Permit GraphShortlistSan Francisco building permits since 2000

Block 3717, lot 020

180 Howard St

City’s use
Commercial Office
Built
1981
Stories
13
Rooms
26 bathrooms
Building
205,690 sq ft
Lot
18,934 sq ft
Zoning
C3OSD
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 4, 2026In progress
issued Sep 2026
180 Howard StMetcon Ti, Incmechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women's
Details
Permit
202609047741
Permit issued
Sep 21, 2026

mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women's

Open the permit page

$150,000
Sep 4, 2026Completed
final sign-off Nov 2026
180 Howard StMetcon Ti, Incmechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n)
Details
Permit
202609047756
Permit issued
Sep 21, 2026
Final sign-off
Nov 3, 2026

mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n)

Open the permit page

$125,000
Aug 4, 2026In progress
issued Aug 2026
180 Howard StMetcon Ti, Inc9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531
Details
Permit
202608046040
Permit issued
Aug 12, 2026

9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531

Open the permit page

Jul 22, 2026Completed
final sign-off Nov 2026
180 Howard StMetcon Ti, Inc2nd floor: anchoring of existing one person furniture phone booths. new signage to designated a recessible phone room and restroom upgrade per form c
Details
Permit
202607225381
Permit issued
Jul 24, 2026
Final sign-off
Nov 3, 2026

2nd floor: anchoring of existing one person furniture phone booths. new signage to designated a recessible phone room and restroom upgrade per form c

Open the permit page

$10,000
Jun 30, 2026In progress
issued Jul 2026
180 Howard StMetcon Ti, Inc9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531
Details
Permit
202606304267
Permit issued
Jul 13, 2026

9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531

Open the permit page

$250,000
May 19, 2026Completed
final sign-off Nov 2026
180 Howard StMetcon Ti, Inc12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.
Details
Permit
202605191562
Permit issued
Jun 1, 2026
Final sign-off
Nov 3, 2026

12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.

Open the permit page

$750,000
May 19, 2026In progress
issued May 2026
180 Howard StMetcon Ti, Inc9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites, selective demo & construction of non-structural partitions, new finishes lighting fixtures, & millwork. mep & fire/life safety under seprate permit
Details
Permit
202605191531
Permit issued
May 20, 2026

9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites, selective demo & construction of non-structural partitions, new finishes lighting fixtures, & millwork. mep & fire/life safety under seprate permit

Open the permit page

May 15, 2026In progress
issued Jun 2026
180 Howard StMetcon Ti, Inc10/fl- ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.
Details
Permit
202605151369
Permit issued
Jun 1, 2026

10/fl- ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.

Open the permit page

$750,000
May 1, 2026In progress
issued May 2026
180 Howard StCa United Mechanical, Incremove and replace chw coil in rooftop unit and install new louvers.
Details
Permit
202605010535
Permit issued
May 8, 2026

remove and replace chw coil in rooftop unit and install new louvers.

Open the permit page

$598,634
Mar 10, 2026Completed
final sign-off Jul 2026
180 Howard StMetcon Ti, Inc8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286
Details
Permit
202603107275
Permit issued
Mar 18, 2026
Final sign-off
Jul 22, 2026

8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286

Open the permit page

$150,000
Feb 12, 2026Completed
final sign-off Mar 2026
180 Howard StPyro-Comm Systems, Inc.8th fl - adding 1 remote power supply; 2 smoke detectors; 8 strobes and 29 speaker strobes, 1 monitor module ` ref pa 202512192286
Details
Permit
202602125807
Permit issued
Feb 27, 2026
Final sign-off
Mar 25, 2026

8th fl - adding 1 remote power supply; 2 smoke detectors; 8 strobes and 29 speaker strobes, 1 monitor module ` ref pa 202512192286

Open the permit page

$12,000
Feb 9, 2026Expired or cancelled
withdrawn Jul 2026
180 Howard StFreedom Fire Protection Inc.9 fl:revise fire sprinkler system to accommodate new tenant floor layout. relocating 78 heads and installing 114 new heads. total of 192 sprinkler heads
Details
Permit
202601304906

9 fl:revise fire sprinkler system to accommodate new tenant floor layout. relocating 78 heads and installing 114 new heads. total of 192 sprinkler heads

Open the permit page

$60,000
Jan 14, 2026Completed
final sign-off Apr 2026
180 Howard StFreedom Fire Protection Inc.8/f: revise fire sprinkler system to accommodate new tenant floor layout. relocating 80 heads and installing 105 new heads. total of 185 sprinkler heads
Details
Permit
202601123679
Permit issued
Mar 26, 2026
Final sign-off
Apr 13, 2026

8/f: revise fire sprinkler system to accommodate new tenant floor layout. relocating 80 heads and installing 105 new heads. total of 185 sprinkler heads

Open the permit page

$20,000
Dec 19, 2025Completed
final sign-off Jul 2026
180 Howard StMetcon Ti, Inc8th floor tenant improvement, selective demolition and construction of non structural partitions, new finishes, light fixtures, and mill work. mep and fire/life and safety under seperate permit.
Details
Permit
202512192286
Permit issued
Jan 8, 2026
Final sign-off
Jul 22, 2026

8th floor tenant improvement, selective demolition and construction of non structural partitions, new finishes, light fixtures, and mill work. mep and fire/life and safety under seperate permit.

Open the permit page

$750,000
Dec 9, 2025Completed
final sign-off Jan 2026
180 Howard Stto obtain final inspection for work approved under 201312275094
Details
Permit
202512091289
Permit issued
Dec 9, 2025
Final sign-off
Jan 30, 2026

to obtain final inspection for work approved under 201312275094

Open the permit page

Dec 4, 2025In progress
issued Jan 2026
180 Howard StMetcon Ti, Inc9/f: tenant improvement to include new partitions, offices, and conference rooms. mep deferred.
Details
Permit
202512041010
Permit issued
Jan 9, 2026

9/f: tenant improvement to include new partitions, offices, and conference rooms. mep deferred.

Open the permit page

$750,000
Dec 3, 2025Completed
final sign-off Feb 2026
180 Howard StMetcon Ti, Inc7/f: deferred mep for ti# 202509044560. replace (e) plumbing fixtures at break froom 7506, according to cpc 2022 and energy code 2022. replace low pressure ductwork for ste 750. install (5) new terminal units. new power and signal devices throughout the space. new 2022 title 24 compliant lighting &
Details
Permit
202512030850
Permit issued
Dec 3, 2025
Final sign-off
Feb 27, 2026

7/f: deferred mep for ti# 202509044560. replace (e) plumbing fixtures at break froom 7506, according to cpc 2022 and energy code 2022. replace low pressure ductwork for ste 750. install (5) new terminal units. new power and signal devices throughout the space. new 2022 title 24 compliant lighting &

Open the permit page

$30,000
Nov 25, 2025Completed
final sign-off Feb 2026
180 Howard StPyro-Comm Systems, Inc.tenant improvement 07th floor suite 750 add (1) smoke, (7) strobe, (10) speaker strobes.
Details
Permit
202511250373
Permit issued
Nov 25, 2025
Final sign-off
Feb 4, 2026

tenant improvement 07th floor suite 750 add (1) smoke, (7) strobe, (10) speaker strobes.

Open the permit page

$3,000
Nov 7, 2025Completed
final sign-off Dec 2025
180 Howard StFreedom Fire Protection Inc.7th/f ste# 750: fire sprinkler t.i. work relocate 41 heads & install 53 new heads. total 94. ref to t.i. 202509044560
Details
Permit
202511079183
Permit issued
Nov 10, 2025
Final sign-off
Dec 8, 2025

7th/f ste# 750: fire sprinkler t.i. work relocate 41 heads & install 53 new heads. total 94. ref to t.i. 202509044560

Open the permit page

$28,000
Oct 24, 2025Completed
final sign-off Feb 2026
180 Howard StMetcon Ti, Inc7th floor: revision to permit #202509044560; minor revisions to ceilings, light fixtures, millwork, and finishes.
Details
Permit
202510248110
Permit issued
Oct 24, 2025
Final sign-off
Feb 27, 2026

7th floor: revision to permit #202509044560; minor revisions to ceilings, light fixtures, millwork, and finishes.

Open the permit page

Sep 30, 2025Completed
final sign-off Dec 2025
180 Howard StMetcon Ti, Incsuite 700: installation and seismic anchoring of 4 phone booths.
Details
Permit
202509306431
Permit issued
Oct 3, 2025
Final sign-off
Dec 10, 2025

suite 700: installation and seismic anchoring of 4 phone booths.

Open the permit page

$8,000
Sep 15, 2025Completed
final sign-off Jan 2026
180 Howard StMetcon Ti, Inclobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with asse 1070, (n) water heater, drinking fountain with bottle filter and water boxes. mep deferred
Details
Permit
202509155304
Permit issued
Sep 17, 2025
Final sign-off
Jan 21, 2026

lobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with asse 1070, (n) water heater, drinking fountain with bottle filter and water boxes. mep deferred

Open the permit page

$75,000
Sep 12, 2025Completed
final sign-off Nov 2025
180 Howard StMetcon Ti, Incdeferred mep for pa# 202505025705: mech-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the space, new 2022 title-24 compliant lighting and controls. plumbing-install
Details
Permit
202509125237
Permit issued
Sep 12, 2025
Final sign-off
Nov 7, 2025

deferred mep for pa# 202505025705: mech-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the space, new 2022 title-24 compliant lighting and controls. plumbing-install

Open the permit page

$385,000
Sep 10, 2025Completed
final sign-off Sep 2025
180 Howard StPyro-Comm Systems, Inc.7th floor. add 1 power supply, 1 monitor module, 1 smoke, 7 stobes, 17 speaker/strobe to (e) system. modify existing fire alarm 7th floor suite 750 ti ref#: 202505025705.
Details
Permit
202509104942
Permit issued
Sep 17, 2025
Final sign-off
Sep 25, 2025

7th floor. add 1 power supply, 1 monitor module, 1 smoke, 7 stobes, 17 speaker/strobe to (e) system. modify existing fire alarm 7th floor suite 750 ti ref#: 202505025705.

Open the permit page

$10,000
Sep 4, 2025Completed
final sign-off Feb 2026
180 Howard StMetcon Ti, Inc7th fl, ste 750 interior ti; construction of non-structural partitions, new finishes, lighting fixtures and millwork. mep and fire/life safety under separate permit
Details
Permit
202509044560
Permit issued
Sep 17, 2025
Final sign-off
Feb 27, 2026

7th fl, ste 750 interior ti; construction of non-structural partitions, new finishes, lighting fixtures and millwork. mep and fire/life safety under separate permit

Open the permit page

$750,000
Aug 20, 2025Completed
final sign-off Jan 2026
180 Howard StMetcon Ti, Inc1/f: revision to permit 202501148318.. revise the description of scope of work stating that there is no modification to fire alarm or sprinkler
Details
Permit
202508203531
Permit issued
Oct 7, 2025
Final sign-off
Jan 21, 2026

1/f: revision to permit 202501148318.. revise the description of scope of work stating that there is no modification to fire alarm or sprinkler

Open the permit page

Jul 21, 2025Completed
final sign-off Sep 2025
180 Howard StFreedom Fire Protection Inc.fire sprinkler t.i. in office space - relocating 23 heads and installing 53 new heads. total 76 heads. only on the 7th floor suite 700. only on the 7th floor suite 700. ref#: 202505025705.
Details
Permit
202507211219
Permit issued
Jul 21, 2025
Final sign-off
Sep 26, 2025

fire sprinkler t.i. in office space - relocating 23 heads and installing 53 new heads. total 76 heads. only on the 7th floor suite 700. only on the 7th floor suite 700. ref#: 202505025705.

Open the permit page

$23,130
Jun 24, 2025Completed
final sign-off Oct 2025
180 Howard StFreedom Fire Protection Inc.fire sprinkler as built plan for pa # 2025-0408-3933 added 11 more heads from the original plan
Details
Permit
202506249335
Permit issued
Jun 24, 2025
Final sign-off
Oct 7, 2025

fire sprinkler as built plan for pa # 2025-0408-3933 added 11 more heads from the original plan

Open the permit page

$5,000
May 2, 2025Completed
final sign-off Nov 2025
180 Howard StMetcon Ti, Inc7/f: interior tenant improvement. selective demolition and construction of non-structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under separate permit.
Details
Permit
202505025705
Permit issued
Jun 3, 2025
Final sign-off
Nov 7, 2025

7/f: interior tenant improvement. selective demolition and construction of non-structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under separate permit.

Open the permit page

$750,000
Apr 8, 2025Completed
final sign-off Oct 2025
180 Howard StFreedom Fire Protection Inc.fire sprinkler ti in office remodel relocation 20 heads and installing 38 new heads total of 58 heads buiiding permit # 2024-1024-3671
Details
Permit
202504083933
Permit issued
May 6, 2025
Final sign-off
Oct 7, 2025

fire sprinkler ti in office remodel relocation 20 heads and installing 38 new heads total of 58 heads buiiding permit # 2024-1024-3671

Open the permit page

$18,600
Apr 4, 2025Completed
final sign-off Oct 2025
180 Howard StPyro-Comm Systems, Inc.addition to existing fire alarm system. ref pa# 202410243671. add 2 ceiling strobes, 2 speaker strobe with 2 weatherproof, 1 relay module for locks 5 speaker strobe (ceiling) 2 speaker strobe (wall), relocate existing dcut detector.
Details
Permit
202504043706
Permit issued
Apr 4, 2025
Final sign-off
Oct 7, 2025

addition to existing fire alarm system. ref pa# 202410243671. add 2 ceiling strobes, 2 speaker strobe with 2 weatherproof, 1 relay module for locks 5 speaker strobe (ceiling) 2 speaker strobe (wall), relocate existing dcut detector.

Open the permit page

$17,334
Mar 19, 2025Completed
final sign-off May 2026
182 Howard StGodsblessings2010 Inc Dba Iegc1/fl- ti of (e) commerical space to include (n) framing, flooring, drywall, electrical and graphics
Details
Permit
202503192593
Permit issued
May 8, 2025
Final sign-off
May 27, 2026

1/fl- ti of (e) commerical space to include (n) framing, flooring, drywall, electrical and graphics

Open the permit page

$20,000
Feb 18, 2025Completed
final sign-off Jan 2026
180 Howard Stadministrative permit to document lost drawings from original set# 201312275094 listed in original index. with no changes.
Details
Permit
202502180541
Permit issued
Apr 16, 2025
Final sign-off
Jan 30, 2026

administrative permit to document lost drawings from original set# 201312275094 listed in original index. with no changes.

Open the permit page

Feb 6, 2025Completed
final sign-off Jan 2026
180 Howard StMetcon Ti, Incexterior non-structural building entry mofification,scope includes new finishes & lighting at walkway ceiling,new signage under deferred permit.modifications to fire sprinkler under deferred permit.this scope of work does not change exisiting bldg occupancy,existing or accessible access.
Details
Permit
202501148318
Permit issued
May 14, 2025
Final sign-off
Jan 21, 2026

exterior non-structural building entry mofification,scope includes new finishes & lighting at walkway ceiling,new signage under deferred permit.modifications to fire sprinkler under deferred permit.this scope of work does not change exisiting bldg occupancy,existing or accessible access.

Open the permit page

$100,000
Feb 3, 2025Completed
final sign-off Jan 2026
180 Howard StMatrix Hg Inc1st/fl- ref 202410243671- hvac modifications to support interior tenant improvements, (n) grills, registers, diffusrs, and ductwork. install 1 (n) exhaust fan.
Details
Permit
202502039530
Permit issued
Feb 3, 2025
Final sign-off
Jan 21, 2026

1st/fl- ref 202410243671- hvac modifications to support interior tenant improvements, (n) grills, registers, diffusrs, and ductwork. install 1 (n) exhaust fan.

Open the permit page

$168,000
Oct 24, 2024Completed
final sign-off Jan 2026
180 Howard StMetcon Ti, Incground fl: interior ti. selective demo & construction of non-structural partitions. new ceilings, lighting, millwork & finishes. mep & life safety deferred submittal
Details
Permit
202410243671
Permit issued
Jan 29, 2025
Final sign-off
Jan 21, 2026

ground fl: interior ti. selective demo & construction of non-structural partitions. new ceilings, lighting, millwork & finishes. mep & life safety deferred submittal

Open the permit page

$500,000
Aug 15, 2024Completed
final sign-off Mar 2025
180 Howard StRichlen Construction6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural work building exterior site landscape or parking changes are proposed no mech elec or plumbing
Details
Permit
202408158726
Permit issued
Aug 16, 2024
Final sign-off
Mar 5, 2025

6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural work building exterior site landscape or parking changes are proposed no mech elec or plumbing

Open the permit page

$139,924
Jun 26, 2024Completed
final sign-off Nov 2024
180 Howard StPyro-Comm Systems, Inc.relocate 14 horn/strobes, 1 new speaker/strobe, add 7 strobes. add 1 smoke detector. replace e power supply with new one ref p/a #:2023 0612-9863
Details
Permit
202406265305
Permit issued
Jun 27, 2024
Final sign-off
Nov 4, 2024

relocate 14 horn/strobes, 1 new speaker/strobe, add 7 strobes. add 1 smoke detector. replace e power supply with new one ref p/a #:2023 0612-9863

Open the permit page

$2,000
Jun 7, 2024Completed
final sign-off Sep 2024
180 Howard StFreedom Fire Protection Inc.revise fire sprinkler system to accomate new spec suite floor plan. installing 102 new heads and relocating 25 heads: total 127
Details
Permit
202406073965
Permit issued
Jun 7, 2024
Final sign-off
Sep 6, 2024

revise fire sprinkler system to accomate new spec suite floor plan. installing 102 new heads and relocating 25 heads: total 127

Open the permit page

$25,500
Jun 4, 2024In progress
filed Jun 2024, not yet issued
180 Howard StPyro-Comm Systems, Inc.addition to (e) fire alarm system. (n) appliances will be added to provide proper coverage for area of work and connected to (e) remote power supply . all appliances will be activated on general alarm condition
Details
Permit
202406043615

addition to (e) fire alarm system. (n) appliances will be added to provide proper coverage for area of work and connected to (e) remote power supply . all appliances will be activated on general alarm condition

Open the permit page

$16,171
May 30, 2024Completed
final sign-off Nov 2024
180 Howard StLegacy Mechanical & Energy Services, Increvision to pa# 202404180237 - 2/f: demo ducting where opening areas will be.reuse all existing vav to cfm need for zone.install linear slot diffuses for wood ceiling aeras.new spiral ducting w/ registers.relocate registers as need for new t-bar offices & ceilig axion.
Details
Permit
202405303348
Permit issued
Jul 22, 2024
Final sign-off
Nov 14, 2024

revision to pa# 202404180237 - 2/f: demo ducting where opening areas will be.reuse all existing vav to cfm need for zone.install linear slot diffuses for wood ceiling aeras.new spiral ducting w/ registers.relocate registers as need for new t-bar offices & ceilig axion.

Open the permit page

$750,000
Apr 18, 2024Completed
final sign-off Nov 2024
180 Howard StMetcon Ti, Incinterior ti selective demo and construction of non structural partitions, new finishes, light fixtures and millwork. mep and fire life safety under separate permit
Details
Permit
202404180237
Permit issued
Jun 10, 2024
Final sign-off
Nov 14, 2024

interior ti selective demo and construction of non structural partitions, new finishes, light fixtures and millwork. mep and fire life safety under separate permit

Open the permit page

$750,000
Sep 14, 2023In progress
issued Oct 2024
180 Howard StPyro-Comm Systems, Inc.three relay modules will be added for elevator recall functions.
Details
Permit
202309146627
Permit issued
Oct 15, 2024

three relay modules will be added for elevator recall functions.

Open the permit page

$2,000
Jun 12, 2023Completed
final sign-off Oct 2025
180 Howard StPyro-Comm Systems, Inc.1/f & roof: fire alarm: 1 weatherproof strobe , 2 relay modules, 4 dual monitor modules, 3 smoke detctors, 2 monitor modules added to provide proper coverage. ref pa 201312275094.
Details
Permit
202306129863
Permit issued
Jun 13, 2023
Final sign-off
Oct 21, 2025

1/f & roof: fire alarm: 1 weatherproof strobe , 2 relay modules, 4 dual monitor modules, 3 smoke detctors, 2 monitor modules added to provide proper coverage. ref pa 201312275094.

Open the permit page

$4,000
Jun 30, 2020Never finaled
issued Jul 2020, no final
180 Howard Ststreet space
Details
Permit
M1214632
Permit issued
Jul 2, 2020

street space

Open the permit page

Jun 16, 2020Never finaled
filed Jun 2020, never issued
180 Howard Ststreet space
Details
Permit
M1211047

street space

Open the permit page

Feb 13, 2020Expired or cancelled
cancelled Jul 2024
180 Howard Staddition of four orangebox air-25 conference room units to existing open office space, addition of new sprinklers tied to existing system under separate permit), no mechanical, electrical & plumbing work on first floor.
Details
Permit
202002134485

addition of four orangebox air-25 conference room units to existing open office space, addition of new sprinklers tied to existing system under separate permit), no mechanical, electrical & plumbing work on first floor.

Open the permit page

$80,000
Feb 13, 2020Expired or cancelled
cancelled Jan 2026
180 Howard St1st fl: addition of 12 room privacy rods to existing open office space. addition of new sprinklers and fire strobes tied to existing system. no mechanical, electrical or plumbing work. maher na
Details
Permit
202002134491

1st fl: addition of 12 room privacy rods to existing open office space. addition of new sprinklers and fire strobes tied to existing system. no mechanical, electrical or plumbing work. maher na

Open the permit page

$80,000
Nov 1, 2019Completed
final sign-off Nov 2019
180 Howard StPyro-Comm Systems, Inc.fire alarm 3 ceiling speaker strobes to be added to existing facu. ref pa 2019-0327-6356
Details
Permit
201911016169
Permit issued
Nov 1, 2019
Final sign-off
Nov 7, 2019

fire alarm 3 ceiling speaker strobes to be added to existing facu. ref pa 2019-0327-6356

Open the permit page

$1,500
Oct 9, 2019Never finaled
issued Oct 2019, no final
180 Howard StPotter Fire Protectionrelocate 6 and add 3 fire sprinklers ref 201908148801
Details
Permit
201910093962
Permit issued
Oct 9, 2019

relocate 6 and add 3 fire sprinklers ref 201908148801

Open the permit page

$4,500
Sep 24, 2019Never finaled
issued Sep 2019, no final
180 Howard StTrue North Signs & Graphic Servicesinstall electric wall projecting double faced sign
Details
Permit
201909242441
Permit issued
Sep 24, 2019

install electric wall projecting double faced sign

Open the permit page

$14,500
Sep 24, 2019Never finaled
issued Sep 2019, no final
180 Howard StTrue North Signs & Graphic Servicesinstall wall single faced sign
Details
Permit
201909242445
Permit issued
Sep 24, 2019

install wall single faced sign

Open the permit page

$2,845
Sep 24, 2019Never finaled
issued Sep 2019, no final
180 Howard StTrue North Signs & Graphic Servicesinstall non electric wall single faced sign
Details
Permit
201909242443
Permit issued
Sep 24, 2019

install non electric wall single faced sign

Open the permit page

$450
Sep 24, 2019Never finaled
issued Sep 2019, no final
180 Howard StTrue North Signs & Graphic Servicesinstall single faced sign door/window
Details
Permit
201909242444
Permit issued
Sep 24, 2019

install single faced sign door/window

Open the permit page

$725
Sep 5, 2019Never finaled
issued Sep 2019, no final
180 Howard StPyro-Comm Systems, Inc.fire alarm as-buiult drawings to reflect existing shut down conditions.
Details
Permit
201909050693
Permit issued
Sep 5, 2019

fire alarm as-buiult drawings to reflect existing shut down conditions.

Open the permit page

Aug 26, 2019Never finaled
issued Aug 2019, no final
180 Howard Ststreet space
Details
Permit
M1128647
Permit issued
Aug 26, 2019

street space

Open the permit page

Aug 14, 2019Completed
final sign-off Nov 2019
180 Howard StNorthern Sun Associatesground floor t.i. food service to food service. new work includes non bearing partitions, casework, lighting, plmg, elec, & finishes. no seating or eat in dinning. all food pre-packaged and prepared off-stie with non requirement for additional food preparation. re use of mechanical system.
Details
Permit
201908148801
Permit issued
Aug 30, 2019
Final sign-off
Nov 25, 2019

ground floor t.i. food service to food service. new work includes non bearing partitions, casework, lighting, plmg, elec, & finishes. no seating or eat in dinning. all food pre-packaged and prepared off-stie with non requirement for additional food preparation. re use of mechanical system.

Open the permit page

$275,000
Jul 25, 2019Never finaled
issued Jul 2019, no final
180 Howard Ststreet space only
Details
Permit
M1115087
Permit issued
Jul 25, 2019

street space only

Open the permit page

Jul 10, 2019Completed
final sign-off Feb 2020
180 Howard StPyro-Comm Systems, Inc.11th fl - 1 smoke detector, 2 duct detectors, 9 ceiling strobes, 4 fire alarm speakers, 18 ceiling speaker strobes to be added to existing facu. ref pa 2018-0921-1042
Details
Permit
201907105479
Permit issued
Jul 10, 2019
Final sign-off
Feb 6, 2020

11th fl - 1 smoke detector, 2 duct detectors, 9 ceiling strobes, 4 fire alarm speakers, 18 ceiling speaker strobes to be added to existing facu. ref pa 2018-0921-1042

Open the permit page

$17,500
Jun 13, 2019Never finaled
issued Sep 2019, no final
180 Howard StTeam Commercial Construction Inc.voluntary seismic improvement of the floor diaphram to core wall connections at level 1. voluntary seismic improvement of the wall stability of the north and south core walls at level 1.
Details
Permit
201906133304
Permit issued
Sep 18, 2019

voluntary seismic improvement of the floor diaphram to core wall connections at level 1. voluntary seismic improvement of the wall stability of the north and south core walls at level 1.

Open the permit page

$82,350
May 17, 2019Never finaled
issued May 2019, no final
180 Howard StPyro-Comm Systems, Inc.1 smoke detector, 2 duct detectors, 3 relay modules, 5 multi-voltage relays, 6-series ceiling mount strobes, 20 l-series ceiling mount horn/strobes to be added to facu. ref pa 2019-0327-6356
Details
Permit
201905170947
Permit issued
May 17, 2019

1 smoke detector, 2 duct detectors, 3 relay modules, 5 multi-voltage relays, 6-series ceiling mount strobes, 20 l-series ceiling mount horn/strobes to be added to facu. ref pa 2019-0327-6356

Open the permit page

$18,500
May 14, 2019Completed
final sign-off Jun 2019
180 Howard StPioneer Fire Inc.1st fl - 19 relocated pendents, 8 relcoated uprights and 1 added. ref pa 2019-0327-6356
Details
Permit
201905140535
Permit issued
May 16, 2019
Final sign-off
Jun 27, 2019

1st fl - 19 relocated pendents, 8 relcoated uprights and 1 added. ref pa 2019-0327-6356

Open the permit page

$12,000
May 6, 2019Expired or cancelled
cancelled Jan 2026
180 Howard St3rd flr. demo on non-structural walls, millwork, ceilings & light fixtuers. no structural work included in scope.
Details
Permit
201905069780

3rd flr. demo on non-structural walls, millwork, ceilings & light fixtuers. no structural work included in scope.

Open the permit page

$126,750
Mar 27, 2019Completed
final sign-off Sep 2019
180 Howard StTeam Commercial Construction Inc.1st fl: t.i. improvement; new non-structural partitions, light fixtures, ceiling system, power/data and finishes, mep will be provided, life safety, sprinklers under sep permit n/a maher
Details
Permit
201903276356
Permit issued
Apr 1, 2019
Final sign-off
Sep 17, 2019

1st fl: t.i. improvement; new non-structural partitions, light fixtures, ceiling system, power/data and finishes, mep will be provided, life safety, sprinklers under sep permit n/a maher

Open the permit page

$1,350,000
Mar 5, 2019Completed
final sign-off Oct 2019
180 Howard StPioneer Fire Inc.ground fl - relocate 6" fdc line out of new fcc room. ref pa 2013-1227-5094. maher n/a.
Details
Permit
201903054384
Permit issued
Mar 5, 2019
Final sign-off
Oct 18, 2019

ground fl - relocate 6" fdc line out of new fcc room. ref pa 2013-1227-5094. maher n/a.

Open the permit page

$28,685
Feb 8, 2019Completed
final sign-off Feb 2020
180 Howard StPyro-Comm Systems, Inc.voluntary provision of new two-way communication system for elevator landing every floor & stairwells every 4 floors in building.
Details
Permit
201902082434
Permit issued
Feb 11, 2019
Final sign-off
Feb 4, 2020

voluntary provision of new two-way communication system for elevator landing every floor & stairwells every 4 floors in building.

Open the permit page

$15,000
Nov 13, 2018Completed
final sign-off Jan 2019
180 Howard StJohnson Controls Fire11th flr fire alarm ti - install 18 speaker/strobes, 9 strobes, 2 duct det, 1 smk det, 5 relays and 1 monitor module maher na
Details
Permit
201811135631
Permit issued
Nov 13, 2018
Final sign-off
Jan 18, 2019

11th flr fire alarm ti - install 18 speaker/strobes, 9 strobes, 2 duct det, 1 smk det, 5 relays and 1 monitor module maher na

Open the permit page

$19,960
Sep 21, 2018Completed
final sign-off Jan 2020
180 Howard StPyro-Comm Systems, Inc.voluntary fire alarm replacement proj (one for one) basis. to meet agreements applied by sffd. ref pa #2013-1227-5094.
Details
Permit
201809211042
Permit issued
Apr 4, 2019
Final sign-off
Jan 9, 2020

voluntary fire alarm replacement proj (one for one) basis. to meet agreements applied by sffd. ref pa #2013-1227-5094.

Open the permit page

$125,000
Sep 11, 2018Completed
final sign-off Oct 2018
180 Howard StPioneer Fire Inc.11th flr - relocate 121 pendent sprinklers and 5 concealers sprinklers gci 201805179357 maher na
Details
Permit
201809119697
Permit issued
Sep 11, 2018
Final sign-off
Oct 24, 2018

11th flr - relocate 121 pendent sprinklers and 5 concealers sprinklers gci 201805179357 maher na

Open the permit page

$38,456
Aug 23, 2018Completed
final sign-off Oct 2018
180 Howard StCapitol Electric Constground 02: remove and replace 8 hologen downlights w/ led downlights
Details
Permit
201808238098
Permit issued
Aug 23, 2018
Final sign-off
Oct 24, 2018

ground 02: remove and replace 8 hologen downlights w/ led downlights

Open the permit page

$2,578
May 17, 2018Completed
final sign-off Feb 2019
180 Howard StTeam Commercial Construction Inc.11/f -interior ti - new partitions, ceilings, mep, existing life safety to remain
Details
Permit
201805179357
Permit issued
Jul 11, 2018
Final sign-off
Feb 19, 2019

11/f -interior ti - new partitions, ceilings, mep, existing life safety to remain

Open the permit page

$1,300,000
Feb 9, 2018Never finaled
issued Feb 2018, no final
180 Howard Ststreet space permit
Details
Permit
M887527
Permit issued
Feb 9, 2018

street space permit

Open the permit page

Dec 4, 2017Never finaled
issued Feb 2019, no final
180 Howard StTeam Commercial Construction Inc.voluntary seismic improvments to the 11th fl diaphragm to core wall connections and wall stability of the north and south core walls. maher not req
Details
Permit
201712045433
Permit issued
Feb 20, 2019

voluntary seismic improvments to the 11th fl diaphragm to core wall connections and wall stability of the north and south core walls. maher not req

Open the permit page

$150,000
Sep 1, 2017Completed
final sign-off Mar 2018
180 Howard StRainbow Waterproofing & Restorfacade access system improvements adding new intermittent stabilization anchors (isas) to the south east (howard st) & south west (main st) elevations. total of 64 isas. parapet extensions to be anchor bolts installed w/in 10" at each end at 3'-6" max spacing
Details
Permit
201709016672
Permit issued
Sep 1, 2017
Final sign-off
Mar 21, 2018

facade access system improvements adding new intermittent stabilization anchors (isas) to the south east (howard st) & south west (main st) elevations. total of 64 isas. parapet extensions to be anchor bolts installed w/in 10" at each end at 3'-6" max spacing

Open the permit page

$133,000
Jun 20, 2017Completed
final sign-off Jul 2017
180 Howard StJohnson Controls Fire2nd flr: fire alarm ti - 201704073495: install 2 new relays, relocate 2 (e) speaker/strobes maher na
Details
Permit
201706209819
Permit issued
Jun 20, 2017
Final sign-off
Jul 10, 2017

2nd flr: fire alarm ti - 201704073495: install 2 new relays, relocate 2 (e) speaker/strobes maher na

Open the permit page

$36,000
May 10, 2017Completed
final sign-off May 2017
180 Howard StAyoob & Peery Plumbing Co Inc2nd fl: add & relocate sprinklers per tenant improvements (3 add ) ( 14 relocate). ref ti 2017-0407-3495.
Details
Permit
201705106193
Permit issued
May 10, 2017
Final sign-off
May 30, 2017

2nd fl: add & relocate sprinklers per tenant improvements (3 add ) ( 14 relocate). ref ti 2017-0407-3495.

Open the permit page

$7,350
Apr 7, 2017Never finaled
issued Apr 2017, no final
180 Howard StM C S Construction Servicestenant improvement 2nd fl to create demised suite area for sub tenant. selective demo and construction of non load bearing walls, new doors/frames, demising wall and new finishes; n/a maher
Details
Permit
201704073495
Permit issued
Apr 11, 2017

tenant improvement 2nd fl to create demised suite area for sub tenant. selective demo and construction of non load bearing walls, new doors/frames, demising wall and new finishes; n/a maher

Open the permit page

$150,000
Mar 7, 2017Never finaled
issued Mar 2017, no final
180 Howard Ststreet space
Details
Permit
M766187
Permit issued
Mar 7, 2017

street space

Open the permit page

Dec 5, 2016Expired or cancelled
cancelled Jan 2026
180 Howard StSpecialized Graphics Incinstall (3) electric projecting signs
Details
Permit
201612054154

install (3) electric projecting signs

Open the permit page

$3,600
Dec 5, 2016Expired or cancelled
cancelled Jan 2026
180 Howard StSpecialized Graphics Incinstall (3) electric projecting signs
Details
Permit
201612054153

install (3) electric projecting signs

Open the permit page

$3,600
Nov 4, 2016Never finaled
issued Nov 2016, no final
180 Howard StJohnson Controls Firesuite 1200: fire alarm: as-built record drawings for pa#201607273458.
Details
Permit
201611041960
Permit issued
Nov 4, 2016

suite 1200: fire alarm: as-built record drawings for pa#201607273458.

Open the permit page

Aug 24, 2016Never finaled
issued Aug 2016, no final
180 Howard StAllied Fire Protectionfire sprinkler t/i. park tower leasing office level 12, 20 added sprinkler, 23 relocated/replaced sprinklers, 43 total sprinklers. apn # 201606139784; n/a maher
Details
Permit
201608245900
Permit issued
Aug 30, 2016

fire sprinkler t/i. park tower leasing office level 12, 20 added sprinkler, 23 relocated/replaced sprinklers, 43 total sprinklers. apn # 201606139784; n/a maher

Open the permit page

$22,230
Jul 27, 2016Completed
final sign-off Feb 2017
180 Howard StJohnson Controls Fire11th flr - fire alarm: 1 booster panel w/signal module, 8 smoke detectors, 6 duct smokes, 6 relays, 7 strobes, 7 speakers. maher na ref 201605187774
Details
Permit
201607273457
Permit issued
Jul 27, 2016
Final sign-off
Feb 6, 2017

11th flr - fire alarm: 1 booster panel w/signal module, 8 smoke detectors, 6 duct smokes, 6 relays, 7 strobes, 7 speakers. maher na ref 201605187774

Open the permit page

$23,000
Jul 27, 2016Completed
final sign-off Feb 2017
180 Howard StJohnson Controls Fire1st flr - fire alarm: 9 smoke detectors, 6 duct detectors, 6 relays, 7 strobes, 7 speakers. ref. 2016-05-04-6576. maher na
Details
Permit
201607273456
Permit issued
Jul 27, 2016
Final sign-off
Feb 6, 2017

1st flr - fire alarm: 9 smoke detectors, 6 duct detectors, 6 relays, 7 strobes, 7 speakers. ref. 2016-05-04-6576. maher na

Open the permit page

$22,000
Jul 27, 2016Never finaled
issued Jul 2016, no final
180 Howard StJohnson Controls Fire12th flr, #1200 - fire alarm: 6 smoke detectors, 1 duct detector, 2 relays, relocate 2 (e) duct smokes, remove 3 (e) speakers/strobes maher na ref pa 201606139784
Details
Permit
201607273458
Permit issued
Jul 27, 2016

12th flr, #1200 - fire alarm: 6 smoke detectors, 1 duct detector, 2 relays, relocate 2 (e) duct smokes, remove 3 (e) speakers/strobes maher na ref pa 201606139784

Open the permit page

$9,500
Jul 21, 2016Never finaled
issued Jul 2016, no final
180 Howard Ststreet space, sidewalk & mta parking meter
Details
Permit
M707308
Permit issued
Jul 21, 2016

street space, sidewalk & mta parking meter

Open the permit page

Jul 5, 2016Never finaled
issued Jul 2016, no final
180 Howard Ststreet space
Details
Permit
M702587
Permit issued
Jul 5, 2016

street space

Open the permit page

Jun 24, 2016Never finaled
issued Jun 2016, no final
180 Howard Ststreet space
Details
Permit
M700487
Permit issued
Jun 24, 2016

street space

Open the permit page

Jun 13, 2016Completed
final sign-off Feb 2018
180 Howard StTeam Commercial Construction Inc.tenant improvement to include new walls, ceiling, lighting, plumbing and hvac, fa, ls, fs, on separate permits.
Details
Permit
201606139784
Permit issued
Jul 14, 2016
Final sign-off
Feb 9, 2018

tenant improvement to include new walls, ceiling, lighting, plumbing and hvac, fa, ls, fs, on separate permits.

Open the permit page

$300,000
Jun 8, 2016Completed
final sign-off Feb 2018
180 Howard StTeam Commercial Construction Inc.12th floor: install operable partition. this is deffered from permit #201603141913. n/a for maher
Details
Permit
201606089381
Permit issued
Jun 9, 2016
Final sign-off
Feb 9, 2018

12th floor: install operable partition. this is deffered from permit #201603141913. n/a for maher

Open the permit page

May 18, 2016Completed
final sign-off May 2017
180 Howard StTeam Commercial Construction Inc.common area & restroom upgrade: fire life safety and sprinkler under seperate permit. mep included unoccupied floor. n/a ordinance #155-13
Details
Permit
201605187774
Permit issued
Jun 1, 2016
Final sign-off
May 26, 2017

common area & restroom upgrade: fire life safety and sprinkler under seperate permit. mep included unoccupied floor. n/a ordinance #155-13

Open the permit page

$1,300,000
May 17, 2016Completed
final sign-off Feb 2017
180 Howard StPioneer Fire Inc.1st & 11th floor: fire sprinklers - 116 sprinklers per floor maher na
Details
Permit
201605177643
Permit issued
May 18, 2016
Final sign-off
Feb 8, 2017

1st & 11th floor: fire sprinklers - 116 sprinklers per floor maher na

Open the permit page

$120,000
May 4, 2016Completed
final sign-off Jul 2016
180 Howard StJohnson Controls Fire12th flr: fire alarm tenant improvement, 6 duct smoke detectors w/relay & indicator, 11 speaker/strobes, relocate 1 existing speaker/strobe, ref. 201603141913; maher n/a
Details
Permit
201605046526
Permit issued
May 4, 2016
Final sign-off
Jul 5, 2016

12th flr: fire alarm tenant improvement, 6 duct smoke detectors w/relay & indicator, 11 speaker/strobes, relocate 1 existing speaker/strobe, ref. 201603141913; maher n/a

Open the permit page

$10,000
May 4, 2016Completed
final sign-off May 2017
180 Howard StTeam Commercial Construction Inc.1st floor: interior t.i. : common area and restroom upgrades. floor to remain unoccupied until a t.i. is filed. n/a for maher
Details
Permit
201605046576
Permit issued
May 11, 2016
Final sign-off
May 26, 2017

1st floor: interior t.i. : common area and restroom upgrades. floor to remain unoccupied until a t.i. is filed. n/a for maher

Open the permit page

$1,300,000
Apr 28, 2016Completed
final sign-off Jul 2016
180 Howard StAllied Fire Protectionlevel #12 fire sprinkelr t.i. "clark const co" #1200 - (42) aded fire sprinklers, (4) relcoated fire sprinklers . ref pa #201603141913. n/a maher ordinance
Details
Permit
201604285951
Permit issued
May 5, 2016
Final sign-off
Jul 5, 2016

level #12 fire sprinkelr t.i. "clark const co" #1200 - (42) aded fire sprinklers, (4) relcoated fire sprinklers . ref pa #201603141913. n/a maher ordinance

Open the permit page

$23,780
Mar 14, 2016Completed
final sign-off Feb 2018
180 Howard StTeam Commercial Construction Inc.12th flr: new lobby, coffee bar & conference rooms, new electrical, mechanical & plumbing; maher n/a
Details
Permit
201603141913
Permit issued
Apr 20, 2016
Final sign-off
Feb 9, 2018

12th flr: new lobby, coffee bar & conference rooms, new electrical, mechanical & plumbing; maher n/a

Open the permit page

$600,000
Mar 2, 2016Completed
final sign-off Mar 2016
180 Howard StTeam Commercial Construction Inc.update mech as builts: addition of 9 two pipe fan coil units to retail spaces on grnd flr/ connect to bld hot water; tie into life safety system (under sep permit). all work consists of making connections to base bld (e) panels no changes to panels. maher na
Details
Permit
201603020998
Permit issued
Mar 2, 2016
Final sign-off
Mar 30, 2016

update mech as builts: addition of 9 two pipe fan coil units to retail spaces on grnd flr/ connect to bld hot water; tie into life safety system (under sep permit). all work consists of making connections to base bld (e) panels no changes to panels. maher na

Open the permit page

Feb 29, 2016Completed
final sign-off Mar 2016
180 Howard StJohnson Controls Fireground flr: fire alarm as built 2015-1013-9497, 2015-1218-5491 per field inspector
Details
Permit
201602290769
Permit issued
Feb 29, 2016
Final sign-off
Mar 10, 2016

ground flr: fire alarm as built 2015-1013-9497, 2015-1218-5491 per field inspector

Open the permit page

Feb 22, 2016Completed
final sign-off Feb 2016
180 Howard StPioneer Fire Inc.2-12 floor: converting (e) riser shafts to closets. 1 sidewall sprinkler in each closet; 22 - total ref pa 2015 0819 4663
Details
Permit
201602220190
Permit issued
Feb 22, 2016
Final sign-off
Feb 26, 2016

2-12 floor: converting (e) riser shafts to closets. 1 sidewall sprinkler in each closet; 22 - total ref pa 2015 0819 4663

Open the permit page

$18,550
Dec 29, 2015Never finaled
issued Dec 2015, no final
180 Howard Ststreet space permit
Details
Permit
M650548
Permit issued
Dec 29, 2015

street space permit

Open the permit page

Dec 18, 2015Never finaled
issued Dec 2015, no final
180 Howard StJohnson Controls Fireground floor: fire alarm plan as built record drawings for 2015-1013-9497
Details
Permit
201512185491
Permit issued
Dec 31, 2015

ground floor: fire alarm plan as built record drawings for 2015-1013-9497

Open the permit page

Dec 16, 2015Completed
final sign-off Mar 2016
180 Howard StPioneer Fire Inc.added 2 pendents. ref pa 2015-0922-7644 maher na
Details
Permit
201512165274
Permit issued
Dec 18, 2015
Final sign-off
Mar 7, 2016

added 2 pendents. ref pa 2015-0922-7644 maher na

Open the permit page

$4,755
Nov 6, 2015Completed
final sign-off Jan 2016
180 Howard StJohnson Controls Firefire alarm system ti to the 12th floor. 2 relay base smoke detectors, 2 duct smore detectors with relay, 1 relay module, 2 speaker/strobes. ref pa 2015-0922-7644
Details
Permit
201511061943
Permit issued
Nov 6, 2015
Final sign-off
Jan 14, 2016

fire alarm system ti to the 12th floor. 2 relay base smoke detectors, 2 duct smore detectors with relay, 1 relay module, 2 speaker/strobes. ref pa 2015-0922-7644

Open the permit page

$4,000
Oct 13, 2015Never finaled
issued Oct 2015, no final
180 Howard StJohnson Controls Firefire alarm ti to ground floor. addition of 9 duct smoke detectors for fan coil units. maher na
Details
Permit
201510139497
Permit issued
Oct 13, 2015

fire alarm ti to ground floor. addition of 9 duct smoke detectors for fan coil units. maher na

Open the permit page

$8,500
Sep 22, 2015Never finaled
issued Oct 2015, no final
180 Howard StTeam Commercial Construction Inc.partial remodel of public corridor on the 12th fl. mep and life safety under sep permit. n/a for maher.
Details
Permit
201509227644
Permit issued
Oct 9, 2015

partial remodel of public corridor on the 12th fl. mep and life safety under sep permit. n/a for maher.

Open the permit page

$20,000
Aug 19, 2015Never finaled
issued Oct 2015, no final
180 Howard StTeam Commercial Construction Inc.new doors & new floors for fa/ems closets @ bldg core. (n) shaft access doors. no change in occupancy, use or area. all work in uninhabitable space. ref pa 2013 1227 5094 maher na
Details
Permit
201508194663
Permit issued
Oct 9, 2015

new doors & new floors for fa/ems closets @ bldg core. (n) shaft access doors. no change in occupancy, use or area. all work in uninhabitable space. ref pa 2013 1227 5094 maher na

Open the permit page

$120,000
Jun 11, 2015Completed
final sign-off Mar 2016
180 Howard StTeam Commercial Construction Inc.ground fl: addition of (8) two pipe fan coil units to retail spaces on g/f, connect to building hot water and tie into life safety system (under seperate permit). all work consists at making connections to base bldg. (e) panels. no changes to (e) base panels. n/a ordinance #155-13
Details
Permit
201506118747
Permit issued
Jun 11, 2015
Final sign-off
Mar 30, 2016

ground fl: addition of (8) two pipe fan coil units to retail spaces on g/f, connect to building hot water and tie into life safety system (under seperate permit). all work consists at making connections to base bldg. (e) panels. no changes to (e) base panels. n/a ordinance #155-13

Open the permit page

$307,452
Sep 19, 2014Completed
final sign-off Oct 2014
180 Howard StJohnson Controls Fireground floor fire alarm tenant improvement: 1 new duct detector for heat pump, 3 new strobes, 2 new speaker/strobes. t.i. #2014.0627.9691.
Details
Permit
201409196783
Permit issued
Sep 23, 2014
Final sign-off
Oct 6, 2014

ground floor fire alarm tenant improvement: 1 new duct detector for heat pump, 3 new strobes, 2 new speaker/strobes. t.i. #2014.0627.9691.

Open the permit page

$3,400
Aug 29, 2014Completed
final sign-off Sep 2014
180 Howard StPioneer Fire Inc.g/f: relocate 10 pendents. ref bpa#201406279691. compliance with maher ordinance no. 155-13 not required.
Details
Permit
201408295028
Permit issued
Aug 29, 2014
Final sign-off
Sep 29, 2014

g/f: relocate 10 pendents. ref bpa#201406279691. compliance with maher ordinance no. 155-13 not required.

Open the permit page

$4,981
Jun 27, 2014Completed
final sign-off Oct 2014
180 Howard StTeam Commercial Construction Inc.interior retail tenant suite of exisitng unoccupied suite space with sidewalk access. new partitions, doors, finishes, ceiling and lighting. accessibility upgrades to existing gr fl restrooms. no structural work. no change in occupancy, use or area. mep same permit. l/s sep permit
Details
Permit
201406279691
Permit issued
Jul 2, 2014
Final sign-off
Oct 8, 2014

interior retail tenant suite of exisitng unoccupied suite space with sidewalk access. new partitions, doors, finishes, ceiling and lighting. accessibility upgrades to existing gr fl restrooms. no structural work. no change in occupancy, use or area. mep same permit. l/s sep permit

Open the permit page

$138,975
Jun 25, 2014Never finaled
issued May 2018, no final
180 Howard StTeam Commercial Construction Inc.chiller replacement (n) electrical roohs, storage room on roof, all in (e) mech penthouse. all work inside (e) enclosure. compliance w/ ordinance no. 155-13 not required.
Details
Permit
201406259496
Permit issued
May 22, 2018

chiller replacement (n) electrical roohs, storage room on roof, all in (e) mech penthouse. all work inside (e) enclosure. compliance w/ ordinance no. 155-13 not required.

Open the permit page

$1,220,000
Jun 25, 2014Never finaled
issued Jun 2014, no final
180 Howard StTeam Commercial Construction Inc.1st floor demolition hvac. replace existing fsd. decommisioning existing supply fan duct system. upgrade existing electrical panels within core electrical room. maher n/a.
Details
Permit
201406259380
Permit issued
Jun 25, 2014

1st floor demolition hvac. replace existing fsd. decommisioning existing supply fan duct system. upgrade existing electrical panels within core electrical room. maher n/a.

Open the permit page

$195,000
Jun 25, 2014Never finaled
issued Jun 2014, no final
180 Howard StTeam Commercial Construction Inc.3rd floor deno of existing hvac, replace existing fsd decommissioning existing supply duct system. upgrade existing electrical panel wihtin electrical room. maher ordinance # 155-13 n/a.
Details
Permit
201406259379
Permit issued
Jun 25, 2014

3rd floor deno of existing hvac, replace existing fsd decommissioning existing supply duct system. upgrade existing electrical panel wihtin electrical room. maher ordinance # 155-13 n/a.

Open the permit page

$195,000
May 7, 2014Completed
final sign-off May 2014
180 Howard StTeam Commercial Construction Inc.12th fl:permit rev #1 to app#201312265027. scope includes bulletin #1 & #2:rooms removed from slope, move f.e.c. to adjacent wall, remove millwork in copy rm, relocate power, data outlets, remove mech. shade, add window film. no strctrl work, mep, life safety under sep. permit.n/a for maher 155-13
Details
Permit
201405075080
Permit issued
May 9, 2014
Final sign-off
May 30, 2014

12th fl:permit rev #1 to app#201312265027. scope includes bulletin #1 & #2:rooms removed from slope, move f.e.c. to adjacent wall, remove millwork in copy rm, relocate power, data outlets, remove mech. shade, add window film. no strctrl work, mep, life safety under sep. permit.n/a for maher 155-13

Open the permit page

Apr 7, 2014Completed
final sign-off Apr 2014
180 Howard St12th floor: install 11 fire sprinkler permit.ref app# 201312265027. n/a for the maher ordinance #155-13
Details
Permit
201404072560
Permit issued
Apr 7, 2014
Final sign-off
Apr 16, 2014

12th floor: install 11 fire sprinkler permit.ref app# 201312265027. n/a for the maher ordinance #155-13

Open the permit page

$5,600
Apr 4, 2014Completed
final sign-off May 2014
180 Howard StTeam Commercial Construction Inc.rev. to pa#201311151973 scope includes bulletin 1 & 2, add 1 office & minor revision to partitions, doors and glaxing, relocate fire extinguisher, revise lighting & exit signs & power/signal. for reference only: demolition of non-structural partitions, construct new partitions, glazing, doors,
Details
Permit
201404042478
Permit issued
Apr 7, 2014
Final sign-off
May 15, 2014

rev. to pa#201311151973 scope includes bulletin 1 & 2, add 1 office & minor revision to partitions, doors and glaxing, relocate fire extinguisher, revise lighting & exit signs & power/signal. for reference only: demolition of non-structural partitions, construct new partitions, glazing, doors,

Open the permit page

$50,000
Apr 4, 2014Completed
final sign-off May 2014
180 Howard StJohnson Controls Firetenant improvement to 12th tl. provide and install 1 duct smoke with relay and test switch, 1 strobe, 3 speaker strobes. 1 relay with slave relay . ref 201312265027. compliance with ordinance #155-13 not required.
Details
Permit
201404042459
Permit issued
Apr 4, 2014
Final sign-off
May 28, 2014

tenant improvement to 12th tl. provide and install 1 duct smoke with relay and test switch, 1 strobe, 3 speaker strobes. 1 relay with slave relay . ref 201312265027. compliance with ordinance #155-13 not required.

Open the permit page

$4,200
Feb 28, 2014Never finaled
issued Feb 2014, no final
180 Howard StStarlite Electric Inc.as built 12th floor. primary pa# 201311151975. revision per fire dept: label address on smoke/co devices.
Details
Permit
201402289583
Permit issued
Feb 28, 2014

as built 12th floor. primary pa# 201311151975. revision per fire dept: label address on smoke/co devices.

Open the permit page

Feb 24, 2014Completed
final sign-off Dec 2014
180 Howard StTeam Commercial Construction Inc.operable wall structural plans/calculations. ref app#201311262831. n/a for the maher ordinance.
Details
Permit
201402249174
Permit issued
Feb 24, 2014
Final sign-off
Dec 1, 2014

operable wall structural plans/calculations. ref app#201311262831. n/a for the maher ordinance.

Open the permit page

Feb 20, 2014Completed
final sign-off Feb 2014
180 Howard StStarlite Electric Inc.12th floor -revision to appl #2013.1211.3869 fire alarm devices, (4) speaker ceiling, (3) wall strobe, (3) delete control mod, (1) duct detector, (5) smoke detector, (3) relay base smoke, (2) reg smoke base parts only. ref t.i. #2013.1115.1975. compliance with ordinance #155-13 not required
Details
Permit
201402208939
Permit issued
Feb 21, 2014
Final sign-off
Feb 27, 2014

12th floor -revision to appl #2013.1211.3869 fire alarm devices, (4) speaker ceiling, (3) wall strobe, (3) delete control mod, (1) duct detector, (5) smoke detector, (3) relay base smoke, (2) reg smoke base parts only. ref t.i. #2013.1115.1975. compliance with ordinance #155-13 not required

Open the permit page

$2,000
Feb 11, 2014Completed
final sign-off Mar 2014
180 Howard StJohnson Controls Firefire alarm ti to 12 th fl booster panel, 1 smoke detector, 7 duct detectors with relay, 1 monitor module, 1 relay module, 1 signal module, 13 speaker strobes. ti 201311262831, 201401317492. compliance with ordinance #155-13 not required.
Details
Permit
201402118264
Permit issued
Feb 11, 2014
Final sign-off
Mar 24, 2014

fire alarm ti to 12 th fl booster panel, 1 smoke detector, 7 duct detectors with relay, 1 monitor module, 1 relay module, 1 signal module, 13 speaker strobes. ti 201311262831, 201401317492. compliance with ordinance #155-13 not required.

Open the permit page

$13,000
Feb 11, 2014Never finaled
issued Feb 2014, no final
180 Howard StJohnson Controls Firefire alarm ti to 2nd fl. 1 smoke detector, 9 duct dtectors, with relay, 1 monitor module, 1 relay module, 15 speaker strobes ref 201311151973. compliance with ordinance #155-13 not required.
Details
Permit
201402118262
Permit issued
Feb 11, 2014

fire alarm ti to 2nd fl. 1 smoke detector, 9 duct dtectors, with relay, 1 monitor module, 1 relay module, 15 speaker strobes ref 201311151973. compliance with ordinance #155-13 not required.

Open the permit page

$13,500
Feb 5, 2014Completed
final sign-off Nov 2014
180 Howard StTeam Commercial Construction Inc.revisions to pa#20131115195 to corridor ceiling lighting & exit signs. addition of bldg electric closet & hallway. evacuation signs included. add fire exit panic hardware to one pair of tenant doors & new rated stair & vestibule stair doors. compliance w/ ordinance no. 155-13 not required. excavatio
Details
Permit
201402057838
Permit issued
Feb 24, 2014
Final sign-off
Nov 24, 2014

revisions to pa#20131115195 to corridor ceiling lighting & exit signs. addition of bldg electric closet & hallway. evacuation signs included. add fire exit panic hardware to one pair of tenant doors & new rated stair & vestibule stair doors. compliance w/ ordinance no. 155-13 not required. excavatio

Open the permit page

Jan 31, 2014Completed
final sign-off Apr 2014
180 Howard StTeam Commercial Construction Inc.12th floor:revisioin to app#201311262831. moveable partition exiting scenarios, dimensional clarifications. revised clg and lighting clarifications to finishes and construction details. mep under same permit. l/s and sprinklers under seperate permit. no change to occupancy or use.
Details
Permit
201401317492
Permit issued
Feb 10, 2014
Final sign-off
Apr 23, 2014

12th floor:revisioin to app#201311262831. moveable partition exiting scenarios, dimensional clarifications. revised clg and lighting clarifications to finishes and construction details. mep under same permit. l/s and sprinklers under seperate permit. no change to occupancy or use.

Open the permit page

Jan 23, 2014Completed
final sign-off Feb 2014
180 Howard Sttenant improvement relocate 95 heads new ceiling at new ceiling. ref pa 201311151973
Details
Permit
201401236904
Permit issued
Jan 23, 2014
Final sign-off
Feb 24, 2014

tenant improvement relocate 95 heads new ceiling at new ceiling. ref pa 201311151973

Open the permit page

$26,752
Jan 15, 2014Completed
final sign-off Mar 2014
180 Howard St12th floor: demolished extg fire sprinkler system and re-install new sprinkler system per t.i. point of connection at extg supply riser on 12th floor. total of 215 heads. ref. app. # 2013 1126 2831
Details
Permit
201401156387
Permit issued
Jan 15, 2014
Final sign-off
Mar 6, 2014

12th floor: demolished extg fire sprinkler system and re-install new sprinkler system per t.i. point of connection at extg supply riser on 12th floor. total of 215 heads. ref. app. # 2013 1126 2831

Open the permit page

$62,000
Dec 30, 2013Never finaled
issued Oct 2014, no final
180 Howard StTeam Commercial Construction Inc.12th flr: interior tenant improvement, including new partitions, doors, ceilings, lighting, power & signal and finishes in an (e) unoccupied shell condition,no structural work . no change in occupancy, use or area, mep and l/s under sep permit; maher n/a
Details
Permit
201312305287
Permit issued
Oct 22, 2014

12th flr: interior tenant improvement, including new partitions, doors, ceilings, lighting, power & signal and finishes in an (e) unoccupied shell condition,no structural work . no change in occupancy, use or area, mep and l/s under sep permit; maher n/a

Open the permit page

$615,305
Dec 27, 2013Expired or cancelled
expired Jan 2026
180 Howard StTeam Commercial Construction Inc.full bldg infrastructure upgrades include (n) emergency generator, fuel piping to roof top generator, smoke contr'l systems upgrades, fire alarm upgrades, existing rated corridor upgrades as required. compli. maher ord. #155-13 not requir'd.
Details
Permit
201312275094
Permit issued
Jun 17, 2016

full bldg infrastructure upgrades include (n) emergency generator, fuel piping to roof top generator, smoke contr'l systems upgrades, fire alarm upgrades, existing rated corridor upgrades as required. compli. maher ord. #155-13 not requir'd.

Open the permit page

$4,000,000
Dec 27, 2013Never finaled
issued Apr 2015, no final
180 Howard StTeam Commercial Construction Inc.12th floor suite #1230: t.i. includes the extention of a one hr rated corridor with new entrance doors. a new incidental bldg storage room with non-fire resistant rated separation in afully sprinkler bldg in accordance with cbc section 508.2.5.2 and 508.2.5. a hallway and electrical closet.
Details
Permit
201312275096
Permit issued
Apr 27, 2015

12th floor suite #1230: t.i. includes the extention of a one hr rated corridor with new entrance doors. a new incidental bldg storage room with non-fire resistant rated separation in afully sprinkler bldg in accordance with cbc section 508.2.5.2 and 508.2.5. a hallway and electrical closet.

Open the permit page

$133,634
Dec 26, 2013Completed
final sign-off May 2014
180 Howard StTeam Commercial Construction Inc.12/f: interior office tenant suite of an unoccupied warm shell condition space on a multi-tenant floor. construction of new partitions, glazing, doors, millwork and finishes. aera of work: 1275 sq ft. no structural work, mep under same permit. life safety under sep permit. maher ordinance exempt/na
Details
Permit
201312265027
Permit issued
Mar 26, 2014
Final sign-off
May 30, 2014

12/f: interior office tenant suite of an unoccupied warm shell condition space on a multi-tenant floor. construction of new partitions, glazing, doors, millwork and finishes. aera of work: 1275 sq ft. no structural work, mep under same permit. life safety under sep permit. maher ordinance exempt/na

Open the permit page

$138,975
Dec 17, 2013Completed
final sign-off Apr 2014
180 Howard StTeam Commercial Construction Inc.2nd floor:lighting and power system for office t.i. ref app#201311151973
Details
Permit
201312174339
Permit issued
Dec 18, 2013
Final sign-off
Apr 24, 2014

2nd floor:lighting and power system for office t.i. ref app#201311151973

Open the permit page

$78,000
Dec 17, 2013Completed
final sign-off Apr 2014
180 Howard StTeam Commercial Construction Inc.2nd floor:install mechanical hvac system for office t.i. ref app#201311151973
Details
Permit
201312174340
Permit issued
Dec 18, 2013
Final sign-off
Apr 24, 2014

2nd floor:install mechanical hvac system for office t.i. ref app#201311151973

Open the permit page

$110,400
Dec 11, 2013Completed
final sign-off Nov 2014
180 Howard StStarlite Electric Inc.fire alarm devices: (4) speakers, (5) wm strobes, (2) duct detectors, (5) control modules and (1) smoke. t.i. #201311151975
Details
Permit
201312113869
Permit issued
Dec 11, 2013
Final sign-off
Nov 5, 2014

fire alarm devices: (4) speakers, (5) wm strobes, (2) duct detectors, (5) control modules and (1) smoke. t.i. #201311151975

Open the permit page

$5,000
Nov 26, 2013Completed
final sign-off Apr 2014
180 Howard StTeam Commercial Construction Inc.12th floor:non-structural demo. new non-structural partitions, doors, electrical, lighting, plumbing, millwork, finishes. mep under same permit. t. i. l/s and sprinkler under separate permit. no change in occupancy, use or area.
Details
Permit
201311262831
Permit issued
Dec 12, 2013
Final sign-off
Apr 23, 2014

12th floor:non-structural demo. new non-structural partitions, doors, electrical, lighting, plumbing, millwork, finishes. mep under same permit. t. i. l/s and sprinkler under separate permit. no change in occupancy, use or area.

Open the permit page

$655,400
Nov 18, 2013Never finaled
issued Nov 2013, no final
180 Howard Ststreet space
Details
Permit
M444927
Permit issued
Nov 18, 2013

street space

Open the permit page

Nov 15, 2013Completed
final sign-off May 2014
180 Howard StTeam Commercial Construction Inc.2nd floor:non-structural demo. new non structural partitions, doors, electrical, lighting,plmg, millwork, finishes. mep under seperate permit. no change in occupany,use or area.
Details
Permit
201311151973
Permit issued
Nov 25, 2013
Final sign-off
May 15, 2014

2nd floor:non-structural demo. new non structural partitions, doors, electrical, lighting,plmg, millwork, finishes. mep under seperate permit. no change in occupany,use or area.

Open the permit page

$701,937
Nov 15, 2013Completed
final sign-off Nov 2014
180 Howard StTeam Commercial Construction Inc.12th floor:non structural demo. new non structural partitions, doors, electrical, lighting, plumbing, millwork, finishes. mep included. l/s and sprinler under sep permit. no change in occupancy, use or area
Details
Permit
201311151975
Permit issued
Nov 25, 2013
Final sign-off
Nov 24, 2014

12th floor:non structural demo. new non structural partitions, doors, electrical, lighting, plumbing, millwork, finishes. mep included. l/s and sprinler under sep permit. no change in occupancy, use or area

Open the permit page

$344,878
Sep 24, 2013Completed
final sign-off Jan 2014
180 Howard StWestern Roofing Servicereroofing
Details
Permit
201309247633
Permit issued
Sep 24, 2013
Final sign-off
Jan 2, 2014

reroofing

Open the permit page

$350,000
Aug 7, 2013Never finaled
issued Aug 2013, no final
180 Howard Ststreet space
Details
Permit
M415127
Permit issued
Aug 7, 2013

street space

Open the permit page

Jul 26, 2013Expired or cancelled
cancelled Sep 2023
180 Howard St2nd floor-evacuation signs (3 total), no structural work
Details
Permit
201307262833

2nd floor-evacuation signs (3 total), no structural work

Open the permit page

$900
Jun 10, 2013Never finaled
issued Jun 2013, no final
180 Howard Ststreet space
Details
Permit
M400308
Permit issued
Jun 10, 2013

street space

Open the permit page

Jun 7, 2013Never finaled
issued Jun 2013, no final
180 Howard StSimplexgrinnell Lp.1st/2nd/3rd floors-fire alarm t.i-1 power supply, 8 smokes, 10 duct smokes & 19 relays, 16 speakers, 11 strobes, 4 door holders
Details
Permit
201306078961
Permit issued
Jun 7, 2013

1st/2nd/3rd floors-fire alarm t.i-1 power supply, 8 smokes, 10 duct smokes & 19 relays, 16 speakers, 11 strobes, 4 door holders

Open the permit page

$28,000
May 17, 2013Completed
final sign-off Jul 2013
180 Howard St2nd floor - demolish existing sprinkler system, install new fire sprinkler system connection at (e) supply riser, total 167 sprinkler heads. ref pa #2013.04.08.3964
Details
Permit
201305177237
Permit issued
May 21, 2013
Final sign-off
Jul 5, 2013

2nd floor - demolish existing sprinkler system, install new fire sprinkler system connection at (e) supply riser, total 167 sprinkler heads. ref pa #2013.04.08.3964

Open the permit page

$57,000
Apr 12, 2013Never finaled
issued Apr 2013, no final
180 Howard Ststreet space permit
Details
Permit
M385028
Permit issued
Apr 12, 2013

street space permit

Open the permit page

Apr 8, 2013Completed
final sign-off Sep 2013
180 Howard StTeam Commercial Construction Inc.2nd floor-non structural demo, new non structural partitions, doors, electrical, lighting, plumbing, millwork, finishes. m.e.p included. life safety & sprinklers under seperate permit. no change in occupancy or use area.
Details
Permit
201304083964
Permit issued
May 6, 2013
Final sign-off
Sep 16, 2013

2nd floor-non structural demo, new non structural partitions, doors, electrical, lighting, plumbing, millwork, finishes. m.e.p included. life safety & sprinklers under seperate permit. no change in occupancy or use area.

Open the permit page

$275,906
Dec 23, 2010Never finaled
issued Dec 2010, no final
180 Howard Ststreet space & sidewalk
Details
Permit
M234387
Permit issued
Dec 23, 2010

street space & sidewalk

Open the permit page

Jul 30, 2010Never finaled
issued Jul 2010, no final
180 Howard Ststreet space
Details
Permit
M213766
Permit issued
Jul 30, 2010

street space

Open the permit page

Jul 8, 2009Expired or cancelled
expired Nov 2010
180 Howard StWestern Allied Mechanical Inc.to obtain final inspection for work approved under app#2008/06/30/5631 all work is complete.
Details
Permit
200907082183
Permit issued
Jul 8, 2009

to obtain final inspection for work approved under app#2008/06/30/5631 all work is complete.

Open the permit page

May 11, 2009Completed
final sign-off Jul 2009
180 Howard StRichlen Constructionrenew pa# 2008/07/18/7062 to obtain final inspection. all work has been completed.
Details
Permit
200905118122
Permit issued
May 11, 2009
Final sign-off
Jul 29, 2009

renew pa# 2008/07/18/7062 to obtain final inspection. all work has been completed.

Open the permit page

Dec 11, 2008Never finaled
issued Dec 2008, no final
180 Howard Stsuite g3 - exhaust fan to meet exhaust for nail salon, ref. pa #200807187062.
Details
Permit
200812118329
Permit issued
Dec 11, 2008

suite g3 - exhaust fan to meet exhaust for nail salon, ref. pa #200807187062.

Open the permit page

$3,000
Sep 9, 2008Completed
final sign-off May 2009
180 Howard StSimplex Grinnellinstalling 2 ceiling mounted strobes and 1 ceiling mounted speaker strobe
Details
Permit
200809091136
Permit issued
Sep 9, 2008
Final sign-off
May 12, 2009

installing 2 ceiling mounted strobes and 1 ceiling mounted speaker strobe

Open the permit page

$5,000
Aug 29, 2008Expired or cancelled
expired Sep 2010
180 Howard StAyoob & Peery Plumbing Co Increlocate fire sprinkler heads to one side of a/c unit extg head to remain ( head relocated)
Details
Permit
200808290432
Permit issued
Aug 29, 2008

relocate fire sprinkler heads to one side of a/c unit extg head to remain ( head relocated)

Open the permit page

$700
Jul 18, 2008Expired or cancelled
expired Jul 2009
180 Howard Stsuite g3:interior alterations including demolition, new door & partition and new sink. all mechanical & electrical will be under seperate permit. all fire alarm & sprinkler will be under seperate permit.
Details
Permit
200807187062
Permit issued
Jul 18, 2008

suite g3:interior alterations including demolition, new door & partition and new sink. all mechanical & electrical will be under seperate permit. all fire alarm & sprinkler will be under seperate permit.

Open the permit page

$15,000
Jul 11, 2008Completed
final sign-off Aug 2008
180 Howard StAyoob & Peery Plumbing Co Increlocate 8 fire sprinkler heads per tenant improvement.
Details
Permit
200807116530
Permit issued
Jul 11, 2008
Final sign-off
Aug 4, 2008

relocate 8 fire sprinkler heads per tenant improvement.

Open the permit page

$1,600
Jun 30, 2008Expired or cancelled
expired Sep 2010
180 Howard StWestern Allied Mechanical Inc.install ceiling hung air conditioning unit to telecom closet on the 5th floor. weight of ac unit 360 lbs.
Details
Permit
200806305631
Permit issued
Jun 30, 2008

install ceiling hung air conditioning unit to telecom closet on the 5th floor. weight of ac unit 360 lbs.

Open the permit page

$20,000
Oct 26, 2007Completed
final sign-off Aug 2008
180 Howard St8th floor - minor interior alterations including new partitions, one door, reconfiguring electrical & hvac. elec., hvac, fire alarm, and fire sprinkler scope will be performed under separate permit.
Details
Permit
200710266626
Permit issued
Oct 29, 2007
Final sign-off
Aug 4, 2008

8th floor - minor interior alterations including new partitions, one door, reconfiguring electrical & hvac. elec., hvac, fire alarm, and fire sprinkler scope will be performed under separate permit.

Open the permit page

$30,000
Jul 30, 2007Completed
final sign-off Aug 2008
180 Howard Stminor interior alterations, 9th floor
Details
Permit
200707308097
Permit issued
Jul 30, 2007
Final sign-off
Aug 4, 2008

minor interior alterations, 9th floor

Open the permit page

$40,000
Jul 30, 2007Never finaled
issued Jul 2007, no final
180 Howard Stminor interior alterations, 7th floor
Details
Permit
200707308098
Permit issued
Jul 30, 2007

minor interior alterations, 7th floor

Open the permit page

$30,000
Apr 12, 2007Completed
final sign-off Oct 2007
180 Howard Stground flr:remove e flooring,8 partial casework (counters and wall cabinets) upgrade finishes (wall,base,ceiling)per sf environmental health dept req at work areas, add plumbing fixtures per sf envir health dept req, provide counter and equipment for take out food svc, provide ada signages.no struct
Details
Permit
200704128592
Permit issued
Apr 12, 2007
Final sign-off
Oct 23, 2007

ground flr:remove e flooring,8 partial casework (counters and wall cabinets) upgrade finishes (wall,base,ceiling)per sf environmental health dept req at work areas, add plumbing fixtures per sf envir health dept req, provide counter and equipment for take out food svc, provide ada signages.no struct

Open the permit page

$20,000
Mar 13, 2007Never finaled
issued Mar 2007, no final
180 Howard Ststreet space and sidewalk permit
Details
Permit
M60448
Permit issued
Mar 13, 2007

street space and sidewalk permit

Open the permit page

Sep 22, 2006Never finaled
issued Sep 2006, no final
180 Howard Ststreet space permit
Details
Permit
M42990
Permit issued
Sep 22, 2006

street space permit

Open the permit page

Jul 24, 2006Never finaled
issued Jul 2006, no final
180 Howard Ststreet space
Details
Permit
M38663
Permit issued
Jul 24, 2006

street space

Open the permit page

Jun 14, 2006Never finaled
issued Jun 2006, no final
180 Howard Ststreet space
Details
Permit
M38067
Permit issued
Jun 14, 2006

street space

Open the permit page

Mar 10, 2006Completed
final sign-off Mar 2007
180 Howard StTurner Construction Covoluntary partial seismic upgrade to special criteria as noted on plan.
Details
Permit
200603106467
Permit issued
Jun 2, 2006
Final sign-off
Mar 15, 2007

voluntary partial seismic upgrade to special criteria as noted on plan.

Open the permit page

$2,000,000
Aug 23, 2005Expired or cancelled
expired Dec 2006
180 Howard Stdemo and const of new office and storage.
Details
Permit
200508230951
Permit issued
Aug 23, 2005

demo and const of new office and storage.

Open the permit page

$48,000
Mar 30, 2005Completed
final sign-off Apr 2005
180 Howard StWhitehouse Buildersremodel existing retailspace on ground floor to include removalof two non structual wall. moving
Details
Permit
200503308775
Permit issued
Mar 30, 2005
Final sign-off
Apr 29, 2005

remodel existing retailspace on ground floor to include removalof two non structual wall. moving

Open the permit page

$26,600
Mar 24, 2005Completed
final sign-off Apr 2005
180 Howard StInternational Commercial Awning, Inc.non-electric painted sign
Details
Permit
200503248361
Permit issued
Mar 24, 2005
Final sign-off
Apr 29, 2005

non-electric painted sign

Open the permit page

Jun 18, 2004Completed
final sign-off Sep 2004
180 Howard StDpr Construction Incoti-2 3/f el me ls sp
Details
Permit
200406186806
Permit issued
Jul 23, 2004
Final sign-off
Sep 2, 2004

oti-2 3/f el me ls sp

Open the permit page

$100,000
Jun 18, 2004Completed
final sign-off Sep 2004
180 Howard StDpr Construction Incoti-2, 1st floor, el me ls sp
Details
Permit
200406186808
Permit issued
Jul 8, 2004
Final sign-off
Sep 2, 2004

oti-2, 1st floor, el me ls sp

Open the permit page

$350,000
Apr 2, 2004Completed
final sign-off Sep 2004
180 Howard Stoti-1, 3rd fl, el, me, sp, ls.
Details
Permit
200404020296
Permit issued
May 25, 2004
Final sign-off
Sep 2, 2004

oti-1, 3rd fl, el, me, sp, ls.

Open the permit page

$35,500
Mar 24, 2004Completed
final sign-off Sep 2004
180 Howard Stoti-1, 1st floor, el, me, ls, sp.
Details
Permit
200403249497
Permit issued
May 25, 2004
Final sign-off
Sep 2, 2004

oti-1, 1st floor, el, me, ls, sp.

Open the permit page

$450,000
Dec 16, 2003Completed
final sign-off Apr 2004
180 Howard StSimplex Grinnelladdition of three (3) a/v devices on 3rd floor, suite 340 for tenant improvement.
Details
Permit
200312162429
Permit issued
Jan 6, 2004
Final sign-off
Apr 2, 2004

addition of three (3) a/v devices on 3rd floor, suite 340 for tenant improvement.

Open the permit page

$5,000
Nov 12, 2003Completed
final sign-off Apr 2004
180 Howard StSkyline Constructioninterior demo and addition of new walls and dr on 3rd flr/title 24 h/c upgrade to men's & wmn rstrm
Details
Permit
200311129969
Permit issued
Nov 12, 2003
Final sign-off
Apr 2, 2004

interior demo and addition of new walls and dr on 3rd flr/title 24 h/c upgrade to men's & wmn rstrm

Open the permit page

$6,000
Jul 3, 2002Expired or cancelled
cancelled Feb 2003
180 Howard Stoti-1 5th floor el,me,ls,sp
Details
Permit
200207030601

oti-1 5th floor el,me,ls,sp

Open the permit page

$31,800
Apr 25, 2002Completed
final sign-off Sep 2002
180 Howard StDpr Construction Inccut concrete slab, install 8 ul listed floor boxes for audio/video. also apply 2 hr rated encl. #200
Details
Permit
200204254940
Permit issued
Apr 25, 2002
Final sign-off
Sep 27, 2002

cut concrete slab, install 8 ul listed floor boxes for audio/video. also apply 2 hr rated encl. #200

Open the permit page

$8,000
Dec 17, 2001Completed
final sign-off Apr 2002
180 Howard StDecker Electric Co Inc Electrical Contraprovide and install smoke detectors (2 ea), door release controls, all per plans and specifications
Details
Permit
200112175424
Permit issued
Dec 17, 2001
Final sign-off
Apr 29, 2002

provide and install smoke detectors (2 ea), door release controls, all per plans and specifications

Open the permit page

$5,000
Aug 15, 2001Completed
final sign-off Apr 2002
180 Howard StDpr Construction Inclobby renovation-new doors,flooring,wall finishes, lighting, and restroom re-work no structural work
Details
Permit
200108156104
Permit issued
Nov 13, 2001
Final sign-off
Apr 29, 2002

lobby renovation-new doors,flooring,wall finishes, lighting, and restroom re-work no structural work

Open the permit page

$850,000
Aug 6, 2001Completed
final sign-off Nov 2001
180 Howard StA.S.T.I. Services (Automatic Sprinkler)relocate 5 extg sprinkler heads
Details
Permit
200108065378
Permit issued
Aug 6, 2001
Final sign-off
Nov 28, 2001

relocate 5 extg sprinkler heads

Open the permit page

$700
Aug 1, 2001Completed
final sign-off Nov 2001
180 Howard Stti construction retail eyewear store (rev to p.a. 200105189582
Details
Permit
200108015035
Permit issued
Aug 1, 2001
Final sign-off
Nov 27, 2001

ti construction retail eyewear store (rev to p.a. 200105189582

Open the permit page

Aug 1, 2001Completed
final sign-off Mar 2002
180 Howard StDpr Construction Incoti-1, 10th fl,el,me,ls,sp
Details
Permit
200108015016
Permit issued
Aug 30, 2001
Final sign-off
Mar 6, 2002

oti-1, 10th fl,el,me,ls,sp

Open the permit page

$130,000
Jul 16, 2001Completed
final sign-off Apr 2002
180 Howard StDpr Construction Incoti-1, 2nd floor, el, me, ls & sp.
Details
Permit
200107163709
Permit issued
Aug 1, 2001
Final sign-off
Apr 29, 2002

oti-1, 2nd floor, el, me, ls & sp.

Open the permit page

$130,000
Jun 22, 2001Expired or cancelled
expired Aug 2003
180 Howard StDecker Electric Co Inc Electrical Contraadd to (e) system, speakers 26, strobes 13 15cd, strobes 4 30cd, strobes 7 110 cd
Details
Permit
200106222224
Permit issued
Jun 27, 2001
Final sign-off
Sep 28, 2001

add to (e) system, speakers 26, strobes 13 15cd, strobes 4 30cd, strobes 7 110 cd

Open the permit page

$15,000
Jun 22, 2001Completed
final sign-off Mar 2002
180 Howard StDecker Electric Co Inc Electrical Contraadd to (e) system, 3 speakers, 4 strobes 15cd
Details
Permit
200106222228
Permit issued
Jun 27, 2001
Final sign-off
Mar 6, 2002

add to (e) system, 3 speakers, 4 strobes 15cd

Open the permit page

$4,000
Jun 22, 2001Completed
final sign-off Sep 2002
180 Howard StDecker Electric Co Inc Electrical Contrao (e) system, 12 speakers, 9 strobes 15cd, 1 strobe 30 cd, 8 strobes 110cd
Details
Permit
200106222225
Permit issued
Jun 27, 2001
Final sign-off
Sep 27, 2002

o (e) system, 12 speakers, 9 strobes 15cd, 1 strobe 30 cd, 8 strobes 110cd

Open the permit page

$8,000
Jun 22, 2001Expired or cancelled
expired Aug 2003
180 Howard StDecker Electric Co Inc Electrical Contraadd to (e) system, 3 speakers, 2 strobes 30cd, 3 strobes 110 cd
Details
Permit
200106222230
Permit issued
Jun 27, 2001
Final sign-off
Jan 16, 2002

add to (e) system, 3 speakers, 2 strobes 30cd, 3 strobes 110 cd

Open the permit page

$4,000
Jun 22, 2001Completed
final sign-off Mar 2002
180 Howard StDecker Electric Co Inc Electrical Contraadd to (e)system; speakers 6,strobes 2 on 10th flr
Details
Permit
200106222234
Permit issued
Jun 27, 2001
Final sign-off
Mar 6, 2002

add to (e)system; speakers 6,strobes 2 on 10th flr

Open the permit page

$6,000
Jun 20, 2001Completed
final sign-off Sep 2002
180 Howard StDpr Construction Incoti-4 4th floor sprk only
Details
Permit
200106201932
Permit issued
Jul 12, 2001
Final sign-off
Sep 27, 2002

oti-4 4th floor sprk only

Open the permit page

$15,000
Jun 20, 2001Completed
final sign-off Mar 2002
180 Howard StDpr Construction Incoti-4 10th floor, spr only
Details
Permit
200106201931
Permit issued
Jul 12, 2001
Final sign-off
Mar 6, 2002

oti-4 10th floor, spr only

Open the permit page

$10,000
Jun 13, 2001Completed
final sign-off Mar 2002
180 Howard StDpr Construction Incoti-3 5th floor mech only
Details
Permit
200106131429
Permit issued
Jul 11, 2001
Final sign-off
Mar 6, 2002

oti-3 5th floor mech only

Open the permit page

$34,000
Jun 13, 2001Completed
final sign-off Mar 2002
180 Howard StDpr Construction Incoti-2 10th floor ltg mech
Details
Permit
200106131432
Permit issued
Jul 11, 2001
Final sign-off
Mar 6, 2002

oti-2 10th floor ltg mech

Open the permit page

$99,000
Jun 13, 2001Completed
final sign-off Sep 2002
180 Howard StDpr Construction Incoti-2 4th floor ltg mech
Details
Permit
200106131430
Permit issued
Jun 28, 2001
Final sign-off
Sep 27, 2002

oti-2 4th floor ltg mech

Open the permit page

$203,000
May 18, 2001Completed
final sign-off Nov 2001
180 Howard StMichael Bovo & Associatesti gr floor retail
Details
Permit
200105189582
Permit issued
May 18, 2001
Final sign-off
Nov 27, 2001

ti gr floor retail

Open the permit page

$50,000
May 9, 2001Expired or cancelled
expired Nov 2003
180 Howard StDpr Construction Incoti-2 8th floor ltg mech spr
Details
Permit
200105098730
Permit issued
Jul 12, 2001
Final sign-off
Sep 28, 2001

oti-2 8th floor ltg mech spr

Open the permit page

$224,200
May 9, 2001Expired or cancelled
expired Nov 2003
180 Howard StDpr Construction Incoti2-7th floor ltg me sprklr
Details
Permit
200105098733
Permit issued
Jun 5, 2001
Final sign-off
Jan 16, 2002

oti2-7th floor ltg me sprklr

Open the permit page

$129,000
May 9, 2001Expired or cancelled
expired Nov 2003
180 Howard StDpr Construction Incoti-25th floor lgt/sprk
Details
Permit
200105098736
Permit issued
Jun 28, 2001
Final sign-off
Mar 6, 2002

oti-25th floor lgt/sprk

Open the permit page

$108,500
May 9, 2001Expired or cancelled
expired Nov 2003
180 Howard StDpr Construction Incoti-2 ltg, mech, spr 9th floor
Details
Permit
200105098735
Permit issued
Jun 13, 2001
Final sign-off
Jan 16, 2002

oti-2 ltg, mech, spr 9th floor

Open the permit page

$26,100
Apr 24, 2001Completed
final sign-off May 2002
180 Howard StWestern Allied Corp.repl in kind 2 chillers,their associated cooling towers,2 auxilliary condenser
Details
Permit
200104247620
Permit issued
Apr 24, 2001
Final sign-off
May 20, 2002

repl in kind 2 chillers,their associated cooling towers,2 auxilliary condenser

Open the permit page

$748,000
Apr 12, 2001Expired or cancelled
expired Nov 2003
180 Howard StDpr Construction Incoti-1 9th fl, el, me, ls,sp
Details
Permit
200104126651
Permit issued
May 31, 2001
Final sign-off
Jan 16, 2002

oti-1 9th fl, el, me, ls,sp

Open the permit page

$101,304
Apr 12, 2001Completed
final sign-off Sep 2002
180 Howard StDpr Construction Incoti-1 4th floor, ltg, me, ls, sp
Details
Permit
200104126642
Permit issued
May 31, 2001
Final sign-off
Sep 27, 2002

oti-1 4th floor, ltg, me, ls, sp

Open the permit page

$468,000
Apr 12, 2001Completed
final sign-off Mar 2002
180 Howard StDpr Construction Incoti-1 5th floor, el, me, ls, sp
Details
Permit
200104126647
Permit issued
Jun 18, 2001
Final sign-off
Mar 6, 2002

oti-1 5th floor, el, me, ls, sp

Open the permit page

$159,138

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Team Commercial Construction Inc. (32), Metcon Ti, Inc (22), Dpr Construction Inc (18), Johnson Controls Fire (15), Pyro-Comm Systems, Inc. (14), Freedom Fire Protection Inc. (7), Pioneer Fire Inc. (7), Decker Electric Co Inc Electrical Contra (6), True North Signs & Graphic Services (4), Ayoob & Peery Plumbing Co Inc (3), Starlite Electric Inc. (3), Allied Fire Protection (2), Richlen Construction (2), Simplex Grinnell (2), Specialized Graphics Inc (2), Western Allied Mechanical Inc. (2), A.S.T.I. Services (Automatic Sprinkler), Ca United Mechanical, Inc, Capitol Electric Const, Godsblessings2010 Inc Dba Iegc, International Commercial Awning, Inc., Legacy Mechanical & Energy Services, Inc, M C S Construction Services, Matrix Hg Inc, Michael Bovo & Associates, Northern Sun Associates, Potter Fire Protection, Rainbow Waterproofing & Restor, Simplexgrinnell Lp., Skyline Construction, Turner Construction Co, Western Allied Corp., Western Roofing Service, Whitehouse Builders
Architects
Stanley Lew (16), George S Soskin (4), Pamela Robinson (4), Daniel Huntsman (3), Charles Blank (2), Douglas Zucker (2), Oji Arch Hects (Alan Lopez) (2), Brian Milford, Charles F Blank, Elisabeth Allen, Ian Lawlor, Luma Jaffar, Pete Kelly, Richard Korchien, Shen-I Chiou, Tood Levine
Engineers
Carlo Biscocho (6), Gregory Gershkovich (5), Stephen Shaffer (4), Alex Filatov (2), Elisabeth Allen (2), Carlos B. Scocho, Chan Siong Loh, Kent Sasaki, Marina Mechanical, Pak Hui, Roberta Morgan, Stanley H Lew, William Hadinger
Authorized agents
Hugo Rodriguez
Designers
Freedom Fire Protection Inc. (4), Michael Joseph Donahue (4), Bay Air Systems (2)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.