- Aug 2005 to May 2026
175 permits since 2000 (engineer on 166 permits, architect on 7 permits, authorized agent-others on 1 permit, designer on 1 permit): 122 completed, 15 in progress, 33 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 175.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2026 | Completed final sign-off Aug 2026 | 680 Folsom St | Gci, Inc | ref to pa 202503051624 landlord improvements to penthouse roof deck, restroom & lobbies for indoor & outdoor lighting & power systems. connecting power to new r relocated light fixtures, power outlets & tenant equipment. all work consists of making connections from base building existing and/Details
ref to pa 202503051624 landlord improvements to penthouse roof deck, restroom & lobbies for indoor & outdoor lighting & power systems. connecting power to new r relocated light fixtures, power outlets & tenant equipment. all work consists of making connections from base building existing and/ | $20,000 |
| May 18, 2026 | In progress filed May 2026, not yet issued | 185 Berry St | like for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repaiDetails
like for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repai | $1,500,000 | |
| Feb 27, 2026 | In progress issued Apr 2026 | 185 Berry St | Hathaway Dinwiddie Co. | interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf.Details
interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf. | $8,000,000 |
| Feb 26, 2026 | In progress issued Apr 2026 | 185 Berry St | Hathaway Dinwiddie Co. | 6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqftDetails
6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqft | $15,855,932 |
| Feb 9, 2026 | In progress issued Mar 2026 | 185 Berry St | Hathaway Dinwiddie Co. | interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans.Details
interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans. | $13,383,368 |
| Jan 27, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.Details
partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas. | $588,286 |
| Jan 27, 2026 | In progress issued May 2026 | 555 California St | Principal Builders Inc. | partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.Details
partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas. | $1,170,366 |
| Jan 20, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areasDetails
40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas | $1,198,400 |
| Dec 31, 2025 | Completed final sign-off Jun 2026 | 801 Montgomery St | West Coast Build Aka Fairway Constructio | 2nd/f mep for t.i. ref 202509256081Details
2nd/f mep for t.i. ref 202509256081 | $10,000 |
| Dec 16, 2025 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.Details
l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas. | $5,419,764 |
| Nov 25, 2025 | In progress issued Dec 2025 | 4 Embarcadero Center | Gci, Inc | 23/fl- ref 202506108325- electrical power lighting and signalDetails
23/fl- ref 202506108325- electrical power lighting and signal | $20,000 |
| Nov 6, 2025 | In progress issued Mar 2026 | 185 Berry St | Hathaway Dinwiddie Co. | revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way.Details
revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way. | $250,000 |
| Jul 23, 2025 | In progress issued Aug 2025 | 3838 California St | Paganini Electric Corp(See Signatories) | provide/replace emergency lighting to existing high rise building built pre- original non-conforming emergency light provided by natural gas generator that is no longer acceptable.Details
provide/replace emergency lighting to existing high rise building built pre- original non-conforming emergency light provided by natural gas generator that is no longer acceptable. | $120,000 |
| Jun 16, 2025 | Completed final sign-off Mar 2026 | 650 California St | Bcci Construction Company | 24/f and 25/f: partial floor mechanical and electrical build to support approved architectural permit 202505297483.Details
24/f and 25/f: partial floor mechanical and electrical build to support approved architectural permit 202505297483. | $175,000 |
| Apr 24, 2025 | Completed final sign-off Jul 2025 | 120 Kearny St | Hathaway Dinwiddie Co. | 37th/f: ref to t.i. 202405152185, deferred mep new lighting in corridor & open officeDetails
37th/f: ref to t.i. 202405152185, deferred mep new lighting in corridor & open office | |
| Apr 15, 2025 | In progress issued Aug 2025 | 185 Berry St | Hathaway Dinwiddie Co. | converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades.Details
converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades. | $15,000,000 |
| Mar 31, 2025 | Completed final sign-off Oct 2025 | 1 Maritime Pz | Bcci Construction Company | 19/fl-202412176941- permit to support approved arch permit for new lightingDetails
19/fl-202412176941- permit to support approved arch permit for new lighting | $110,000 |
| Jul 19, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | Novo Construction Inc | 5/f: mechanical and electrical work for tenant improvement on the 5th floor. ref pa# 202405293190Details
5/f: mechanical and electrical work for tenant improvement on the 5th floor. ref pa# 202405293190 | $30,000 |
| Jul 18, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | Novo Construction Inc | 6/f: mechanical and electrical work for t.i. ref permit 202405293207Details
6/f: mechanical and electrical work for t.i. ref permit 202405293207 | $30,000 |
| Jul 18, 2024 | Completed final sign-off Feb 2025 | 185 Berry St | Hathaway Dinwiddie Co. | 6th fl - deferred mep 202406285548 per pa#202406285548Details
6th fl - deferred mep 202406285548 per pa#202406285548 | $1,113,624 |
| Jul 17, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | Novo Construction Inc | 1st fl - mechanical and electrical work for ti ref pa 202405283043Details
1st fl - mechanical and electrical work for ti ref pa 202405283043 | $25,000 |
| Jul 17, 2024 | Completed final sign-off Apr 2025 | 505 Brannan St | Novo Construction Inc | 4th fl: mechanical & electrical work for tenant improvement. ref pa# 202405293138.Details
4th fl: mechanical & electrical work for tenant improvement. ref pa# 202405293138. | $20,000 |
| Jul 17, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | Novo Construction Inc | 2nd fl: mechanical & electrical work for tenant improvement. ref pa# 202405283041.Details
2nd fl: mechanical & electrical work for tenant improvement. ref pa# 202405283041. | $20,000 |
| Jul 12, 2024 | Completed final sign-off Sep 2026 | 120 Kearny St | Hathaway Dinwiddie Co. | deferred electrical submittal for pa# 2024-0515-2160Details
deferred electrical submittal for pa# 2024-0515-2160 | $100,000 |
| Jun 13, 2024 | In progress issued Jul 2024 | 4 Embarcadero Center | Gci, Inc | 10/f: demo, non structural partitions. construction of new non structural partitions & finishes. mechanical & electricalDetails
10/f: demo, non structural partitions. construction of new non structural partitions & finishes. mechanical & electrical | $1,000,000 |
| May 22, 2024 | Completed final sign-off Nov 2024 | 650 California St | Bcci Construction Company | revision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom.Details
revision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom. | $70,000 |
| May 21, 2024 | Completed final sign-off Nov 2024 | 650 California St | Bcci Construction Company | revision to pa# 202312072109: 25/f - to include modifications to pantry and removal of drinking foundation.Details
revision to pa# 202312072109: 25/f - to include modifications to pantry and removal of drinking foundation. | $55,000 |
| May 13, 2024 | Completed final sign-off Feb 2025 | 650 California St | Bcci Construction Company | 28/f: mep to support approved arch permit. new heat pumps, vav boxes, ducts, lighting and plumbing. ref pa# 202404220445Details
28/f: mep to support approved arch permit. new heat pumps, vav boxes, ducts, lighting and plumbing. ref pa# 202404220445 | $815,000 |
| May 9, 2024 | Completed final sign-off Apr 2025 | 1 Market St | Field Construction Inc. | 12/f: lighting and power. ref pa# 202310279621Details
12/f: lighting and power. ref pa# 202310279621 | $75,000 |
| May 9, 2024 | Completed final sign-off Apr 2025 | 1 Market St | Field Construction Inc. | 15th fl - lighting & power. ref permit 202310279620Details
15th fl - lighting & power. ref permit 202310279620 | $55,000 |
| Apr 29, 2024 | In progress issued May 2024 | 4 Embarcadero Center | Gci, Inc | 23rd fl - new non-structural partitions including new millwork & finishes. mechanical - new exhaust fans, ductwork & air distribution, ddc controls & air balance. power, lighting & signalDetails
23rd fl - new non-structural partitions including new millwork & finishes. mechanical - new exhaust fans, ductwork & air distribution, ddc controls & air balance. power, lighting & signal | $1,273,322 |
| Apr 24, 2024 | In progress issued Apr 2024 | 4 Embarcadero Center | Gci, Inc | 9/f: mechanical - new exhaust fans, ductwork, heat pump. electrical - power and lighting. ref pa 202404160076Details
9/f: mechanical - new exhaust fans, ductwork, heat pump. electrical - power and lighting. ref pa 202404160076 | $550,000 |
| Jan 11, 2024 | Completed final sign-off Jul 2024 | 582 Sutter St | Wisdom Electrical & Bldg Contractors | replace appliances, new accessible counter, change e light with led lights, upgrade e ansul fire suppressio system under separate permitDetails
replace appliances, new accessible counter, change e light with led lights, upgrade e ansul fire suppressio system under separate permit | $10,000 |
| Jan 3, 2024 | Completed final sign-off Jul 2024 | 650 California St | Gci, Inc | 28th fl - mechanical install (1) vav box, ductowrk for new floor layout; electrical - power & lighting. ref pa 2023-1011-8403Details
28th fl - mechanical install (1) vav box, ductowrk for new floor layout; electrical - power & lighting. ref pa 2023-1011-8403 | $100,000 |
| Dec 13, 2023 | Completed final sign-off Oct 2024 | 650 California St | Bcci Construction Company | 24th fl - selective demo and construction of non load bearing partitions, new door, frame & glazing, new suspended ceilings, ne light fixtures, new millwork and new finishesDetails
24th fl - selective demo and construction of non load bearing partitions, new door, frame & glazing, new suspended ceilings, ne light fixtures, new millwork and new finishes | $2,000,000 |
| May 16, 2023 | Completed final sign-off Nov 2023 | 185 Berry St | Skyline Construction | 4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.Details
4/f ste 4800: mep for tenant improvement, ref pa# 202304105357. | $175,000 |
| Jan 13, 2023 | Completed final sign-off Mar 2023 | 505 Montgomery St | Novo Construction Inc | 12th fl - electrical/lighting for ti as ste 1200. ref pa 2022-1121-6947Details
12th fl - electrical/lighting for ti as ste 1200. ref pa 2022-1121-6947 | $21,000 |
| Dec 23, 2022 | Never finaled issued Jan 2023, no final | 510 Townsend St | Bcci Construction Company | 2nd fl: phase 2. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included.Details
2nd fl: phase 2. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included. | $400,000 |
| Dec 21, 2022 | Completed final sign-off Jun 2024 | 1 Market St | Novo Construction Inc | 17th/f: mech & electrical & plumbing for t.i. 202211075982Details
17th/f: mech & electrical & plumbing for t.i. 202211075982 | $750,000 |
| Nov 16, 2022 | Never finaled issued Jan 2023, no final | 510 Townsend St | Bcci Construction Company | 6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.Details
6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood. | $50,000 |
| Nov 15, 2022 | Expired or cancelled expired Apr 2026 | 510 Townsend St | Bcci Construction Company | basement: elec only to support approved arch permit. new lighting and controls. ref 202207128306Details
basement: elec only to support approved arch permit. new lighting and controls. ref 202207128306 | $15,000 |
| Nov 2, 2022 | Completed final sign-off Sep 2023 | 510 Townsend St | Bcci Construction Company | 4/f: mep deferred submittal to support approved architectural. demo and install hvac and ductwork, new lighting. ref permit 202207279365Details
4/f: mep deferred submittal to support approved architectural. demo and install hvac and ductwork, new lighting. ref permit 202207279365 | $130,000 |
| Oct 26, 2022 | Never finaled issued Nov 2022, no final | 510 Townsend St | Bcci Construction Company | 2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709Details
2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709 | $50,000 |
| Aug 19, 2022 | Completed final sign-off May 2023 | 555 California St | Principal Builders Inc. | 27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.Details
27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's. | $3,120,000 |
| Aug 16, 2022 | Never finaled issued Aug 2022, no final | 185 Berry St | Paganini Electric Corp(See Signatories) | demo and replacement of boiler equipment on the roof. wharfside bldg. addition of vfds for e pumps in street side bldg, basement , boiler rm. new equip to be reconnected to e mcc. new panels for 120/240 v controls, circulating pumps. arch ref 202206156409Details
demo and replacement of boiler equipment on the roof. wharfside bldg. addition of vfds for e pumps in street side bldg, basement , boiler rm. new equip to be reconnected to e mcc. new panels for 120/240 v controls, circulating pumps. arch ref 202206156409 | $95,000 |
| Jun 14, 2022 | Completed final sign-off Jun 2023 | 121 Spear St | Bcci Construction Company | 4th fl - mep deferred submittal to support approved architectural permit. 2022-0218-8358, new ductwork and various mechanical equipment installed for new ti layoutDetails
4th fl - mep deferred submittal to support approved architectural permit. 2022-0218-8358, new ductwork and various mechanical equipment installed for new ti layout | $400,000 |
| May 4, 2022 | Completed final sign-off Oct 2022 | 22 04th St | Dpr Construction | 11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work.Details
11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work. | $80,000 |
| Mar 2, 2022 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.Details
28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810. | $500,000 |
| Nov 29, 2021 | Never finaled issued Nov 2021, no final | 505 Brannan St | Hathaway Dinwiddie Construct Co | deferred mech & elec submittal for pa# 202108307359. new hvac split system. electrical connections for hvac and desks. basement 1 level.Details
deferred mech & elec submittal for pa# 202108307359. new hvac split system. electrical connections for hvac and desks. basement 1 level. | $50,000 |
| Nov 16, 2021 | Completed final sign-off Sep 2022 | 140 New Montgomery St | Skyline Construction | mecanical and electrical upgrades to accomodate a new electric fire pump to be installed on basement level b1 adjacent the existing diesel fire pump.Details
mecanical and electrical upgrades to accomodate a new electric fire pump to be installed on basement level b1 adjacent the existing diesel fire pump. | $375,000 |
| Nov 4, 2021 | Completed final sign-off Jun 2022 | 1 Market St | Gci, Inc | 2nd fl ti of spear-steuart tower to create server roomDetails
2nd fl ti of spear-steuart tower to create server room | $40,000 |
| Nov 4, 2021 | Completed final sign-off Aug 2022 | 1 Market St | Gci, Inc | ti on 2nd fl to provide rated server room & ti on 7th fl roof mech equipment w/screen wall enclosure.Details
ti on 2nd fl to provide rated server room & ti on 7th fl roof mech equipment w/screen wall enclosure. | $120,000 |
| Sep 15, 2021 | Completed final sign-off Oct 2023 | 580 Sutter St | Paganini Electric Corp(See Signatories) | eletrical for t.i. 202106172693. upgrade electrical services. new 600 amp main services switch board. 2 100 amp panel boards. 4 225 amp panel boards. 10 led strip linesDetails
eletrical for t.i. 202106172693. upgrade electrical services. new 600 amp main services switch board. 2 100 amp panel boards. 4 225 amp panel boards. 10 led strip lines | $150,000 |
| Aug 24, 2021 | Never finaled issued Sep 2021, no final | 22 04th St | Dpr Construction | 11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler.Details
11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler. | $160,000 |
| Aug 9, 2021 | Never finaled issued Aug 2021, no final | 1 Market St | Bcci Construction Company | 27/f: mep deferred submittal to support approved architecture permit. ref pa 202107144345.Details
27/f: mep deferred submittal to support approved architecture permit. ref pa 202107144345. | $40,000 |
| Jul 21, 2021 | Completed final sign-off Sep 2022 | 2445 Golden Gate Av | Skyline Construction | t.i to former lecture space plan for new research exam room with new pressure plates and assoicated computer data pcs.Details
t.i to former lecture space plan for new research exam room with new pressure plates and assoicated computer data pcs. | $55,000 |
| Jul 6, 2021 | Completed final sign-off Sep 2021 | 1100 Ellis St | Paganini Electric Corp(See Signatories) | hvac power upgrades for the floor classrooms.Details
hvac power upgrades for the floor classrooms. | $200,000 |
| Apr 27, 2021 | Completed final sign-off Nov 2021 | 2101 Mission St | Dome Construction Corp | ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes.Details
ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes. | $636,000 |
| Dec 23, 2020 | Completed final sign-off Jan 2023 | 1 De Haro St | Hathaway Dinwiddie Co. | level 1: first time t.i.. non-structural demo, new servery, dining hall, pdr and storage spaces. new restrooms on mezzanine. office use approved pursuant to planning commission motion no.20206. case no.2015-015010 ofa.Details
level 1: first time t.i.. non-structural demo, new servery, dining hall, pdr and storage spaces. new restrooms on mezzanine. office use approved pursuant to planning commission motion no.20206. case no.2015-015010 ofa. | $2,000,000 |
| Dec 10, 2020 | Never finaled issued Mar 2021, no final | 22 04th St | Dpr Construction | overall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905Details
overall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905 | |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 455 Market St | A S F Electric Inc | 3/f: electrical title 24 comlpliance. ref t.i. pa201901241116. maher n/aDetails
3/f: electrical title 24 comlpliance. ref t.i. pa201901241116. maher n/a | |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 455 Market St | A S F Electric Inc | 2/f: electrical title 24 comlpliance. ref t.i. pa201901241114. maher n/aDetails
2/f: electrical title 24 comlpliance. ref t.i. pa201901241114. maher n/a | |
| Aug 28, 2020 | Completed final sign-off Jan 2021 | 1 Embarcadero Center | Gci, Inc | 35/f: electrical only, reference bpa#202003167121. floor lighting & power systemsDetails
35/f: electrical only, reference bpa#202003167121. floor lighting & power systems | $150,000 |
| Feb 25, 2020 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | 30th fl mep - deferred submittal to support approved arch, set, new vav boxes, heat pumps, transfer fans & fsd's ref pa 2019-1219-0036Details
30th fl mep - deferred submittal to support approved arch, set, new vav boxes, heat pumps, transfer fans & fsd's ref pa 2019-1219-0036 | $150,000 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 456 Montgomery St | Hathaway Dinwiddie Co. | suite gc-5: new electrical,lighting & power distribution. new mechanical system for new tenant space. ref pa 201908209234. maher n/a.Details
suite gc-5: new electrical,lighting & power distribution. new mechanical system for new tenant space. ref pa 201908209234. maher n/a. | $100,855 |
| Dec 30, 2019 | Completed final sign-off Feb 2021 | 988 Market St | Novo Construction Inc | mech and electrical work for ti on the 6th floor. reference arch pa# 2019-1223-0242Details
mech and electrical work for ti on the 6th floor. reference arch pa# 2019-1223-0242 | $250,000 |
| Dec 30, 2019 | Completed final sign-off Feb 2021 | 988 Market St | Novo Construction Inc | mech and electrical work for ti on the 8th floor. reference arch pa# 2019-1223-0244Details
mech and electrical work for ti on the 8th floor. reference arch pa# 2019-1223-0244 | $250,000 |
| Dec 23, 2019 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.Details
partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted. | $210,000 |
| Dec 18, 2019 | Completed final sign-off Nov 2021 | 333 Valencia St | Wells Electrical, Inc | core and shell electrical, title 24 lighting. new electrical service. ref pa 2018-1029-4388Details
core and shell electrical, title 24 lighting. new electrical service. ref pa 2018-1029-4388 | $100,000 |
| Nov 25, 2019 | Completed final sign-off Jun 2021 | 100 Hooper St | Gci, Inc | 1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968Details
1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968 | $750,000 |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 18, 2019 | Never finaled issued Nov 2019, no final | 185 Berry St | Paganini Electric Corp(See Signatories) | 1st floor suite #180: install new lighting and receptables for relocated engineering office. work on 1st floor only.Details
1st floor suite #180: install new lighting and receptables for relocated engineering office. work on 1st floor only. | $65,000 |
| Nov 12, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | 22nd fl: improvements to existing bldg core & shell restrooms. connecting power to new or rleocated light fixtures, power outlets & tenant equipment.Details
22nd fl: improvements to existing bldg core & shell restrooms. connecting power to new or rleocated light fixtures, power outlets & tenant equipment. | $250,000 |
| Nov 12, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | ste 2200: ti to existing bldg. connecting power to new or relocated light fixtures. power outlets & tenant equipment. maher naDetails
ste 2200: ti to existing bldg. connecting power to new or relocated light fixtures. power outlets & tenant equipment. maher na | $250,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 456 Montgomery St | Hathaway Dinwiddie Co. | suite 2200 on 22nd fl: new power & lighting for ti. ref pa #201910235274Details
suite 2200 on 22nd fl: new power & lighting for ti. ref pa #201910235274 | $60,000 |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 1715 Octavia St | D Kelly Construction Inc. | electrical power and lighting title 24, ref pa 2019-0612-3274Details
electrical power and lighting title 24, ref pa 2019-0612-3274 | $145,000 |
| Oct 10, 2019 | Completed final sign-off Jun 2020 | 111 Pine St | Western Allied Mechanical Inc. | like for like cooling tower & pumps replacement.Details
like for like cooling tower & pumps replacement. | $350,000 |
| Oct 9, 2019 | Completed final sign-off Mar 2021 | 1 Embarcadero Center | Gci, Inc | suite 3500: redistribute (e) ductwork & isntall 6 new vav box; making connections to base building (e) panels.connecting power to light fixtures, outleets & tenant equipment. ref pa#201908138669.Details
suite 3500: redistribute (e) ductwork & isntall 6 new vav box; making connections to base building (e) panels.connecting power to light fixtures, outleets & tenant equipment. ref pa#201908138669. | $350,000 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | 21st floor: ref pa# 201907155845-connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.Details
21st floor: ref pa# 201907155845-connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel. | $20,000 |
| Sep 6, 2019 | Completed final sign-off Mar 2020 | 101 Mission St | Gci, Inc | ref pa# 201907226482connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.Details
ref pa# 201907226482connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel. | $130,000 |
| Apr 22, 2019 | Completed final sign-off Sep 2021 | 300 Clay St | Gci, Inc | 13th fl -fire smoke dampers & linear diffusers mechanical & electrical ref pa 2019-0109-9946Details
13th fl -fire smoke dampers & linear diffusers mechanical & electrical ref pa 2019-0109-9946 | $300,000 |
| Apr 15, 2019 | Completed final sign-off Oct 2019 | 1 Maritime Pz | Gci, Inc | ref # 2019-0125-1223. electrical only.Details
ref # 2019-0125-1223. electrical only. | $67,000 |
| Apr 3, 2019 | Completed final sign-off Jun 2019 | 650 California St | Gci, Inc | suite 2950: mechanical: install new ducts, grilles, vav boxes & air balance. electrical: connect power to new or relocated light fixtures, power outlets & tenant equipment. title 24 compliance. maher n/a.Details
suite 2950: mechanical: install new ducts, grilles, vav boxes & air balance. electrical: connect power to new or relocated light fixtures, power outlets & tenant equipment. title 24 compliance. maher n/a. | $268,000 |
| Mar 15, 2019 | Completed final sign-off Jun 2019 | 235 Montgomery St | Gci, Inc | work consist of making connections to base building existing panels. installation of new/added fixtures at existing corridor. connect to existing lighting controls.Details
work consist of making connections to base building existing panels. installation of new/added fixtures at existing corridor. connect to existing lighting controls. | $14,500 |
| Dec 7, 2018 | Completed final sign-off Mar 2019 | 185 Berry St | Paganini Electric Corp(See Signatories) | as builts for 201710060646 change 1 fuses from 1200a to 900aDetails
as builts for 201710060646 change 1 fuses from 1200a to 900a | $1,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 600 Townsend St | C B F Inc | 5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher naDetails
5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher na | $546,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 415 Mission St | Hathaway Dinwiddie Co. | bring electrical power from main level up to level 5 for future tenants. install transformer.Details
bring electrical power from main level up to level 5 for future tenants. install transformer. | $75,000 |
| Jun 20, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | Team Commercial Construction Inc. | 25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permitDetails
25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permit | $857,547 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 185 Berry St | Paganini Electric Corp(See Signatories) | install power at 3 new car chargers. electrical drawings only ref pa 2017-0727-3111Details
install power at 3 new car chargers. electrical drawings only ref pa 2017-0727-3111 | $19,500 |
| Sep 15, 2017 | Expired or cancelled expired Jul 2020 | 1 Maritime Pz | Gci, Inc | 14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13Details
14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13 | $80,000 |
| Aug 28, 2017 | Completed final sign-off Dec 2017 | 1 Montgomery St | Hathaway Dinwiddie Co. | 33/f partialt.i. - mechanical & electrical scope for pa#201707182140 & 201708164963, demo & additional of ductwork, vav vboxes and diffusers. new & relocated like fixtures. no work to card readers or elevator lobbies. fire under sep permits.Details
33/f partialt.i. - mechanical & electrical scope for pa#201707182140 & 201708164963, demo & additional of ductwork, vav vboxes and diffusers. new & relocated like fixtures. no work to card readers or elevator lobbies. fire under sep permits. | $200,000 |
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 350 Bush St | Skyline Construction | electrical work for ti on 6th & 7th fl. ref arch #201706209767. n/a maher ordinanceDetails
electrical work for ti on 6th & 7th fl. ref arch #201706209767. n/a maher ordinance | $200,000 |
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 350 Bush St | Skyline Construction | electrical work for ti for 4th & 5th fl. rf arch #201706200770.Details
electrical work for ti for 4th & 5th fl. rf arch #201706200770. | $200,000 |
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 350 Bush St | Skyline Construction | electrical work for ti 8th & 9th fl. ref arch #201705317996Details
electrical work for ti 8th & 9th fl. ref arch #201705317996 | $200,000 |
| Aug 3, 2017 | Completed final sign-off Nov 2017 | 360 Post St | Marchetti Group | 7/f- commercial t.i. on 7/f to include new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical & mechanical.Details
7/f- commercial t.i. on 7/f to include new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical & mechanical. | $140,000 |
| May 26, 2017 | Completed final sign-off Oct 2017 | 360 03rd St | Principal Builders Inc. | 3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher naDetails
3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na | $68,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 2500 16th St | Paganini Electric Corp(See Signatories) | 1st & 2nd flr: lighting & power installation maher na ref ti 201408184035Details
1st & 2nd flr: lighting & power installation maher na ref ti 201408184035 | $300,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 2500 16th St | Paganini Electric Corp(See Signatories) | exterior lighting at new dog park maher na ref ti 201408184057Details
exterior lighting at new dog park maher na ref ti 201408184057 | $125,000 |
| Feb 24, 2017 | Completed final sign-off Jun 2017 | 90 New Montgomery St | Commercial Interior Builders Inc | power to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/aDetails
power to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/a | $39,138 |