17 permits since 2000 (engineer on 15 permits, architect on 2 permits): 15 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 7, 2026 | Completed final sign-off Sep 2026 | 162 15th Av | voluntary grout injection into subgrade soils under tradesmen hallway & north property line foundation, work is limited in interior of this site onlyDetails
voluntary grout injection into subgrade soils under tradesmen hallway & north property line foundation, work is limited in interior of this site only | $14,750 | |
| Dec 18, 2019 | Completed final sign-off Jun 2020 | 1239 Athens St | Ward-Tek Inc. | to comply with nov 201935681 repair minor structural ldamage to a post supporting a steel beam. temporarily shore the steel beam and replace the fire damaged post with in-kind timber post 6x6 df#1 and in-kind connections (lag screws at l6x6 & cbsq66 base)Details
to comply with nov 201935681 repair minor structural ldamage to a post supporting a steel beam. temporarily shore the steel beam and replace the fire damaged post with in-kind timber post 6x6 df#1 and in-kind connections (lag screws at l6x6 & cbsq66 base) | $2,000 |
| Dec 12, 2019 | Completed final sign-off Sep 2020 | 153 Kearny St | C C I Commercial Construction & Improv | voluntary seismic upgrade, structural enhancement of (e) colums with frp n/a maherDetails
voluntary seismic upgrade, structural enhancement of (e) colums with frp n/a maher | $20,000 |
| Jul 30, 2019 | Completed final sign-off Nov 2019 | 2853 Green St | Stroub Construction | replacement of e retaining wall along property line, in kindDetails
replacement of e retaining wall along property line, in kind | $25,000 |
| Dec 1, 2017 | Never finaled issued Jun 2018, no final | 217 Sutter St | C C I Commercial Construction & Improv | 1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13Details
1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13 | $300,000 |
| Jun 14, 2017 | Completed final sign-off May 2019 | 447 Minna St | Plant Construction Co, Lp | install (n) elevator in new 2-hour rated shaft and replace wood stairs at interior. provide 2 (n) accessible restrooms. provide mechanical, electrical, plumbing systems at bldg core. (under separate permit: add sprinklers in entire building nfpa13; remove 2 restrooms)Details
install (n) elevator in new 2-hour rated shaft and replace wood stairs at interior. provide 2 (n) accessible restrooms. provide mechanical, electrical, plumbing systems at bldg core. (under separate permit: add sprinklers in entire building nfpa13; remove 2 restrooms) | $850,000 |
| Jun 14, 2017 | Completed final sign-off Dec 2018 | 690 Church St | De Brus Construction Inc | common area- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
common area- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $20,000 |
| Dec 16, 2015 | Completed final sign-off Mar 2016 | 2 Lake St | Plant Construction Co, Lp | install steel channels and expansion anchors to extg concrete walls. install steel braces between steel channels. voluntary seismic strengthening.Details
install steel channels and expansion anchors to extg concrete walls. install steel braces between steel channels. voluntary seismic strengthening. | $20,000 |
| Nov 23, 2015 | Completed final sign-off Apr 2020 | 733 Kearny St | Alpha Bay Builders, Inc., Arana Group, Inc., Lmnop-Design Inc. | renov of an(e)parking garage. upgrades to(e)mech,elec,plumb & lighting systems; ada upgrades; waterproofing improvements & repair of(e)structure; reolocation of interior prog areas; replace interior stairs; enclosure of exterior stairs & mech openings; infill of interior structural bay (floor slab)Details
renov of an(e)parking garage. upgrades to(e)mech,elec,plumb & lighting systems; ada upgrades; waterproofing improvements & repair of(e)structure; reolocation of interior prog areas; replace interior stairs; enclosure of exterior stairs & mech openings; infill of interior structural bay (floor slab) | $1,987,718 |
| Sep 25, 2015 | Completed final sign-off Dec 2016 | 4115 Lincoln Wy | Aka Construction Company | soft story retrofit per sfbc ch 34 per fema p-807 installation of new plywood shearwall w/concrete grade beam and new plywood sheathin on addtional (e) stud walls to bring structure into compliance with sf ordinaceDetails
soft story retrofit per sfbc ch 34 per fema p-807 installation of new plywood shearwall w/concrete grade beam and new plywood sheathin on addtional (e) stud walls to bring structure into compliance with sf ordinace | $50,000 |
| Feb 6, 2015 | Completed final sign-off Sep 2015 | 1649 12th Av | to comply with soft story ordinance. sheer wall and collector beam will be added mandatory. soft story retrofit per sfbc chapter 34b-fema p-807.Details
to comply with soft story ordinance. sheer wall and collector beam will be added mandatory. soft story retrofit per sfbc chapter 34b-fema p-807. | $35,000 | |
| Jan 13, 2015 | Completed final sign-off Sep 2015 | 11 Naglee Av | Aka Construction Company | soft story retrofit per sfbc chapter 34b. fema p-807.Details
soft story retrofit per sfbc chapter 34b. fema p-807. | $30,000 |
| Apr 11, 2014 | Never finaled issued Oct 2014, no final | 3555 Cesar Chavez St | Herreroboldt Partners | temporary shoring.Details
temporary shoring. | $2,600,000 |
| Feb 13, 2013 | Completed final sign-off Oct 2014 | 55 09th St | Avalon Bay Communities | artwork installation along 55 9th st. reference approved & issued pa #201108233049-sDetails
artwork installation along 55 9th st. reference approved & issued pa #201108233049-s | $37,500 |
| Mar 19, 2012 | Completed final sign-off Jan 2014 | 140 New Montgomery St | Plant Construction Company Lp | temporary tower crane to be used during building renovation. interior renovation of building under pa #201112221187 and seismic upgrade of building under pa #201110176931.Details
temporary tower crane to be used during building renovation. interior renovation of building under pa #201112221187 and seismic upgrade of building under pa #201110176931. | $300,000 |
| Sep 16, 2008 | Completed final sign-off Oct 2008 | 965 Geary St | R G K Construction Services | cracked brick repair at east property lineDetails
cracked brick repair at east property line | $25,000 |
| Feb 14, 2007 | Completed final sign-off Aug 2007 | 942 Market St | structural demolition. all disable access and siesmic upgrade will be under app #200308051236 in file, no exterior workDetails
structural demolition. all disable access and siesmic upgrade will be under app #200308051236 in file, no exterior work | $40,000 |