2014 | Completed final sign-off Nov 2014 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 10th flr, ste 1090: fire alarm t.i. , add 4 speaker strobes into existing power supply, demo 2 strobes (ref. 201407242025) maher n/aDetails
10th flr, ste 1090: fire alarm t.i. , add 4 speaker strobes into existing power supply, demo 2 strobes (ref. 201407242025) maher n/a | $5,500 |
| Sep 18, 2014 | Completed final sign-off Oct 2014 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite 1100: fire alarm t.i. add 2 smoke detectors. 1 strobe, 3 speaker strobes and 5 speakers. n/a for the maher ordinance #155-13 ref app#201406259387Details
suite 1100: fire alarm t.i. add 2 smoke detectors. 1 strobe, 3 speaker strobes and 5 speakers. n/a for the maher ordinance #155-13 ref app#201406259387 | $5,000 |
| Sep 12, 2014 | Completed final sign-off Sep 2014 | 601 Montgomery St | Anderson, Rowe & Buckley, Inc. | 11th floor fire sprinkler t.i. - relocate 19 heads. ref pa #2014.0625.9387. n/a maher ordinanceDetails
11th floor fire sprinkler t.i. - relocate 19 heads. ref pa #2014.0625.9387. n/a maher ordinance | $9,800 |
| Sep 10, 2014 | Never finaled issued Sep 2014, no final | 601 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit. relocate 15, add 1 , delete 1 pendent on the 10th flDetails
fire sprinkler permit. relocate 15, add 1 , delete 1 pendent on the 10th fl | $8,224 |
| Jul 24, 2014 | Completed final sign-off Mar 2015 | 601 Montgomery St | Rossi Builders Inc. | 10th flr: #1090, partial interior only demolition. proposed interior only partition construction. new lights, ceiling grid throughout. installation of new suite entry door, private office doors with sidelights. construction of new copy; maher n/aDetails
10th flr: #1090, partial interior only demolition. proposed interior only partition construction. new lights, ceiling grid throughout. installation of new suite entry door, private office doors with sidelights. construction of new copy; maher n/a | $225,000 |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | #1150- add 2 smoke detectors. relocate 1 speaker. ref. appl 201406067676. maher n/a.Details
#1150- add 2 smoke detectors. relocate 1 speaker. ref. appl 201406067676. maher n/a. | $5,200 |
| Jun 25, 2014 | Completed final sign-off Nov 2014 | 601 Montgomery St | Commercial Interior Builders Inc | 11th flr, ste #1100- partial interior only demolition to existing suite, proposed interior only partition construction. new lights, and ceiling throughout. construction of new copy area and networking closet; maher n/aDetails
11th flr, ste #1100- partial interior only demolition to existing suite, proposed interior only partition construction. new lights, and ceiling throughout. construction of new copy area and networking closet; maher n/a | $250,000 |
| Jun 6, 2014 | Completed final sign-off Oct 2014 | 601 Montgomery St | Commercial Interior Builders Inc | partial interior only demo to suite 1150. proposed interior only partition construction, new lights and ceiling system throughout. restroom work includes relocating womens and mens toilet tissue dispenser. installation of powered door openers at women and men's restrms; compliance with ord 155-13 naDetails
partial interior only demo to suite 1150. proposed interior only partition construction, new lights and ceiling system throughout. restroom work includes relocating womens and mens toilet tissue dispenser. installation of powered door openers at women and men's restrms; compliance with ord 155-13 na | $263,403 |
| May 28, 2014 | Completed final sign-off Jul 2015 | 601 Montgomery St | Rossi Builders Inc. | 10th floor: to comply with current code. upgrade finishes in lobby, corridors, restrooms to current bldg standard. installation of new suspended ceiling tile system, lighting, and relocation hvac as required. new extg signs. provide 2nd exit at suite 1000. demo to interior partitions.Details
10th floor: to comply with current code. upgrade finishes in lobby, corridors, restrooms to current bldg standard. installation of new suspended ceiling tile system, lighting, and relocation hvac as required. new extg signs. provide 2nd exit at suite 1000. demo to interior partitions. | $170,000 |
| Apr 14, 2014 | Expired or cancelled expired Jul 2018 | 601 Montgomery St | Rossi Builders Inc., Commercial Interior Builders Inc | 20th floor: t.i. in suite 2000, conversion of one office to 2. upgrade common area restrooms. n/a for the maher ordinance #155-13Details
20th floor: t.i. in suite 2000, conversion of one office to 2. upgrade common area restrooms. n/a for the maher ordinance #155-13 | $16,000 |
| Dec 31, 2013 | Completed final sign-off Jun 2014 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | replace voice /evac system. 3 panels. adding one uio with 6 mcc-1. adding 21 aom and 2 rf modules. adding 2 uio's with 11 mct2 monitor modulesDetails
replace voice /evac system. 3 panels. adding one uio with 6 mcc-1. adding 21 aom and 2 rf modules. adding 2 uio's with 11 mct2 monitor modules | $20,000 |
| Dec 17, 2013 | Completed final sign-off Jan 2014 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | unit #540: 5th floor: addition of 2 strobes and 6 speakers to extg fa system. relocate one strobe. t.i. ref app#201311272973Details
unit #540: 5th floor: addition of 2 strobes and 6 speakers to extg fa system. relocate one strobe. t.i. ref app#201311272973 | $4,000 |
| Nov 27, 2013 | Expired or cancelled expired Jul 2018 | 601 Montgomery St | Commercial Interior Builders Inc | 5th floor #540 -t.i.include proposed interior only wall construction & new casework. relocation of (e) light fixtures & hvac as required. new electrical, relocate sprinklers as required. partial accessibility upgrades to men's & women's restrooms. no changes to (e) bldg envelope or (e) structure.Details
5th floor #540 -t.i.include proposed interior only wall construction & new casework. relocation of (e) light fixtures & hvac as required. new electrical, relocate sprinklers as required. partial accessibility upgrades to men's & women's restrooms. no changes to (e) bldg envelope or (e) structure. | $20,000 |
| Nov 14, 2013 | Completed final sign-off Jan 2014 | 601 Montgomery St | Pribuss Engineering Inc | fire sprinkler as built per inspector, ref pa #201307121676Details
fire sprinkler as built per inspector, ref pa #201307121676 | |
| Sep 19, 2013 | Completed final sign-off Feb 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite 1095: fire alarm ti. add 1 snew speaker, 1 new strobe, 1 new smoke detector, 1 new control relay, 1 door holder. 1 pr-1.Details
suite 1095: fire alarm ti. add 1 snew speaker, 1 new strobe, 1 new smoke detector, 1 new control relay, 1 door holder. 1 pr-1. | $3,000 |
| Sep 17, 2013 | Completed final sign-off Oct 2013 | 601 Montgomery St | R L H Fire Protection Inc | suite #1095-fire sprinkler permit-relocate 1 & delete 2 pendentsDetails
suite #1095-fire sprinkler permit-relocate 1 & delete 2 pendents | $1,000 |
| Aug 29, 2013 | Completed final sign-off Feb 2015 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | suite 1206: fire alarm tenant improvement adding 5 new speakers and 4 new strobesDetails
suite 1206: fire alarm tenant improvement adding 5 new speakers and 4 new strobes | $4,500 |
| Aug 28, 2013 | Never finaled issued Aug 2013, no final | 601 Montgomery St | Pribuss Engineering Inc | 12th fl: fire sprinkler t.i. common area upgrades, adds = 2, relocate= 26 total 28. 514.62 x 28 = $14,409 t.i. pa# 201307121676.Details
12th fl: fire sprinkler t.i. common area upgrades, adds = 2, relocate= 26 total 28. 514.62 x 28 = $14,409 t.i. pa# 201307121676. | $14,409 |
| Jul 25, 2013 | Expired or cancelled expired Jul 2018 | 601 Montgomery St | Bevilacqua & Sons | 10th floor:partial interior only demolition to extg suite 1095. proposed interior only wall construction. addition to hvac system and addition of light fixtures. relocate extg toilet tissue dispenser in 10th floor common mens and womens restrooms to meet accessibility requirments.Details
10th floor:partial interior only demolition to extg suite 1095. proposed interior only wall construction. addition to hvac system and addition of light fixtures. relocate extg toilet tissue dispenser in 10th floor common mens and womens restrooms to meet accessibility requirments. | $85,208 |
| Jul 25, 2013 | Never finaled issued Jul 2013, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 1st floor:revisioin to permit #201303252970. added 2 notification devices and relocated (3) hvac units.Details
1st floor:revisioin to permit #201303252970. added 2 notification devices and relocated (3) hvac units. | $1,000 |
| Jul 12, 2013 | Completed final sign-off Jul 2015 | 601 Montgomery St | Bevilacqua & Sons | 12th floor-remodel suite #1206-demo of walls & new acoustical ceilings & lights. new casework & sink in copy room & new finishes. common area upgrdes are complaince in the restrooms & new fininshes for the restrooms. upgrade elevator lobby & corridor finishes, ceilings, lights, wall coveringsDetails
12th floor-remodel suite #1206-demo of walls & new acoustical ceilings & lights. new casework & sink in copy room & new finishes. common area upgrdes are complaince in the restrooms & new fininshes for the restrooms. upgrade elevator lobby & corridor finishes, ceilings, lights, wall coverings | $169,945 |
| Jun 26, 2013 | Never finaled issued Jul 2013, no final | 601 Montgomery St | Northwest Signs | to erect non-electrical single faced change to extg cabinet.Details
to erect non-electrical single faced change to extg cabinet. | $300 |
| Jun 26, 2013 | Never finaled issued Jul 2013, no final | 601 Montgomery St | Northwest Signs | to erect non-electrical sign. face change to extg cabinet. sign h & i x 6Details
to erect non-electrical sign. face change to extg cabinet. sign h & i x 6 | $1,200 |
| Jun 26, 2013 | Never finaled issued Jul 2013, no final | 601 Montgomery St | Northwest Signs | to erect non-electrical sign. replace extg d/f blade sign (x2)Details
to erect non-electrical sign. replace extg d/f blade sign (x2) | $1,500 |
| Apr 17, 2013 | Never finaled issued May 2013, no final | 601 Montgomery St | 15th floor-create & produce 5 evac signs. the signs aluminum romark with a non glare arylic covering the signsDetails
15th floor-create & produce 5 evac signs. the signs aluminum romark with a non glare arylic covering the signs | $1,875 | |
| Mar 25, 2013 | Never finaled issued Mar 2013, no final | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | 1st floor: fire alarm t.i. adding 18 new noticationDetails
1st floor: fire alarm t.i. adding 18 new notication | $9,000 |
| Mar 15, 2013 | Completed final sign-off Jul 2013 | 601 Montgomery St | R L H Fire Protection Inc | 1st floor fire sprinkler permit relcoate 47, add 2, & delete 5 pendent heads.Details
1st floor fire sprinkler permit relcoate 47, add 2, & delete 5 pendent heads. | $24,500 |
| Jan 15, 2013 | Completed final sign-off Mar 2013 | 601 Montgomery St | Golden Gate Fire Protection Inc | 15th floor fire sprinkler system upgrade, relcoate 67 pendent sprinkler heads. t.i. #2012.10.24.2694.Details
15th floor fire sprinkler system upgrade, relcoate 67 pendent sprinkler heads. t.i. #2012.10.24.2694. | $34,505 |
| Jan 9, 2013 | Completed final sign-off Mar 2013 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | tenant improvement will include - speaker/strobe and speakers added/relocated, duct detector and shutdown relay added, smoke detector and door holder added, smoke detector relocated. ref ti 201210242694Details
tenant improvement will include - speaker/strobe and speakers added/relocated, duct detector and shutdown relay added, smoke detector and door holder added, smoke detector relocated. ref ti 201210242694 | $18,000 |
| Dec 7, 2012 | Completed final sign-off Sep 2013 | 601 Montgomery St | Jones Lang La Salle Construction Company | tenant improvement, demo of non structural walls. modificiation of existing, ceiling, lighting, mechanical system. new office room and teller station. no change to use, occupancy.egress, plumbing elect, mechanical life safety fire sprinklerDetails
tenant improvement, demo of non structural walls. modificiation of existing, ceiling, lighting, mechanical system. new office room and teller station. no change to use, occupancy.egress, plumbing elect, mechanical life safety fire sprinkler | $200,000 |
| Oct 24, 2012 | Never finaled issued Nov 2012, no final | 601 Montgomery St | Jones Lang La Salle Construction Company | tenant improvement - demo of non structural walls, 2 new handicap bathroom, break room, offices, plumbing, electrical, mechanical, life safety - fire sprinklers. work on the 15th floor only. single t.i occupancy. remove (e) non load bearing partitions. modifications to (e) ceilings, lighting & mech.Details
tenant improvement - demo of non structural walls, 2 new handicap bathroom, break room, offices, plumbing, electrical, mechanical, life safety - fire sprinklers. work on the 15th floor only. single t.i occupancy. remove (e) non load bearing partitions. modifications to (e) ceilings, lighting & mech. | $700,000 |
| Aug 30, 2012 | Completed final sign-off Sep 2012 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | as built drawing for fire alarm t.i under pa# 201206051893.Details
as built drawing for fire alarm t.i under pa# 201206051893. | |
| Jul 26, 2012 | Completed final sign-off Aug 2012 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | add 2 sprinkler heads at 3rd floor suite 333Details
add 2 sprinkler heads at 3rd floor suite 333 | $1,030 |
| Jun 27, 2012 | Completed final sign-off Jul 2012 | 601 Montgomery St | Paganini Electric Corp(See Signatories) | 19th floor-add 7 devices to (e) system-3 speakers & 4 speaker/strobesDetails
19th floor-add 7 devices to (e) system-3 speakers & 4 speaker/strobes | $8,000 |
| Jun 19, 2012 | Completed final sign-off Aug 2012 | 601 Montgomery St | Rossi Builders Inc. | work in suite 333: buildout one conference rm, & one office in existing suiteDetails
work in suite 333: buildout one conference rm, & one office in existing suite | $91,083 |
| Jun 5, 2012 | Completed final sign-off Sep 2012 | 601 Montgomery St | Paganini Electric Corp(See Signatories) | 16th & 17th floors-install 6 smoke detectors, 4 door holders, 1 remote test station, 2 dual sync modules, 5 strobes, 10 speaker/strobes, 17 speakers, 1 fsd, & 1 duct detector housing. relocate 13 existing devices to new locationsDetails
16th & 17th floors-install 6 smoke detectors, 4 door holders, 1 remote test station, 2 dual sync modules, 5 strobes, 10 speaker/strobes, 17 speakers, 1 fsd, & 1 duct detector housing. relocate 13 existing devices to new locations | $15,700 |
| May 30, 2012 | Completed final sign-off Jul 2012 | 601 Montgomery St | R L H Fire Protection Inc | 19th floor-fire sprinkler only-relocate 7 heads & add 1 headDetails
19th floor-fire sprinkler only-relocate 7 heads & add 1 head | $4,000 |
| May 15, 2012 | Completed final sign-off Sep 2012 | 601 Montgomery St | R L H Fire Protection Inc | 16th & 17th floor fire sprinkler permit - relocate 22, add 13 heads add remove precation system on th 16th floor. relocate 26 & add 6 heads on the 17th floor. bracing calc's done- no changesDetails
16th & 17th floor fire sprinkler permit - relocate 22, add 13 heads add remove precation system on th 16th floor. relocate 26 & add 6 heads on the 17th floor. bracing calc's done- no changes | $33,500 |
| Apr 19, 2012 | Completed final sign-off Sep 2012 | 601 Montgomery St | Gci, Inc | 16th floor-partial floor t.i to demo doors, partitions & finishes. construct new non structural partitions & m.e.p equipmentDetails
16th floor-partial floor t.i to demo doors, partitions & finishes. construct new non structural partitions & m.e.p equipment | $450,000 |
| Apr 19, 2012 | Completed final sign-off Sep 2012 | 601 Montgomery St | Gci, Inc | 17th floor-paritial floor t.i to demo doors, partitions & finishes. construct new non structural partitions & m.e.p equipmentDetails
17th floor-paritial floor t.i to demo doors, partitions & finishes. construct new non structural partitions & m.e.p equipment | $450,000 |
| Aug 16, 2011 | Completed final sign-off Mar 2012 | 601 Montgomery St | Carrier Corporation | 9th floor - install heat pump to cool data room (hvac upgrade).Details
9th floor - install heat pump to cool data room (hvac upgrade). | $15,750 |
| May 6, 2011 | Completed final sign-off Jul 2011 | 601 Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm ti on the 7th floor. 3 ceiling mounted speaker/strobes, 1 ceiling mounted speakerDetails
fire alarm ti on the 7th floor. 3 ceiling mounted speaker/strobes, 1 ceiling mounted speaker | $4,400 |
| Apr 12, 2011 | Completed final sign-off May 2011 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | 7th floor-t.i-relocate 9 sprinkler & add 2 sprinkler heads, total 11Details
7th floor-t.i-relocate 9 sprinkler & add 2 sprinkler heads, total 11 | $4,000 |
| Mar 15, 2011 | Completed final sign-off Jul 2011 | 601 Montgomery St | Rossi Builders Inc. | office ti on the 7th floor, suite # 777. demolish (e) offices and build out new officesDetails
office ti on the 7th floor, suite # 777. demolish (e) offices and build out new offices | $97,150 |
| Dec 21, 2010 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | Mc Millan Electric | replace 9 each 2x4 light fixturesDetails
replace 9 each 2x4 light fixtures | $3,000 |
| Dec 7, 2010 | Completed final sign-off Dec 2010 | 601 Montgomery St | G Swanson Constr. Inc. | minor deconstruction and tenant improvement workDetails
minor deconstruction and tenant improvement work | $45,000 |
| Nov 5, 2010 | Completed final sign-off Nov 2010 | 601 Montgomery St | Diversified Fire Products | 17th floor fire alarm t.i. - (1) control relay, (2) smoke detectors, (2) wall strobes, (2) ceiling speakers.Details
17th floor fire alarm t.i. - (1) control relay, (2) smoke detectors, (2) wall strobes, (2) ceiling speakers. | $5,298 |
| Oct 26, 2010 | Never finaled issued Oct 2010, no final | 601 Montgomery St | R L H Fire Protection Inc | 17th floor-t.i. upgrade to (e) fire sprinkler system. relocate 3-sprinklers.Details
17th floor-t.i. upgrade to (e) fire sprinkler system. relocate 3-sprinklers. | $2,000 |
| Sep 24, 2010 | Completed final sign-off Jun 2013 | 601 Montgomery St | High Level Construction Co | revision to 200909217301. error on original application. scope of work: build out 10 offices, phone room, 1 copy room, 1 coffee room at suites 1925 and 1950 per approved plansDetails
revision to 200909217301. error on original application. scope of work: build out 10 offices, phone room, 1 copy room, 1 coffee room at suites 1925 and 1950 per approved plans | |
| Sep 3, 2010 | Completed final sign-off Nov 2010 | 601 Montgomery St | High Level Construction Co | 17th floor - demolitoin of one restroom & one conference room wall. build server room. upgrade three restrooms.Details
17th floor - demolitoin of one restroom & one conference room wall. build server room. upgrade three restrooms. | $147,400 |
| Jul 8, 2010 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | mechanical electrical and plumbing associated with office remodelDetails
mechanical electrical and plumbing associated with office remodel | $65,000 | |
| Jul 8, 2010 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | mechanical, electrical and plumbing associated with creating public corridor and upgrading toilet stalls.Details
mechanical, electrical and plumbing associated with creating public corridor and upgrading toilet stalls. | $67,000 | |
| Jul 8, 2010 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | remodel of existing office suite. 4328 sf; mep under separate permit.Details
remodel of existing office suite. 4328 sf; mep under separate permit. | $74,000 | |
| Jul 8, 2010 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | create multi tenant public corridor. upgrade accessible toilet room stalls. 905 sf. mep under separate permit.Details
create multi tenant public corridor. upgrade accessible toilet room stalls. 905 sf. mep under separate permit. | $79,000 | |
| Dec 11, 2009 | Completed final sign-off Feb 2010 | 601 Montgomery St | Paganini Electric Corp(See Signatories) | life safety work as part of tenant improvement on the 11th floor. scope includes 6 speaker strobesDetails
life safety work as part of tenant improvement on the 11th floor. scope includes 6 speaker strobes | $1,200 |
| Dec 3, 2009 | Completed final sign-off Feb 2010 | 601 Montgomery St | High Level Construction Co | office tenant improvement; demise existing suite, add new door to corridor, remove one existing room(store rm.).Details
office tenant improvement; demise existing suite, add new door to corridor, remove one existing room(store rm.). | $46,126 |
| Dec 2, 2009 | Completed final sign-off Jan 2010 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | 1th floor-relocate fire sprinkler head per tenant improvements-relocate 2Details
1th floor-relocate fire sprinkler head per tenant improvements-relocate 2 | $400 |
| Nov 30, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Rossi Builders Inc. | to obtain final inspection for work approved under app #200709284042. all work is completeDetails
to obtain final inspection for work approved under app #200709284042. all work is complete | |
| Nov 30, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Rossi Builders Inc. | to obtain final inspection for work approved under app #200710256393. all work is completeDetails
to obtain final inspection for work approved under app #200710256393. all work is complete | |
| Nov 30, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Rossi Builders Inc. | to obtain final inspection for work approved under app #200710024214. all work is completeDetails
to obtain final inspection for work approved under app #200710024214. all work is complete | |
| Nov 30, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Rossi Builders Inc. | to obtain final inspection for work approved under app #200710175608. all work is completeDetails
to obtain final inspection for work approved under app #200710175608. all work is complete | |
| Nov 17, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Diversified Fire Products | fire alarm t.i. for suites 700 & 780; adding 1-strobe, 7-speaker/strobes.Details
fire alarm t.i. for suites 700 & 780; adding 1-strobe, 7-speaker/strobes. | $7,330 |
| Nov 13, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Anderson, Rowe & Buckley, Inc. | 7th fl: tenant improvement to existing fire sprinkler systemDetails
7th fl: tenant improvement to existing fire sprinkler system | $2,000 |
| Oct 27, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | to obtain final inspection for work approved under pa#200705020225. all work is complete.Details
to obtain final inspection for work approved under pa#200705020225. all work is complete. | ||
| Oct 27, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | to obtain final inspection for work approved under pa#200705252303. all work is complete.Details
to obtain final inspection for work approved under pa#200705252303. all work is complete. | ||
| Oct 27, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | to obtain final inspection for work approved under pa#200707277929. all work is complete.Details
to obtain final inspection for work approved under pa#200707277929. all work is complete. | ||
| Oct 27, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | to obtain final inspection for work approved under pa#200705020221. all work is complete.Details
to obtain final inspection for work approved under pa#200705020221. all work is complete. | ||
| Oct 27, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | Rossi Builders Inc. | to obtain final inspection for work approved under pa#200705302501. all work is complete.Details
to obtain final inspection for work approved under pa#200705302501. all work is complete. | |
| Oct 23, 2009 | Completed final sign-off Feb 2010 | 601 Montgomery St | High Level Construction Co | 7th floor suite 777 office tennant improvement, remove closet in copy room & install new door, infill existing openign to coffee area. install new section of millwork on coffee area.Details
7th floor suite 777 office tennant improvement, remove closet in copy room & install new door, infill existing openign to coffee area. install new section of millwork on coffee area. | $15,500 |
| Oct 21, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Novo Construction Inc | expansion of suite 700 & build out of spec suite 780.Details
expansion of suite 700 & build out of spec suite 780. | $125,667 |
| Oct 8, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Paganini Electric Corp(See Signatories) | 19th floor fir ealarm upgrade which inculde: (3) ceiling mount ada speaker/strobes & (5) ceiling mount speakers.Details
19th floor fir ealarm upgrade which inculde: (3) ceiling mount ada speaker/strobes & (5) ceiling mount speakers. | $1,600 |
| Oct 8, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | 19th floor relcoate fire sprinkler heads per tenant improvements, 14 relocate.Details
19th floor relcoate fire sprinkler heads per tenant improvements, 14 relocate. | $2,100 |
| Sep 30, 2009 | Never finaled issued Oct 2009, no final | 601 Montgomery St | High Level Construction Co | 19th floor - mep submittal for tenant improvement of 2 offices spaces. ref. appl.200909217301.Details
19th floor - mep submittal for tenant improvement of 2 offices spaces. ref. appl.200909217301. | $74,100 |
| Sep 21, 2009 | Completed final sign-off Jun 2013 | 601 Montgomery St | 19th floor office tenant improvement: buildout 6 offices, 1 phone closet & 1 coffee room.Details
19th floor office tenant improvement: buildout 6 offices, 1 phone closet & 1 coffee room. | $226,113 | |
| Jun 24, 2009 | Completed final sign-off Nov 2022 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | relocate 2 fire sprinkler heads on 18th floorDetails
relocate 2 fire sprinkler heads on 18th floor | $600 |
| Jun 16, 2009 | Completed final sign-off Jul 2009 | 601 Montgomery St | High Level Construction Co | 18th floor-demise (e) office suite into 2 suites of 3529 sq ft & 1670 sq ft, all work non structural. sprinklers and fire alarm separate permitsDetails
18th floor-demise (e) office suite into 2 suites of 3529 sq ft & 1670 sq ft, all work non structural. sprinklers and fire alarm separate permits | $12,000 |
| May 7, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | Mc Millan Electric | renew pa# 2007/07/27/7929 to obtain final inspection. all work has been completed.Details
renew pa# 2007/07/27/7929 to obtain final inspection. all work has been completed. | |
| May 7, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | Mc Millan Electric | renew pa# 2006/06/27/5085 to obtain final inspection. all work has been completed.Details
renew pa# 2006/06/27/5085 to obtain final inspection. all work has been completed. | |
| May 6, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | Diversified Fire Products | fire alarm t.i. for core building floors 7, 8, & 11 - 6 ceiling speaker strobes, 15 wall strobes, 4 ceiling speakers, 1 dual synch module.Details
fire alarm t.i. for core building floors 7, 8, & 11 - 6 ceiling speaker strobes, 15 wall strobes, 4 ceiling speakers, 1 dual synch module. | $12,278 |
| Apr 27, 2009 | Completed final sign-off Jul 2009 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinklers per tenant improvements. 7th floor relocate 12, 8th floor relocate 11 & 11th floor relocate 11.Details
relocate fire sprinklers per tenant improvements. 7th floor relocate 12, 8th floor relocate 11 & 11th floor relocate 11. | $7,200 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | High Level Construction Co | 11th floor: remodel e restrooms. new fishes at corridors and lobby. smoke guard added at freight elevator-- mech and electrical included....Details
11th floor: remodel e restrooms. new fishes at corridors and lobby. smoke guard added at freight elevator-- mech and electrical included.... | $88,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | High Level Construction Co | 8th floor: remodel restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator- mech and electrical...life safety separate permit.......Details
8th floor: remodel restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator- mech and electrical...life safety separate permit....... | $88,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | High Level Construction Co | 7th floor - remodel of restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator, mech and electricalDetails
7th floor - remodel of restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator, mech and electrical | $88,000 |
| Feb 18, 2009 | Completed final sign-off Mar 2009 | 601 Montgomery St | Diversified Fire Products | 19th floor-as built submission for iabc, 601 montgomery street, requested by field inspector (fire alarm).Details
19th floor-as built submission for iabc, 601 montgomery street, requested by field inspector (fire alarm). | $100 |
| Feb 13, 2009 | Completed final sign-off Mar 2009 | 601 Montgomery St | High Level Construction Co | voluntary barrier removal: provide diagonal access to toilets (men's & women's)Details
voluntary barrier removal: provide diagonal access to toilets (men's & women's) | $22,500 |
| Feb 6, 2009 | Completed final sign-off Mar 2009 | 601 Montgomery St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements. 10th fl: 4 relocate, 19th fl: 4 relocate, 20th floor: 4 relocateDetails
relocate fire sprinkler heads per tenant improvements. 10th fl: 4 relocate, 19th fl: 4 relocate, 20th floor: 4 relocate | $2,160 |
| Jan 8, 2009 | Completed final sign-off Mar 2009 | 601 Montgomery St | Diversified Fire Products | 19th floor. fire alarm ada uprade for tenant- iabc. 1 control relay, 1 sync module, 7 strobes, 12 speakers, 10 speaker/strobesDetails
19th floor. fire alarm ada uprade for tenant- iabc. 1 control relay, 1 sync module, 7 strobes, 12 speakers, 10 speaker/strobes | $11,643 |
| Dec 11, 2008 | Completed final sign-off Mar 2009 | 601 Montgomery St | R L H Fire Protection Inc | 19th floor t.i. upgrade of existing fire sprinkler system. relocate 35 sprinklers & add 12 sprinklers.Details
19th floor t.i. upgrade of existing fire sprinkler system. relocate 35 sprinklers & add 12 sprinklers. | $9,400 |
| Dec 8, 2008 | Completed final sign-off Feb 2009 | 601 Montgomery St | 19th floor-provide diagonal access to toilet stalls in men's & women's restroomsDetails
19th floor-provide diagonal access to toilet stalls in men's & women's restrooms | $18,000 | |
| Dec 8, 2008 | Completed final sign-off Mar 2009 | 601 Montgomery St | 20th floor-provide diagonal access to toilet stalls in men's & women's restroomsDetails
20th floor-provide diagonal access to toilet stalls in men's & women's restrooms | $18,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.