Permit 202509155304
180 Howard St
lobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with asse 1070, (n) water heater, drinking fountain with bottle filter and water boxes. mep deferred
- Outcome
- Completed (city status: complete, Jan 21, 2026)
- Filed
- Sep 15, 2025
- Permit issued
- Sep 17, 2025
- Final sign-off
- Jan 21, 2026
- Declared cost
- $75,000
- Building use
- office
- Neighborhood
- Financial District/South Beach (how long permits take there)
- Contractor
- Metcon Ti, Inc (license 974976)
- Property
- All permits at this address (block 3717, lot 020)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Contractor
- Metcon Ti, Inc (license 974976)
- Architect
- Stanley Lew, Rmw Arch. (license C29609)
- Authorized agent
- Tj Barkdull, Legancy Mechanical (no license listed), applicant