Ian Lawlor
- Listed as
- architect, engineer
- Firm
- Stantec
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Jan 2020
27 permits since 2000 (architect on 25 permits, engineer on 2 permits): 19 completed, 6 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2020 | Completed final sign-off Dec 2020 | 470 Castro St | C & N Construction | revision to pa #2019-0916-1773: remodel to 2nd floor rooms #209 - lab #209 - consult for lab expansion. includes arch, electrical, mech, & plumbing improvements.Details
revision to pa #2019-0916-1773: remodel to 2nd floor rooms #209 - lab #209 - consult for lab expansion. includes arch, electrical, mech, & plumbing improvements. | $42,500 |
| Nov 19, 2019 | Completed final sign-off Nov 2020 | 818 Mission St | Aecore Inc. | revision to pa #201907115620. sheet a-9.0 revised with the following scope - change doors e211, e218, e410, e416, 500a, and 500b from hw set #4 to hw set #6.Details
revision to pa #201907115620. sheet a-9.0 revised with the following scope - change doors e211, e218, e410, e416, 500a, and 500b from hw set #4 to hw set #6. | |
| Nov 14, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Gci, Inc | 51st floor: revision to pa #2019-0124-1198 & #2019-0806-8035 - addition of fsd's & clarification regarding dfh assembliesDetails
51st floor: revision to pa #2019-0124-1198 & #2019-0806-8035 - addition of fsd's & clarification regarding dfh assemblies | $1,000 |
| Nov 14, 2019 | Completed final sign-off Mar 2020 | 1550 Bryant St | Field Construction Inc. | 4th fl - infill opening at (e) non-structural wall @ (e) storage room and install (n) interior access doorDetails
4th fl - infill opening at (e) non-structural wall @ (e) storage room and install (n) interior access door | $10,000 |
| Nov 14, 2019 | Never finaled issued Nov 2019, no final | 303 02nd St | Gci, Inc | occupant load calculation only room 504a circulation, 504b commons, 505 coffee #570 roof deck #506 x-large training. ref pa 2019-1101-6211. maher n/a.Details
occupant load calculation only room 504a circulation, 504b commons, 505 coffee #570 roof deck #506 x-large training. ref pa 2019-1101-6211. maher n/a. | |
| Nov 12, 2019 | Never finaled issued Feb 2020, no final | 303 02nd St | Novo Construction Inc | suite #401 4th floor: new construction of non-structural wall. new millwork, addition of power and data and replaceing light fixtures in suite #401. no structural work inlcuded in scope. no increase in area. no change in occupancy or use. fire/life safety, mech, elec, plumbing separate permitDetails
suite #401 4th floor: new construction of non-structural wall. new millwork, addition of power and data and replaceing light fixtures in suite #401. no structural work inlcuded in scope. no increase in area. no change in occupancy or use. fire/life safety, mech, elec, plumbing separate permit | $600,000 |
| Nov 12, 2019 | Never finaled issued Feb 2020, no final | 303 02nd St | Novo Construction Inc | #401 4th floor: demo of existing non-structural demising wall in suite 401. no increase in area. no change in occupancy or use. mech, electrical, and fire/life safety scopes are not part of project work. remodel per pf #201911127095Details
#401 4th floor: demo of existing non-structural demising wall in suite 401. no increase in area. no change in occupancy or use. mech, electrical, and fire/life safety scopes are not part of project work. remodel per pf #201911127095 | $30,000 |
| Sep 23, 2019 | Completed final sign-off May 2022 | 303 02nd St | Gci, Inc | 5th flr. demolition of non-structural walls.new construction including modifiying existing ceiling.replcing light fixtures.addition of new power/data. no structural work included in scope.no increse in area.l/s& mep under separatDetails
5th flr. demolition of non-structural walls.new construction including modifiying existing ceiling.replcing light fixtures.addition of new power/data. no structural work included in scope.no increse in area.l/s& mep under separat | $1,098,688 |
| Sep 12, 2019 | Completed final sign-off Nov 2020 | 818 Mission St | Aecore Inc. | revision to 201907115620 - accessibility upgrades misc work at vestibule on fls 2,4,5. bld entrance and adjacent sidewalk upgradedDetails
revision to 201907115620 - accessibility upgrades misc work at vestibule on fls 2,4,5. bld entrance and adjacent sidewalk upgraded | $25,000 |
| Aug 30, 2019 | Completed final sign-off Jun 2020 | 465 California St | Bcci Construction Company | demo of non-structural walls,new construction consits of non-structural wall & new millwork 2 replacing light fixture, no structural work included in scope life safety and mep to be design build under sep permitDetails
demo of non-structural walls,new construction consits of non-structural wall & new millwork 2 replacing light fixture, no structural work included in scope life safety and mep to be design build under sep permit | $1,995,878 |
| Aug 28, 2019 | Completed final sign-off Dec 2019 | 625 02nd St | Sc Builders, Inc | suite 104 - interior construction w/soft demo of non load bearing structurae. millwork in breakroom, ele power and reuse of (e) plm already in place. (no change to any hvac - hvac system will not be touched) ele permit submitted separatelyDetails
suite 104 - interior construction w/soft demo of non load bearing structurae. millwork in breakroom, ele power and reuse of (e) plm already in place. (no change to any hvac - hvac system will not be touched) ele permit submitted separately | $150,000 |
| Aug 6, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Gci, Inc | interior buildout of approx 7991 sf deferred mep. to reduce scope of work from previously approved and issued permit. ref 201901241198. construction cost reduced fro 3,600,000 to $1,000,000 (john finnegan 08/07/2019)Details
interior buildout of approx 7991 sf deferred mep. to reduce scope of work from previously approved and issued permit. ref 201901241198. construction cost reduced fro 3,600,000 to $1,000,000 (john finnegan 08/07/2019) | |
| Jul 31, 2019 | Completed final sign-off Apr 2021 | 303 02nd St | Gci, Inc | 4th floor: new construction consists of non structural wall, new millwork and replacing light fixture. no structural work including in scope, no increase in area. no change in occupancy or use. mep and life safty to be differed. n/a for maherDetails
4th floor: new construction consists of non structural wall, new millwork and replacing light fixture. no structural work including in scope, no increase in area. no change in occupancy or use. mep and life safty to be differed. n/a for maher | $917,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2019 | 660 Market St | Aecore Inc. | demo of non structural wall, new construction consists of non-structural wall, new millwork, and replacing light fixtures, no structural work included, no increase in area, no change in occupancy or use life safety,& sprinkler to be design build mep & life safety under sep permitDetails
demo of non structural wall, new construction consists of non-structural wall, new millwork, and replacing light fixtures, no structural work included, no increase in area, no change in occupancy or use life safety,& sprinkler to be design build mep & life safety under sep permit | $155,960 |
| Jul 25, 2019 | Completed final sign-off Jul 2020 | 100 Pine St | Team Commercial Construction Inc. | suite 1000: the proposed pnc layout is app. 13,500 sq ft.for a full floor tenant interior alteration including new lighting to meet t-24 requirement, nw furniture, and nw wall to accommodateDetails
suite 1000: the proposed pnc layout is app. 13,500 sq ft.for a full floor tenant interior alteration including new lighting to meet t-24 requirement, nw furniture, and nw wall to accommodate | $1,300,500 |
| May 30, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 7th floor: revision to pa# 201901241200 to revise demolition and construction plans and addition of food service area.Details
7th floor: revision to pa# 201901241200 to revise demolition and construction plans and addition of food service area. | |
| May 30, 2019 | Expired or cancelled cancelled Jan 2026 | 455 Market St | Novo Construction Inc | 8th floor: revision to pa# 201901241201 to revise demolition and construction plans.Details
8th floor: revision to pa# 201901241201 to revise demolition and construction plans. | |
| May 6, 2019 | Expired or cancelled cancelled Jan 2026 | 180 Howard St | 3rd flr. demo on non-structural walls, millwork, ceilings & light fixtuers. no structural work included in scope.Details
3rd flr. demo on non-structural walls, millwork, ceilings & light fixtuers. no structural work included in scope. | $126,750 | |
| Mar 4, 2019 | Completed final sign-off Jun 2019 | 625 02nd St | Sc Builders, Inc | 1st & 2nd - demo only, partial floor demo. ref pa201903014140 for f/s permit. to comply with ab-017. maher n/a.Details
1st & 2nd - demo only, partial floor demo. ref pa201903014140 for f/s permit. to comply with ab-017. maher n/a. | $25,000 |
| Jan 24, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 8th floor: demolition of non structural wall/flooring. new construction consists of non structural wall, new millwork, new light fixtures, no structural work included.Details
8th floor: demolition of non structural wall/flooring. new construction consists of non structural wall, new millwork, new light fixtures, no structural work included. | $2,000,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Gci, Inc | 51st flr, t.i. interior build-out of approx 7,991 sq ft. no structural work. no increase in area, no change in occ or use. life safety and sprinklers to be pulled separately. mep deferred.Details
51st flr, t.i. interior build-out of approx 7,991 sq ft. no structural work. no increase in area, no change in occ or use. life safety and sprinklers to be pulled separately. mep deferred. | $3,600,000 |
| Jan 24, 2019 | Completed final sign-off Oct 2019 | 455 Market St | Novo Construction Inc | 7th floor: demolition of non structural wall/flooring, new construction consists of non-structural wall, new millwork, new ligh fixturesDetails
7th floor: demolition of non structural wall/flooring, new construction consists of non-structural wall, new millwork, new ligh fixtures | $2,000,000 |
| Oct 23, 2018 | Never finaled issued Nov 2018, no final | 814 Mission St | Aecore Inc. | 4th flr - demo under sep permit. new construction is non structural walls, new millwork, replaceing light fixtures. mep/fire/life safety under sep permitDetails
4th flr - demo under sep permit. new construction is non structural walls, new millwork, replaceing light fixtures. mep/fire/life safety under sep permit | $200,000 |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 2351 Clay St | Herrero Builders Incorporated | revision to 201805159146, minor changes per arch drawings. work in 1st fl infusion centerDetails
revision to 201805159146, minor changes per arch drawings. work in 1st fl infusion center | |
| Jun 4, 2018 | Never finaled issued Jul 2018, no final | 2351 Clay St | Herrero Builders Incorporated | revision to pa 2017-1121-4570, revised drawings to switch location of toilet room and bulk sotrage. minor revision to plans per existing field conditions. revised mechanical, plumbing, electrical, and structural drawings to reflect architectural changesDetails
revision to pa 2017-1121-4570, revised drawings to switch location of toilet room and bulk sotrage. minor revision to plans per existing field conditions. revised mechanical, plumbing, electrical, and structural drawings to reflect architectural changes | |
| May 15, 2018 | Completed final sign-off Jan 2019 | 2351 Clay St | Herrero Builders Incorporated | g/f: renovate an existing conference room and toilet room into an outpatient infusion suite and new single occupancy toilet room. the remainder of the existing infusion department will be paint, have 3 new sinks added and a door removed such that 2 rooms may be completely separated. life safety def.Details
g/f: renovate an existing conference room and toilet room into an outpatient infusion suite and new single occupancy toilet room. the remainder of the existing infusion department will be paint, have 3 new sinks added and a door removed such that 2 rooms may be completely separated. life safety def. | $1,000,000 |
| May 11, 2018 | Completed final sign-off Feb 2021 | 500 02nd St | Opi Commercial Builders | demo of non structural wall, new construction of non structural wall, new millwork, replace light fixture. no structural. no increased area. no chang occupancy or use. ls/sprinkler, mep sep permitDetails
demo of non structural wall, new construction of non structural wall, new millwork, replace light fixture. no structural. no increased area. no chang occupancy or use. ls/sprinkler, mep sep permit | $300,000 |