Western Roofing Service
- Based in
- San Leandro
- On San Francisco permits
- Jun 2000 to Oct 2024
- Last 24 months
- 1 permit filed
127 permits since 2000: 73 completed, 1 in progress, 29 never finaled, 24 expired or cancelled.
Of the 29 never-finaled permits, 1 is 5 to 10 years old, 28 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 127.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2024 | Expired or cancelled withdrawn May 2026 | 220 Montgomery St | roof demo: tear off, haul, and dispose of eixsting roofing to down to structural concrete deck. prime and prepare concrete deck to receive sbs roofing. install sbs base sheet, heat welded (torch), install sbs cap sheet, heat welded (torch). install 2-ply flashings, pipe boots, termination barsDetails
roof demo: tear off, haul, and dispose of eixsting roofing to down to structural concrete deck. prime and prepare concrete deck to receive sbs roofing. install sbs base sheet, heat welded (torch), install sbs cap sheet, heat welded (torch). install 2-ply flashings, pipe boots, termination bars | $850,000 |
| Sep 16, 2024 | Completed final sign-off Dec 2024 | 450 Guerrero St | re-roofingDetails
re-roofing | $215,000 |
| Dec 20, 2023 | In progress issued May 2024 | 49 Geary St | existing roofing membrane removal and full replacement of the membrane system. removal and disposal of existing wood curbs of mechanical units, and replacement with new. new roofing system to be installed shall be 2-ply sbs modified bituman roofing over tapered polyiso insulationDetails
existing roofing membrane removal and full replacement of the membrane system. removal and disposal of existing wood curbs of mechanical units, and replacement with new. new roofing system to be installed shall be 2-ply sbs modified bituman roofing over tapered polyiso insulation | $1,200,000 |
| Jun 29, 2023 | Completed final sign-off Feb 2024 | 420 Montgomery St | reroofing. to comply with cool roof requirements per 2022 california energy code 141.0(b)2b. crrc 0742-0018. remove/replace old roof.Details
reroofing. to comply with cool roof requirements per 2022 california energy code 141.0(b)2b. crrc 0742-0018. remove/replace old roof. | $350,000 |
| Jul 5, 2022 | Completed final sign-off Aug 2022 | 1 Dr. Carlton B. Goodlett Pl | install 88 horizontal lifeline anchors @ roofDetails
install 88 horizontal lifeline anchors @ roof | $350,000 |
| Jun 10, 2022 | Completed final sign-off Jun 2023 | 525 Market St | replacement of roofing membrane on the main roof and 39th floor roofDetails
replacement of roofing membrane on the main roof and 39th floor roof | $950,000 |
| Dec 2, 2020 | Expired or cancelled withdrawn Jun 2021 | 1550 Treat Av | re-roofing, perimeter exterior fence / guardrailDetails
re-roofing, perimeter exterior fence / guardrail | $75,000 |
| Nov 10, 2020 | Completed final sign-off Feb 2021 | 135 Mississippi St | reroofing. tear off (e) bur, install firestone tpo single ply above 2" insulation w/1/4" coverboard, new counter flashingsDetails
reroofing. tear off (e) bur, install firestone tpo single ply above 2" insulation w/1/4" coverboard, new counter flashings | $156,041 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 59 Brookdale Av | roof leak & structure repair for unit 59, 61 brookdale ave.Details
roof leak & structure repair for unit 59, 61 brookdale ave. | $3,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 147 Brookdale Av | roof leak & roof structure repair for units at 145, 147, 149 brookdale ave, to comply with nov #24756362.Details
roof leak & roof structure repair for units at 145, 147, 149 brookdale ave, to comply with nov #24756362. | $20,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 180 Brookdale Av | roof leak repair for units at 1869, 1871, 1875 sunnydale ave.Details
roof leak repair for units at 1869, 1871, 1875 sunnydale ave. | $3,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 20 Santos St | roof leak repair for units at 20 santos street.Details
roof leak repair for units at 20 santos street. | $3,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 19 Brookdale Av | roof structure repair at 119 brookdale ave.Details
roof structure repair at 119 brookdale ave. | $3,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 252 Blythdale Av | roof leak repair & roof structure repair for 252 blythdale ave.Details
roof leak repair & roof structure repair for 252 blythdale ave. | $10,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 101 Blythdale Av | roof leak repair for units at 101, 111, 113 blythdale ave.Details
roof leak repair for units at 101, 111, 113 blythdale ave. | $3,000 |
| Nov 20, 2017 | Never finaled issued Nov 2017, no final | 2 Townsend St | reroofing.Details
reroofing. | $100,000 |
| Sep 19, 2017 | Expired or cancelled revoked Sep 2017 | 730 Taraval St | to obtain final inspection for work approved under pa# 200704249561. all work is complete.Details
to obtain final inspection for work approved under pa# 200704249561. all work is complete. | |
| Sep 29, 2016 | Completed final sign-off Dec 2016 | 600 California St | reroofing.Details
reroofing. | $250,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2017 | 685 Market St | reroofing.Details
reroofing. | $510,450 |
| Oct 27, 2015 | Completed final sign-off Jul 2016 | 901 California St | reroofingDetails
reroofing | $910,000 |
| Oct 27, 2015 | Completed final sign-off Jan 2016 | 180 Post St | reroofingDetails
reroofing | $190,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 75 Folsom St | replace existing deck waterproofing membrane with new waterproofing. area is for residential only.Details
replace existing deck waterproofing membrane with new waterproofing. area is for residential only. | $160,000 |
| Jul 14, 2015 | Completed final sign-off Dec 2015 | 2800 Turk Bl | reroofingDetails
reroofing | $3,000 |
| May 21, 2015 | Completed final sign-off Aug 2015 | 1625 Post St | reroofingDetails
reroofing | $345,000 |
| Apr 13, 2015 | Completed final sign-off May 2015 | 3701 Balboa St | reroof; t/o (e) bur roof and install single ply roof. remove tile roof, install new underlayment and re-install (e) tile. nw parapet copingDetails
reroof; t/o (e) bur roof and install single ply roof. remove tile roof, install new underlayment and re-install (e) tile. nw parapet coping | $70,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 151 10th St | reroofing. compliance with maher ordinance no 155-13 not required.Details
reroofing. compliance with maher ordinance no 155-13 not required. | $60,000 |
| Nov 21, 2014 | Completed final sign-off Aug 2015 | 1 Market St | reroofing. compliance with maher ordinance no 155-13 not required.Details
reroofing. compliance with maher ordinance no 155-13 not required. | $110,000 |
| Aug 20, 2014 | Completed final sign-off Dec 2014 | 301 Howard St | reroofingDetails
reroofing | $330,000 |
| Jul 2, 2014 | Completed final sign-off Aug 2014 | 234 Ulloa St | reroofingDetails
reroofing | $60,000 |
| Jul 2, 2014 | Completed final sign-off Aug 2014 | 940 Laguna Honda Bl | reroofingDetails
reroofing | $70,000 |
| May 5, 2014 | Completed final sign-off Jul 2014 | 390 Missouri St | reroofingDetails
reroofing | $11,500 |
| Apr 24, 2014 | Completed final sign-off Jul 2014 | 4131 Geary Bl | re-roofingDetails
re-roofing | $450,000 |
| Mar 18, 2014 | Completed final sign-off Jul 2014 | 1188 Franklin St | reroofingDetails
reroofing | $140,000 |
| Jan 16, 2014 | Completed final sign-off Feb 2014 | 29 Rockaway Av | reroofingDetails
reroofing | $120,000 |
| Oct 9, 2013 | Completed final sign-off Dec 2013 | 255 California St | reroofingDetails
reroofing | $245,000 |
| Sep 25, 2013 | Completed final sign-off Jan 2014 | 756 Mission St | reroofingDetails
reroofing | $380,000 |
| Sep 24, 2013 | Completed final sign-off Jan 2014 | 180 Howard St | reroofingDetails
reroofing | $350,000 |
| Aug 21, 2013 | Completed final sign-off Jan 2014 | 322 Ritch St | reroofingDetails
reroofing | $49,000 |
| Jan 31, 2013 | Never finaled issued Jan 2013, no final | 450 Mission St | reroofingDetails
reroofing | $300,000 |
| Oct 17, 2012 | Never finaled issued Oct 2012, no final | 109 Stevenson St | reroofingDetails
reroofing | $39,700 |
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 281 Masonic Av | reroofingDetails
reroofing | $185,000 |
| Jul 20, 2012 | Never finaled issued Jul 2012, no final | 2199 Fulton St | reroofingDetails
reroofing | $370,000 |
| Apr 26, 2012 | Never finaled issued Apr 2012, no final | 12 Delmar St | reroofingDetails
reroofing | $7,500 |
| Apr 26, 2012 | Never finaled issued Apr 2012, no final | 12 Delmar St | 6" oc perimeter, 12" oc field. install 1/2" plywood by using the following nail pattern: 6" oc @ the perimeter & 12" oc @ the field of each sheet of plywood.Details
6" oc perimeter, 12" oc field. install 1/2" plywood by using the following nail pattern: 6" oc @ the perimeter & 12" oc @ the field of each sheet of plywood. | $8,000 |
| Oct 26, 2011 | Never finaled issued Oct 2011, no final | 450 Guerrero St | reroofingDetails
reroofing | $95,000 |
| Oct 5, 2011 | Completed final sign-off Apr 2012 | 850 Powell St | reroofingDetails
reroofing | $610,000 |
| Sep 14, 2011 | Completed final sign-off Nov 2011 | 1 South Van Ness Av | to obtain final inspection for work approved under app#201004160448. all work is complete.Details
to obtain final inspection for work approved under app#201004160448. all work is complete. | |
| Aug 30, 2011 | Completed final sign-off Nov 2011 | 666 Post St | new roof deck for suite 1700Details
new roof deck for suite 1700 | $3,000 |
| May 12, 2011 | Never finaled issued May 2011, no final | 333 Ofarrell St | reroofingDetails
reroofing | $730,000 |
| Apr 21, 2011 | Completed final sign-off Jul 2011 | 666 Post St | install new guard railing attached to the parapet wallDetails
install new guard railing attached to the parapet wall | $40,000 |
| Jan 13, 2011 | Completed final sign-off Jan 2011 | 1001 Polk St | reroofingDetails
reroofing | $99,870 |
| Dec 9, 2010 | Completed final sign-off Dec 2010 | 650 Prentiss St | reroofingDetails
reroofing | $4,000 |
| Nov 12, 2010 | Completed final sign-off Nov 2010 | 3193 California St | reroofingDetails
reroofing | $31,400 |
| Oct 7, 2010 | Completed final sign-off Apr 2012 | 666 Post St | reroofingDetails
reroofing | $118,000 |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 768 Brannan St | reroofing (remove (e) build up roof; install fire rated cover board. install 60 mil title 24 compliant thermoplastic membrane on the new roo).Details
reroofing (remove (e) build up roof; install fire rated cover board. install 60 mil title 24 compliant thermoplastic membrane on the new roo). | $38,000 |
| Oct 20, 2009 | Never finaled issued Oct 2009, no final | 45 Beale St | reroofingDetails
reroofing | $521,288 |
| Aug 26, 2009 | Never finaled issued Aug 2009, no final | 101 Market St | reroofingDetails
reroofing | $1,100,000 |
| Jul 20, 2009 | Completed final sign-off Nov 2011 | 2400 Cesar Chavez St | reroofingDetails
reroofing | $200,000 |
| Jul 16, 2009 | Expired or cancelled expired Oct 2009 | 2400 Cesar Chavez St | 2nd phase of voluntary bracing work of existing warehouse and office plywood railing only for this permit. 1st phase app 200608220185Details
2nd phase of voluntary bracing work of existing warehouse and office plywood railing only for this permit. 1st phase app 200608220185 | $7,500 |
| Apr 20, 2009 | Completed final sign-off Apr 2009 | 1 Zoo Rd | obtain final inspection for work approved under pa# 2007-1017-5698, all work is completeDetails
obtain final inspection for work approved under pa# 2007-1017-5698, all work is complete | |
| Nov 10, 2008 | Never finaled issued Nov 2008, no final | 475 Sansome St | reroofing.Details
reroofing. | $250,000 |
| Oct 27, 2008 | Never finaled issued Oct 2008, no final | 55 Hawthorne St | reroofing.Details
reroofing. | $250,000 |
| Apr 28, 2008 | Completed final sign-off Oct 2008 | 55 Hawthorne St | reroofingDetails
reroofing | $230,000 |
| Apr 23, 2008 | Completed final sign-off May 2008 | 450 Somerset St | reroofingDetails
reroofing | $82,445 |
| Nov 14, 2007 | Completed final sign-off Jan 2008 | 1650 Mission St | reroofingDetails
reroofing | $813,019 |
| Oct 17, 2007 | Expired or cancelled expired Feb 2018 | 1 Zoo Rd | skylights replacement - existing wire glass skylights to be replaced with new laminated insulated glass skylights. 5 units 12'-6" x 17' and 2 units 11' x 15'.Details
skylights replacement - existing wire glass skylights to be replaced with new laminated insulated glass skylights. 5 units 12'-6" x 17' and 2 units 11' x 15'. | $180,000 |
| Sep 26, 2007 | Completed final sign-off Oct 2007 | 430 Turk St | reroofingDetails
reroofing | $215,919 |
| Aug 17, 2007 | Never finaled issued Aug 2007, no final | 201 03rd St | reroofingDetails
reroofing | $188,950 |
| Aug 17, 2007 | Never finaled issued Aug 2007, no final | 155 05th St | reroofingDetails
reroofing | $698,720 |
| Jul 18, 2007 | Completed final sign-off Oct 2007 | 123 Locust St | reroofingDetails
reroofing | $77,000 |
| Jun 27, 2007 | Never finaled issued Jun 2007, no final | 4131 Geary Bl | reroofingDetails
reroofing | $161,727 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 185 Berry St | reroofingDetails
reroofing | $1,710,665 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 165 Sutter St | reroofingDetails
reroofing | $160,000 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 120 Kearny St | reroofingDetails
reroofing | $224,495 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 201 Spear St | reroofingDetails
reroofing | $422,900 |
| Apr 24, 2007 | Never finaled issued May 2007, no final | 730 Taraval St | roof parking deck repair work which includes applicatio of new waterproofing membrane. reoval of exising topping slab. install new topping slab over waterproofing membrane to match existing layout. modify existing planter. install new trellis.Details
roof parking deck repair work which includes applicatio of new waterproofing membrane. reoval of exising topping slab. install new topping slab over waterproofing membrane to match existing layout. modify existing planter. install new trellis. | $500,000 |
| Sep 29, 2006 | Completed final sign-off Mar 2007 | 345 Stockton St | reroofingDetails
reroofing | $300,000 |
| Sep 13, 2006 | Expired or cancelled expired Apr 2011 | 701 Minnesota St | reroofingDetails
reroofing | $338,200 |
| Aug 23, 2006 | Never finaled issued Aug 2006, no final | 2200 Sacramento St | reroofing reroofingDetails
reroofing reroofing | $310,920 |
| Aug 9, 2006 | Completed final sign-off Sep 2007 | 25 Van Ness Av | installation of new roof. higher than 0.70 reflectance, higher than 0.75 thermal emittanceDetails
installation of new roof. higher than 0.70 reflectance, higher than 0.75 thermal emittance | $610,000 |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 425 Market St | reroofingDetails
reroofing | $430,000 |
| May 12, 2006 | Completed final sign-off May 2006 | 1001 Franklin St | reroofingDetails
reroofing | $81,000 |
| Sep 30, 2005 | Never finaled issued Sep 2005, no final | 201 03rd St | reroofingDetails
reroofing | $235,000 |
| Sep 30, 2005 | Completed final sign-off Nov 2005 | 1800 Oakdale Av | reroofingDetails
reroofing | $312,000 |
| Sep 29, 2005 | Expired or cancelled expired Aug 2007 | 201 03rd St | reroofingDetails
reroofing | $58,900 |
| Sep 23, 2005 | Expired or cancelled expired Jul 2009 | 333 Pine St | reroofingDetails
reroofing | $11,000 |
| Aug 29, 2005 | Expired or cancelled expired Jul 2006 | 98 Battery St | reroofingDetails
reroofing | $15,000 |
| May 10, 2005 | Expired or cancelled expired Aug 2007 | 2345 03rd St | reroofingDetails
reroofing | $100,000 |
| Apr 15, 2005 | Completed final sign-off Jun 2005 | 430 Turk St | renovation to men's and women's tiolet rooms at ground flr of 430 turk st & to front doorDetails
renovation to men's and women's tiolet rooms at ground flr of 430 turk st & to front door | |
| May 17, 2004 | Completed final sign-off Jun 2005 | 440 Turk St | replace (e)built up roof assembly @3/f withnew built up roof w/protected membrane roof panels.Details
replace (e)built up roof assembly @3/f withnew built up roof w/protected membrane roof panels. | $80,000 |
| May 3, 2004 | Expired or cancelled expired Jan 2007 | 1958 Vallejo St | reroofingDetails
reroofing | $60,000 |
| Mar 19, 2004 | Never finaled issued Mar 2004, no final | 547 Clement St | reroofingDetails
reroofing | $23,000 |
| Nov 13, 2003 | Expired or cancelled expired Nov 2007 | 300 Montgomery St | reroofingDetails
reroofing | $73,000 |
| Oct 6, 2003 | Expired or cancelled expired Mar 2005 | 1 California St | reroofingDetails
reroofing | $58,595 |
| Aug 12, 2003 | Completed final sign-off Sep 2003 | 1219 Ingalls St | reroofingDetails
reroofing | $3,250 |
| Aug 12, 2003 | Completed final sign-off Sep 2003 | 1255 Ingalls St | reroofingDetails
reroofing | $3,250 |
| Aug 12, 2003 | Never finaled issued Aug 2003, no final | 1243 Ingalls St | reroofingDetails
reroofing | $3,250 |
| Aug 12, 2003 | Completed final sign-off Nov 2003 | 1227 Ingalls St | reroofingDetails
reroofing | $3,250 |
| Aug 12, 2003 | Completed final sign-off Sep 2003 | 1235 Ingalls St | reroofingDetails
reroofing | $3,250 |
| Mar 7, 2003 | Expired or cancelled expired Aug 2007 | 753 Davis St | reroofingDetails
reroofing | $160,000 |