Block 3707, lot 004
109 Stevenson St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 6
- Units
- 2
- Rooms
- 12 bathrooms
- Building
- 15,150 sq ft
- Lot
- 2,375 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2024 | In progress issued Mar 2024 | 109 Stevenson St | to obtain final inspection for work approved under pa#: 2001.0306.3581. all work is complete.Details
to obtain final inspection for work approved under pa#: 2001.0306.3581. all work is complete. | ||
| Sep 6, 2017 | Expired or cancelled withdrawn Mar 2024 | 109 Stevenson St | Yesco Signs Llc | erece two (2) double faced projecting non-electric signs for "the dental suite". n/a ordinance #155-13Details
erece two (2) double faced projecting non-electric signs for "the dental suite". n/a ordinance #155-13 | $2,000 |
| Aug 17, 2016 | Completed final sign-off Oct 2017 | 109 Stevenson St | Barber Construction | construct tenant improvement of new dental office creating new non-bearing partition walls, operatories, doctors office & related support areas with new gypsum board ceiling/soffits plus 1 ada accessible restroom/no medical gas piping. maher naDetails
construct tenant improvement of new dental office creating new non-bearing partition walls, operatories, doctors office & related support areas with new gypsum board ceiling/soffits plus 1 ada accessible restroom/no medical gas piping. maher na | $140,000 |
| Feb 14, 2014 | Expired or cancelled cancelled Mar 2024 | 109 Stevenson St | Angotti & Reilly Inc. | 3rd floor:demoltion of extg non-load bearing partitions on 3rd floor to create vacant space for future t.i. per ab017 space to remain unoccupied and all ada to be addressed under future t.i. permit.n/a for the maher ordinance #155-13 & n/a for interim controls #428-13Details
3rd floor:demoltion of extg non-load bearing partitions on 3rd floor to create vacant space for future t.i. per ab017 space to remain unoccupied and all ada to be addressed under future t.i. permit.n/a for the maher ordinance #155-13 & n/a for interim controls #428-13 | $11,000 |
| Sep 26, 2013 | Completed final sign-off Dec 2013 | 36 02nd St | Wells Construction Inc | minor t.i to cafe front bar, back bar w/reconfiguration. relocate bar equipment, floor sinks, update furniture & casework. repaint (e) walls & ceilings for new finish. install new flooring, non load bearing walls. update light fixtures. install vertical grab bars & diaper changing station in restrmDetails
minor t.i to cafe front bar, back bar w/reconfiguration. relocate bar equipment, floor sinks, update furniture & casework. repaint (e) walls & ceilings for new finish. install new flooring, non load bearing walls. update light fixtures. install vertical grab bars & diaper changing station in restrm | $100,000 |
| Oct 17, 2012 | Never finaled issued Oct 2012, no final | 109 Stevenson St | Western Roofing Service | reroofingDetails
reroofing | $39,700 |
| Aug 15, 2012 | Completed final sign-off Feb 2013 | 109 Stevenson St | Angotti & Reilly Inc. | tenant improvement on the 4th floor to demo ceiling height non load bearing partitons and construct new full height partitions and finishes. mech, el, sprinklers and life safety separate permitDetails
tenant improvement on the 4th floor to demo ceiling height non load bearing partitons and construct new full height partitions and finishes. mech, el, sprinklers and life safety separate permit | $170,000 |
| Apr 5, 2010 | Completed final sign-off Jun 2010 | 36 02nd St | J. M. Maita Construction Inc. | starbucks. addition of a new hvac unit and modification of (e) mech ducting as required. (e) wall and platform frammg to be demolished and rebuilt to support new mechanical unitsDetails
starbucks. addition of a new hvac unit and modification of (e) mech ducting as required. (e) wall and platform frammg to be demolished and rebuilt to support new mechanical units | $30,000 |
| Oct 2, 2008 | Expired or cancelled cancelled Jan 2026 | 109 Stevenson St | Angotti & Reilly Inc. | minor non-loading improvements within existing office space, remove and replace 3 new walls.Details
minor non-loading improvements within existing office space, remove and replace 3 new walls. | $15,000 |
| Sep 17, 2008 | Completed final sign-off Dec 2008 | 36 02nd St | J. M. Maita Construction Inc. | replace of extg casework and counter. relocation of extg equipment and new plumg fixtures to replace extg minor electric & plmg. associsated with new work; patch floor finishes as applcable.Details
replace of extg casework and counter. relocation of extg equipment and new plumg fixtures to replace extg minor electric & plmg. associsated with new work; patch floor finishes as applcable. | $96,000 |
| Oct 21, 2003 | Completed final sign-off Nov 2003 | 109 Stevenson St | Berkey Construction Inc | rev.appl#200306025962 drawing revision,revise bollards fm embedded to surface mount w/anchor boltsDetails
rev.appl#200306025962 drawing revision,revise bollards fm embedded to surface mount w/anchor bolts | |
| Jun 2, 2003 | Completed final sign-off Nov 2003 | 109 Stevenson St | Berkey Construction Inc | replace existing damaged bollards next to curb on stevenson st. 54" high x 5' pipe bollars-10 totalDetails
replace existing damaged bollards next to curb on stevenson st. 54" high x 5' pipe bollars-10 total | $1,800 |
| Jun 19, 2002 | Completed final sign-off Mar 2003 | 109 Stevenson St | rev#200103063581 umb retrofit general procedureDetails
rev#200103063581 umb retrofit general procedure | ||
| Mar 6, 2001 | Expired or cancelled expired Apr 2002 | 109 Stevenson St | seismic upgrade, new braced frame at north elevation to replace windowDetails
seismic upgrade, new braced frame at north elevation to replace window | ||
| Jul 12, 2000 | Completed final sign-off Sep 2000 | 36 02nd St | install a new restroom within the tenancy as shown on the drawingsDetails
install a new restroom within the tenancy as shown on the drawings | $5,500 | |
| Jul 10, 2000 | Completed final sign-off Aug 2000 | 107 Stevenson St | Steve's Awning | install new awning, awning made of tubing three quarter frame and cover with canvas sheetDetails
install new awning, awning made of tubing three quarter frame and cover with canvas sheet | $400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Angotti & Reilly Inc. (3), Berkey Construction Inc (2), J. M. Maita Construction Inc. (2), Barber Construction, Steve's Awning, Wells Construction Inc, Western Roofing Service, Yesco Signs Llc
- Architects
- Jay Baptista