Plant Construction Company Lp
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to May 2015
- Last 24 months
- 0 permits filed
479 permits since 2000: 391 completed, 44 never finaled, 44 expired or cancelled.
Of the 44 never-finaled permits, 44 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 479.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2015 | Completed final sign-off Feb 2016 | 140 New Montgomery St | 22nd flr: revision to pa 2014 0909 5863 for sffd assembly permitDetails
22nd flr: revision to pa 2014 0909 5863 for sffd assembly permit | |
| Mar 30, 2015 | Never finaled issued Mar 2015, no final | 140 New Montgomery St | 8th floor: to establish an occupant load for training multi purpose room for sffd public assembly permit. maher - not req'dDetails
8th floor: to establish an occupant load for training multi purpose room for sffd public assembly permit. maher - not req'd | |
| Mar 24, 2015 | Completed final sign-off Dec 2015 | 140 New Montgomery St | repair of window washing equipment on level 23. provide additional stiffeners to existing plates. structural only.Details
repair of window washing equipment on level 23. provide additional stiffeners to existing plates. structural only. | $5,000 |
| Feb 12, 2015 | Never finaled issued Feb 2015, no final | 1155 Market St | 6th flr: replacement of existing glass guard rail at the 6th flr, covered balcony tenant space (non public)Details
6th flr: replacement of existing glass guard rail at the 6th flr, covered balcony tenant space (non public) | $50,000 |
| Feb 5, 2015 | Completed final sign-off Nov 2015 | 1555 Mariposa St | partial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent buildingDetails
partial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent building | $1,250,000 |
| Jan 28, 2015 | Completed final sign-off Mar 2016 | 450 Shotwell St | core and shell gr floor alteration to existing 2 story warehouse. demo non bearing walls, lighting. construction of restrooms and rated corridor for exiting.Details
core and shell gr floor alteration to existing 2 story warehouse. demo non bearing walls, lighting. construction of restrooms and rated corridor for exiting. | $231,000 |
| Jan 22, 2015 | Completed final sign-off Feb 2017 | 2155 Webster St | interior sprinkler soft demo. all floors. revision to app#201406108020Details
interior sprinkler soft demo. all floors. revision to app#201406108020 | |
| Jan 13, 2015 | Completed final sign-off Feb 2015 | 1 Maritime Pz | ste 2300: revision to mechanical permit 201412083249 and arch 201411242313. revision to delete fsd and update smoke control report on m0.01 as it was determined the added fsd impedes the smoke control sequence of operationDetails
ste 2300: revision to mechanical permit 201412083249 and arch 201411242313. revision to delete fsd and update smoke control report on m0.01 as it was determined the added fsd impedes the smoke control sequence of operation | |
| Dec 19, 2014 | Completed final sign-off Apr 2015 | 1155 Market St | 6th floor tenant improvement to existing office space. new non-structural interior partitions, electrical outlets, lighting, restroom accessibility upgrades. life safety deferred.Details
6th floor tenant improvement to existing office space. new non-structural interior partitions, electrical outlets, lighting, restroom accessibility upgrades. life safety deferred. | $950,000 |
| Dec 8, 2014 | Never finaled issued Dec 2014, no final | 1 Maritime Pz | suite #2300 - mechanical and electrical design/build for t.i. appl. 2014.1124.2313. maher n/a.Details
suite #2300 - mechanical and electrical design/build for t.i. appl. 2014.1124.2313. maher n/a. | $200,000 |
| Nov 24, 2014 | Completed final sign-off Feb 2015 | 1 Maritime Pz | ste #2300: revision to app#201410209310. for restrooms and added scope of office space. n/a for the maher ordinance.Details
ste #2300: revision to app#201410209310. for restrooms and added scope of office space. n/a for the maher ordinance. | $60,000 |
| Nov 19, 2014 | Completed final sign-off Dec 2014 | 690 Folsom St | revision to app#201307292946 .handrail minimum clearance detail change.n/a for the interimDetails
revision to app#201307292946 .handrail minimum clearance detail change.n/a for the interim | |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 601 Dolores St | revision to pa #2012/0828/9650. work includes installation of a type-1, ul-300 exhaust hood and ansel system at break room 208, with associated equipment, exhaust and make-up air ducting and 2-hr. rated duct enclosure.Details
revision to pa #2012/0828/9650. work includes installation of a type-1, ul-300 exhaust hood and ansel system at break room 208, with associated equipment, exhaust and make-up air ducting and 2-hr. rated duct enclosure. | $50,000 |
| Oct 29, 2014 | Never finaled issued Feb 2015, no final | 1155 Market St | 6th flr: demolition of existing interior partitions & finishes, electrical outlets, lighting, restroom fixtures. per ab-17 accessibility documentation will be provied with tenant improvement application.Details
6th flr: demolition of existing interior partitions & finishes, electrical outlets, lighting, restroom fixtures. per ab-17 accessibility documentation will be provied with tenant improvement application. | $25,000 |
| Oct 23, 2014 | Expired or cancelled withdrawn Apr 2015 | 2155 Webster St | site work, grading, excavation & utilities. reference pa #201311222660-s, 201406057550-s, 201406057554-s, 201406057555-s.Details
site work, grading, excavation & utilities. reference pa #201311222660-s, 201406057550-s, 201406057554-s, 201406057555-s. | $600,000 |
| Oct 20, 2014 | Completed final sign-off Feb 2015 | 1 Maritime Pz | selective demo & construction of non-load bearing partitions modification to ceiling grid & tile, new light fixtures, new doors, frames, hardware, new millwork & new finishes.Details
selective demo & construction of non-load bearing partitions modification to ceiling grid & tile, new light fixtures, new doors, frames, hardware, new millwork & new finishes. | $1,000,000 |
| Aug 27, 2014 | Never finaled issued Nov 2014, no final | 200 Stockton St | cosmetic repair water damaged areas in cellar and sub-cellar areas. painting and patching - no structural work.Details
cosmetic repair water damaged areas in cellar and sub-cellar areas. painting and patching - no structural work. | $3,000 |
| Aug 26, 2014 | Expired or cancelled withdrawn Mar 2018 | 1501 Mariposa St | revision to appl #2014.0519.6166 & 2014.0616.8444 - to add one additional room & to modify vestibule dimensions. n/a maher ordinanceDetails
revision to appl #2014.0519.6166 & 2014.0616.8444 - to add one additional room & to modify vestibule dimensions. n/a maher ordinance | $10,000 |
| Aug 5, 2014 | Completed final sign-off Nov 2015 | 615 Front St | revision appl. #2013.1204.3324ss/r2. installation of 24 micropiles. maher n/a.Details
revision appl. #2013.1204.3324ss/r2. installation of 24 micropiles. maher n/a. | $48,000 |
| Aug 4, 2014 | Completed final sign-off Feb 2023 | 322 Ritch St | revision to pa#201405276694 restroom corrections: men's room move wall & woman's room move wall to achieve 60" in front of toilet. n/a to ordinance #155-13Details
revision to pa#201405276694 restroom corrections: men's room move wall & woman's room move wall to achieve 60" in front of toilet. n/a to ordinance #155-13 | $3,500 |
| Aug 1, 2014 | Never finaled issued Aug 2014, no final | 62 01st St | 5th flr: tenant improvement, 2 new phone rooms, 5 new conference rooms, doors, frames, hdw, finishes, light fixtures, mechanical (added supply & return diffusers) electrical, fire sprinkler under separate permit.Details
5th flr: tenant improvement, 2 new phone rooms, 5 new conference rooms, doors, frames, hdw, finishes, light fixtures, mechanical (added supply & return diffusers) electrical, fire sprinkler under separate permit. | $250,000 |
| Jul 28, 2014 | Never finaled issued Jul 2014, no final | 2155 Webster St | construction of 1 tower crane foundation & 1 man lift foundation at the basement level of the existing building. (reference site permit appl #2013-11-22-2660/s) all work performed with in existing property lines.Details
construction of 1 tower crane foundation & 1 man lift foundation at the basement level of the existing building. (reference site permit appl #2013-11-22-2660/s) all work performed with in existing property lines. | $100,000 |
| Jul 23, 2014 | Completed final sign-off Feb 2017 | 2155 Webster St | hard demo include demo portions of (e) concrete wall & for new openings through the (e) 4 slabs. removal of mechanical penthouse above (e) roof. removal of portions of concrete cover on (e) columns & removal of column bracing @ 2nd floor level for 6 columns. removal of exterior cladding.Details
hard demo include demo portions of (e) concrete wall & for new openings through the (e) 4 slabs. removal of mechanical penthouse above (e) roof. removal of portions of concrete cover on (e) columns & removal of column bracing @ 2nd floor level for 6 columns. removal of exterior cladding. | $1,200,000 |
| Jul 15, 2014 | Completed final sign-off Jan 2015 | 2500 16th St | scope of work limited to demo of non-structural interior wall partitions, windows, doors. n/a ordinance #155-13Details
scope of work limited to demo of non-structural interior wall partitions, windows, doors. n/a ordinance #155-13 | $20,000 |
| Jun 24, 2014 | Completed final sign-off Jan 2015 | 690 Folsom St | tenant improvement for 2nd floor office space. fire alarm and fire sprinkler under separate permit. ref. appl. # 2013-07-29-2946. maher n/a.Details
tenant improvement for 2nd floor office space. fire alarm and fire sprinkler under separate permit. ref. appl. # 2013-07-29-2946. maher n/a. | $400,000 |
| Jun 13, 2014 | Expired or cancelled cancelled Jan 2026 | 22 04th St | rev. to pa#201404032342 power assist doors in lieu of raising deck level on 14, 15, 16 floors. n/a ordinance #155-13Details
rev. to pa#201404032342 power assist doors in lieu of raising deck level on 14, 15, 16 floors. n/a ordinance #155-13 | $10,000 |
| Jun 10, 2014 | Completed final sign-off Apr 2015 | 2155 Webster St | interior non-structural (soft demo) on all floors.Details
interior non-structural (soft demo) on all floors. | $875,000 |
| Jun 9, 2014 | Completed final sign-off Aug 2014 | 1335 Sutter St | revision to pa#2012-0827-8287, s2, request for hardship pertaining to accessible restroom. automatic push plate opener will be provided in lieu of providing door maneuvering clearances.Details
revision to pa#2012-0827-8287, s2, request for hardship pertaining to accessible restroom. automatic push plate opener will be provided in lieu of providing door maneuvering clearances. | |
| Jun 5, 2014 | Completed final sign-off Sep 2016 | 2468 Sacramento St | (townhouse# 2) to erect 3 stories, no basement, 3 units townhouse building.Details
(townhouse# 2) to erect 3 stories, no basement, 3 units townhouse building. | $1,500,000 |
| Jun 3, 2014 | Completed final sign-off Aug 2014 | 300 Newhall St | remodel and expand ground floor shower room to provide ada accessible shower. compliance with ord 155-13 not requiredDetails
remodel and expand ground floor shower room to provide ada accessible shower. compliance with ord 155-13 not required | $60,000 |
| May 27, 2014 | Completed final sign-off Aug 2014 | 322 Ritch St | office t.i. remove extg partitions, doors, frames and hardware. construct new partition,related doors, frames, and hardware. construct new code compliant toilets men's and women's and new shower. replace lights and new hvac. n/a for the maher ordiance #155-13Details
office t.i. remove extg partitions, doors, frames and hardware. construct new partition,related doors, frames, and hardware. construct new code compliant toilets men's and women's and new shower. replace lights and new hvac. n/a for the maher ordiance #155-13 | $209,000 |
| May 23, 2014 | Completed final sign-off Feb 2015 | 201 Alabama St | install storage racks in existing storage roomDetails
install storage racks in existing storage room | $5,500 |
| May 23, 2014 | Never finaled issued Jun 2014, no final | 26 03rd St | interior soft demolition for future t.i. per ab-017. n/a for the maher ordinance #155-13Details
interior soft demolition for future t.i. per ab-017. n/a for the maher ordinance #155-13 | $200,000 |
| May 20, 2014 | Completed final sign-off Aug 2015 | 2001 37th Av | soft demolition, interior per ab-017. t.i. under seperate permit. no structural work, bldg to remain vacant during demolition /ab-017 work.Details
soft demolition, interior per ab-017. t.i. under seperate permit. no structural work, bldg to remain vacant during demolition /ab-017 work. | $30,000 |
| May 19, 2014 | Expired or cancelled expired Dec 2018 | 1501 Mariposa St | remodel e space on the ground level. new work shall include partial and full height partitons, interior glazing, new plumbing for classroom sinks, new mech service, new lighting, elec, new entry and awningDetails
remodel e space on the ground level. new work shall include partial and full height partitons, interior glazing, new plumbing for classroom sinks, new mech service, new lighting, elec, new entry and awning | $630,000 |
| May 19, 2014 | Completed final sign-off Nov 2015 | 1555 Mariposa St | create opening in e non bearing cmu wall between live oak at 1555 mariposa and live oak school expansion at 1501 mariposa. these spaces are e occupancy, sprinklered and located in the same building. maher 155-13 not requiredDetails
create opening in e non bearing cmu wall between live oak at 1555 mariposa and live oak school expansion at 1501 mariposa. these spaces are e occupancy, sprinklered and located in the same building. maher 155-13 not required | $10,000 |
| Apr 4, 2014 | Never finaled issued Apr 2015, no final | 1127 Market St | erect electric, single-faced, direct, new sign.Details
erect electric, single-faced, direct, new sign. | |
| Apr 4, 2014 | Never finaled issued Apr 2015, no final | 1127 Market St | erect electric, double-faced, direct, new sign.Details
erect electric, double-faced, direct, new sign. | |
| Apr 4, 2014 | Never finaled issued Jan 2015, no final | 1127 Market St | painted wall, non-illuminated, new sign.Details
painted wall, non-illuminated, new sign. | |
| Apr 4, 2014 | Never finaled issued Apr 2015, no final | 1127 Market St | erect electric, single-faced, direct, new sign.Details
erect electric, single-faced, direct, new sign. | |
| Apr 4, 2014 | Never finaled issued Jan 2015, no final | 1127 Market St | painted wall, non-illuminated, new signDetails
painted wall, non-illuminated, new sign | |
| Apr 4, 2014 | Never finaled issued Apr 2015, no final | 1127 Market St | erect electric, double-faced, direct, new sign.Details
erect electric, double-faced, direct, new sign. | |
| Apr 4, 2014 | Never finaled issued Apr 2015, no final | 1127 Market St | erect door/window, single-faced, non-illuminated, new sign.Details
erect door/window, single-faced, non-illuminated, new sign. | |
| Apr 4, 2014 | Never finaled issued Apr 2015, no final | 1127 Market St | erect electric, single-faced, direct, new sign.Details
erect electric, single-faced, direct, new sign. | |
| Apr 3, 2014 | Never finaled issued Jul 2014, no final | 2001 37th Av | seismic retrofit to existing buildings.Details
seismic retrofit to existing buildings. | $1,100,000 |
| Apr 2, 2014 | Completed final sign-off Feb 2015 | 260 10th St | mep work related to title 24. ref. appl. 2014.02.01.2139. maher or. 155-13 not applicable.Details
mep work related to title 24. ref. appl. 2014.02.01.2139. maher or. 155-13 not applicable. | $10,000 |
| Apr 1, 2014 | Completed final sign-off Feb 2015 | 260 10th St | interior t.i. of western portion of (e) parish hall bldg which includes toilet rooms & three classrooms. scope of limited to interior construction only. mezz floor & stairs (int or ext) approved under #2014.0204.7720. compliance with ordinance #155-13 not requiredDetails
interior t.i. of western portion of (e) parish hall bldg which includes toilet rooms & three classrooms. scope of limited to interior construction only. mezz floor & stairs (int or ext) approved under #2014.0204.7720. compliance with ordinance #155-13 not required | $200,000 |
| Mar 6, 2014 | Completed final sign-off Oct 2014 | 767 Market St | existing vacant retail space - installation of new elevator & escalator, selective demolition. tenant improvements under separate permit. sprinkler & fire alarm under separate permit. to remain vacant until tenant improvement permit.Details
existing vacant retail space - installation of new elevator & escalator, selective demolition. tenant improvements under separate permit. sprinkler & fire alarm under separate permit. to remain vacant until tenant improvement permit. | $650,000 |
| Feb 18, 2014 | Completed final sign-off May 2015 | 100 Van Ness Av | provide stair #1 details. refer to approved bpa #2012-08-02-6344. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.Details
provide stair #1 details. refer to approved bpa #2012-08-02-6344. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. | |
| Feb 12, 2014 | Completed final sign-off Jan 2015 | 50 03rd St | convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab.Details
convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab. | $210,000 |
| Feb 4, 2014 | Completed final sign-off Feb 2015 | 260 10th St | revision to pa# 201309257723 and 201306189889. revised structural details to accommodate existing conditions, revised construction type from 5a to 5b. compliance with ordinance #155-13 not required.Details
revision to pa# 201309257723 and 201306189889. revised structural details to accommodate existing conditions, revised construction type from 5a to 5b. compliance with ordinance #155-13 not required. | $150,000 |
| Jan 27, 2014 | Completed final sign-off Feb 2015 | 201 Alabama St | work at unit# a only. m.e.p. associated with t.i. under pa# 2013/11/20/2436. all other work under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
work at unit# a only. m.e.p. associated with t.i. under pa# 2013/11/20/2436. all other work under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $75,000 |
| Jan 27, 2014 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | soft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd.Details
soft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd. | $6,000 |
| Jan 17, 2014 | Completed final sign-off Aug 2014 | 1335 Sutter St | interior demolition floors 1-3 and roof. all work to comply with ab-017 maintain exiting. t.i. pa#201208278287sDetails
interior demolition floors 1-3 and roof. all work to comply with ab-017 maintain exiting. t.i. pa#201208278287s | $40,000 |
| Dec 27, 2013 | Never finaled issued Apr 2014, no final | 22 04th St | renov of 2(e)roof decks @ 9&13/fls.no addl sq ft added.install(n)roof membrane 9&13/roof decks,modular deck paver/planter sys,req'd light/signage, irrigation sys & (n)ramp @ 9th level roof deck to provide accessible access.** maher: compliance with ordinance no# 155-13 not required **Details
renov of 2(e)roof decks @ 9&13/fls.no addl sq ft added.install(n)roof membrane 9&13/roof decks,modular deck paver/planter sys,req'd light/signage, irrigation sys & (n)ramp @ 9th level roof deck to provide accessible access.** maher: compliance with ordinance no# 155-13 not required ** | $375,000 |
| Dec 23, 2013 | Completed final sign-off May 2014 | 50 03rd St | revision to 201304154588 and 201308164584. removal of existing vestibule and exterior improvements from project scope. existing entry system to remainDetails
revision to 201304154588 and 201308164584. removal of existing vestibule and exterior improvements from project scope. existing entry system to remain | |
| Dec 20, 2013 | Completed final sign-off Nov 2014 | 155 05th St | t.i. build out office and education space. compliance with ord 155-13 not requiredDetails
t.i. build out office and education space. compliance with ord 155-13 not required | $1,900,000 |
| Dec 18, 2013 | Completed final sign-off Feb 2015 | 201 Alabama St | work @ unit# a only. front lobby to be updated with new cement plaster & a new storefront system to provide a transparent entry. new skylights to be added for optimal daylight. interior lobby new finishes. all other work under separate pa. compliance with ord 15-133 not required.Details
work @ unit# a only. front lobby to be updated with new cement plaster & a new storefront system to provide a transparent entry. new skylights to be added for optimal daylight. interior lobby new finishes. all other work under separate pa. compliance with ord 15-133 not required. | $92,250 |
| Dec 4, 2013 | Completed final sign-off Nov 2015 | 615 Front St | full building upgrade including structure, glazing rear facade replacement, roof sky lights, inter stairs, finishes restooms & pantries. compliance with maher ordinance no.155-13 required. route to dphDetails
full building upgrade including structure, glazing rear facade replacement, roof sky lights, inter stairs, finishes restooms & pantries. compliance with maher ordinance no.155-13 required. route to dph | $1,000,000 |
| Dec 2, 2013 | Completed final sign-off Feb 2015 | 201 Alabama St | non-structural interior demo of (e) maddies adoption center. demo includes partitions, doors & frames, ceilings & light fixtures. t.i. under pa#2013-1120-2436. no work to core or shell per ab 017. space will remain vacant.Details
non-structural interior demo of (e) maddies adoption center. demo includes partitions, doors & frames, ceilings & light fixtures. t.i. under pa#2013-1120-2436. no work to core or shell per ab 017. space will remain vacant. | $25,000 |
| Nov 26, 2013 | Completed final sign-off Jun 2014 | 62 01st St | exterior painting of 1st st facade. minor interior modifications, paint & new floor finish @ entry lobby. new conference room & coffee area 5th fl w/new paint & floor covering throughout hvac, life safety, &fire sprinklers under sep permit. no exterior modifications. no increase in office spaceDetails
exterior painting of 1st st facade. minor interior modifications, paint & new floor finish @ entry lobby. new conference room & coffee area 5th fl w/new paint & floor covering throughout hvac, life safety, &fire sprinklers under sep permit. no exterior modifications. no increase in office space | $462,500 |
| Nov 21, 2013 | Completed final sign-off Feb 2015 | 2500 16th St | t.i. for (e) spca middle bldg, work includes (n) partitoins, millwork, equipment, & (n) connection to adjacent bldg (pa#2013.1120.2436). no exterior work, mep & fire protection under separate permits. (demo permit #2013.0607.8983 under separate bldg)Details
t.i. for (e) spca middle bldg, work includes (n) partitoins, millwork, equipment, & (n) connection to adjacent bldg (pa#2013.1120.2436). no exterior work, mep & fire protection under separate permits. (demo permit #2013.0607.8983 under separate bldg) | $440,000 |
| Oct 16, 2013 | Completed final sign-off May 2014 | 155 05th St | 2nd floor tenent improvement fo r2,581 sq for audiology department. sprinklers, fire alarm separate permitsDetails
2nd floor tenent improvement fo r2,581 sq for audiology department. sprinklers, fire alarm separate permits | $485,000 |
| Oct 11, 2013 | Completed final sign-off May 2014 | 2999 Pacific Av | replace fixtures & finishes in 2 bathrooms, add casework in various room, paint & re-finish hardwood floors, no walls to be relocated.Details
replace fixtures & finishes in 2 bathrooms, add casework in various room, paint & re-finish hardwood floors, no walls to be relocated. | $225,000 |
| Sep 25, 2013 | Completed final sign-off Feb 2015 | 260 10th St | low level only - revision to appl #2013.06.18.9889 - new windows in kind replacement & door to exterior, remove steps, patch stucco, new roofing, new gym floor over conc slab (previsouly pa #2013.06.18.9889) ot provide ada access to hall. provide occ load verification.Details
low level only - revision to appl #2013.06.18.9889 - new windows in kind replacement & door to exterior, remove steps, patch stucco, new roofing, new gym floor over conc slab (previsouly pa #2013.06.18.9889) ot provide ada access to hall. provide occ load verification. | $150,000 |
| Sep 23, 2013 | Completed final sign-off Jan 2015 | 460 Bryant St | shell strucural work on 1 story portion of building. remove selected columns from basementDetails
shell strucural work on 1 story portion of building. remove selected columns from basement | $40,000 |
| Sep 19, 2013 | Completed final sign-off Jun 2014 | 680 Folsom St | ground floor-hvac & electrical improvements to (e) vacant tenant area. ref app#201304245377Details
ground floor-hvac & electrical improvements to (e) vacant tenant area. ref app#201304245377 | $44,500 |
| Aug 23, 2013 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | erect 1 story, no basement, type 5, garden cafe building.Details
erect 1 story, no basement, type 5, garden cafe building. | $200,000 |
| Aug 16, 2013 | Completed final sign-off May 2014 | 50 03rd St | revision to pa# 2013-0415-4588-clarification of code interpation for rated corridors in hotel lobbyDetails
revision to pa# 2013-0415-4588-clarification of code interpation for rated corridors in hotel lobby | |
| Aug 12, 2013 | Completed final sign-off Jun 2014 | 680 Folsom St | interior signage support structure.Details
interior signage support structure. | $20,000 |
| Jul 29, 2013 | Completed final sign-off Jan 2015 | 690 Folsom St | change of use.renov incl seismic strengtheing.install new core elements,remov grd fl walls&replace columns.install new exterior cladding over approx 40%of(e)exterior walls.new mech,elec,plumb&fire protection system & t.i. under separate permit.Details
change of use.renov incl seismic strengtheing.install new core elements,remov grd fl walls&replace columns.install new exterior cladding over approx 40%of(e)exterior walls.new mech,elec,plumb&fire protection system & t.i. under separate permit. | $4,000,000 |
| Jul 19, 2013 | Completed final sign-off Oct 2013 | 3450 03rd St | revise classification of existing building construction as directed by sffd. ref app#201311214666Details
revise classification of existing building construction as directed by sffd. ref app#201311214666 | |
| Jul 19, 2013 | Completed final sign-off Oct 2013 | 3450 03rd St | revise existing construction type as directed by sffd. ref app#201211214668Details
revise existing construction type as directed by sffd. ref app#201211214668 | |
| Jul 16, 2013 | Completed final sign-off Oct 2013 | 255 California St | revision to pa #2013.05.02.5973 -& 2013.05.24.7813 - change designation of rm #325 to "it room", omit enclosing one-hr rating on walls, omit fsd's.Details
revision to pa #2013.05.02.5973 -& 2013.05.24.7813 - change designation of rm #325 to "it room", omit enclosing one-hr rating on walls, omit fsd's. | |
| Jul 3, 2013 | Completed final sign-off Oct 2013 | 250 Valencia St | new exterior egress stairs h and j at west of building. defereed submittal for permit 201303132128Details
new exterior egress stairs h and j at west of building. defereed submittal for permit 201303132128 | $50,000 |
| Jun 25, 2013 | Never finaled issued Jun 2013, no final | 220 Montgomery St | repairs to 3 steel column bases at the basement level due to corrosion. column numbers 114 120, 121Details
repairs to 3 steel column bases at the basement level due to corrosion. column numbers 114 120, 121 | $50,000 |
| Jun 21, 2013 | Completed final sign-off Jun 2014 | 901 Battery St | voluntary seismic upgrade. accessibility upgrade of (e) common restrooms. improvements of two bldg entry lobbies. teixant spaces maintenance upgradesDetails
voluntary seismic upgrade. accessibility upgrade of (e) common restrooms. improvements of two bldg entry lobbies. teixant spaces maintenance upgrades | $1,300,000 |
| Jun 18, 2013 | Completed final sign-off Feb 2015 | 260 10th St | soft story voluntary seismic upgrade to comply with sfbc 2010Details
soft story voluntary seismic upgrade to comply with sfbc 2010 | $300,000 |
| Jun 7, 2013 | Completed final sign-off Jan 2015 | 2500 16th St | demolish 2-story, type 5, spca hospital & kennels building.Details
demolish 2-story, type 5, spca hospital & kennels building. | $30,000 |
| May 23, 2013 | Completed final sign-off Feb 2014 | 1170 Market St | replace failed exterior cement plaster on the east elevation & reinforce support system of framing members. material to be replace in kind.Details
replace failed exterior cement plaster on the east elevation & reinforce support system of framing members. material to be replace in kind. | $125,000 |
| May 16, 2013 | Completed final sign-off Oct 2013 | 255 California St | 3rd floor - revision to appl #2013.05.02.5973 - revision to lobby doorsDetails
3rd floor - revision to appl #2013.05.02.5973 - revision to lobby doors | |
| May 8, 2013 | Completed final sign-off May 2013 | 300 Gaven St | install elevator lobby evacuation signs on levels 1, 2, 3 at each elevator lobby. (main pa #2011.11.22.9458).Details
install elevator lobby evacuation signs on levels 1, 2, 3 at each elevator lobby. (main pa #2011.11.22.9458). | $1,000 |
| May 2, 2013 | Completed final sign-off Jan 2014 | 140 New Montgomery St | revision to pa# 2011/10/17/6931. strengthening of structural steel floors 26 to penthouse.Details
revision to pa# 2011/10/17/6931. strengthening of structural steel floors 26 to penthouse. | $75,000 |
| May 2, 2013 | Completed final sign-off Oct 2013 | 255 California St | floor 3. office t.i. - new partitions, finishes, lighting. mechanical and electrical under separate permit.Details
floor 3. office t.i. - new partitions, finishes, lighting. mechanical and electrical under separate permit. | $700,000 |
| Apr 24, 2013 | Completed final sign-off Jun 2014 | 680 Folsom St | ground floor (n) non-structural partitions, doors, lighting, electrical, millwork, finishes. no change in occupancy, use, area, mep, life safety & sprinklers under separate permit.Details
ground floor (n) non-structural partitions, doors, lighting, electrical, millwork, finishes. no change in occupancy, use, area, mep, life safety & sprinklers under separate permit. | $125,000 |
| Apr 15, 2013 | Completed final sign-off May 2014 | 50 03rd St | lobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit.Details
lobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit. | $600,000 |
| Apr 11, 2013 | Completed final sign-off Jan 2014 | 140 New Montgomery St | installation of new stairs (stairs "c" ) from level 1 through 26, reference pa #2011.12.22.1187.Details
installation of new stairs (stairs "c" ) from level 1 through 26, reference pa #2011.12.22.1187. | $200,000 |
| Mar 29, 2013 | Completed final sign-off Oct 2013 | 30 Grant Av | alteration of existing office. 1 demoliton of interconnecting stairs and infill floor slab. 2. alteration of interior partition - new doors window removal add reception window wall, relocate interior partition 3 remodel of bathrooms by removing toilets and urinals, partions 4 construction of openDetails
alteration of existing office. 1 demoliton of interconnecting stairs and infill floor slab. 2. alteration of interior partition - new doors window removal add reception window wall, relocate interior partition 3 remodel of bathrooms by removing toilets and urinals, partions 4 construction of open | $140,000 |
| Mar 13, 2013 | Completed final sign-off Oct 2013 | 250 Valencia St | t.i of third floor. classrooms & theater. addition of light court deck on third floor. egress stairs at west elevation. relocating an exist bathroom & adding a unisex restroom.Details
t.i of third floor. classrooms & theater. addition of light court deck on third floor. egress stairs at west elevation. relocating an exist bathroom & adding a unisex restroom. | $1,800,000 |
| Feb 27, 2013 | Completed final sign-off Apr 2016 | 927 Post St | non structural demo to interior and finishes, demo of e (exterior) steelbulkhead. comply with ab-17 sfbc. no improvements under this permitDetails
non structural demo to interior and finishes, demo of e (exterior) steelbulkhead. comply with ab-17 sfbc. no improvements under this permit | $4,000 |
| Feb 20, 2013 | Completed final sign-off Jan 2014 | 140 New Montgomery St | revision to pa#2011-12-22-1187. (n) exit stairs from b1 level to first floor. lcation of stairs approved under pa 2011-12-22-1187 sheets a-100b & a-704Details
revision to pa#2011-12-22-1187. (n) exit stairs from b1 level to first floor. lcation of stairs approved under pa 2011-12-22-1187 sheets a-100b & a-704 | $16,000 |
| Feb 13, 2013 | Completed final sign-off Sep 2013 | 814 Mission St | add new distribution to serve existing and new restrooms and elevator lobby. (3) new fsds being added to secure elevator lobby. fire alarm has a separate permit pa# 201301248645.Details
add new distribution to serve existing and new restrooms and elevator lobby. (3) new fsds being added to secure elevator lobby. fire alarm has a separate permit pa# 201301248645. | $17,000 |
| Feb 5, 2013 | Never finaled issued Feb 2013, no final | 333 Dolores St | renew permit #200906089962 for inspection. all work complete. renew for final inspection only.Details
renew permit #200906089962 for inspection. all work complete. renew for final inspection only. | |
| Jan 30, 2013 | Never finaled issued Feb 2013, no final | 22 04th St | interior improvement to ground floor lobby, toilet - single occ, rear corridor including new finishes, lighting & coffee service area. electrical, plumbing & sprinkler under seprate builder's permit.Details
interior improvement to ground floor lobby, toilet - single occ, rear corridor including new finishes, lighting & coffee service area. electrical, plumbing & sprinkler under seprate builder's permit. | $1,510,000 |
| Jan 25, 2013 | Expired or cancelled cancelled Apr 2013 | 100 Van Ness Av | erection of tower crane attached to existing buildingDetails
erection of tower crane attached to existing building | $200,000 |
| Dec 18, 2012 | Completed final sign-off Mar 2013 | 333 Dolores St | modify cast - in - place concrete wall to shotcrete. revisoin to pa# 201206253376Details
modify cast - in - place concrete wall to shotcrete. revisoin to pa# 201206253376 | |
| Dec 13, 2012 | Completed final sign-off Oct 2013 | 3450 03rd St | change of use to outpatient medical clinic for zoning only. no change for building code. reference permits #201211214666 & 201211214668.Details
change of use to outpatient medical clinic for zoning only. no change for building code. reference permits #201211214666 & 201211214668. | |
| Dec 13, 2012 | Completed final sign-off Oct 2013 | 3450 03rd St | change of use to outpatient medical clinic for zoning only. no change for building code. reference permits #201211214666 & 201211214668.Details
change of use to outpatient medical clinic for zoning only. no change for building code. reference permits #201211214666 & 201211214668. | |
| Dec 11, 2012 | Never finaled issued Jul 2013, no final | 1127 Market St | renovation and conversion of (e) theater (movies and live performance) into a live performance theater. work includes sidewalk improvements, preservation of histonic facade, seismic retrofit, interior renovation, replacement of (e) mep systems, new sprinker system, new elevator, roof replacement.Details
renovation and conversion of (e) theater (movies and live performance) into a live performance theater. work includes sidewalk improvements, preservation of histonic facade, seismic retrofit, interior renovation, replacement of (e) mep systems, new sprinker system, new elevator, roof replacement. | $10,000,000 |
| Dec 11, 2012 | Never finaled issued Dec 2013, no final | 300 Clay St | "as-builts"-revision to pa#2011-0830-3528 to document the installation of emergency door releases installed on the 21st floor of a high rise office building as part of prior bldg. permit (201108303528) this permit does not involve any actual work.Details
"as-builts"-revision to pa#2011-0830-3528 to document the installation of emergency door releases installed on the 21st floor of a high rise office building as part of prior bldg. permit (201108303528) this permit does not involve any actual work. |