Plant Construction Company Lp
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to May 2015
- Last 24 months
- 0 permits filed
479 permits since 2000: 391 completed, 44 never finaled, 44 expired or cancelled.
Of the 44 never-finaled permits, 44 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
24 stairs permits: 23 completed, 1 never finaled. Typically 81 days from filing to permit and 219 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2015 | Completed final sign-off Nov 2015 | 1555 Mariposa St | partial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent buildingDetails
partial remodel on g/f and 1/f of the k-8 school and includes a voluntary seismic rtrofit. this project moves an (e) stair, creates an office area. adds restrooms, adds shear walls and creates three openings to the adjacent building | $1,250,000 |
| Apr 1, 2014 | Completed final sign-off Feb 2015 | 260 10th St | interior t.i. of western portion of (e) parish hall bldg which includes toilet rooms & three classrooms. scope of limited to interior construction only. mezz floor & stairs (int or ext) approved under #2014.0204.7720. compliance with ordinance #155-13 not requiredDetails
interior t.i. of western portion of (e) parish hall bldg which includes toilet rooms & three classrooms. scope of limited to interior construction only. mezz floor & stairs (int or ext) approved under #2014.0204.7720. compliance with ordinance #155-13 not required | $200,000 |
| Feb 18, 2014 | Completed final sign-off May 2015 | 100 Van Ness Av | provide stair #1 details. refer to approved bpa #2012-08-02-6344. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.Details
provide stair #1 details. refer to approved bpa #2012-08-02-6344. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. | |
| Dec 4, 2013 | Completed final sign-off Nov 2015 | 615 Front St | full building upgrade including structure, glazing rear facade replacement, roof sky lights, inter stairs, finishes restooms & pantries. compliance with maher ordinance no.155-13 required. route to dphDetails
full building upgrade including structure, glazing rear facade replacement, roof sky lights, inter stairs, finishes restooms & pantries. compliance with maher ordinance no.155-13 required. route to dph | $1,000,000 |
| Jul 3, 2013 | Completed final sign-off Oct 2013 | 250 Valencia St | new exterior egress stairs h and j at west of building. defereed submittal for permit 201303132128Details
new exterior egress stairs h and j at west of building. defereed submittal for permit 201303132128 | $50,000 |
| Apr 11, 2013 | Completed final sign-off Jan 2014 | 140 New Montgomery St | installation of new stairs (stairs "c" ) from level 1 through 26, reference pa #2011.12.22.1187.Details
installation of new stairs (stairs "c" ) from level 1 through 26, reference pa #2011.12.22.1187. | $200,000 |
| Mar 29, 2013 | Completed final sign-off Oct 2013 | 30 Grant Av | alteration of existing office. 1 demoliton of interconnecting stairs and infill floor slab. 2. alteration of interior partition - new doors window removal add reception window wall, relocate interior partition 3 remodel of bathrooms by removing toilets and urinals, partions 4 construction of openDetails
alteration of existing office. 1 demoliton of interconnecting stairs and infill floor slab. 2. alteration of interior partition - new doors window removal add reception window wall, relocate interior partition 3 remodel of bathrooms by removing toilets and urinals, partions 4 construction of open | $140,000 |
| Mar 13, 2013 | Completed final sign-off Oct 2013 | 250 Valencia St | t.i of third floor. classrooms & theater. addition of light court deck on third floor. egress stairs at west elevation. relocating an exist bathroom & adding a unisex restroom.Details
t.i of third floor. classrooms & theater. addition of light court deck on third floor. egress stairs at west elevation. relocating an exist bathroom & adding a unisex restroom. | $1,800,000 |
| Feb 20, 2013 | Completed final sign-off Jan 2014 | 140 New Montgomery St | revision to pa#2011-12-22-1187. (n) exit stairs from b1 level to first floor. lcation of stairs approved under pa 2011-12-22-1187 sheets a-100b & a-704Details
revision to pa#2011-12-22-1187. (n) exit stairs from b1 level to first floor. lcation of stairs approved under pa 2011-12-22-1187 sheets a-100b & a-704 | $16,000 |
| Sep 28, 2012 | Never finaled issued Feb 2013, no final | 40 Hawthorne St | remove (e) precast concrete facade & install (n) curtain wall system, revisions to entrance lobby layout & 1st fl toilet rm layout, relocate exterior entrance stair & revise garden court layout. no increase in office space.Details
remove (e) precast concrete facade & install (n) curtain wall system, revisions to entrance lobby layout & 1st fl toilet rm layout, relocate exterior entrance stair & revise garden court layout. no increase in office space. | $735,000 |
| Aug 18, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door.Details
phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door. | $28,000 |
| May 24, 2011 | Completed final sign-off Feb 2012 | 101 Post St | change of use in basement ground and mezzanine. interior tenant improvement. new basement kitchen, new small coffee bar at g/f. new steel stairs at each floor. new storefront enclosure at interior atrium at 2nd & 3rd floor. change in use at basement ground and mezzanine (m to b).Details
change of use in basement ground and mezzanine. interior tenant improvement. new basement kitchen, new small coffee bar at g/f. new steel stairs at each floor. new storefront enclosure at interior atrium at 2nd & 3rd floor. change in use at basement ground and mezzanine (m to b). | $3,500,000 |
| Dec 21, 2010 | Completed final sign-off Aug 2011 | 626 Polk St | demolish (e) basement walls and construct new family area incl. new kitchen, laundry ,dining, ada restroom. replace (e) exit stairs from basement w/ new code compliant. construct offices on level 1. update (e) elevator. life safety and sprinkler system under separate permitDetails
demolish (e) basement walls and construct new family area incl. new kitchen, laundry ,dining, ada restroom. replace (e) exit stairs from basement w/ new code compliant. construct offices on level 1. update (e) elevator. life safety and sprinkler system under separate permit | $500,000 |
| Nov 22, 2010 | Completed final sign-off Dec 2011 | 699 08th St | constr new exit corridor concourse level, fl infill at st levelw/new stair down,constr non fire rated demising wall fls2,3,5&6,new glazing level 4,new railings levels 3,5&6,new elev openings w/access bridge at levels 3,4&6,replace skylight.no incr in offe space.no exterior modifi/fire spri sep peritDetails
constr new exit corridor concourse level, fl infill at st levelw/new stair down,constr non fire rated demising wall fls2,3,5&6,new glazing level 4,new railings levels 3,5&6,new elev openings w/access bridge at levels 3,4&6,replace skylight.no incr in offe space.no exterior modifi/fire spri sep perit | $2,500,000 |
| Oct 13, 2010 | Completed final sign-off Jun 2011 | 699 08th St | concourse, ground, 2,3,4,5,6 -demolition of existing finishes & removal of existing escalators in preparation for new stairs & tenant improvements under future permit applicaiton. note: ab-017 (this portion of the bldg is vacant, all levels no exterior modifications/no increase in office space.)Details
concourse, ground, 2,3,4,5,6 -demolition of existing finishes & removal of existing escalators in preparation for new stairs & tenant improvements under future permit applicaiton. note: ab-017 (this portion of the bldg is vacant, all levels no exterior modifications/no increase in office space.) | $78,500 |
| Dec 31, 2009 | Completed final sign-off Dec 2010 | 300 Beale St | unit 609 on 5th and 6th floors. remodel kitchen and bathrooms incl. casework, plumbing fixtures, cladding stairs, repalce (e) wood fireplace with gas, new fllorings & lightings. fire sprinklers under separate permit.Details
unit 609 on 5th and 6th floors. remodel kitchen and bathrooms incl. casework, plumbing fixtures, cladding stairs, repalce (e) wood fireplace with gas, new fllorings & lightings. fire sprinklers under separate permit. | $300,000 |
| Nov 13, 2009 | Completed final sign-off Apr 2010 | 875 Howard St | basement level-reference pa# 2009-0818-5016-for fire review only, previous review missed fire department-tenant work. add panic hardware on basement vestibule door to stair sta.Details
basement level-reference pa# 2009-0818-5016-for fire review only, previous review missed fire department-tenant work. add panic hardware on basement vestibule door to stair sta. | |
| Aug 18, 2009 | Completed final sign-off Feb 2010 | 875 Howard St | construct telecom room (1 hr rated) & non rated bldg storage rms/stair vestibule, provide ada parking. no increase in office space, no exterior modifications (e) garage ventilation system to remain. previous app. ref. 200905047617. fire sprinklers & life safety under separate permits.Details
construct telecom room (1 hr rated) & non rated bldg storage rms/stair vestibule, provide ada parking. no increase in office space, no exterior modifications (e) garage ventilation system to remain. previous app. ref. 200905047617. fire sprinklers & life safety under separate permits. | $22,500 |
| Feb 21, 2008 | Completed final sign-off Jun 2008 | 199 Arguello Bl | relocation and consolidation of archive and artwork storage from balcony level to basement. partition 2 rabbi offices. upgrade stairs from ground floor to basement. remove bathroom toilet fixtures and partitions from basement level. no lighting changes.Details
relocation and consolidation of archive and artwork storage from balcony level to basement. partition 2 rabbi offices. upgrade stairs from ground floor to basement. remove bathroom toilet fixtures and partitions from basement level. no lighting changes. | $25,000 |
| Jan 30, 2007 | Completed final sign-off Jul 2017 | 2266 California St | project provides seismic strengthening. roof access stair will be modified to accommodate revisions to roof diaphragm. project also includes new roofing & exterior repairs to facade. improvements to disabled access include provision for accessible seating at main floor and balcony.Details
project provides seismic strengthening. roof access stair will be modified to accommodate revisions to roof diaphragm. project also includes new roofing & exterior repairs to facade. improvements to disabled access include provision for accessible seating at main floor and balcony. | $5,400,000 |
| Jun 4, 2004 | Completed final sign-off Aug 2004 | 1 Market St | rev. appl#200405053066 delete 1 private office & 1 copy room,add new corridor connected to (e)stairsDetails
rev. appl#200405053066 delete 1 private office & 1 copy room,add new corridor connected to (e)stairs | |
| May 27, 2004 | Completed final sign-off Mar 2005 | 1000 California St | interior alteration of 3/f offices, construct new stairs to access the roof & remove of storage tankDetails
interior alteration of 3/f offices, construct new stairs to access the roof & remove of storage tank | $72,500 |
| Jan 22, 2004 | Completed final sign-off Apr 2005 | 155 Sansome St | 7512 sf t.i.- basemt & partial grnd flr constr. of int partitions, stairs,one restrm,incl. hvac,elecDetails
7512 sf t.i.- basemt & partial grnd flr constr. of int partitions, stairs,one restrm,incl. hvac,elec | $700,000 |
| Jan 22, 2004 | Completed final sign-off Apr 2005 | 301 Pine St | t.i.- basement, grd & 2nd flr constr. of int partitions; stairs, elevator restrms incl.hvac,elec,Details
t.i.- basement, grd & 2nd flr constr. of int partitions; stairs, elevator restrms incl.hvac,elec, | $3,400,000 |