Block 3924, lot 006
200 Florida St
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 48,268 sq ft
- Zoning
- M1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 14, 2014 | Completed final sign-off Feb 2015 | 201 Alabama St | Paganini Electric Corp(See Signatories) | electrical drawings to be submitted as building alteration to application 201311202436. electrical work including new lighting and power upgrades. compliance with ordinance no 155-13 not required.Details
electrical drawings to be submitted as building alteration to application 201311202436. electrical work including new lighting and power upgrades. compliance with ordinance no 155-13 not required. | $300,000 |
| Feb 28, 2014 | Completed final sign-off Jul 2014 | 201 Alabama St | Siemens Industry, Inc. | addition of 26 speakers/strobes, 12 strobes, and 1 power supply for the "sf spca" remodel on floors 1 and 2. all new devices connect onto the fire alarm system. ref pa 201311202436Details
addition of 26 speakers/strobes, 12 strobes, and 1 power supply for the "sf spca" remodel on floors 1 and 2. all new devices connect onto the fire alarm system. ref pa 201311202436 | $19,800 |
| Feb 18, 2014 | Never finaled issued Feb 2014, no final | 201 Alabama St | R L H Fire Protection Inc | add, relocate & remove fire sprinkler heads per tenant improvement. lower floor: 12 add, 9 relocate, 5 remove. main floor: 25 add, 61 relocate, 16 remove. total 107.Details
add, relocate & remove fire sprinkler heads per tenant improvement. lower floor: 12 add, 9 relocate, 5 remove. main floor: 25 add, 61 relocate, 16 remove. total 107. | $54,998 |
| Jan 27, 2014 | Completed final sign-off Feb 2015 | 201 Alabama St | Plant Construction Company Lp | work at unit# a only. m.e.p. associated with t.i. under pa# 2013/11/20/2436. all other work under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
work at unit# a only. m.e.p. associated with t.i. under pa# 2013/11/20/2436. all other work under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $75,000 |
| Dec 18, 2013 | Completed final sign-off Feb 2015 | 201 Alabama St | Plant Construction Company Lp | work @ unit# a only. front lobby to be updated with new cement plaster & a new storefront system to provide a transparent entry. new skylights to be added for optimal daylight. interior lobby new finishes. all other work under separate pa. compliance with ord 15-133 not required.Details
work @ unit# a only. front lobby to be updated with new cement plaster & a new storefront system to provide a transparent entry. new skylights to be added for optimal daylight. interior lobby new finishes. all other work under separate pa. compliance with ord 15-133 not required. | $92,250 |
| Dec 2, 2013 | Completed final sign-off Feb 2015 | 201 Alabama St | Plant Construction Company Lp | non-structural interior demo of (e) maddies adoption center. demo includes partitions, doors & frames, ceilings & light fixtures. t.i. under pa#2013-1120-2436. no work to core or shell per ab 017. space will remain vacant.Details
non-structural interior demo of (e) maddies adoption center. demo includes partitions, doors & frames, ceilings & light fixtures. t.i. under pa#2013-1120-2436. no work to core or shell per ab 017. space will remain vacant. | $25,000 |
| Nov 20, 2013 | Completed final sign-off Feb 2015 | 201 Alabama St | t.i for (e) animal shelter "maddies" adiption center. work includes (n) wall + window partitions furniture + equipment. front lobby toget (n) cement plaster. no exterior work. compliance w/ ordinance no 155-13 no required.Details
t.i for (e) animal shelter "maddies" adiption center. work includes (n) wall + window partitions furniture + equipment. front lobby toget (n) cement plaster. no exterior work. compliance w/ ordinance no 155-13 no required. | $2,800,000 | |
| Aug 23, 2013 | Never finaled issued Aug 2013, no final | 201 Alabama St | street spaceDetails
street space | ||
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 201 Alabama St | Plant Construction Company Lp | revision to appl #2011.1220.1064 - additional storage racks in existing warehouse.Details
revision to appl #2011.1220.1064 - additional storage racks in existing warehouse. | $5,000 |
| May 2, 2012 | Completed final sign-off Jul 2012 | 201 Alabama St | Zebra Awning Co Inc | fabricate 1 canopyDetails
fabricate 1 canopy | $2,000 |
| May 2, 2012 | Completed final sign-off Jul 2012 | 201 Alabama St | Zebra Awning Co Inc | non-structural sign, graphic paint on existing canopy.Details
non-structural sign, graphic paint on existing canopy. | $500 |
| Apr 5, 2012 | Completed final sign-off Jul 2012 | 201 Alabama St | Allied Fire Protection | 1st and 2nd floor, t.i. fire sprinklers. added 18 fire sprinkler heads and relocated 2 fire sprinkler heads.Details
1st and 2nd floor, t.i. fire sprinklers. added 18 fire sprinkler heads and relocated 2 fire sprinkler heads. | $10,000 |
| Mar 13, 2012 | Never finaled issued Mar 2012, no final | 201 Alabama St | Red Hawk Fire & Security Ca Llc | 1st floor-phase 1-fire alarm tenant improvement-2 smoke detectors, 1 heat detector, 3 duct detectors, 6 control relays, 2 horn/strobes & 1 strobeDetails
1st floor-phase 1-fire alarm tenant improvement-2 smoke detectors, 1 heat detector, 3 duct detectors, 6 control relays, 2 horn/strobes & 1 strobe | $10,000 |
| Mar 13, 2012 | Completed final sign-off Aug 2012 | 201 Alabama St | Red Hawk Fire & Security Ca Llc | 2nd floor-phase 3-fire alarm tenant improvement-1 smoke detector & 1 control relayDetails
2nd floor-phase 3-fire alarm tenant improvement-1 smoke detector & 1 control relay | $2,000 |
| Mar 13, 2012 | Completed final sign-off Aug 2012 | 201 Alabama St | Red Hawk Fire & Security Ca Llc | 2nd & 3rd floors-phase 2-fire alarm tenant improvement-3 smoke detectors, 1 control relay, 5 duct detectors, 30 horn/strobes & 4 strobesDetails
2nd & 3rd floors-phase 2-fire alarm tenant improvement-3 smoke detectors, 1 control relay, 5 duct detectors, 30 horn/strobes & 4 strobes | $10,000 |
| Mar 12, 2012 | Completed final sign-off Jun 2013 | 201 Alabama St | Durkin Signs & Graphics Inc | erect an illuminated signDetails
erect an illuminated sign | $60,000 |
| Mar 12, 2012 | Completed final sign-off Jul 2012 | 201 Alabama St | Allied Fire Protection | add (159) heads to (e) fire sprinkler system; floors 2 & 3.Details
add (159) heads to (e) fire sprinkler system; floors 2 & 3. | $79,500 |
| Jan 26, 2012 | Completed final sign-off Jul 2012 | 201 Alabama St | Acco Engineered Systems Inc. Dba Acco En | phase 3, 2nd floor maddie's connection - mechanical work only. ref t.i. #201108182702.Details
phase 3, 2nd floor maddie's connection - mechanical work only. ref t.i. #201108182702. | |
| Jan 26, 2012 | Completed final sign-off Aug 2012 | 201 Alabama St | Acco Engineered Systems Inc. Dba Acco En | phase 2, 2nd, 3rd & roof floor - mechanical work only. ref t.i. #201108182700. install 1 new fire/smoke damper.Details
phase 2, 2nd, 3rd & roof floor - mechanical work only. ref t.i. #201108182700. install 1 new fire/smoke damper. | |
| Jan 26, 2012 | Completed final sign-off Aug 2012 | 201 Alabama St | Acco Engineered Systems Inc. Dba Acco En | phase 1, t.i. of 1st floor storage - mechanical portion (work) only. ref t.i. #201108182698. 2 new fire/smoke dampers. field verify fa system.Details
phase 1, t.i. of 1st floor storage - mechanical portion (work) only. ref t.i. #201108182698. 2 new fire/smoke dampers. field verify fa system. | |
| Dec 20, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | Plant Construction Company Lp | installation of new storage racks in existing storage area.Details
installation of new storage racks in existing storage area. | $11,050 |
| Dec 5, 2011 | Expired or cancelled withdrawn Sep 2012 | 201 Alabama St | Plant Construction Company Lp | to document the seismic work previously completed under pa 200705010109, conforms w/ seismic requirt in the 2001 cbc w. sf amendments subject to review in current pa 201108182700. for record keeping purpose.Details
to document the seismic work previously completed under pa 200705010109, conforms w/ seismic requirt in the 2001 cbc w. sf amendments subject to review in current pa 201108182700. for record keeping purpose. | |
| Aug 18, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | phase 2 - tenant improvement of approx 18,964 sf of adminstrative space for animal service facility. this includes a new 7,889 sf 3rd floor.adding a communicating door on grid line 1. seismic upgrade is triggered due to increase in occupant load.Details
phase 2 - tenant improvement of approx 18,964 sf of adminstrative space for animal service facility. this includes a new 7,889 sf 3rd floor.adding a communicating door on grid line 1. seismic upgrade is triggered due to increase in occupant load. | $1,695,000 | |
| Aug 18, 2011 | Completed final sign-off Sep 2012 | 201 Alabama St | Plant Construction Company Lp | phase 1 - tenant improvement of approx 15,045 sf of 1st floor storage, office and laundry space, including a new structural mechanical platform on the roof.Details
phase 1 - tenant improvement of approx 15,045 sf of 1st floor storage, office and laundry space, including a new structural mechanical platform on the roof. | $32,500 |
| Aug 18, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | Plant Construction Company Lp | phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door.Details
phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door. | $28,000 |
| May 13, 2011 | Never finaled issued May 2011, no final | 200 Florida St | add additional address for 201-b alabama street.Details
add additional address for 201-b alabama street. | ||
| May 12, 2010 | Expired or cancelled cancelled Jan 2012 | 201 Alabama St | provide new driveway and (n) curb cut for entrance into parking lot. provide new ramp inside the building parking lot. (n) fence & gate.Details
provide new driveway and (n) curb cut for entrance into parking lot. provide new ramp inside the building parking lot. (n) fence & gate. | $7,000 | |
| Jan 22, 2010 | Expired or cancelled expired Feb 2012 | 201 Alabama St | Diversified Fire Products | 1st floor-fire alarm t.i.-valve tamper & exterior horn add, 2 monitor modules & 1 waterproof exterior horn. fire inspector to field verify that the siga-ct1 tamper monitor modules are covered in the csfm listing 7300-1657-121. ref. p/a 200903134106 for sprinkler valve work associated with this f/aDetails
1st floor-fire alarm t.i.-valve tamper & exterior horn add, 2 monitor modules & 1 waterproof exterior horn. fire inspector to field verify that the siga-ct1 tamper monitor modules are covered in the csfm listing 7300-1657-121. ref. p/a 200903134106 for sprinkler valve work associated with this f/a | $9,450 |
| Jun 23, 2009 | Completed final sign-off Jul 2009 | 201 Alabama St | Decker Electric Co Inc Electrical Contra | add one duct mounted smoke detector with associated control relayDetails
add one duct mounted smoke detector with associated control relay | $2,290 |
| Apr 24, 2009 | Expired or cancelled expired Feb 2012 | 201 Alabama St | install (2) new signs (6'x32' each) on alabama st. (west) & treat ave. (north) facades.Details
install (2) new signs (6'x32' each) on alabama st. (west) & treat ave. (north) facades. | $4,000 | |
| Apr 2, 2009 | Expired or cancelled expired Feb 2012 | 201 Alabama St | Durkin Signs & Graphics Inc | erect non electric wall signDetails
erect non electric wall sign | $3,300 |
| Mar 13, 2009 | Completed final sign-off Jan 2010 | 201 Alabama St | Ken Johns Plumbing | fire sprinkler upgrade, change out 299 spk heads, change out 1200 ft of pipe, ref pa #200902021255r-1.Details
fire sprinkler upgrade, change out 299 spk heads, change out 1200 ft of pipe, ref pa #200902021255r-1. | $25,000 |
| Mar 12, 2009 | Completed final sign-off Jul 2009 | 201 Alabama St | Plant Construction Company Lp | add a supply fan and 5 separate heating coils to warm outside air being suplied to the dog wards in the spca. work also includes a new window system in (e) openings facing florida st. ref pa#200705010109.Details
add a supply fan and 5 separate heating coils to warm outside air being suplied to the dog wards in the spca. work also includes a new window system in (e) openings facing florida st. ref pa#200705010109. | $200,000 |
| Mar 12, 2009 | Completed final sign-off Jan 2010 | 201 Alabama St | Warehouse Engineering & Equipment Servic | installation of pallet racking, cantilever racking,and clip shelving in warehouse area. comply with high pile storage chp. 23, ca. fire code 2007.Details
installation of pallet racking, cantilever racking,and clip shelving in warehouse area. comply with high pile storage chp. 23, ca. fire code 2007. | $164,000 |
| Mar 6, 2009 | Never finaled issued Mar 2009, no final | 201 Alabama St | to request (#201a alabama street) to be the 2nd address for block 3924 lot 006Details
to request (#201a alabama street) to be the 2nd address for block 3924 lot 006 | ||
| Feb 10, 2009 | Never finaled issued Feb 2009, no final | 201 Alabama St | Decker Electric Co Inc Electrical Contra | revision to pa# 2007-0827-1015-revise freight elevator matrix & add 1 horn strobe in food prep area.Details
revision to pa# 2007-0827-1015-revise freight elevator matrix & add 1 horn strobe in food prep area. | |
| Feb 2, 2009 | Completed final sign-off Apr 2009 | 201 Alabama St | Vic - 1 Construction | (unit #201a) verify legal use. provide 1-hr. separation between s-2/b occupancy provide 1-hr. separation adequate bracing for 200 ft. long wall.Details
(unit #201a) verify legal use. provide 1-hr. separation between s-2/b occupancy provide 1-hr. separation adequate bracing for 200 ft. long wall. | $19,000 |
| Sep 19, 2008 | Completed final sign-off Dec 2008 | 201 Alabama St | install aluminum frame with decorative finish over (e) building facade. +/- 960 s.f.Details
install aluminum frame with decorative finish over (e) building facade. +/- 960 s.f. | $34,600 | |
| Sep 19, 2008 | Completed final sign-off Dec 2008 | 201 Alabama St | erect a non-electric wall single faced non-illuminated new signDetails
erect a non-electric wall single faced non-illuminated new sign | $31,500 | |
| May 16, 2008 | Completed final sign-off Feb 2009 | 201 Alabama St | new front fence and gate at entry to southwest cortyardDetails
new front fence and gate at entry to southwest cortyard | $35,000 | |
| Apr 14, 2008 | Completed final sign-off Oct 2008 | 201 Alabama St | new mechanical equipment enclosure in equipment yard 4 hr cmu walls with chain link covering at roof. all mep is under seperate permitDetails
new mechanical equipment enclosure in equipment yard 4 hr cmu walls with chain link covering at roof. all mep is under seperate permit | $35,000 | |
| Sep 10, 2007 | Completed final sign-off Oct 2008 | 201 Alabama St | interior non-structural demo. 1/f & 2/f. no exterior work to be performed under this permit.Details
interior non-structural demo. 1/f & 2/f. no exterior work to be performed under this permit. | $20,000 | |
| Aug 27, 2007 | Completed final sign-off Nov 2008 | 201 Alabama St | Allied Fire Protection | new fully sprinklered floor system at 2/f mezzanine area and relocate existing sprinklers on 1/fDetails
new fully sprinklered floor system at 2/f mezzanine area and relocate existing sprinklers on 1/f | $130,000 |
| Aug 27, 2007 | Completed final sign-off Feb 2009 | 201 Alabama St | Decker Electric Co Inc Electrical Contra | new fire alarm system for anumal care center. rest of bldg fire alarm under separate application.Details
new fire alarm system for anumal care center. rest of bldg fire alarm under separate application. | $85,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction Company Lp (9), Acco Engineered Systems Inc. Dba Acco En (3), Allied Fire Protection (3), Decker Electric Co Inc Electrical Contra (3), Red Hawk Fire & Security Ca Llc (3), Durkin Signs & Graphics Inc (2), Zebra Awning Co Inc (2), Diversified Fire Products, Ken Johns Plumbing, Paganini Electric Corp(See Signatories), R L H Fire Protection Inc, Siemens Industry, Inc., Vic - 1 Construction, Warehouse Engineering & Equipment Servic
- Architects
- James Sunseri (9), Warren Freedenfeld (2), Diversified / Fire Product
- Engineers
- Kevin Menninger (4), Craig W. Ristow (3), Dfp Dfp, Elizabeth Allen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.