Block 3709, lot 012
455 Market St
- City’s use
- Commercial Office
- Built
- 1988
- Stories
- 23
- Building
- 459,696 sq ft
- Lot
- 12,632 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures.Details
20th f/l, ste 2000 & 2070: addition of new non-load bearing demising partition w/ the reloacation of one (1) light fixture and re-switching if fixtures. | $62,370 |
| Jul 23, 2026 | In progress issued Jul 2026 | 455 Market St | Sabah International Incorporated | revision to pa# 202412116639: (e) fan/damper control panel inside fcc shall be replaced with a new firefighters smoke control panel. building has (e) smoke control system controlled by (e) bms system. all other work remaining.Details
revision to pa# 202412116639: (e) fan/damper control panel inside fcc shall be replaced with a new firefighters smoke control panel. building has (e) smoke control system controlled by (e) bms system. all other work remaining. | |
| Aug 19, 2025 | Completed final sign-off Feb 2026 | 455 Market St | Golden Gate Fire Protection Inc | remove 2 upright sprinkler and piping in elevator machine room and remove 6 sidewall sprinklers and all piping in elevator shafts on the 9th flr. remove 11 uprights sprinklers and branch lines in elevator machine room on the 24th flr. also remove 1 sprinkler in the penthouse machine room. removeDetails
remove 2 upright sprinkler and piping in elevator machine room and remove 6 sidewall sprinklers and all piping in elevator shafts on the 9th flr. remove 11 uprights sprinklers and branch lines in elevator machine room on the 24th flr. also remove 1 sprinkler in the penthouse machine room. remove | $16,275 |
| Jul 31, 2025 | In progress filed Jul 2025, not yet issued | 455 Market St | suite# 170 - change/update electrical kitchen equipmentDetails
suite# 170 - change/update electrical kitchen equipment | $8,000 | |
| Apr 2, 2025 | Completed final sign-off May 2025 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite 700 & 800: anchoring existing furniture phone boothsDetails
suite 700 & 800: anchoring existing furniture phone booths | $34,560 |
| Dec 13, 2024 | In progress issued Apr 2025 | 455 Market St | Sabah International Incorporated | to replace (e) obsolete networked siemens (mxl) voice f/a with new gen edwards est-4 voice f/a system as per calstate fire marshal information bulletin dates 9/1/2005 and code interpretations (12-001) dates 07/23/2012.Details
to replace (e) obsolete networked siemens (mxl) voice f/a with new gen edwards est-4 voice f/a system as per calstate fire marshal information bulletin dates 9/1/2005 and code interpretations (12-001) dates 07/23/2012. | $303,574 |
| Oct 7, 2024 | Completed final sign-off Oct 2025 | 455 Market St | Convergint Technologies Llc | 17th floor. new 2-way emergency call station on the 17th flr. ref#: 202404049316Details
17th floor. new 2-way emergency call station on the 17th flr. ref#: 202404049316 | $5,000 |
| Sep 19, 2024 | Completed final sign-off Nov 2024 | 455 Market St | Siemens Industry, Inc. | fire only work for the suite 1700 remodel on floor 17; additions/replacements are 6 smoke detectors, 2 modules, 22 speakers/strobes, and 6 stories. 1 smoke detectors is also relocated. ref#: app#: 202404049316.Details
fire only work for the suite 1700 remodel on floor 17; additions/replacements are 6 smoke detectors, 2 modules, 22 speakers/strobes, and 6 stories. 1 smoke detectors is also relocated. ref#: app#: 202404049316. | $31,000 |
| Aug 29, 2024 | Completed final sign-off Dec 2024 | 455 Market St | R M I Mechanical Contractors | add 1 vav with eating coil, add 3 heating coils to existing vavs, add 1 transfer fan, add ceiling and sidewall diffusers, new ductwork and hot water piping, add 1 thermostat and relocate thermostats, and air balance.Details
add 1 vav with eating coil, add 3 heating coils to existing vavs, add 1 transfer fan, add ceiling and sidewall diffusers, new ductwork and hot water piping, add 1 thermostat and relocate thermostats, and air balance. | $150,000 |
| Aug 23, 2024 | Completed final sign-off Oct 2024 | 455 Market St | Golden Gate Fire Protection Inc | fire sprinklers as built to pa 202406265264Details
fire sprinklers as built to pa 202406265264 | $1,000 |
| Jun 26, 2024 | Completed final sign-off Oct 2024 | 455 Market St | Golden Gate Fire Protection Inc | 17/f: relocate (45) pendent sprinklers and (39) uprights. ref bpa# 202404049316Details
17/f: relocate (45) pendent sprinklers and (39) uprights. ref bpa# 202404049316 | $21,250 |
| Apr 18, 2024 | Completed final sign-off May 2024 | 455 Market St | Principal Builders Inc. | suite 1690 16/f- office ti to include addition of millwork and sink to wellness roomDetails
suite 1690 16/f- office ti to include addition of millwork and sink to wellness room | $10,000 |
| Apr 4, 2024 | Completed final sign-off Dec 2024 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 17th/f, ste 1700: demo & construct non load bearing partitions, new ceiling grids & tile. mew light fixtures, office doors & frames, millworks & sinks. new finishes. mep deferredDetails
17th/f, ste 1700: demo & construct non load bearing partitions, new ceiling grids & tile. mew light fixtures, office doors & frames, millworks & sinks. new finishes. mep deferred | $1,085,600 |
| Feb 27, 2024 | In progress issued Mar 2024 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ste 900:minor revision to 202307142182. revised deteails and plan to show existing ada compliant breakroom sink.Details
ste 900:minor revision to 202307142182. revised deteails and plan to show existing ada compliant breakroom sink. | |
| Jul 14, 2023 | Never finaled issued Jul 2023, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | work include selective demo and construction of non load bearing partitions. relocate light fixture, new office doors and frames. mollwork and sink. new finishes. new drinking fountain in common area. mep deferred.Details
work include selective demo and construction of non load bearing partitions. relocate light fixture, new office doors and frames. mollwork and sink. new finishes. new drinking fountain in common area. mep deferred. | $192,530 |
| May 25, 2023 | Completed final sign-off Jul 2023 | 455 Market St | A S F Electric Inc | 18/f: title 24 electrical, ref t.i. pa#202302091720Details
18/f: title 24 electrical, ref t.i. pa#202302091720 | |
| May 25, 2023 | Never finaled issued May 2023, no final | 455 Market St | A S F Electric Inc | 6/f: title 24 electrical, ref t.i. pa# 202211227010Details
6/f: title 24 electrical, ref t.i. pa# 202211227010 | |
| Apr 11, 2023 | Never finaled issued Apr 2023, no final | 455 Market St | Siemens Industry, Inc. | fire only work for the "suite 620: on fl. 6 additions are 1 smoke detector, 11 speaker/strobes, and 1 strobe ref pa# 2022-1122-7010Details
fire only work for the "suite 620: on fl. 6 additions are 1 smoke detector, 11 speaker/strobes, and 1 strobe ref pa# 2022-1122-7010 | $11,912 |
| Feb 23, 2023 | Completed final sign-off Mar 2023 | 455 Market St | Golden Gate Fire Protection Inc | 6/f suite 620: relocated 15 fire sprinkler pendents. ref ti pa #202211227010.Details
6/f suite 620: relocated 15 fire sprinkler pendents. ref ti pa #202211227010. | $9,300 |
| Feb 9, 2023 | Completed final sign-off Jul 2023 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 18th fl: selective demo and construction of non load bearing partitions,modification to existing ceiling reid and tile, new light fixtures, includes reswitching, new millwork, finishes (mep defferred)Details
18th fl: selective demo and construction of non load bearing partitions,modification to existing ceiling reid and tile, new light fixtures, includes reswitching, new millwork, finishes (mep defferred) | $269,832 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 455 Market St | Matrix Hg Inc | hvac tenant improvement install new ater source heat pump, install ceiling plunum, mounted exhaust fan install carbon dioxide sensor. convert e control system to ddc. provide air balancer. base building hvac system remains unchangedDetails
hvac tenant improvement install new ater source heat pump, install ceiling plunum, mounted exhaust fan install carbon dioxide sensor. convert e control system to ddc. provide air balancer. base building hvac system remains unchanged | $149,417 |
| Nov 22, 2022 | Never finaled issued Dec 2022, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite #620: work includes: demo and construction of non-load bearing partitions, modifications to extg ceiling grid & tile, new light fixture and swiching, new office doors and frames, salvage & reuse of extg selected materials, new millwork and sink, & new finishes. (mep deffered)Details
suite #620: work includes: demo and construction of non-load bearing partitions, modifications to extg ceiling grid & tile, new light fixture and swiching, new office doors and frames, salvage & reuse of extg selected materials, new millwork and sink, & new finishes. (mep deffered) | $639,000 |
| Nov 17, 2022 | Never finaled issued Dec 2022, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 19/f - suite 1900: add new bi-fold movable partition in (e) conference roomDetails
19/f - suite 1900: add new bi-fold movable partition in (e) conference room | $83,000 |
| Sep 1, 2022 | Completed final sign-off Mar 2023 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 19/f ste 1900: selective demo and contruction of non bearing partitions, new and relocated light fixture and switching new office doors, new office doors, frames and new finishesDetails
19/f ste 1900: selective demo and contruction of non bearing partitions, new and relocated light fixture and switching new office doors, new office doors, frames and new finishes | $70,798 |
| Jun 13, 2022 | Completed final sign-off Aug 2022 | 455 Market St | Swinerton Builders | 20th fl ste 2000: selective demo of 1 existing private office and buildout of 1 new private office. also includes 1 floor core for cubicle furniture where office was removed.Details
20th fl ste 2000: selective demo of 1 existing private office and buildout of 1 new private office. also includes 1 floor core for cubicle furniture where office was removed. | $75,000 |
| Apr 28, 2022 | Never finaled issued Apr 2022, no final | 455 Market St | R M I Mechanical Contractors | ste 1460: add 2 vav boxes. add 1 transfer fan. new ductwork. new heating piping, control work, and air balance. bldg pa# 202201286899.Details
ste 1460: add 2 vav boxes. add 1 transfer fan. new ductwork. new heating piping, control work, and air balance. bldg pa# 202201286899. | $40,000 |
| Mar 25, 2022 | Never finaled issued Mar 2022, no final | 455 Market St | Siemens Industry, Inc. | 14/f: fire only work for the suite 1460 remodel. additions are 1 smoke detector, 7 speaker/strobes, and 1 strobe. ref permit 202201286899.Details
14/f: fire only work for the suite 1460 remodel. additions are 1 smoke detector, 7 speaker/strobes, and 1 strobe. ref permit 202201286899. | $5,625 |
| Mar 8, 2022 | Completed final sign-off Sep 2022 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ste #1460: revision to pa# 202201286899. tenant improvement. change of layout.Details
ste #1460: revision to pa# 202201286899. tenant improvement. change of layout. | |
| Jan 28, 2022 | Completed final sign-off Sep 2022 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite 1460: tenant improvement: demo & constructon of non-load bearing partitions, new lighting fixtures and compliant millwork and finishes.Details
suite 1460: tenant improvement: demo & constructon of non-load bearing partitions, new lighting fixtures and compliant millwork and finishes. | $535,000 |
| Oct 28, 2021 | Completed final sign-off Nov 2021 | 455 Market St | R M I Mechanical Contractors | suite# 1900. add 5 vav terminal units iwth controls, add 1 transfer fan for it room, new ductwork, add & relocate thermostates & air balance.Details
suite# 1900. add 5 vav terminal units iwth controls, add 1 transfer fan for it room, new ductwork, add & relocate thermostates & air balance. | $90,000 |
| Oct 15, 2021 | Completed final sign-off May 2022 | 455 Market St | R M I Mechanical Contractors | 21st floor:add 2 transfer fans modify extg hvac systems, relocate thermostats and air balance.Details
21st floor:add 2 transfer fans modify extg hvac systems, relocate thermostats and air balance. | $8,000 |
| Sep 22, 2021 | Completed final sign-off Sep 2022 | 455 Market St | Kastle Systems Of Los Angeles Partnershi | installing card reader (cr) and mushroom button (mb) to the extg elevator lobby doors on level 21 per cbc 1010.1.9.13Details
installing card reader (cr) and mushroom button (mb) to the extg elevator lobby doors on level 21 per cbc 1010.1.9.13 | $6,000 |
| Aug 24, 2021 | Completed final sign-off May 2022 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | +/- 300 sq ft interior office t.i. to convert 2 offices to a mailroom in an extg office space with non-bearing partitions, finishes, ceilig, lighting, outlets, and door. replacing elevator lobby door with new. rework lighting/outlets in conferance rooms and open office area.Details
+/- 300 sq ft interior office t.i. to convert 2 offices to a mailroom in an extg office space with non-bearing partitions, finishes, ceilig, lighting, outlets, and door. replacing elevator lobby door with new. rework lighting/outlets in conferance rooms and open office area. | $25,000 |
| Aug 12, 2021 | Completed final sign-off Dec 2021 | 455 Market St | Convergint Technologies Llc | 21st floor: provide one elevator landing 2 way call station. ref 2021-0922-8923Details
21st floor: provide one elevator landing 2 way call station. ref 2021-0922-8923 | $4,000 |
| Aug 10, 2021 | Completed final sign-off Oct 2021 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ste 1500. this project involves modification of existing t.i to include selective demolition & construction of non load bearing partitions, new lights fixtures (e) ceiling grid and tile, new office doors and frames, and new finishes.Details
ste 1500. this project involves modification of existing t.i to include selective demolition & construction of non load bearing partitions, new lights fixtures (e) ceiling grid and tile, new office doors and frames, and new finishes. | $83,724 |
| Aug 6, 2021 | Completed final sign-off Sep 2023 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite 1690: minor renovation: new partitions, revised power and lighting, minor mechanical changes.Details
suite 1690: minor renovation: new partitions, revised power and lighting, minor mechanical changes. | $250,000 |
| Jun 10, 2021 | Completed final sign-off Aug 2021 | 455 Market St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 56 pendent sprinklers on the 19th floor. suite 1900. t.i. ref # 2020-1215-1054Details
fire sprinklers; relocate 56 pendent sprinklers on the 19th floor. suite 1900. t.i. ref # 2020-1215-1054 | $29,400 |
| May 11, 2021 | Never finaled issued Jun 2021, no final | 455 Market St | Siemens Industry, Inc. | fire only work for the "suite 1900" remodel on floor 19; additions are 14 speaker/strobes and 1 strobe. ref. permit app # 2020-1215-1054.Details
fire only work for the "suite 1900" remodel on floor 19; additions are 14 speaker/strobes and 1 strobe. ref. permit app # 2020-1215-1054. | $9,440 |
| Dec 15, 2020 | Completed final sign-off Mar 2022 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ste #1900: modification of an existing tenant improvement. to include selective demo & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures & switching, new doors, frames, millwork, sink & finishes.Details
ste #1900: modification of an existing tenant improvement. to include selective demo & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures & switching, new doors, frames, millwork, sink & finishes. | $1,000,000 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 455 Market St | A S F Electric Inc | 3/f: electrical title 24 comlpliance. ref t.i. pa201901241116. maher n/aDetails
3/f: electrical title 24 comlpliance. ref t.i. pa201901241116. maher n/a | |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 455 Market St | A S F Electric Inc | 2/f: electrical title 24 comlpliance. ref t.i. pa201901241114. maher n/aDetails
2/f: electrical title 24 comlpliance. ref t.i. pa201901241114. maher n/a | |
| Sep 28, 2020 | Completed final sign-off Nov 2020 | 455 Market St | Convergint Technologies Llc | 23/f: provide an elevator landing 2-way emergency communication sation on 23/f. the call station will report to the (e) command center in the fcc. t.i. pa201912179718. ep ew202001176097. maher n/aDetails
23/f: provide an elevator landing 2-way emergency communication sation on 23/f. the call station will report to the (e) command center in the fcc. t.i. pa201912179718. ep ew202001176097. maher n/a | $8,000 |
| Sep 9, 2020 | Completed final sign-off Nov 2020 | 455 Market St | 23rd floor evacuation plan n/a maherDetails
23rd floor evacuation plan n/a maher | $1,650 | |
| Sep 5, 2020 | Completed final sign-off Nov 2020 | 455 Market St | Siemens Industry, Inc. | 23rd floor: fire only work to add an audio/visual shustdown relay module pli remodel. install f.a. permit(202002065422) was done for the space. ref app#201912179718Details
23rd floor: fire only work to add an audio/visual shustdown relay module pli remodel. install f.a. permit(202002065422) was done for the space. ref app#201912179718 | $500 |
| Sep 5, 2020 | Never finaled issued Sep 2020, no final | 455 Market St | Siemens Industry, Inc. | 3rd floor: fire only work to add 1 door lock release relay. no ref app#Details
3rd floor: fire only work to add 1 door lock release relay. no ref app# | $500 |
| Sep 5, 2020 | Never finaled issued Sep 2020, no final | 455 Market St | Siemens Industry, Inc. | 2nd floor: fire only work to add 1 door lock release relay. no ref app#Details
2nd floor: fire only work to add 1 door lock release relay. no ref app# | $500 |
| Aug 27, 2020 | Completed final sign-off Oct 2020 | 455 Market St | Dpr Construction | revision to pa#2019-1217-9718. new floor sink penetrations through the 23rd floor.Details
revision to pa#2019-1217-9718. new floor sink penetrations through the 23rd floor. | $3,500 |
| Aug 24, 2020 | Completed final sign-off Feb 2021 | 455 Market St | A S F Electric Inc | unit #1920: electrical t-24 only. reference pa #2019-1227-0780Details
unit #1920: electrical t-24 only. reference pa #2019-1227-0780 | |
| Aug 24, 2020 | Completed final sign-off Feb 2021 | 455 Market St | A S F Electric Inc | unit #1200: electrical t-24 only. reference pa #2019-1227-0782Details
unit #1200: electrical t-24 only. reference pa #2019-1227-0782 | |
| Jul 14, 2020 | Completed final sign-off Jul 2020 | 455 Market St | Ingram Fire Protection Inc | 23/f: as built for 202002043430Details
23/f: as built for 202002043430 | |
| Mar 16, 2020 | Completed final sign-off Aug 2020 | 455 Market St | Siemens Industry, Inc. | 12th fl - fire alarm work for "suite 1200" remodel. additions are 3 speakers, 5 speaker/strobes, and 2 strobes. ref pa 2019-1227-0782Details
12th fl - fire alarm work for "suite 1200" remodel. additions are 3 speakers, 5 speaker/strobes, and 2 strobes. ref pa 2019-1227-0782 | $6,175 |
| Mar 16, 2020 | Completed final sign-off Aug 2020 | 455 Market St | Siemens Industry, Inc. | 19th fl - fire alarm work for "suite 1920" remodel. additions are 3 speakers. ref pa 2019-1227-0780Details
19th fl - fire alarm work for "suite 1920" remodel. additions are 3 speakers. ref pa 2019-1227-0780 | $1,900 |
| Mar 10, 2020 | Completed final sign-off Aug 2020 | 455 Market St | Golden Gate Fire Protection Inc | fire sprinkler only for 19th - relocate 17 pendents for suite #1920 (19th) 455 market st. ref pa #201912270785.Details
fire sprinkler only for 19th - relocate 17 pendents for suite #1920 (19th) 455 market st. ref pa #201912270785. | $8,500 |
| Feb 26, 2020 | Completed final sign-off Aug 2020 | 455 Market St | Siemens Industry, Inc. | fire alarm work for "pli" remodel; additions are 2 smoke detectors, 5 duct detectors, 7 speakers, 26 speaker/strobes and 3 strobes. ref pa 2019-1217-9718Details
fire alarm work for "pli" remodel; additions are 2 smoke detectors, 5 duct detectors, 7 speakers, 26 speaker/strobes and 3 strobes. ref pa 2019-1217-9718 | $31,800 |
| Feb 4, 2020 | Completed final sign-off Jul 2020 | 455 Market St | Ingram Fire Protection Inc | 23rd fl - ref pa 201912179718; relocate 97 pendent sprinklers from (e) outletsDetails
23rd fl - ref pa 201912179718; relocate 97 pendent sprinklers from (e) outlets | $24,280 |
| Jan 15, 2020 | Completed final sign-off Jul 2021 | 455 Market St | R M I Mechanical Contractors | mech for suite 201 & 202 on 2nd fl: add 1 heat pump, add 3 transfer fans, add heat pump thermostat, relocate existing vav thermostats, new duct work, & air balanace. ref pa #201901241114.Details
mech for suite 201 & 202 on 2nd fl: add 1 heat pump, add 3 transfer fans, add heat pump thermostat, relocate existing vav thermostats, new duct work, & air balanace. ref pa #201901241114. | $60,000 |
| Jan 15, 2020 | Completed final sign-off Jul 2021 | 455 Market St | R M I Mechanical Contractors | mech for suite 300 on 3rd fl: add 1 heat pump, 4 vav boxes, add 2 fire smoke dampers, add 1 heat pump thermostat, add 4 vav thermostats. rleocate existing vav thermostats, new ductwork, & air balance. ref pa #201901241116.Details
mech for suite 300 on 3rd fl: add 1 heat pump, 4 vav boxes, add 2 fire smoke dampers, add 1 heat pump thermostat, add 4 vav thermostats. rleocate existing vav thermostats, new ductwork, & air balance. ref pa #201901241116. | $150,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite 1920: selective demo and construction of non load bearing partitions, new ceiling grid and tile, new light fixtures and switching, new office doors, frames, salvage and reuse of selected materials, new millwork, new sink and new finishesDetails
suite 1920: selective demo and construction of non load bearing partitions, new ceiling grid and tile, new light fixtures and switching, new office doors, frames, salvage and reuse of selected materials, new millwork, new sink and new finishes | $240,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | selective demo and construction of non load bearing partitions, modification to existing ceiling grid, tile, light fixture relocation and new switching, slavage and reuse of existing selected materials, new millwork, and plumbing and new finishesDetails
selective demo and construction of non load bearing partitions, modification to existing ceiling grid, tile, light fixture relocation and new switching, slavage and reuse of existing selected materials, new millwork, and plumbing and new finishes | $350,000 |
| Dec 27, 2019 | Completed final sign-off Aug 2020 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | selective demo and construction of non load bearing partitions, modification to ceiling grid and tile, light fixture relocation and switching, salvage and reuse of e selective materials if practicable millwork new sink new finishesDetails
selective demo and construction of non load bearing partitions, modification to ceiling grid and tile, light fixture relocation and switching, salvage and reuse of e selective materials if practicable millwork new sink new finishes | $120,000 |
| Dec 17, 2019 | Completed final sign-off Nov 2020 | 455 Market St | Dpr Construction Inc | 23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or areaDetails
23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or area | $1,034,959 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 455 Market St | street space onlyDetails
street space only | ||
| Nov 22, 2019 | Completed final sign-off Aug 2020 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 21st floor - #2100 -project involves selective demolition of non-load bearing partition, millwork, plumbing and finishes n/a haher;ab-017 applies. no ceiling work.Details
21st floor - #2100 -project involves selective demolition of non-load bearing partition, millwork, plumbing and finishes n/a haher;ab-017 applies. no ceiling work. | $13,580 |
| Nov 6, 2019 | Completed final sign-off Mar 2020 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite #600: project involves modification of an existing tenant improvement to include selective demolition and construction of non-loading bearing partitions modification to ceiling grid & tile. new light fixtures and switching. new millwork, new sink and finishesDetails
suite #600: project involves modification of an existing tenant improvement to include selective demolition and construction of non-loading bearing partitions modification to ceiling grid & tile. new light fixtures and switching. new millwork, new sink and finishes | $76,840 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 455 Market St | street space onlyDetails
street space only | ||
| Oct 15, 2019 | Completed final sign-off Mar 2020 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 23/f: ada compliant upgrades to (e) mens & womens restrooms facilites & finishes.Details
23/f: ada compliant upgrades to (e) mens & womens restrooms facilites & finishes. | $182,600 |
| Oct 10, 2019 | Never finaled issued Oct 2019, no final | 455 Market St | Convergint Technologies Llc | revise drawings (as builts) for 2way comm system 3,7,8th fls, & head end on 1st fl. (201905312091). this permit for increase to battery capacity only.Details
revise drawings (as builts) for 2way comm system 3,7,8th fls, & head end on 1st fl. (201905312091). this permit for increase to battery capacity only. | $2,000 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 21st st - this scope involves ada compliant upgrades to existing restroom facilitiesDetails
21st st - this scope involves ada compliant upgrades to existing restroom facilities | $182,600 |
| Aug 23, 2019 | Never finaled issued Aug 2019, no final | 455 Market St | Siemens Industry, Inc. | 8th fl - as built permit for the fire alarm work "knotel" remodel per the direction of the sffd testing inspectors. 1 spekaer/strobe was added to the original device count on pa 2019-0322-5965. ref pa pa 2019-0124-1201Details
8th fl - as built permit for the fire alarm work "knotel" remodel per the direction of the sffd testing inspectors. 1 spekaer/strobe was added to the original device count on pa 2019-0322-5965. ref pa pa 2019-0124-1201 | $635 |
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 455 Market St | Siemens Industry, Inc. | fire alarm for suite 1650 floor 16 - add 6 speaker/strobes, relocate 2 speakers and 2 strobes. ref 201904158000. maher n/a.Details
fire alarm for suite 1650 floor 16 - add 6 speaker/strobes, relocate 2 speakers and 2 strobes. ref 201904158000. maher n/a. | $4,200 |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 455 Market St | A S F Electric Inc | #1100 - electrical t-24 ref 201902011911Details
#1100 - electrical t-24 ref 201902011911 | |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 455 Market St | A S F Electric Inc | #1690 - electrical t-24 ref 201903226028Details
#1690 - electrical t-24 ref 201903226028 | |
| May 31, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Convergint Technologies Llc | 2 way emergency communicator system on 3rd, 7th, 8th floor lobbies control equip located on 1stDetails
2 way emergency communicator system on 3rd, 7th, 8th floor lobbies control equip located on 1st | $15,000 |
| May 30, 2019 | Expired or cancelled cancelled Jan 2026 | 455 Market St | Novo Construction Inc | 8th floor: revision to pa# 201901241201 to revise demolition and construction plans.Details
8th floor: revision to pa# 201901241201 to revise demolition and construction plans. | |
| May 30, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 7th floor: revision to pa# 201901241200 to revise demolition and construction plans and addition of food service area.Details
7th floor: revision to pa# 201901241200 to revise demolition and construction plans and addition of food service area. | |
| May 22, 2019 | Completed final sign-off Aug 2019 | 455 Market St | 7th and 8th fl evacuation plansDetails
7th and 8th fl evacuation plans | $3,800 | |
| May 1, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Pribuss Engineering Inc | modify sprinkler head locations to accomodate new ceiling and partition layout for renovated office space on 2nd & 3rd floors. relocate 77 and 11. ref pa 2nd fl 2019-0124-1114 & 3rd fl ref 2019-0124-1116Details
modify sprinkler head locations to accomodate new ceiling and partition layout for renovated office space on 2nd & 3rd floors. relocate 77 and 11. ref pa 2nd fl 2019-0124-1114 & 3rd fl ref 2019-0124-1116 | $45,232 |
| Apr 15, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | suite 1650: partial tenant improvement incl demo, partition, ceiling, finishes, electrical, mechanical & plumbing.Details
suite 1650: partial tenant improvement incl demo, partition, ceiling, finishes, electrical, mechanical & plumbing. | $650,000 |
| Apr 8, 2019 | Completed final sign-off Jul 2020 | 455 Market St | Siemens Industry, Inc. | fire alarm work for floor 3 remodel; additions are 7 smoke detectors, 36 speaker/strobes, and 20 speakers. ref pa #201901241116. maher naDetails
fire alarm work for floor 3 remodel; additions are 7 smoke detectors, 36 speaker/strobes, and 20 speakers. ref pa #201901241116. maher na | $39,900 |
| Apr 8, 2019 | Completed final sign-off Jul 2020 | 455 Market St | Siemens Industry, Inc. | fire alarm work for floor 2 remodel; additions are 6 smoke detectors, 1 strobe power supply, and 30 speaker/strobes. ref pa #201901241114. maher naDetails
fire alarm work for floor 2 remodel; additions are 6 smoke detectors, 1 strobe power supply, and 30 speaker/strobes. ref pa #201901241114. maher na | $24,400 |
| Apr 3, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 8th flr mep for ti ref 201901241201 maher naDetails
8th flr mep for ti ref 201901241201 maher na | $288,000 |
| Apr 3, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 7th flr mep for ti ref 201901241200 maher naDetails
7th flr mep for ti ref 201901241200 maher na | $288,000 |
| Mar 29, 2019 | Completed final sign-off Jul 2020 | 455 Market St | Siemens Industry, Inc. | 2nd fl - fire alarm work for the "restroom upgrades" - additions are 4 speakers and 4 strobesDetails
2nd fl - fire alarm work for the "restroom upgrades" - additions are 4 speakers and 4 strobes | $4,730 |
| Mar 29, 2019 | Completed final sign-off May 2019 | 455 Market St | Pioneer Fire Inc. | remodel-relocate (32) pendents and removed (9) pendents ref# 7th fl. 201901241200 & ref# 8th 201901241201Details
remodel-relocate (32) pendents and removed (9) pendents ref# 7th fl. 201901241200 & ref# 8th 201901241201 | $20,500 |
| Mar 28, 2019 | Completed final sign-off Jun 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ada form c for revision to app#201903044283Details
ada form c for revision to app#201903044283 | |
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 455 Market St | Siemens Industry, Inc. | 8th fl - fire alarm work for the "knotel" remodel; additions are 7 smoke detectors, 2 door holders, 33 speaker/strobes and 8 strobes. ref pa 2019-0124-1201Details
8th fl - fire alarm work for the "knotel" remodel; additions are 7 smoke detectors, 2 door holders, 33 speaker/strobes and 8 strobes. ref pa 2019-0124-1201 | $29,600 |
| Mar 22, 2019 | Completed final sign-off Jun 2019 | 455 Market St | Siemens Industry, Inc. | 7th fl l- fire alarm work for the "knotel" remodel; additions are 7 smoke detectors, 2 door holders, 33 speaker/strobes and 8 strobes. ref pa 2019-0124-1200Details
7th fl l- fire alarm work for the "knotel" remodel; additions are 7 smoke detectors, 2 door holders, 33 speaker/strobes and 8 strobes. ref pa 2019-0124-1200 | $29,600 |
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 16th floor: modification and demising of an extg t.i. to include selactive demolition and construction of non load bearing partitions, light fixture relocations, re switching, new office doors, frames and glazing, nw millwork and new finishes.Details
16th floor: modification and demising of an extg t.i. to include selactive demolition and construction of non load bearing partitions, light fixture relocations, re switching, new office doors, frames and glazing, nw millwork and new finishes. | $329,142 |
| Mar 21, 2019 | Completed final sign-off Sep 2019 | 455 Market St | Novo Construction Inc | 8th fl - electrical work for tenant improvement. ref pa 2019-0124-1201Details
8th fl - electrical work for tenant improvement. ref pa 2019-0124-1201 | $200,000 |
| Mar 21, 2019 | Completed final sign-off Sep 2019 | 455 Market St | Novo Construction Inc | 7th fl - electrical work for tenant improvement. ref pa 2019-0124-1200Details
7th fl - electrical work for tenant improvement. ref pa 2019-0124-1200 | $200,000 |
| Mar 4, 2019 | Completed final sign-off Jun 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite 970. modification & demising of (e) t.i incl selective demo & construction of non load-bearing, modifications to ceiling grid/tile, light fixture relocation/new including re-switching/salvage/reuse of (e) selective materials.Details
suite 970. modification & demising of (e) t.i incl selective demo & construction of non load-bearing, modifications to ceiling grid/tile, light fixture relocation/new including re-switching/salvage/reuse of (e) selective materials. | $123,144 |
| Feb 21, 2019 | Completed final sign-off Aug 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 16/f: barrier removal for ada compliant upgrades to (e) restroom facilities. maher n/a.Details
16/f: barrier removal for ada compliant upgrades to (e) restroom facilities. maher n/a. | $50,000 |
| Feb 13, 2019 | Completed final sign-off Jul 2021 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | structure drawing for movable partition in the conference room on 3rd fl.Details
structure drawing for movable partition in the conference room on 3rd fl. | $1,200,000 |
| Feb 13, 2019 | Completed final sign-off Jul 2021 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | structural drawing for seismic bracing at the shelving system/open storage on 2nd fl.Details
structural drawing for seismic bracing at the shelving system/open storage on 2nd fl. | |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 455 Market St | Siemens Industry, Inc. | ref. permit number 2018-0405-5626. fire alarm "as built" permit for the "shower/bike storage" remodel on g1 level per the testin sffd inspector, drawings reflect the addition of 2 relay modules and a matrix correction.Details
ref. permit number 2018-0405-5626. fire alarm "as built" permit for the "shower/bike storage" remodel on g1 level per the testin sffd inspector, drawings reflect the addition of 2 relay modules and a matrix correction. | $1,000 |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite #1100:modification & demising of extg t.i. to include selective demolition for construction of non load bearing partitions, modifications to ceiling grid & tile, light fixture relocation & nw including re-switching, salvage & reuse of extg materials.n/a for maherDetails
suite #1100:modification & demising of extg t.i. to include selective demolition for construction of non load bearing partitions, modifications to ceiling grid & tile, light fixture relocation & nw including re-switching, salvage & reuse of extg materials.n/a for maher | $245,000 |
| Jan 24, 2019 | Completed final sign-off Jul 2021 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 2/f: modification of e tenant improvement to include new demising wall, selective demo and construction of non load bearing partitons, millwork, new light fixtures, finishes on second floor.Details
2/f: modification of e tenant improvement to include new demising wall, selective demo and construction of non load bearing partitons, millwork, new light fixtures, finishes on second floor. | $850,000 |
| Jan 24, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 7th floor: demolition of non structural wall/flooring, new construction consists of non-structural wall, new millwork, new ligh fixturesDetails
7th floor: demolition of non structural wall/flooring, new construction consists of non-structural wall, new millwork, new ligh fixtures | $2,000,000 |
| Jan 24, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 8th floor: demolition of non structural wall/flooring. new construction consists of non structural wall, new millwork, new light fixtures, no structural work included.Details
8th floor: demolition of non structural wall/flooring. new construction consists of non structural wall, new millwork, new light fixtures, no structural work included. | $2,000,000 |
| Jan 24, 2019 | Completed final sign-off Jul 2021 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 3/f: modification of e tenant improvment to include new demising wall, selective demo and contruction of non load bearing partitons, millwork, new light fixtures and finishes on the third floor.Details
3/f: modification of e tenant improvment to include new demising wall, selective demo and contruction of non load bearing partitons, millwork, new light fixtures and finishes on the third floor. | $1,200,000 |
| Dec 12, 2018 | Completed final sign-off Dec 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | demo restroom toilet partition, millwork, wall & floorDetails
demo restroom toilet partition, millwork, wall & floor | $116,575 |
| Dec 7, 2018 | Completed final sign-off Apr 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ada compliant upgrades to (e) restroom facilitesDetails
ada compliant upgrades to (e) restroom facilites | $32,000 |
| Dec 7, 2018 | Completed final sign-off May 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ada compliant upgrades to (e) restroom facilitesDetails
ada compliant upgrades to (e) restroom facilites | $32,000 |
| Dec 7, 2018 | Completed final sign-off Apr 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ada compliant upgrades to (e) restroom facilitesDetails
ada compliant upgrades to (e) restroom facilites | $32,000 |
| Oct 17, 2018 | Expired or cancelled cancelled Jan 2026 | 455 Market St | revision to 201808036455. furring wall on both side of restroom at woman's bathroom in order to compensate for 2 single carriersDetails
revision to 201808036455. furring wall on both side of restroom at woman's bathroom in order to compensate for 2 single carriers | $5,000 | |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 455 Market St | Golden Gate Fire Protection Inc | fire sprinkler only - rleocate 145 upright, add 1 for the 7th fl. demo planDetails
fire sprinkler only - rleocate 145 upright, add 1 for the 7th fl. demo plan | $75,400 |
| Sep 26, 2018 | Never finaled issued Sep 2018, no final | 455 Market St | Certified Fire And Safety | suite 140: revision to ul300 ansul system to project kitchen hood and cooking equipment ref pa 2018-0917-0416Details
suite 140: revision to ul300 ansul system to project kitchen hood and cooking equipment ref pa 2018-0917-0416 | |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 455 Market St | Novo Construction Inc | 3rd flr. electrical work for tenant improvement. ref pa 201808036455Details
3rd flr. electrical work for tenant improvement. ref pa 201808036455 | $15,000 |
| Sep 17, 2018 | Completed final sign-off Oct 2018 | 455 Market St | Certified Fire And Safety | suite#140 install ul300 core & awsul fire systems to protect kitchen hoods, cooking equipment, and polllution control unit. ref#20705257666Details
suite#140 install ul300 core & awsul fire systems to protect kitchen hoods, cooking equipment, and polllution control unit. ref#20705257666 | $9,000 |
| Sep 6, 2018 | Expired or cancelled withdrawn Jan 2019 | 455 Market St | Novo Construction Inc | mechanical & electrical for tenant improvement on the 3rd fl. ref arch #201808157424. maher naDetails
mechanical & electrical for tenant improvement on the 3rd fl. ref arch #201808157424. maher na | |
| Aug 30, 2018 | Completed final sign-off Apr 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | revision to app#201709077273 which includes selective demolition of non bearing restroom partions, millwork. wall and floor finishes. plmbg fixtures, restroom accessories, lighting fixture and lighting switchesDetails
revision to app#201709077273 which includes selective demolition of non bearing restroom partions, millwork. wall and floor finishes. plmbg fixtures, restroom accessories, lighting fixture and lighting switches | $23,180 |
| Aug 15, 2018 | Expired or cancelled cancelled Feb 2019 | 455 Market St | Novo Construction Inc | 3rd fl - ti on the 3rd fl to include meeting rooms and employee break areaDetails
3rd fl - ti on the 3rd fl to include meeting rooms and employee break area | $1,150,000 |
| Aug 8, 2018 | Expired or cancelled cancelled Nov 2019 | 455 Market St | Pioneer Fire Inc. | remove 15 pendent sprinklers relocate 12 pendent sprinkersDetails
remove 15 pendent sprinklers relocate 12 pendent sprinkers | $7,141 |
| Aug 3, 2018 | Completed final sign-off Nov 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 3rd flr. upgrade 2 restrooms for ada compliance, title 24Details
3rd flr. upgrade 2 restrooms for ada compliance, title 24 | $280,000 |
| Aug 1, 2018 | Completed final sign-off Feb 2019 | 455 Market St | A S F Electric Inc | title 24 ref pa 2018-0405-5626Details
title 24 ref pa 2018-0405-5626 | $7,500 |
| Jul 27, 2018 | Completed final sign-off Nov 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 8th fl: selective demo of non-bearing partitions, ceilings, millworkl, plumbing and finishes per ab-017. maher naDetails
8th fl: selective demo of non-bearing partitions, ceilings, millworkl, plumbing and finishes per ab-017. maher na | $80,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 7th fl: selective demo of non-bearing partitions, ceilings, millworkl, plumbing and finishes per ab-017. maher naDetails
7th fl: selective demo of non-bearing partitions, ceilings, millworkl, plumbing and finishes per ab-017. maher na | $95,000 |
| Jul 26, 2018 | Completed final sign-off Sep 2018 | 455 Market St | Siemens Industry, Inc. | 1st flr - fire alarm for "the melt" add 4 duct dets. 8 speaker/strobes and 2 strobes ref 201705257666. n/a for maher.Details
1st flr - fire alarm for "the melt" add 4 duct dets. 8 speaker/strobes and 2 strobes ref 201705257666. n/a for maher. | $12,520 |
| Jul 20, 2018 | Completed final sign-off Jul 2018 | 455 Market St | Golden Gate Fire Protection Inc | fire sprinkler only. garage level 1. shower & bike area. relocate 5 pendents. maher n/aDetails
fire sprinkler only. garage level 1. shower & bike area. relocate 5 pendents. maher n/a | $2,500 |
| Jul 18, 2018 | Never finaled issued Jul 2018, no final | 455 Market St | Novo Construction Inc | 3rd fl: interior demo of non-structural partitions, finishes, ceiling, lighting. per ab-017. maher naDetails
3rd fl: interior demo of non-structural partitions, finishes, ceiling, lighting. per ab-017. maher na | $5,000 |
| Jul 17, 2018 | Never finaled issued Jan 2019, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | basement/lower level parking: addition of (1) heat pump/(1) exhaust fan/(1) outside air supply fan. no structural changes. maher n/a.Details
basement/lower level parking: addition of (1) heat pump/(1) exhaust fan/(1) outside air supply fan. no structural changes. maher n/a. | $76,836 |
| Jul 11, 2018 | Completed final sign-off Sep 2018 | 455 Market St | Potter Fire Protection | fire sprinklers-relocate 17 pendent sprinklers. replace 11 pendent sprinklers with upright. install 2 sprinklers under ducts. ref pa 2017-0525-7666Details
fire sprinklers-relocate 17 pendent sprinklers. replace 11 pendent sprinklers with upright. install 2 sprinklers under ducts. ref pa 2017-0525-7666 | $15,000 |
| Jul 5, 2018 | Completed final sign-off Aug 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 3rd fl: selective demo of non-structural bearing restroom partitions, millwork, wall and floor finishes, plumbing fixtures, restroom accessories, light fixtures and light switches.Details
3rd fl: selective demo of non-structural bearing restroom partitions, millwork, wall and floor finishes, plumbing fixtures, restroom accessories, light fixtures and light switches. | $180,000 |
| Jun 22, 2018 | Completed final sign-off Oct 2018 | 455 Market St | Siemens Industry, Inc. | fire alarm work the suite 500 heat pump installatoin addition is 1 duct detectorDetails
fire alarm work the suite 500 heat pump installatoin addition is 1 duct detector | $1,585 |
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 455 Market St | Siemens Industry, Inc. | fire alarm work for the shower bike storage areas garage level gi additions are 3 duct detectors, 2 speaker strobes 3 strobes. ref 201804055626Details
fire alarm work for the shower bike storage areas garage level gi additions are 3 duct detectors, 2 speaker strobes 3 strobes. ref 201804055626 | $7,750 |
| Jun 1, 2018 | Completed final sign-off Jun 2018 | 455 Market St | Siemens Industry, Inc. | 10th flr - fire alarm - "suite 1050" remodel - 2 speaker/strobes are being relocated and a pull station/smk det are removed. no new devices maher na ref pa201803264626Details
10th flr - fire alarm - "suite 1050" remodel - 2 speaker/strobes are being relocated and a pull station/smk det are removed. no new devices maher na ref pa201803264626 | $1,000 |
| May 31, 2018 | Never finaled issued Jun 2018, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite 500 - modify (e) hvac system to match layout - add 1 heat pump with control for cooling, air balance hvac - outside air quantities & ventilation rates are provided through (e) equip & will remain uncharged as result of work. maher n/a.Details
suite 500 - modify (e) hvac system to match layout - add 1 heat pump with control for cooling, air balance hvac - outside air quantities & ventilation rates are provided through (e) equip & will remain uncharged as result of work. maher n/a. | $264,771 |
| May 23, 2018 | Completed final sign-off Jun 2018 | 455 Market St | 10th floor evacuation maps (x3) n/a maherDetails
10th floor evacuation maps (x3) n/a maher | $1,650 | |
| Apr 20, 2018 | Expired or cancelled cancelled Jan 2026 | 455 Market St | modify (e) hvac system to match (n)arch layout, addition of one heat pump w/ controls for cooling air balance.Details
modify (e) hvac system to match (n)arch layout, addition of one heat pump w/ controls for cooling air balance. | $266,000 | |
| Apr 10, 2018 | Completed final sign-off Nov 2018 | 455 Market St | A S F Electric Inc | title 24 ref 201802060561 maher na includes exit sign and emergency lightingDetails
title 24 ref 201802060561 maher na includes exit sign and emergency lighting | |
| Apr 5, 2018 | Completed final sign-off Feb 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | scope of work includes modification to an extg storage room. new bike storage and shower room. impromvents to include selective demolition and construction of non-load bearing partition & construction of new lighting fixtures, new doors, new plmg, showers,nw sinks, nw finishes. n/a for maherDetails
scope of work includes modification to an extg storage room. new bike storage and shower room. impromvents to include selective demolition and construction of non-load bearing partition & construction of new lighting fixtures, new doors, new plmg, showers,nw sinks, nw finishes. n/a for maher | $892,873 |
| Mar 26, 2018 | Completed final sign-off Jun 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 10/f: scope of work includes expansion of existing suite 1000 into suite 1050. work also includes selective demo & construction of non-load bearing partitions, new ceiling grid & tiles, new office doors & frames & finishes.Details
10/f: scope of work includes expansion of existing suite 1000 into suite 1050. work also includes selective demo & construction of non-load bearing partitions, new ceiling grid & tiles, new office doors & frames & finishes. | $100,000 |
| Mar 5, 2018 | Completed final sign-off Mar 2018 | 455 Market St | Golden Gate Fire Protection Inc | 5th flr, suite 500-fire sprinklers - relocate 6 pendent sprinklers ref 201802060561 maher naDetails
5th flr, suite 500-fire sprinklers - relocate 6 pendent sprinklers ref 201802060561 maher na | $1,530 |
| Feb 6, 2018 | Completed final sign-off Nov 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 5th flr - selective demo and construction of non load bearing partitions, new lighting fixtures, new doors & frames and finishes. maher naDetails
5th flr - selective demo and construction of non load bearing partitions, new lighting fixtures, new doors & frames and finishes. maher na | $153,650 |
| Jan 16, 2018 | Completed final sign-off Nov 2022 | 455 Market St | Ayoob & Peery Plumbing Co Inc | g/f: relocate fire sprinklers per tenant improvements (totral 9 relocate) ref. pa#201711012838. n/a for maher.Details
g/f: relocate fire sprinklers per tenant improvements (totral 9 relocate) ref. pa#201711012838. n/a for maher. | $2,025 |
| Jan 11, 2018 | Completed final sign-off Jan 2018 | 455 Market St | Siemens Industry, Inc. | fire alarm work for the "starbuck's" remodel on floor 1; additions are 1 speaker/strobe and 1 strobe. ref pa 2017-1101-2838. n/a for maher.Details
fire alarm work for the "starbuck's" remodel on floor 1; additions are 1 speaker/strobe and 1 strobe. ref pa 2017-1101-2838. n/a for maher. | $1,200 |
| Jan 8, 2018 | Completed final sign-off Jan 2018 | 455 Market St | C B F Inc | provide new lighting and branch circuiting to existing panel; maintain some existing power/provide additional power and railways as required to power and signal outlets. ref pa 2016-0825-5970; n/a maherDetails
provide new lighting and branch circuiting to existing panel; maintain some existing power/provide additional power and railways as required to power and signal outlets. ref pa 2016-0825-5970; n/a maher | $50,000 |
| Jan 4, 2018 | Completed final sign-off Sep 2018 | 455 Market St | Acco Engineered Systems Inc. Dba Acco En | cooling tower replacement #2, like for like. initial permit was for only one tower. n/a for maherDetails
cooling tower replacement #2, like for like. initial permit was for only one tower. n/a for maher | $400,000 |
| Dec 4, 2017 | Completed final sign-off Jan 2018 | 455 Market St | Peacock Construction | ground floor - t-24 mechanical for work under pa #201708255970. n/a maher ordinanceDetails
ground floor - t-24 mechanical for work under pa #201708255970. n/a maher ordinance | $14,000 |
| Dec 1, 2017 | Completed final sign-off Dec 2017 | 455 Market St | Siemens Industry, Inc. | 1st floor fire alarm "as-built" to indicate that no kitchen hood suppression system was installed for the "organic coup" remodel per the sffd testing inspector's request. ref pa #201708255970. n/a maher ordinanceDetails
1st floor fire alarm "as-built" to indicate that no kitchen hood suppression system was installed for the "organic coup" remodel per the sffd testing inspector's request. ref pa #201708255970. n/a maher ordinance | |
| Dec 1, 2017 | Completed final sign-off Sep 2019 | 455 Market St | A S F Electric Inc | title 24/ electrical only ref pa 2017-0907-7273Details
title 24/ electrical only ref pa 2017-0907-7273 | $15,000 |
| Nov 15, 2017 | Completed final sign-off Dec 2017 | 455 Market St | Siemens Industry, Inc. | fire alarm work for the "suite 1190" remodel on floor 11; additions are 1 speaker and 3 speaker/strobes. ref pa 2017-0907-7273. maher naDetails
fire alarm work for the "suite 1190" remodel on floor 11; additions are 1 speaker and 3 speaker/strobes. ref pa 2017-0907-7273. maher na | $2,540 |
| Nov 13, 2017 | Completed final sign-off Jan 2018 | 455 Market St | Thomas Swan Sign Co Inc | new non electric projecting sign. maher n/aDetails
new non electric projecting sign. maher n/a | $3,000 |
| Nov 10, 2017 | Completed final sign-off Dec 2017 | 455 Market St | Siemens Industry, Inc. | fire alarm work for the "organic coup" remodel on floor 1; additions are 1 monitor module for the kitchen hood suppression system and 1 speaker/strobe. ref arch pa 201708255970, no mep no ul300 re pa's n/a maherDetails
fire alarm work for the "organic coup" remodel on floor 1; additions are 1 monitor module for the kitchen hood suppression system and 1 speaker/strobe. ref arch pa 201708255970, no mep no ul300 re pa's n/a maher | $1,120 |
| Nov 1, 2017 | Completed final sign-off May 2019 | 455 Market St | T C B Builders Inc | suite #100 - renovation of existing unit "starbucks coffee" - remove existing & install new walls, doors, casework, furniture, finishes, ceilings & lighting. new restrooms fixtures & accessories for compliance. permit 201605036413 is to be cancelled. maher naDetails
suite #100 - renovation of existing unit "starbucks coffee" - remove existing & install new walls, doors, casework, furniture, finishes, ceilings & lighting. new restrooms fixtures & accessories for compliance. permit 201605036413 is to be cancelled. maher na | $129,245 |
| Oct 30, 2017 | Completed final sign-off Oct 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ste 1190 -modify (e) hvac system to match new architectural layout. the addition of one vav box with controls. air balance hvac system.Details
ste 1190 -modify (e) hvac system to match new architectural layout. the addition of one vav box with controls. air balance hvac system. | $16,900 |
| Oct 30, 2017 | Never finaled issued Oct 2017, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | modify (e) hvac system to match new architectural layout. the addition of one vav box with controls. air balance hvac system.Details
modify (e) hvac system to match new architectural layout. the addition of one vav box with controls. air balance hvac system. | $29,735 |
| Oct 26, 2017 | Completed final sign-off Nov 2017 | 455 Market St | Golden Gate Fire Protection Inc | 11th floor suite 1190 fire sprinklers - relocate 13 pendents. ref t.i. #201709077273. n/a maher ordianceDetails
11th floor suite 1190 fire sprinklers - relocate 13 pendents. ref t.i. #201709077273. n/a maher ordiance | $3,250 |
| Oct 20, 2017 | Completed final sign-off Nov 2017 | 455 Market St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 7 pendents for organic co-op, gr lvel 1st fl. ref ti 2017-0825-5970.Details
fire sprinkler only. relocate 7 pendents for organic co-op, gr lvel 1st fl. ref ti 2017-0825-5970. | $1,500 |
| Sep 28, 2017 | Completed final sign-off Oct 2017 | 455 Market St | A S F Electric Inc | 22/: suite 2200: fire alarm revision: as-builts to f/a pa#201708316495.Details
22/: suite 2200: fire alarm revision: as-builts to f/a pa#201708316495. | |
| Sep 19, 2017 | Completed final sign-off Nov 2017 | 455 Market St | A S F Electric Inc | new lights, plugs, controls. ref 2016-1123-3428.maher not reqDetails
new lights, plugs, controls. ref 2016-1123-3428.maher not req | $35,000 |
| Sep 7, 2017 | Completed final sign-off Oct 2019 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 11/f #1190- relocate demising wall between suite 1100 & 1190 to increase #1190 by approx. 155 sq.ft., selective demo & construct of non-load bearing partitions, new ceiling grid & tiles, new light fixtures & switching, new doors & frames, new millwork, plumbing & finishes. n/a ordinance #155-13Details
11/f #1190- relocate demising wall between suite 1100 & 1190 to increase #1190 by approx. 155 sq.ft., selective demo & construct of non-load bearing partitions, new ceiling grid & tiles, new light fixtures & switching, new doors & frames, new millwork, plumbing & finishes. n/a ordinance #155-13 | $228,000 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 455 Market St | A S F Electric Inc | ste. 2200: new lights, plugs & control. ref pa 2017-0711-1521Details
ste. 2200: new lights, plugs & control. ref pa 2017-0711-1521 | $40,000 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 455 Market St | A S F Electric Inc | ste 1450 - new lights, plugs & control. ref pa 2017-0405-3296Details
ste 1450 - new lights, plugs & control. ref pa 2017-0405-3296 | $45,000 |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 455 Market St | Golden Gate Fire Protection Inc | 2/f suite 220: fire sprinkler only: relocate 12 pendents for ste # 220 on the 2nd floor. n/a maherDetails
2/f suite 220: fire sprinkler only: relocate 12 pendents for ste # 220 on the 2nd floor. n/a maher | $3,000 |
| Aug 31, 2017 | Completed final sign-off Oct 2017 | 455 Market St | Siemens Industry, Inc. | fire alrm work for the suite 2200 remodel on floor 22; additions are 2 smoke detectors, 6 speaker/strobes, 1 strobe and 1 relay module. ref pa 2017-0711-1521. maher naDetails
fire alrm work for the suite 2200 remodel on floor 22; additions are 2 smoke detectors, 6 speaker/strobes, 1 strobe and 1 relay module. ref pa 2017-0711-1521. maher na | $8,360 |
| Aug 31, 2017 | Never finaled issued Sep 2017, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 22/f: modify hvac duct distribution to meet new layout; maher ord 155-13 naDetails
22/f: modify hvac duct distribution to meet new layout; maher ord 155-13 na | $8,688 |
| Aug 25, 2017 | Completed final sign-off Jan 2018 | 455 Market St | Peacock Construction | interior improvements to accomodate a new gr fl quick service restaurant, no seating. scope includes new walls, fixtures, finishes, plumbing. no exterior work. mep and fire under separate permits.Details
interior improvements to accomodate a new gr fl quick service restaurant, no seating. scope includes new walls, fixtures, finishes, plumbing. no exterior work. mep and fire under separate permits. | $70,000 |
| Jul 11, 2017 | Completed final sign-off Jan 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 22nd floor - modification of existing ti to include selective demo & construction of non load bearing partitions, existing ceiling grid & tiles, new light fixtures & re-switching, (e) office doors with new frames, new millwork & sink, and new finishesDetails
22nd floor - modification of existing ti to include selective demo & construction of non load bearing partitions, existing ceiling grid & tiles, new light fixtures & re-switching, (e) office doors with new frames, new millwork & sink, and new finishes | $355,000 |
| Jun 21, 2017 | Completed final sign-off Jan 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 2/f, suite 2200: partial floor - selective demo of non-load bearing partitions, millwork, electrical, plumbing and relocation of light fixtures per ab-017; maher ord 155-13 naDetails
2/f, suite 2200: partial floor - selective demo of non-load bearing partitions, millwork, electrical, plumbing and relocation of light fixtures per ab-017; maher ord 155-13 na | $8,700 |
| Jun 13, 2017 | Completed final sign-off Aug 2017 | 455 Market St | Siemens Industry, Inc. | fire alarm work for the "suite 1160" remodel on floor 11; addition of 1 speaker/strobe and the relocation of 1 speaker. ref pa 2017-0327-2444 n/a for maher.Details
fire alarm work for the "suite 1160" remodel on floor 11; addition of 1 speaker/strobe and the relocation of 1 speaker. ref pa 2017-0327-2444 n/a for maher. | $760 |
| Jun 13, 2017 | Completed final sign-off Aug 2017 | 455 Market St | Siemens Industry, Inc. | fire alarm work for the "suite 1450" remodel on floor 14; addition of 1 speaker/strobe and the relocation of 4 strobes. ref pa 2017-0405-3296 n/a for maher.Details
fire alarm work for the "suite 1450" remodel on floor 14; addition of 1 speaker/strobe and the relocation of 4 strobes. ref pa 2017-0405-3296 n/a for maher. | $1,510 |
| May 25, 2017 | Completed final sign-off Oct 2018 | 455 Market St | Northern Sun Associates | 2074 sq tenant improvement for restaurant, mep. facade upgrades. change of use from office to restaurant-maher extended ord. 155-13 n/aDetails
2074 sq tenant improvement for restaurant, mep. facade upgrades. change of use from office to restaurant-maher extended ord. 155-13 n/a | $325,000 |
| May 9, 2017 | Completed final sign-off Sep 2018 | 455 Market St | Acco Engineered Systems Inc. Dba Acco En | cooling tower replacement, like-for-likeDetails
cooling tower replacement, like-for-like | $400,000 |
| May 4, 2017 | Never finaled issued May 2017, no final | 455 Market St | Golden Gate Fire Protection Inc | 11th flr, suite 1160: fire sprinklers add 2, remove 2 relocate 11 pendents sprinklers. ti 2017-0327-2444 maher naDetails
11th flr, suite 1160: fire sprinklers add 2, remove 2 relocate 11 pendents sprinklers. ti 2017-0327-2444 maher na | $3,250 |
| Apr 5, 2017 | Completed final sign-off Jan 2018 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | selective demo and construction of non-load bearing partitions, relocation of lighting fixtures in existing grid and reswitching existing and new power, new office doors & frames, new millwork and plumbing and new finishes. n/a for maher.Details
selective demo and construction of non-load bearing partitions, relocation of lighting fixtures in existing grid and reswitching existing and new power, new office doors & frames, new millwork and plumbing and new finishes. n/a for maher. | $178,752 |
| Mar 27, 2017 | Never finaled issued Mar 2017, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 11th flr, suite 1160: selective demo and construction of non load bearing partitions new ceiling grid, tiles, new light fixtures & switching, new office doors & frames. new millwork and plumbing and new finishes. maher naDetails
11th flr, suite 1160: selective demo and construction of non load bearing partitions new ceiling grid, tiles, new light fixtures & switching, new office doors & frames. new millwork and plumbing and new finishes. maher na | $129,002 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 455 Market St | Siemens Industry, Inc. | 6th flr: fire alarm additions are 2 smoke detectors, 26 speaker, 3 speaker/strobes, 24 strobes and 1 door holder maher na ref 201611233428Details
6th flr: fire alarm additions are 2 smoke detectors, 26 speaker, 3 speaker/strobes, 24 strobes and 1 door holder maher na ref 201611233428 | $28,500 |
| Mar 7, 2017 | Completed final sign-off Jun 2017 | 455 Market St | Golden Gate Fire Protection Inc | 6th floor fire sprinkler only - relocate 4 sprinkler pendents, add 2 sprinkler pendents, plug off 1 head. n/a maher ordinanceDetails
6th floor fire sprinkler only - relocate 4 sprinkler pendents, add 2 sprinkler pendents, plug off 1 head. n/a maher ordinance | $1,500 |
| Nov 23, 2016 | Completed final sign-off Nov 2017 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | selective demolition & construction of non-load bearing partitions, modifications to ceiling grid & tiles, new light fixtures & switching, new doors & frames, new millwork & plumbing & new finishes. maher naDetails
selective demolition & construction of non-load bearing partitions, modifications to ceiling grid & tiles, new light fixtures & switching, new doors & frames, new millwork & plumbing & new finishes. maher na | $350,000 |
| Sep 12, 2016 | Never finaled issued Sep 2016, no final | 455 Market St | street space, sidewalk & mta parking meterDetails
street space, sidewalk & mta parking meter | ||
| Jun 14, 2016 | Never finaled issued Jun 2016, no final | 455 Market St | 15th floor: evac maps 3 maher naDetails
15th floor: evac maps 3 maher na | $1,500 | |
| Jun 7, 2016 | Never finaled issued Jun 2016, no final | 455 Market St | Thomas Swan Sign Co Inc | install 1 electrical double faced projecting signDetails
install 1 electrical double faced projecting sign | $3,000 |
| May 13, 2016 | Completed final sign-off May 2016 | 455 Market St | Pioneer Fire Inc. | 18th floor: relocate 13 pendent fire sprinklers. t.i. #201604804324 n/a for maher.Details
18th floor: relocate 13 pendent fire sprinklers. t.i. #201604804324 n/a for maher. | $2,300 |
| May 3, 2016 | Expired or cancelled cancelled Dec 2017 | 455 Market St | T C B Builders Inc | suite 100 -interior: remove (e) walls, install (n) walls & door. remnove (e) floor penetrations, replace w/new. remove (e) small wares, furniture, graphics, casework, flooring, walk of matt, finishes, bathroom fixtures, lighting & provide all new.install new handsink, modify (e) ceiling,m.e. systemDetails
suite 100 -interior: remove (e) walls, install (n) walls & door. remnove (e) floor penetrations, replace w/new. remove (e) small wares, furniture, graphics, casework, flooring, walk of matt, finishes, bathroom fixtures, lighting & provide all new.install new handsink, modify (e) ceiling,m.e. system | $104,160 |
| Apr 8, 2016 | Completed final sign-off Jul 2016 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite #1810: t.i. , selective demo and construction of non-load bearing walls, modification to ceiling and lighting.Details
suite #1810: t.i. , selective demo and construction of non-load bearing walls, modification to ceiling and lighting. | $85,000 |
| Apr 8, 2016 | Completed final sign-off May 2016 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite #1500: t.i. , selective demo and construction of non-load bearing walls, modification to ceiling and lighting.Details
suite #1500: t.i. , selective demo and construction of non-load bearing walls, modification to ceiling and lighting. | $98,000 |
| Feb 3, 2016 | Completed final sign-off Feb 2016 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | demo only on 5th floor, suite 550. this project invloves selective non bearing wall removal, demolish projection screen & wall, millwork, plumbing and finishes per ab-017Details
demo only on 5th floor, suite 550. this project invloves selective non bearing wall removal, demolish projection screen & wall, millwork, plumbing and finishes per ab-017 | $35,000 |
| Dec 4, 2015 | Never finaled issued Dec 2015, no final | 455 Market St | evacuation plan on 4/f. n/a ordinance #155-13Details
evacuation plan on 4/f. n/a ordinance #155-13 | $1,600 | |
| Nov 6, 2015 | Completed final sign-off Nov 2015 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 4th flr: this project involves a revision to ada compliant upgrades to existing restroom facilities in reference to issued permit app. 201506169060; signage only. maher n/aDetails
4th flr: this project involves a revision to ada compliant upgrades to existing restroom facilities in reference to issued permit app. 201506169060; signage only. maher n/a | $300 |
| Sep 22, 2015 | Completed final sign-off Nov 2015 | 455 Market St | R L H Fire Protection Inc | 4th flr: fire sprinkler tenant improvement relocate 300 heads, reference permit 201503134127; maher n/aDetails
4th flr: fire sprinkler tenant improvement relocate 300 heads, reference permit 201503134127; maher n/a | $58,325 |
| Sep 18, 2015 | Completed final sign-off Dec 2015 | 455 Market St | Siemens Industry, Inc. | fire alarm work for the emc ti remodel on floor 4, additions are 6 smoke detectors, 3 modules, 2 strobe power supply, 31 speakers, 28 speaker/strobes, 29 strobes. reference ti 2015.0813.4127 and mechanical 2015.0909.6495 maher not reqDetails
fire alarm work for the emc ti remodel on floor 4, additions are 6 smoke detectors, 3 modules, 2 strobe power supply, 31 speakers, 28 speaker/strobes, 29 strobes. reference ti 2015.0813.4127 and mechanical 2015.0909.6495 maher not req | $51,100 |
| Sep 9, 2015 | Completed final sign-off Dec 2015 | 455 Market St | Critchfield Mechanical Inc | #400- t.i. work, add (1) 2 ton wshp, (4) cw in-row cooling units, (9) reheat vav boxes, (11) cooling only vav boxes and remodel (21) vav boxes, alter existing vav system and hot water & condenser water system. n/a ordinance #155-13Details
#400- t.i. work, add (1) 2 ton wshp, (4) cw in-row cooling units, (9) reheat vav boxes, (11) cooling only vav boxes and remodel (21) vav boxes, alter existing vav system and hot water & condenser water system. n/a ordinance #155-13 | $436,648 |
| Aug 13, 2015 | Completed final sign-off Dec 2015 | 455 Market St | Dpr Construction | 4th floor suite 400 - new construction to include interior office renovation of non-structural interior partitions, doors, ceilings, & finishes. mep, life safety & sprinklers as deferred submittal. n/a maher ord. 155-13Details
4th floor suite 400 - new construction to include interior office renovation of non-structural interior partitions, doors, ceilings, & finishes. mep, life safety & sprinklers as deferred submittal. n/a maher ord. 155-13 | $1,620,720 |
| Jun 16, 2015 | Completed final sign-off Nov 2015 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | this project involves ada compliant upgrades to existing restroom facilities. n/a ordinance #155-13Details
this project involves ada compliant upgrades to existing restroom facilities. n/a ordinance #155-13 | $300,000 |
| Feb 5, 2015 | Completed final sign-off Aug 2015 | 455 Market St | Emcor Services/Mesa Energy Systems Inc | basement & 24th floor - remove (1) toilet exhaust fan & (1) garage exhaust fan in basement, replace with new (like for like). remove (2) supply fans & replace with new (like for like) on 24th floor. n/a ordinance #155-13.Details
basement & 24th floor - remove (1) toilet exhaust fan & (1) garage exhaust fan in basement, replace with new (like for like). remove (2) supply fans & replace with new (like for like) on 24th floor. n/a ordinance #155-13. | $210,000 |
| Jan 22, 2015 | Completed final sign-off Apr 2015 | 455 Market St | Anderson, Rowe & Buckley, Inc. | 20th floor ; add exhaust fan for copy room. relocate (e) supply grille and add 4 return grilles. ref. appl. #2014.1223.4383. maher n/a.Details
20th floor ; add exhaust fan for copy room. relocate (e) supply grille and add 4 return grilles. ref. appl. #2014.1223.4383. maher n/a. | $5,000 |
| Dec 23, 2014 | Completed final sign-off Apr 2015 | 455 Market St | Swinerton Builders | 20th floor - build a new print/supply room enclosure. ref t.i. #2014.0618.8720. n/a maher ordinanceDetails
20th floor - build a new print/supply room enclosure. ref t.i. #2014.0618.8720. n/a maher ordinance | $25,000 |
| Oct 28, 2014 | Completed final sign-off Dec 2014 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ada upgrades to bathrooms on the 20th flr; maher n/a. barrier removal work only under this permit. compliance with maher ordinance no 155-13 not required.Details
ada upgrades to bathrooms on the 20th flr; maher n/a. barrier removal work only under this permit. compliance with maher ordinance no 155-13 not required. | $65,000 |
| Sep 19, 2014 | Completed final sign-off Oct 2014 | 455 Market St | Siemens Industry, Inc. | 15th flr, ste 1500: fire alarm work , t.i. on floor 15 additions of 7 speakers, 2 speaker/strobes and 6 strobes, ref. permit 201404102903; maher n/aDetails
15th flr, ste 1500: fire alarm work , t.i. on floor 15 additions of 7 speakers, 2 speaker/strobes and 6 strobes, ref. permit 201404102903; maher n/a | $7,000 |
| Jul 31, 2014 | Completed final sign-off Oct 2014 | 455 Market St | Pribuss Engineering Inc | fire sprinkler t.i., relocate existing ground floor control station ; maher n/aDetails
fire sprinkler t.i., relocate existing ground floor control station ; maher n/a | $5,700 |
| Jul 31, 2014 | Completed final sign-off Aug 2014 | 455 Market St | Golden Gate Fire Protection Inc | 20th floor fire sprinkler - relocate 18 pendent sprinklers. ref #2014/0618/8720. n/a maher ordinanceDetails
20th floor fire sprinkler - relocate 18 pendent sprinklers. ref #2014/0618/8720. n/a maher ordinance | $9,270 |
| Jul 24, 2014 | Completed final sign-off Dec 2014 | 455 Market St | Swinerton Builders | 20th flr: this permit application is a revision to 201406188720, scope is limited to changing the rating of door 2022 (elevator lobby door) and removing the ab 2.10 requirement. elec, mech, fire/life safety under separate permits. maher n/aDetails
20th flr: this permit application is a revision to 201406188720, scope is limited to changing the rating of door 2022 (elevator lobby door) and removing the ab 2.10 requirement. elec, mech, fire/life safety under separate permits. maher n/a | |
| Jul 3, 2014 | Completed final sign-off Sep 2014 | 455 Market St | Siemens Industry, Inc. | 20th floor: t.i for "cnr" remodel: fire alarm work. addition of 3 speakers, 2 speaker/strobe and one strobe. also 2 speakers/strobes are being relocated. ref app# 201406188720. n/a for the maher ordinance #155-13Details
20th floor: t.i for "cnr" remodel: fire alarm work. addition of 3 speakers, 2 speaker/strobe and one strobe. also 2 speakers/strobes are being relocated. ref app# 201406188720. n/a for the maher ordinance #155-13 | $3,200 |
| Jul 2, 2014 | Never finaled issued Jul 2014, no final | 455 Market St | 18th floor: four evacuation map. n/a maher ordinance #155-13Details
18th floor: four evacuation map. n/a maher ordinance #155-13 | $1,600 | |
| Jun 26, 2014 | Completed final sign-off Dec 2014 | 455 Market St | Anderson, Rowe & Buckley, Inc. | mechanical work for ti on 20th floor to install new equipment. reference to pa 201406188720; maher n/aDetails
mechanical work for ti on 20th floor to install new equipment. reference to pa 201406188720; maher n/a | $60,000 |
| Jun 18, 2014 | Completed final sign-off Dec 2014 | 455 Market St | Swinerton Builders | 20th flr: partial floor tenant improvement on multi tenant floor includes demo, new partitions, ceiling revisions, electrical, mechanical, fire/life safety under separate permit. construction is on the 20th flr; compliance with ord 155-13 not required includes elevator lobby locksDetails
20th flr: partial floor tenant improvement on multi tenant floor includes demo, new partitions, ceiling revisions, electrical, mechanical, fire/life safety under separate permit. construction is on the 20th flr; compliance with ord 155-13 not required includes elevator lobby locks | $300,000 |
| Jun 18, 2014 | Completed final sign-off Aug 2014 | 455 Market St | Golden Gate Fire Protection Inc | on 15th floor - relocate 42 pendent sprinklers on 15th fl ti 201404102903Details
on 15th floor - relocate 42 pendent sprinklers on 15th fl ti 201404102903 | $21,630 |
| Apr 24, 2014 | Never finaled issued Apr 2014, no final | 455 Market St | Golden Gate Fire Protection Inc | 18th floor - relocate 3 pendent sprinklers. ref #2014.0324.1529. compliance with ordinance #155-13 not requiredDetails
18th floor - relocate 3 pendent sprinklers. ref #2014.0324.1529. compliance with ordinance #155-13 not required | $1,545 |
| Apr 10, 2014 | Completed final sign-off Oct 2014 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite #1500: selective demo and build back of non structural wall. replacement of acoustic ceiling, lighting electrical distribution. n/a for the maher ordinance #155-13Details
suite #1500: selective demo and build back of non structural wall. replacement of acoustic ceiling, lighting electrical distribution. n/a for the maher ordinance #155-13 | $263,000 |