Permit GraphShortlistSan Francisco building permits since 2000

Greg Sheppard

License
C26557
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C26557 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer, lessee
Firm
Forge
Based in
San Francisco
On San Francisco permits
Jun 2006 to Nov 2020

73 permits since 2000 (architect on 71 permits, authorized agent-others on 1 permit, engineer on 1 permit, lessee on 1 permit): 50 completed, 1 in progress, 14 never finaled, 8 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Gci, Inc (14), Bcci Construction Company (10), Commercial Interior Builders Inc (5), C C I Commercial Construction & Improv (4), Field Construction Inc. (3), Peacock Construction (3), Richlen Construction (3), Skyline Construction (3), Swinerton Builders (3), Webcor Construction Lp (3), Edgewood Builders Inc (2), Hp Build (2), Bevilacqua & Sons, C & J Contracting Inc, Charles Pankow Builders Ltd, Cobuild Construction Services Inc, Hathaway Dinwiddie Co., Jon K Takata Corp Dba Restoration Mgmt, M C S Construction Services, Marchetti Group, Novo Construction Inc, Plant Construction Co, Lp, San Francisco Commercial Builders Inc, Source Planning And Construction Inc, Truebeck Construction
Architects
Douglas Zucker (2), Jack Munson
Engineers
Justin Schultz (2), Kyle Pace (2), Michael Giangrave (2), Amit Wadhwa, Andrew Scott, Elisabeth M Allen, Jennifer Ashley Ma, Joseph A Remling, Levi Abarte, Madison Ryutaro Roberts, Paul Littler

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 5, 2020Completed
final sign-off Feb 2023
301 Toland StC & J Contracting Increnovation of an existing warehouse including new exterior openings, and new accessible exit
Details
Permit
202011058335
Permit issued
Dec 23, 2020
Final sign-off
Feb 10, 2023

renovation of an existing warehouse including new exterior openings, and new accessible exit

Open the permit page

$250,000
Sep 22, 2020Never finaled
filed Sep 2020, never issued
450 Shotwell StEdgewood Builders Inctenant improvement to add conf rooms, storage room, and subdivision of e rooms to create a mechanical shop and space operations room. addition of internal storefront and door. no exterior work to occur, existing productions, distribution and repair use to remain. no change in use. no structural work
Details
Permit
202009224717

tenant improvement to add conf rooms, storage room, and subdivision of e rooms to create a mechanical shop and space operations room. addition of internal storefront and door. no exterior work to occur, existing productions, distribution and repair use to remain. no change in use. no structural work

Open the permit page

$215,000
May 8, 2020Expired or cancelled
suspend Feb 2021
438 Shotwell StEdgewood Builders Incti for 438 shotwell: to add 2 conf rooms, 1 storage room, and subdivisions of e rooms t create a mech shop and space operation rm. addition of interal storefront and door. no exterior work to occur, existing production, distributions and repair use to remain. no change in use. no structural work
Details
Permit
202005087375
Permit issued
Oct 13, 2020

ti for 438 shotwell: to add 2 conf rooms, 1 storage room, and subdivisions of e rooms t create a mech shop and space operation rm. addition of interal storefront and door. no exterior work to occur, existing production, distributions and repair use to remain. no change in use. no structural work

Open the permit page

$215,000
Mar 3, 2020Expired or cancelled
cancelled Jan 2026
235 02nd Stthe work is in responce to the accessible bldg entrance program addition of auto door operator push button/bar, restriping accessible parking spaces, adjusting door operating force.
Details
Permit
202003036034

the work is in responce to the accessible bldg entrance program addition of auto door operator push button/bar, restriping accessible parking spaces, adjusting door operating force.

Open the permit page

$6,000
Feb 24, 2020Completed
final sign-off Apr 2022
450 Shotwell StC C I Commercial Construction & Improvdemolition of non-structural partitions, ceiling, lighting, finishes, and any associated mechanical, plumbing and electrical at 2nd floor. pid eid required for demo sep permits
Details
Permit
202002245249
Permit issued
Mar 3, 2020
Final sign-off
Apr 13, 2022

demolition of non-structural partitions, ceiling, lighting, finishes, and any associated mechanical, plumbing and electrical at 2nd floor. pid eid required for demo sep permits

Open the permit page

$15,000
Feb 20, 2020Completed
final sign-off Jun 2020
220 Montgomery StSan Francisco Commercial Builders Inccommercial ti on 10 fl, suite 1060: includes new consturction of non-structural walls, casework, ceiling, lighting and finishes. maher na
Details
Permit
202002204911
Permit issued
Feb 25, 2020
Final sign-off
Jun 1, 2020

commercial ti on 10 fl, suite 1060: includes new consturction of non-structural walls, casework, ceiling, lighting and finishes. maher na

Open the permit page

$379,500
Jan 30, 2020Completed
final sign-off Oct 2022
101 Spear StMarchetti Grouprevision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit.
Details
Permit
202001303189
Permit issued
Feb 19, 2020
Final sign-off
Oct 5, 2022

revision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit.

Open the permit page

Jan 29, 2020Completed
final sign-off Jan 2022
170 Maiden LnHp Buildrevision to pa 201808207774. dimension changes to penthouse wall, 6th floor smoke door and other misc
Details
Permit
202001292983
Permit issued
Feb 5, 2020
Final sign-off
Jan 12, 2022

revision to pa 201808207774. dimension changes to penthouse wall, 6th floor smoke door and other misc

Open the permit page

Jan 24, 2020Completed
final sign-off Feb 2021
1 Market StM C S Construction Serviceslobby - demo of (e) security desks, (e) wood cielings & lighting fixtures @ plaza level in spear & steuart tower lobbies. construction of new security desks, custom millwork and wood slat portals in plaza level lobbies
Details
Permit
202001242724
Permit issued
Feb 10, 2020
Final sign-off
Feb 25, 2021

lobby - demo of (e) security desks, (e) wood cielings & lighting fixtures @ plaza level in spear & steuart tower lobbies. construction of new security desks, custom millwork and wood slat portals in plaza level lobbies

Open the permit page

$250,000
Dec 30, 2019Completed
final sign-off May 2021
55 02nd StField Construction Inc.19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terrace
Details
Permit
201912300972
Permit issued
Jan 16, 2020
Final sign-off
May 10, 2021

19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terrace

Open the permit page

$385,000
Dec 23, 2019Completed
final sign-off Dec 2021
100 Hooper StGci, Incsuite 4 - revision to permit #201901291477. to clarify co2 system per sffd request. maher na.
Details
Permit
201912230309
Permit issued
Jan 10, 2020
Final sign-off
Dec 28, 2021

suite 4 - revision to permit #201901291477. to clarify co2 system per sffd request. maher na.

Open the permit page

Dec 20, 2019Completed
final sign-off Feb 2020
450 Shotwell StC C I Commercial Construction & Improvproposed level 1 work only. removal of existing non-structural brick infill to reopen connection in 450 shotwell. infill two existing openings between 454 and 450 shotwell. exisitng pdr use to remain. no change in use. no structural work to occur
Details
Permit
201912200190
Permit issued
Feb 10, 2020
Final sign-off
Feb 21, 2020

proposed level 1 work only. removal of existing non-structural brick infill to reopen connection in 450 shotwell. infill two existing openings between 454 and 450 shotwell. exisitng pdr use to remain. no change in use. no structural work to occur

Open the permit page

$10,000
Dec 19, 2019Completed
final sign-off Oct 2021
1 Market StBcci Construction Company18th fl - office ti. new partitions, millwork & finishes. mep deferred.
Details
Permit
201912190043
Permit issued
Jan 7, 2020
Final sign-off
Oct 26, 2021

18th fl - office ti. new partitions, millwork & finishes. mep deferred.

Open the permit page

$990,000
Dec 19, 2019Completed
final sign-off Oct 2021
1 Market StBcci Construction Company19th fl - office ti. new partitions, millwork & finishes. mep deferred.
Details
Permit
201912190040
Permit issued
Jan 7, 2020
Final sign-off
Oct 26, 2021

19th fl - office ti. new partitions, millwork & finishes. mep deferred.

Open the permit page

$980,000
Dec 12, 2019Completed
final sign-off Jul 2020
601 Montgomery StCommercial Interior Builders Incti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na
Details
Permit
201912129293
Permit issued
Feb 4, 2020
Final sign-off
Jul 15, 2020

ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na

Open the permit page

$254,249
Dec 11, 2019Completed
final sign-off May 2021
55 02nd StField Construction Inc.basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher na
Details
Permit
201912119253
Permit issued
Jan 29, 2020
Final sign-off
May 19, 2021

basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher na

Open the permit page

$1,100,000
Dec 11, 2019Completed
final sign-off May 2021
55 02nd StField Construction Inc.demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroom
Details
Permit
201912119252
Permit issued
Jan 16, 2020
Final sign-off
May 10, 2021

demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroom

Open the permit page

$1,250,000
Dec 4, 2019Expired or cancelled
cancelled Jan 2026
600 Montgomery StSkyline Constructioninstall an additional door in extg office of suite 1900. n/a for maher
Details
Permit
201912048613

install an additional door in extg office of suite 1900. n/a for maher

Open the permit page

$34,427
Dec 3, 2019Completed
final sign-off Sep 2023
220 Montgomery StWebcor Construction Lprevision to 201903084752, 201906062714 and 201910184996 includes reconfiguring rated vestibule at top of e egress stair
Details
Permit
201912038521
Permit issued
Jan 21, 2020
Final sign-off
Sep 20, 2023

revision to 201903084752, 201906062714 and 201910184996 includes reconfiguring rated vestibule at top of e egress stair

Open the permit page

Nov 25, 2019Completed
final sign-off Jun 2021
100 Hooper StGci, Inc1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968
Details
Permit
201911258061
Permit issued
Dec 9, 2019
Final sign-off
Jun 30, 2021

1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968

Open the permit page

$750,000
Nov 14, 2019In progress
issued Nov 2024
5 03rd Stchange of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest rooms
Details
Permit
201911147319
Permit issued
Nov 21, 2024

change of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest rooms

Open the permit page

$43,000,000
Oct 30, 2019Completed
final sign-off Jun 2021
100 Hooper StGci, Increvision to pa# 201908158968; updated electrical rm. with 1 hr rating & relocate compressor room
Details
Permit
201910305956
Permit issued
Nov 6, 2019
Final sign-off
Jun 30, 2021

revision to pa# 201908158968; updated electrical rm. with 1 hr rating & relocate compressor room

Open the permit page

$1,000
Oct 25, 2019Completed
final sign-off Jul 2020
500 Sutter StJon K Takata Corp Dba Restoration Mgmtdemo (e) millwork and installing new millwork
Details
Permit
201910255594
Permit issued
Nov 21, 2019
Final sign-off
Jul 30, 2020

demo (e) millwork and installing new millwork

Open the permit page

$50,000
Oct 23, 2019Completed
final sign-off Dec 2019
909 Montgomery StSource Planning And Construction Inc6th floor: demolition of extg finishes, casework and construction of new non structural partitions, doors, glazing, power, finishes, and lighting.
Details
Permit
201910235288
Permit issued
Nov 4, 2019
Final sign-off
Dec 23, 2019

6th floor: demolition of extg finishes, casework and construction of new non structural partitions, doors, glazing, power, finishes, and lighting.

Open the permit page

$40,000
Oct 23, 2019Completed
final sign-off May 2020
601 Montgomery StCommercial Interior Builders Incsuite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a.
Details
Permit
201910235279
Permit issued
Nov 1, 2019
Final sign-off
May 15, 2020

suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a.

Open the permit page

$120,155
Oct 21, 2019Completed
final sign-off May 2022
100 Hooper StGci, Incproposed new curb cut mid-block on hooper st. frontage for dpw review. ref pa 2019-0815-8968
Details
Permit
201910215038
Permit issued
Oct 24, 2019
Final sign-off
May 5, 2022

proposed new curb cut mid-block on hooper st. frontage for dpw review. ref pa 2019-0815-8968

Open the permit page

Oct 18, 2019Completed
final sign-off Dec 2021
220 Montgomery StWebcor Construction Lp2nd floor: revision to app#201906062714 includes: adding new electrical room, revising lighting layout, new structural support at new interior openings at extg brick wall, relocating one new drinking fountain, and modifying layout to 2 new restroom enteries. n/a for maher
Details
Permit
201910184996
Permit issued
Jan 31, 2020
Final sign-off
Dec 8, 2021

2nd floor: revision to app#201906062714 includes: adding new electrical room, revising lighting layout, new structural support at new interior openings at extg brick wall, relocating one new drinking fountain, and modifying layout to 2 new restroom enteries. n/a for maher

Open the permit page

$400,000
Oct 17, 2019Completed
final sign-off May 2020
500 Sutter StCobuild Construction Services Incfloors 2/5/8: each floor install new accessible drinking fountain based on approved pre-app letter issued on 04/24/2019. maher n/a.
Details
Permit
201910174745
Permit issued
Feb 24, 2020
Final sign-off
May 27, 2020

floors 2/5/8: each floor install new accessible drinking fountain based on approved pre-app letter issued on 04/24/2019. maher n/a.

Open the permit page

$15,000
Oct 15, 2019Completed
final sign-off Mar 2020
123 Townsend StSwinerton Builderspartial 4th floor interior t.i. to include: non-structural demo; construction of non-structural partition, doors, millwork, finishes, lighting, mep n/a maher
Details
Permit
201910154388
Permit issued
Oct 18, 2019
Final sign-off
Mar 2, 2020

partial 4th floor interior t.i. to include: non-structural demo; construction of non-structural partition, doors, millwork, finishes, lighting, mep n/a maher

Open the permit page

$1,000,000
Aug 22, 2019Completed
final sign-off Apr 2022
100 Hooper StGci, Increvision to app#201906042400. revised lift layout and relocated stairs. n/a for maher
Details
Permit
201908229551
Permit issued
Sep 6, 2019
Final sign-off
Apr 11, 2022

revision to app#201906042400. revised lift layout and relocated stairs. n/a for maher

Open the permit page

$1,000
Aug 15, 2019Completed
final sign-off Apr 2021
100 Hooper StGci, Incste 1,2 & 6 - commercial tenant improvement including construction of non-structural partitoins; exterior door alterations, lighting, cabinetry & finishes. ample for use pursuant to planning code section 102 w/accessory office, gategory g per approved pdr use map-robotics manufacturing
Details
Permit
201908158968
Permit issued
Sep 24, 2019
Final sign-off
Apr 7, 2021

ste 1,2 & 6 - commercial tenant improvement including construction of non-structural partitoins; exterior door alterations, lighting, cabinetry & finishes. ample for use pursuant to planning code section 102 w/accessory office, gategory g per approved pdr use map-robotics manufacturing

Open the permit page

$2,000,000
Jul 22, 2019Completed
final sign-off Mar 2020
64 Townsend StTruebeck Constructiondemo of non-structural partitions, restrooms and showers, light fixtures and finishes. construction of (n) non-structural partitions, restrooms, light fixtures, millwork and finishes.
Details
Permit
201907226469
Permit issued
Aug 2, 2019
Final sign-off
Mar 3, 2020

demo of non-structural partitions, restrooms and showers, light fixtures and finishes. construction of (n) non-structural partitions, restrooms, light fixtures, millwork and finishes.

Open the permit page

$480,000
Jun 20, 2019Completed
final sign-off Oct 2019
303 02nd StCommercial Interior Builders Inc4th floor: includes removal of non-compliant modular ramps and door hardware, and installation of new compliant modular ramps and door hardware. n/a for maher
Details
Permit
201906203964
Permit issued
Jul 19, 2019
Final sign-off
Oct 3, 2019

4th floor: includes removal of non-compliant modular ramps and door hardware, and installation of new compliant modular ramps and door hardware. n/a for maher

Open the permit page

$30,000
Jun 12, 2019Completed
final sign-off Jan 2021
465 California StBevilacqua & Sonsrevision to pa 201902011867. revision of ceilings and light fixtures at 6th flr.
Details
Permit
201906123192
Permit issued
Jun 14, 2019
Final sign-off
Jan 25, 2021

revision to pa 201902011867. revision of ceilings and light fixtures at 6th flr.

Open the permit page

Jun 11, 2019Completed
final sign-off Mar 2022
100 Hooper StGci, Incunit 8: construction of new mezzanine level, accessible lift, stairs in (e) core and shell building. maher n/a.
Details
Permit
201906113160
Permit issued
Aug 14, 2019
Final sign-off
Mar 31, 2022

unit 8: construction of new mezzanine level, accessible lift, stairs in (e) core and shell building. maher n/a.

Open the permit page

$150,000
Jun 6, 2019Completed
final sign-off Aug 2020
220 Montgomery StWebcor Construction Lpwork includes improvements on 2nd fl - phase 2 - construction includes new lighting and restrooms, including new finishes, fixtures and accessories. maher na
Details
Permit
201906062714
Permit issued
Jun 20, 2019
Final sign-off
Aug 11, 2020

work includes improvements on 2nd fl - phase 2 - construction includes new lighting and restrooms, including new finishes, fixtures and accessories. maher na

Open the permit page

$1,445,000
Jun 4, 2019Completed
final sign-off Apr 2022
100 Hooper StGci, Incunit 6 - construction of mazzanine, accessible lift & stairs in (e) core & shell building n/a maher
Details
Permit
201906042404
Permit issued
Aug 14, 2019
Final sign-off
Apr 11, 2022

unit 6 - construction of mazzanine, accessible lift & stairs in (e) core & shell building n/a maher

Open the permit page

$180,000
Jun 4, 2019Completed
final sign-off Mar 2022
100 Hooper Stunit 2: construction of mezzanine, accessible lift & stairs in (e) core & shell building n/a maher
Details
Permit
201906042400
Permit issued
Aug 14, 2019
Final sign-off
Mar 31, 2022

unit 2: construction of mezzanine, accessible lift & stairs in (e) core & shell building n/a maher

Open the permit page

$165,000
May 9, 2019Never finaled
issued May 2019, no final
303 02nd StSkyline Constructionti to 2nd fl to include new non0load bearing partitions, floor finishes, ceilings, millworks. mech, elec, life safety and sprinkler under separate permit.
Details
Permit
201905090218
Permit issued
May 10, 2019

ti to 2nd fl to include new non0load bearing partitions, floor finishes, ceilings, millworks. mech, elec, life safety and sprinkler under separate permit.

Open the permit page

$800,000
May 8, 2019Completed
final sign-off Sep 2020
150 Hooper StGci, Incti - unit 212 & 214 on 2nd flr. partition & door for conference room, a sound-rated door btwn units, relocattion of plumbing for utility sink & misc finishes
Details
Permit
201905080084
Permit issued
May 10, 2019
Final sign-off
Sep 29, 2020

ti - unit 212 & 214 on 2nd flr. partition & door for conference room, a sound-rated door btwn units, relocattion of plumbing for utility sink & misc finishes

Open the permit page

$300,000
Mar 27, 2019Never finaled
issued May 2019, no final
235 02nd StSwinerton Buildersmaintenance permit to waterproof (e) fountain and replace (e) finishes wtih bronze tiles, no expansion of (e) fountain dimensions mep under separate permit
Details
Permit
201903276417
Permit issued
May 2, 2019

maintenance permit to waterproof (e) fountain and replace (e) finishes wtih bronze tiles, no expansion of (e) fountain dimensions mep under separate permit

Open the permit page

$100,000
Mar 11, 2019Completed
final sign-off Aug 2019
123 Townsend StSwinerton Buildersinterior ti improvement to include: selective non structural demo of partitions, doors, lighting & finishes. construction of non structual partitions , doors, millwork, finishes, lighting electrical, mechanical, & plumbing
Details
Permit
201903114865
Permit issued
Mar 22, 2019
Final sign-off
Aug 30, 2019

interior ti improvement to include: selective non structural demo of partitions, doors, lighting & finishes. construction of non structual partitions , doors, millwork, finishes, lighting electrical, mechanical, & plumbing

Open the permit page

$700,000
Nov 20, 2018Never finaled
issued Jan 2019, no final
100 Hooper StGci, Increvision to pa #201810052399. for sffd approval of a-2 assembly space only. suite 4
Details
Permit
201811206419
Permit issued
Jan 18, 2019

revision to pa #201810052399. for sffd approval of a-2 assembly space only. suite 4

Open the permit page

Nov 16, 2018Never finaled
issued Nov 2018, no final
150 Hooper St2nd fl - new sink and casework in existing breakroom. existing electrical and rough in plumbing
Details
Permit
201811166135
Permit issued
Nov 21, 2018

2nd fl - new sink and casework in existing breakroom. existing electrical and rough in plumbing

Open the permit page

$5,000
Nov 6, 2018Expired or cancelled
expired Jul 2020
150 Hooper StBcci Construction Companyunit 211. add a demising wall in order to create unit 215
Details
Permit
201811065091
Permit issued
Nov 8, 2018

unit 211. add a demising wall in order to create unit 215

Open the permit page

$5,000
Oct 10, 2018Expired or cancelled
cancelled Jan 2026
601 Montgomery Streplace extg hot water boilers with 2 high efficiency condensing boiler units. n/a for maher
Details
Permit
201810102746

replace extg hot water boilers with 2 high efficiency condensing boiler units. n/a for maher

Open the permit page

$200,000
Oct 5, 2018Completed
final sign-off Apr 2021
100 Hooper StGci, Incsuite 4: construction of temporary non structural partitions, doors, lighting for phase 1, 1500sf of production distribution and repair with accessary retail. n/a for maher
Details
Permit
201810052399
Permit issued
Oct 12, 2018
Final sign-off
Apr 13, 2021

suite 4: construction of temporary non structural partitions, doors, lighting for phase 1, 1500sf of production distribution and repair with accessary retail. n/a for maher

Open the permit page

$50,000
Sep 26, 2018Completed
final sign-off Oct 2018
150 Hooper StBcci Construction Company3rd fl: architectural drawings of construction of demising wall in unit 3a to create unit 3g. mep submittals deferred.
Details
Permit
201809261431
Permit issued
Sep 26, 2018
Final sign-off
Oct 24, 2018

3rd fl: architectural drawings of construction of demising wall in unit 3a to create unit 3g. mep submittals deferred.

Open the permit page

$15,000
Sep 18, 2018Completed
final sign-off Jul 2020
150 Hooper StBcci Construction Companytenant build out of 4th fl suite for manufacturing studio including machine shop, wood shop, office and conference space, breakroom. no changes to e lighting, defered mep, sprinkler, alarm
Details
Permit
201809180668
Permit issued
Sep 24, 2018
Final sign-off
Jul 27, 2020

tenant build out of 4th fl suite for manufacturing studio including machine shop, wood shop, office and conference space, breakroom. no changes to e lighting, defered mep, sprinkler, alarm

Open the permit page

$600,000
Sep 17, 2018Expired or cancelled
cancelled Jan 2026
1 Market Stscope of work demo on non structural partitions, ceiling, lighting, finishes, and andy associated mech, plumb, elec. new snon structural parotions, interior storefront, lighting, floor and wall finishes
Details
Permit
201809170508

scope of work demo on non structural partitions, ceiling, lighting, finishes, and andy associated mech, plumb, elec. new snon structural parotions, interior storefront, lighting, floor and wall finishes

Open the permit page

$637,000
Aug 20, 2018Completed
final sign-off Jan 2022
170 Maiden LnHp Build, Peacock Constructionbarrier removal at existing service elevator, including access compliant smoke doors, raised elevator entry sill, doors, frames & adjacent rated shaft elevator call buttons. rebuild access to penthouse and penthouse floor. streeet entrance under separate permit.
Details
Permit
201808207774
Permit issued
Dec 10, 2018
Final sign-off
Jan 12, 2022

barrier removal at existing service elevator, including access compliant smoke doors, raised elevator entry sill, doors, frames & adjacent rated shaft elevator call buttons. rebuild access to penthouse and penthouse floor. streeet entrance under separate permit.

Open the permit page

$500,000
Jul 16, 2018Completed
final sign-off Aug 2018
100 01st StCommercial Interior Builders Inc3rd flr. restroom accessibility upgrades; expansion into adjacent suite, limited partition demolition, new soffit between 2 suites
Details
Permit
201807164615
Permit issued
Jul 24, 2018
Final sign-off
Aug 21, 2018

3rd flr. restroom accessibility upgrades; expansion into adjacent suite, limited partition demolition, new soffit between 2 suites

Open the permit page

$30,000
Jul 10, 2018Expired or cancelled
expired Jul 2020
150 Hooper StBcci Construction Companyrev to pa# 201803163925; to omit door at non-rated corridor & break rm.
Details
Permit
201807104096
Permit issued
Jul 17, 2018

rev to pa# 201803163925; to omit door at non-rated corridor & break rm.

Open the permit page

May 24, 2018Completed
final sign-off Apr 2022
100 Hooper StGci, Incfirst floor ti for spec space.construction of mezzanine, accesible with lift & stairs in existing core & shell. n/a maher
Details
Permit
201805240118
Permit issued
Sep 6, 2019
Final sign-off
Apr 11, 2022

first floor ti for spec space.construction of mezzanine, accesible with lift & stairs in existing core & shell. n/a maher

Open the permit page

$150,000
May 4, 2018Completed
final sign-off Aug 2020
100 Hooper StGci, Incsuite 7: commercial t.i. includes construction of non-structural partitions ceiling, lighting, mechanical and electrical as well as casework and finishes. n/a for maher
Details
Permit
201805048217
Permit issued
Jun 15, 2018
Final sign-off
Aug 4, 2020

suite 7: commercial t.i. includes construction of non-structural partitions ceiling, lighting, mechanical and electrical as well as casework and finishes. n/a for maher

Open the permit page

$968,250
May 4, 2018Completed
final sign-off Aug 2020
100 Hooper StGci, Incsuite 7: construction of mezzanine, accessible lift and stairs in extg core and shell
Details
Permit
201805048216
Permit issued
Jun 15, 2018
Final sign-off
Aug 4, 2020

suite 7: construction of mezzanine, accessible lift and stairs in extg core and shell

Open the permit page

$500,000
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyt.i. to 4 suite on 2nd fl in new building. work includes partitions, lighting, plumbing & ventilation systems. 12775 sf. maher na sprinkler nad fire alarm separte permit
Details
Permit
201803163925
Permit issued
Apr 25, 2018

t.i. to 4 suite on 2nd fl in new building. work includes partitions, lighting, plumbing & ventilation systems. 12775 sf. maher na sprinkler nad fire alarm separte permit

Open the permit page

$853,000
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyt.i. to 1 suite (full floor) om 4th level in new building. work includes, power, lighting, plumbing & hvac systems. 12785 sf. maher na
Details
Permit
201803163921
Permit issued
Apr 25, 2018

t.i. to 1 suite (full floor) om 4th level in new building. work includes, power, lighting, plumbing & hvac systems. 12785 sf. maher na

Open the permit page

$882,000
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyti to 3 ground level suites in new building. work includes partitions, lighting, plumbing & exhaust system. 8430 sf
Details
Permit
201803163916
Permit issued
Apr 25, 2018

ti to 3 ground level suites in new building. work includes partitions, lighting, plumbing & exhaust system. 8430 sf

Open the permit page

$707,000
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyti to create 4 light industrial workshop suites on 3rd level in new building. work includes pratitions, lighting, plumbing & ventilation system. 12785 sf, fire alarm and sprinklers under separate permits.
Details
Permit
201803163914
Permit issued
Apr 25, 2018

ti to create 4 light industrial workshop suites on 3rd level in new building. work includes pratitions, lighting, plumbing & ventilation system. 12785 sf, fire alarm and sprinklers under separate permits.

Open the permit page

$747,500
Dec 1, 2017Never finaled
issued Jun 2018, no final
217 Sutter StC C I Commercial Construction & Improv1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13
Details
Permit
201712015276
Permit issued
Jun 12, 2018

1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13

Open the permit page

$300,000
Sep 25, 2017Never finaled
issued Jan 2018, no final
217 Sutter StC C I Commercial Construction & Improvexploratory demo associated with 2017-007879coa minor permit to alter & permit app #2017-0601-8094 bldg permit app for a facade modification. explored locations shall be patched back to original finishes.
Details
Permit
201709259448
Permit issued
Jan 11, 2018

exploratory demo associated with 2017-007879coa minor permit to alter & permit app #2017-0601-8094 bldg permit app for a facade modification. explored locations shall be patched back to original finishes.

Open the permit page

$1,000
Jun 30, 2017Completed
final sign-off Nov 2017
121 Spear StPeacock Constructionrevision to app#201612024097. removal of 4 additional planters, expanded demolition area at south end, and change infill material from tile to concrete. n/a for maher
Details
Permit
201706300857
Permit issued
Jul 12, 2017
Final sign-off
Nov 21, 2017

revision to app#201612024097. removal of 4 additional planters, expanded demolition area at south end, and change infill material from tile to concrete. n/a for maher

Open the permit page

$50,000
May 15, 2017Never finaled
issued Aug 2017, no final
600 California StNovo Construction Incdemo plaza level: exterior stone pavers & panels & waterproofing system. construct with paving & waterproofing system, modify handrails. n/a maher ordinance
Details
Permit
201705156641
Permit issued
Aug 11, 2017

demo plaza level: exterior stone pavers & panels & waterproofing system. construct with paving & waterproofing system, modify handrails. n/a maher ordinance

Open the permit page

$1,000,000
Mar 16, 2017Completed
final sign-off Nov 2017
121 Spear StRichlen Constructionrevision to pa 2017-0126-8020 - revise drawings to reflect demolition of (e) plaster ceiling to be replaced by gyp ceiling. move location of (n) fire place in wall (tower 2) maher na
Details
Permit
201703161582
Permit issued
Mar 21, 2017
Final sign-off
Nov 27, 2017

revision to pa 2017-0126-8020 - revise drawings to reflect demolition of (e) plaster ceiling to be replaced by gyp ceiling. move location of (n) fire place in wall (tower 2) maher na

Open the permit page

$100,000
Jan 26, 2017Completed
final sign-off Nov 2017
121 Spear StRichlen Constructionrenovation of existing interior lobby. new lighting, finishes, entry doors, gas fireplace, new glass guardrail at mezzanine
Details
Permit
201701268020
Permit issued
Feb 14, 2017
Final sign-off
Nov 27, 2017

renovation of existing interior lobby. new lighting, finishes, entry doors, gas fireplace, new glass guardrail at mezzanine

Open the permit page

$200,000
Dec 21, 2016Expired or cancelled
cancelled Jun 2017
303 02nd StSkyline Construction9/f, #950n- improvements to unoccupied suite on 9th fl, ste 950n - new non-structural partitions, ceilings, light fixtures, millwork and finishes. demo under separate pa 2016-0913-7556
Details
Permit
201612215526
Permit issued
Feb 9, 2017

9/f, #950n- improvements to unoccupied suite on 9th fl, ste 950n - new non-structural partitions, ceilings, light fixtures, millwork and finishes. demo under separate pa 2016-0913-7556

Open the permit page

$450,000
Dec 2, 2016Completed
final sign-off Nov 2017
121 Spear StPeacock Constructionremoval of built-in planters, concrete pedestral and floor mounted light poles. areas to be filled in with new paving to match extg. n/a for maher
Details
Permit
201612024097
Permit issued
Jun 9, 2017
Final sign-off
Nov 21, 2017

removal of built-in planters, concrete pedestral and floor mounted light poles. areas to be filled in with new paving to match extg. n/a for maher

Open the permit page

$90,000
Nov 2, 2016Completed
final sign-off Jun 2017
600 Montgomery StHathaway Dinwiddie Co.4th flr, suite 480: demo of non structural partitions. addition of new non structural walls, light fixtures, power signals and finishes maher na
Details
Permit
201611021709
Permit issued
Nov 8, 2016
Final sign-off
Jun 21, 2017

4th flr, suite 480: demo of non structural partitions. addition of new non structural walls, light fixtures, power signals and finishes maher na

Open the permit page

$250,000
Apr 12, 2016Never finaled
issued Jun 2016, no final
600 California StRichlen Constructionground floor: revision to app#2015-1201-3828. additional scope of work includes new gypsum board backdrop and surround, and structural design for securing new wall-hung art work. n/a for maher.
Details
Permit
201604124577
Permit issued
Jun 3, 2016

ground floor: revision to app#2015-1201-3828. additional scope of work includes new gypsum board backdrop and surround, and structural design for securing new wall-hung art work. n/a for maher.

Open the permit page

$75,000
Jul 10, 2015Completed
final sign-off Oct 2015
100 01st StCommercial Interior Builders Incselective demo of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit.
Details
Permit
201507101131
Permit issued
Jul 10, 2015
Final sign-off
Oct 27, 2015

selective demo of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit.

Open the permit page

$15,134
Apr 26, 2013Never finaled
issued Apr 2013, no final
340 Bryant StCharles Pankow Builders Ltd1st/2nd/3rd/4th floors-limited interior demolition of portion of slab on grade & floor penitrations per ab-017
Details
Permit
201304265528
Permit issued
Apr 26, 2013

1st/2nd/3rd/4th floors-limited interior demolition of portion of slab on grade & floor penitrations per ab-017

Open the permit page

$25,000
Jun 1, 2006Completed
final sign-off Sep 2006
1100 California StPlant Construction Co, Lprevision to existing permit to relocate presure refief damper & related fire smoke
Details
Permit
200606013016
Permit issued
Jun 1, 2006
Final sign-off
Sep 12, 2006

revision to existing permit to relocate presure refief damper & related fire smoke

Open the permit page