Block 1539, lot 001
4131 Geary Bl
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
124 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2026 | In progress issued May 2026 | 4131 Geary Bl | Siemens Industry, Inc. | fire only work to add 1 smoke detector and 1 heat detector for the elevator car 4 top of shaft area. these added devices are with the elevator modernization project and the initial fire alarm permit 202507241460.Details
fire only work to add 1 smoke detector and 1 heat detector for the elevator car 4 top of shaft area. these added devices are with the elevator modernization project and the initial fire alarm permit 202507241460. | $1,440 |
| Apr 7, 2026 | In progress issued Aug 2026 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | card readers added to elevator modernization project under pa202505015606 and required coordiante of (e) security system.Details
card readers added to elevator modernization project under pa202505015606 and required coordiante of (e) security system. | $20,000 |
| Oct 23, 2025 | In progress issued Jul 2026 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | replacement of emergency generator equipment at medical office building.Details
replacement of emergency generator equipment at medical office building. | $250,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | rev to pa# 2025-0501-5606: elevator machinery anchorage revised after summory of existing conditions. revised calcuations also provided structural onlyDetails
rev to pa# 2025-0501-5606: elevator machinery anchorage revised after summory of existing conditions. revised calcuations also provided structural only | |
| Oct 7, 2025 | In progress filed Oct 2025, not yet issued | 4131 Geary Bl | W. Bradley Electric | fire alarm system migration at the kaiser (cn31-24) central plant as part of a campus wide fire alarm upgrade; migrating to new equipment - provide minimal conduits where needed by fire alarm, provide (1) power outlet with new circuit. re-use (e) electrical circuit. structural details to coverDetails
fire alarm system migration at the kaiser (cn31-24) central plant as part of a campus wide fire alarm upgrade; migrating to new equipment - provide minimal conduits where needed by fire alarm, provide (1) power outlet with new circuit. re-use (e) electrical circuit. structural details to cover | $70,000 |
| Oct 6, 2025 | Completed final sign-off Sep 2026 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | relocate nitrogen starage tank & asscociated components from rm 355 3rd/f to rm 1112b 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1112b 1st/f to install nitrogen tank & associated componentDetails
relocate nitrogen starage tank & asscociated components from rm 355 3rd/f to rm 1112b 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1112b 1st/f to install nitrogen tank & associated component | $50,000 |
| Jul 24, 2025 | In progress issued Nov 2025 | 4131 Geary Bl | Siemens Industry, Inc. | fire only work for the elevator modernization done under pa# 202505015606; addiions are 8 smoke detectors, 3 head detectors, and 13 modulesDetails
fire only work for the elevator modernization done under pa# 202505015606; addiions are 8 smoke detectors, 3 head detectors, and 13 modules | $14,200 |
| Jun 6, 2025 | In progress issued Sep 2025 | 4131 Geary Bl | W. Bradley Electric | central plant: f/a system upgrade; migrating new equip: 1 c/p,1 network annunicator,1 remove annunciator, 9 pull stations, 6 modules. 7 smoke detectors, 21 heat detectors, 2 duckt smoke detctors. fire alarm additions only.Details
central plant: f/a system upgrade; migrating new equip: 1 c/p,1 network annunicator,1 remove annunciator, 9 pull stations, 6 modules. 7 smoke detectors, 21 heat detectors, 2 duckt smoke detctors. fire alarm additions only. | $262,283 |
| May 1, 2025 | In progress issued Jul 2025 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room.Details
modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room. | $1,800,000 |
| Sep 17, 2024 | Completed final sign-off Feb 2025 | 4131 Geary Bl | Booth Electric Inc | revision to pa#: 202312062020. change of electrical feed and panel location.Details
revision to pa#: 202312062020. change of electrical feed and panel location. | $5,000 |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 4131 Geary Bl | replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinetDetails
replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinet | $35,000 | |
| Dec 6, 2023 | Completed final sign-off Feb 2025 | 4131 Geary Bl | Booth Electric Inc | parking area - installing (4) level 2 ev chargers and (1) level 3 fast charger in outdoor parking lot. installing power feeds from (e) switchgear in the basement under outdoor, uncovered parking area.Details
parking area - installing (4) level 2 ev chargers and (1) level 3 fast charger in outdoor parking lot. installing power feeds from (e) switchgear in the basement under outdoor, uncovered parking area. | $100,000 |
| Jun 30, 2023 | Completed final sign-off Jul 2023 | 450 06th Av | Kaiser Foundation Health Plan Inc | revision to 202305026868 to update form c of da checklist and path of travel upgrades. codes 2023 cbcDetails
revision to 202305026868 to update form c of da checklist and path of travel upgrades. codes 2023 cbc | |
| Jun 12, 2023 | Completed final sign-off Jul 2024 | 450 06th Av | Kaiser Foundation Health Plan Inc | install (2) wall mounted procedure light & laser machines, new backing for new cabinets w/sinksDetails
install (2) wall mounted procedure light & laser machines, new backing for new cabinets w/sinks | $50,000 |
| May 30, 2023 | Completed final sign-off Jan 2024 | 4131 Geary Bl | The Cbr Group | removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf36xc067.Details
removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf36xc067. | $8,300 |
| May 2, 2023 | Completed final sign-off Jul 2023 | 450 06th Av | Kaiser Foundation Health Plan Inc | 5/f-exam rms 55065/55063: remove casework counters/install modular casework counter w/sink (ref bpa#202012181345). no changes to (e)ceilings/wall locations/f/a devices, fire protection devices, mechanical systems or electrical. this space will remain a non-oshpd clinic.Details
5/f-exam rms 55065/55063: remove casework counters/install modular casework counter w/sink (ref bpa#202012181345). no changes to (e)ceilings/wall locations/f/a devices, fire protection devices, mechanical systems or electrical. this space will remain a non-oshpd clinic. | $50,000 |
| Dec 5, 2022 | Never finaled issued Dec 2022, no final | 450 06th Av | Del Monte Electric Co Inc | project consists of a one-for-one retrofit or replacement in-kind of (e) interior and exterior light fixtures with led light sources in accordance with a fixture schedule located on electrical plans, no building construction, re-circulating or re-wiring of any fixturesDetails
project consists of a one-for-one retrofit or replacement in-kind of (e) interior and exterior light fixtures with led light sources in accordance with a fixture schedule located on electrical plans, no building construction, re-circulating or re-wiring of any fixtures | $368,000 |
| Jun 28, 2022 | Completed final sign-off Jun 2023 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy.Details
renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy. | $300,000 |
| Feb 16, 2022 | Completed final sign-off Oct 2022 | 450 06th Av | Kaiser Foundation Health Plan Inc | upgrade/refresh restrooms located 3rd fl, room 3324t, 4th fl room 4424ta 5th fl room 5500j- sinks, toilets, accessories, flooring, wall finishesDetails
upgrade/refresh restrooms located 3rd fl, room 3324t, 4th fl room 4424ta 5th fl room 5500j- sinks, toilets, accessories, flooring, wall finishes | $89,000 |
| Dec 13, 2021 | Completed final sign-off Dec 2021 | 4131 Geary Bl | Siemens Industry, Inc. | basement - fire alarm only work to add a speaker/strobe to the pharmacy compounding room. ref pa 2020-1022-7091Details
basement - fire alarm only work to add a speaker/strobe to the pharmacy compounding room. ref pa 2020-1022-7091 | $635 |
| Apr 20, 2021 | Completed final sign-off Sep 2021 | 4131 Geary Bl | Potter Fire Protection | relocate (3) and plug (2) fire sprinklers reference permit #2020-1022-7091Details
relocate (3) and plug (2) fire sprinklers reference permit #2020-1022-7091 | $3,360 |
| Dec 18, 2020 | Completed final sign-off Jul 2021 | 450 06th Av | Kaiser Foundation Health Plan Inc | replace & refresh interior finishes floor and walls for orthopedics podiatry, perioperative medicine and rehab depts. replace caseworks relocation of sinks - no changes to ceilings, walls, locations fire alarm devices, fire protection, mechanical or electrical system.Details
replace & refresh interior finishes floor and walls for orthopedics podiatry, perioperative medicine and rehab depts. replace caseworks relocation of sinks - no changes to ceilings, walls, locations fire alarm devices, fire protection, mechanical or electrical system. | $100,000 |
| Nov 25, 2020 | Completed final sign-off Aug 2021 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | replacement of 3 low temp sterilizer with 2 new low temp terilizer to support surgical space in the basement room #0183. removal of a roll-up shutter on the south wall of the room & closure.Details
replacement of 3 low temp sterilizer with 2 new low temp terilizer to support surgical space in the basement room #0183. removal of a roll-up shutter on the south wall of the room & closure. | $62,000 |
| Oct 22, 2020 | Completed final sign-off Jan 2022 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | renovation of (e) office into an unclassified segregated hazardous compounding pharmacy.Details
renovation of (e) office into an unclassified segregated hazardous compounding pharmacy. | $160,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 450 06th Av | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Nov 7, 2019 | Completed final sign-off Feb 2020 | 450 06th Av | Pioneer Contractors Inc | re-roofing---require min solar reflectance=0.63 & min thermal emittance=0.75 or min sri=75Details
re-roofing---require min solar reflectance=0.63 & min thermal emittance=0.75 or min sri=75 | $334,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2021 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | installation of hub parking pay machine equpment at 4131 & 4141 geary mob's and the french campus parking garageDetails
installation of hub parking pay machine equpment at 4131 & 4141 geary mob's and the french campus parking garage | $50,000 |
| Oct 18, 2019 | Completed final sign-off Feb 2020 | 4131 Geary Bl | Contra Costa Electric Inc | retrofit existing fluorescent fixtures to led in underground garage. no wiring changes, 640 fixtures.Details
retrofit existing fluorescent fixtures to led in underground garage. no wiring changes, 640 fixtures. | $223,131 |
| Jun 27, 2019 | Completed final sign-off Jul 2019 | 4131 Geary Bl | Siemens Industry, Inc. | basement: fire alarm work for the "aho 12/ef-12 replacement" project at the basement level; additions are 1 duct detector and relay module.Details
basement: fire alarm work for the "aho 12/ef-12 replacement" project at the basement level; additions are 1 duct detector and relay module. | $2,150 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 4131 Geary Bl | Siemens Industry, Inc. | roof - fire alarm work for the "ahu-2 and ef-1 fan replacement. additions are 2 duct dectectors and 2 relay modules. ref pa pmw20180608375Details
roof - fire alarm work for the "ahu-2 and ef-1 fan replacement. additions are 2 duct dectectors and 2 relay modules. ref pa pmw20180608375 | $4,170 |
| Aug 3, 2018 | Expired or cancelled cancelled Aug 2023 | 4131 Geary Bl | installation of fire alarm floor 1-4Details
installation of fire alarm floor 1-4 | $80,000 | |
| Jun 4, 2018 | Never finaled issued Jun 2018, no final | 4131 Geary Bl | Siemens Industry, Inc. | mezzanine - fire alarm for aho-10 replacement. 1 duct detector added to to replace e) ref pmw201806011218Details
mezzanine - fire alarm for aho-10 replacement. 1 duct detector added to to replace e) ref pmw201806011218 | $1,585 |
| Jun 4, 2018 | Never finaled issued Jun 2018, no final | 4131 Geary Bl | Siemens Industry, Inc. | roof - fire alarm for ahp-7 replacement, 1 (e) duct det is being re-installed onto thhe new unit. no new device are added ref 201806011217Details
roof - fire alarm for ahp-7 replacement, 1 (e) duct det is being re-installed onto thhe new unit. no new device are added ref 201806011217 | $950 |
| May 16, 2018 | Never finaled issued May 2018, no final | 4131 Geary Bl | street spaceDetails
street space | ||
| Apr 26, 2018 | Completed final sign-off Sep 2019 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | replacement of (e) air unit (auu # 12) & exhaust fan (ef#12) located on the basement level including new pipe run from the roof to the air handling unit. the scope includes a wall enclosure to provide an extension of the (e) air intake shalft located @ grade level that serves ahu #12Details
replacement of (e) air unit (auu # 12) & exhaust fan (ef#12) located on the basement level including new pipe run from the roof to the air handling unit. the scope includes a wall enclosure to provide an extension of the (e) air intake shalft located @ grade level that serves ahu #12 | $425,000 |
| Dec 13, 2017 | Completed final sign-off Jan 2018 | 4131 Geary Bl | Potter Fire Protection | replace 750 fire sprinklers with new on (2) levels of building garage only. sprinkler replacement in-kind, like for like. no branch line modifications, no pipe layout changes.Details
replace 750 fire sprinklers with new on (2) levels of building garage only. sprinkler replacement in-kind, like for like. no branch line modifications, no pipe layout changes. | $158,000 |
| Sep 20, 2017 | Never finaled issued Sep 2017, no final | 4131 Geary Bl | street space permit - pa 201706098983Details
street space permit - pa 201706098983 | ||
| Jun 21, 2017 | Completed final sign-off Jan 2019 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | t.i. of corridor and elevator lobbies on basement and 1st floor. paint, carpet, light fixtures replacement.Details
t.i. of corridor and elevator lobbies on basement and 1st floor. paint, carpet, light fixtures replacement. | $118,000 |
| Jun 19, 2017 | Completed final sign-off Nov 2017 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | installation of nre concrete pads and regarding portion of exterior lot - to accomodate trailerDetails
installation of nre concrete pads and regarding portion of exterior lot - to accomodate trailer | $80,000 |
| Jan 11, 2017 | Completed final sign-off Sep 2017 | 4131 Geary Bl | Rubicon Professional Services Llc | install (1) bloom energy outdoor natural gas fuel cell system & associated natural gas & water plumbing as well as electrical to tie into building. the fuel cell system will be installed on a concrete pad.Details
install (1) bloom energy outdoor natural gas fuel cell system & associated natural gas & water plumbing as well as electrical to tie into building. the fuel cell system will be installed on a concrete pad. | $170,000 |
| Oct 21, 2016 | Completed final sign-off Feb 2017 | 4131 Geary Bl | Siemens Industry, Inc. | roof - fire alarm: add 1 duct for new fau ref 201602189901Details
roof - fire alarm: add 1 duct for new fau ref 201602189901 | $610 |
| Sep 15, 2016 | Never finaled issued Sep 2016, no final | 4131 Geary Bl | Siemens Industry, Inc. | roof: fire alarm work for the "ahu-4 fan replacement" project on the roof; the addition is 1 duct detector for the new fan. ref pa 2016-0218-9901Details
roof: fire alarm work for the "ahu-4 fan replacement" project on the roof; the addition is 1 duct detector for the new fan. ref pa 2016-0218-9901 | $610 |
| Aug 26, 2016 | Completed final sign-off Oct 2016 | 4131 Geary Bl | Siemens Industry, Inc. | fire alarm work for the "ksfo pharmacy" remodel on floor 1; additions are 10 speaker/strobes, as well as the relocation of 2 strobes. ref pa 2015-0921-7532Details
fire alarm work for the "ksfo pharmacy" remodel on floor 1; additions are 10 speaker/strobes, as well as the relocation of 2 strobes. ref pa 2015-0921-7532 | $5,100 |
| Mar 31, 2016 | Completed final sign-off Dec 2016 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | per plumbing inspector request for app#201510169910, replace fixture in-kind in bathroomDetails
per plumbing inspector request for app#201510169910, replace fixture in-kind in bathroom | |
| Mar 30, 2016 | Completed final sign-off Apr 2016 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | revision pa#201509217532; no changes of use & no exterior work. removal of plumbing fixtures from (1) restroom. convert back to storage.Details
revision pa#201509217532; no changes of use & no exterior work. removal of plumbing fixtures from (1) restroom. convert back to storage. | $650,000 |
| Mar 25, 2016 | Never finaled issued Mar 2016, no final | 4131 Geary Bl | Siemens Industry, Inc. | fire alarm work for the "sfo" ti remodel on floor 1; additions are 1 pull station, 8 speaker/strobes and 2 strobes. ref pa 2015-0921-7532Details
fire alarm work for the "sfo" ti remodel on floor 1; additions are 1 pull station, 8 speaker/strobes and 2 strobes. ref pa 2015-0921-7532 | $5,600 |
| Mar 14, 2016 | Completed final sign-off Aug 2016 | 4131 Geary Bl | Potter Fire Protection | 1st flr: relocate (31) and plug (13) fire sprinklers. ref. permit 201509217532Details
1st flr: relocate (31) and plug (13) fire sprinklers. ref. permit 201509217532 | $15,500 |
| Feb 18, 2016 | Never finaled issued Mar 2016, no final | 4131 Geary Bl | Peterson Mechanical Inc. | replace existing air handling unit and exhaust fan (roof top).Details
replace existing air handling unit and exhaust fan (roof top). | $328,000 |
| Feb 3, 2016 | Never finaled issued Feb 2016, no final | 4131 Geary Bl | Potter Fire Protection | relocate 20 fire sprinklers. ref app#201510169910Details
relocate 20 fire sprinklers. ref app#201510169910 | $10,500 |
| Oct 16, 2015 | Completed final sign-off Dec 2016 | 4131 Geary Bl | 1st floor: interior renovations of existing tenant space. interior walls, doors, glazing, for offices. full sprinklered spaceDetails
1st floor: interior renovations of existing tenant space. interior walls, doors, glazing, for offices. full sprinklered space | $823,663 | |
| Sep 21, 2015 | Completed final sign-off Apr 2016 | 4131 Geary Bl | replace (e) decontamination sink & move doorDetails
replace (e) decontamination sink & move door | $80,000 | |
| Sep 21, 2015 | Completed final sign-off Sep 2016 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | 1st floor: 3000 sq ft of t.i. renovation. one new toilet room, modification to extg mechanical, electrical, plumbing, fire alarm and fire sprinklers.Details
1st floor: 3000 sq ft of t.i. renovation. one new toilet room, modification to extg mechanical, electrical, plumbing, fire alarm and fire sprinklers. | $650,000 |
| May 27, 2015 | Completed final sign-off Oct 2015 | 450 06th Av | Kaiser Foundation Health Plan Inc | 2/f -minor alterations at the extg head and neck department on 2nd floor. work includes addition of power and data outlets, some modifications to extg casework and the conversion of an unused shower room into a small storage closet.Details
2/f -minor alterations at the extg head and neck department on 2nd floor. work includes addition of power and data outlets, some modifications to extg casework and the conversion of an unused shower room into a small storage closet. | $10,000 |
| Jul 15, 2014 | Completed final sign-off Dec 2014 | 4131 Geary Bl | Acco Engineered Systems Inc. Dba Acco En | like for like replacement of cooling tower. install new vfds.Details
like for like replacement of cooling tower. install new vfds. | $660,000 |
| Jul 15, 2014 | Completed final sign-off Dec 2014 | 4131 Geary Bl | Acco Engineered Systems Inc. Dba Acco En | like for like replacement of one chiller. bms upgrade.Details
like for like replacement of one chiller. bms upgrade. | $415,000 |
| Jun 30, 2014 | Completed final sign-off Mar 2015 | 4131 Geary Bl | Metropolitan Electrical Construction | add (3) 2.5 panel antennas (1) each at sectors a b c. add (3) rrh,(1) each at sectors a, b & c. add coax jumper lines from rrhs to new antennas. reuse (e) hybrid cable or install (n) as needed. add (n) cable shrounds at each of 3 (e) & 3 (p) antennas. add (n) 2.5 equipment in (e) mmbs cabinet sprintDetails
add (3) 2.5 panel antennas (1) each at sectors a b c. add (3) rrh,(1) each at sectors a, b & c. add coax jumper lines from rrhs to new antennas. reuse (e) hybrid cable or install (n) as needed. add (n) cable shrounds at each of 3 (e) & 3 (p) antennas. add (n) 2.5 equipment in (e) mmbs cabinet sprint | $20,000 |
| Apr 24, 2014 | Completed final sign-off Jul 2014 | 4131 Geary Bl | Western Roofing Service | re-roofingDetails
re-roofing | $450,000 |
| Sep 23, 2013 | Never finaled issued Sep 2013, no final | 450 06th Av | streestpace and sidewalkDetails
streestpace and sidewalk | ||
| Jul 31, 2013 | Completed final sign-off Apr 2014 | 450 06th Av | Ad Art Inc. | one replacement of shuttle stop sign(non-illuminated)Details
one replacement of shuttle stop sign(non-illuminated) | $3,000 |
| Feb 11, 2013 | Completed final sign-off Apr 2015 | 4131 Geary Bl | Overland Contracting Inc | sprint proposes to modify (e) unmanned telecommunications facility. 4 (e) panel antennas to be removed. 3 (e) new panel antennas mounted on (e) building. 3 (e) equipment cabinets to be remove & 2 (e) new equipment cabinets to be installed at (e) equipment room.Details
sprint proposes to modify (e) unmanned telecommunications facility. 4 (e) panel antennas to be removed. 3 (e) new panel antennas mounted on (e) building. 3 (e) equipment cabinets to be remove & 2 (e) new equipment cabinets to be installed at (e) equipment room. | $45,000 |
| Oct 31, 2012 | Completed final sign-off Oct 2014 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | replacing an extg card reader equipment with new card reader equipment.Details
replacing an extg card reader equipment with new card reader equipment. | $41,197 |
| Sep 27, 2012 | Completed final sign-off Apr 2014 | 450 06th Av | Ad Art Inc. | installation of one illuminated address signDetails
installation of one illuminated address sign | $2,500 |
| Sep 27, 2012 | Completed final sign-off Apr 2014 | 4131 Geary Bl | Ad Art Inc. | to erect electrical single faced wall sign.Details
to erect electrical single faced wall sign. | $2,500 |
| Sep 7, 2012 | Completed final sign-off Oct 2012 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | install 5 new smoke detectors, bsmt-4th floorDetails
install 5 new smoke detectors, bsmt-4th floor | $2,500 |
| Sep 7, 2012 | Completed final sign-off Apr 2013 | 450 06th Av | Kaiser Foundation Health Plan Inc | install 6 new smoke detectors, floors 2, 3, 4, 5Details
install 6 new smoke detectors, floors 2, 3, 4, 5 | $2,500 |
| Feb 2, 2012 | Never finaled issued Feb 2012, no final | 4131 Geary Bl | sidewalkDetails
sidewalk | ||
| Jan 30, 2012 | Completed final sign-off Dec 2013 | 4131 Geary Bl | upper, lower, basement & first floor. replacing existing garage exhaust equipment with (n) equipment, (n) ductwork, & (n) controls to achieve code required ventilation air quantities. a new lowered enclosure will be constructed to enclose the exhaust plenum.Details
upper, lower, basement & first floor. replacing existing garage exhaust equipment with (n) equipment, (n) ductwork, & (n) controls to achieve code required ventilation air quantities. a new lowered enclosure will be constructed to enclose the exhaust plenum. | $150,000 | |
| Dec 15, 2011 | Completed final sign-off Nov 2012 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | provide electrical and mechanical upgrades to tr rooms to support new equipment. installation of new equipment racks, new hvac equipment, new electrical outlets and new ground bus bars and the conversion of 1 storage room into a telecommunications room, mechanical work only.Details
provide electrical and mechanical upgrades to tr rooms to support new equipment. installation of new equipment racks, new hvac equipment, new electrical outlets and new ground bus bars and the conversion of 1 storage room into a telecommunications room, mechanical work only. | $295,000 |
| Dec 15, 2011 | Completed final sign-off Mar 2013 | 450 06th Av | Kaiser Foundation Health Plan Inc | provide architecural and electrical upgrades to tr rooms to support new it equipment. includes installation of new equipment racks, new hvac equipment, new electrical outlets, new ground bus bars and interior thermal glazing film, mechanical work only.Details
provide architecural and electrical upgrades to tr rooms to support new it equipment. includes installation of new equipment racks, new hvac equipment, new electrical outlets, new ground bus bars and interior thermal glazing film, mechanical work only. | $325,000 |
| Dec 15, 2011 | Completed final sign-off Jun 2012 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | provide architecural and electrical upgrades to 1 tr room to support new it equipment.minimal infill work. the application of thermal control glazing film to the interior or 1 existing window and installation of new ups equipment, new electrical outlets and 1 new ground bus barsDetails
provide architecural and electrical upgrades to 1 tr room to support new it equipment.minimal infill work. the application of thermal control glazing film to the interior or 1 existing window and installation of new ups equipment, new electrical outlets and 1 new ground bus bars | $80,000 |
| Nov 2, 2011 | Completed final sign-off Jun 2013 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | work to accomodate steam sterilizer which includes minor demo of non-structural walls, patch paint-minor electrical & plumbing.Details
work to accomodate steam sterilizer which includes minor demo of non-structural walls, patch paint-minor electrical & plumbing. | $128,000 |
| Aug 17, 2011 | Never finaled issued Aug 2011, no final | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | exterior exit stairs guard, handrail, concrete & emergency exit lighting repairs & replacement in an (e) medical office building (fully sprinklered building). per planDetails
exterior exit stairs guard, handrail, concrete & emergency exit lighting repairs & replacement in an (e) medical office building (fully sprinklered building). per plan | $700,000 |
| Jul 1, 2011 | Completed final sign-off Nov 2011 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | revision to app.#201101078043. remove (e) door & frame, install door w/ louver & frame ventilation fan unit 400cfm.Details
revision to app.#201101078043. remove (e) door & frame, install door w/ louver & frame ventilation fan unit 400cfm. | |
| Jun 23, 2011 | Completed final sign-off Aug 2011 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | rev. to pa# 2009.07.07.2082. add concrete topping to provide 2% cross slope at high top van accessible parking and associated path of travel updated parking analysis, indicate detectable warnings btn elevator lobbies and drive aislesDetails
rev. to pa# 2009.07.07.2082. add concrete topping to provide 2% cross slope at high top van accessible parking and associated path of travel updated parking analysis, indicate detectable warnings btn elevator lobbies and drive aisles | |
| Apr 19, 2011 | Completed final sign-off Jun 2012 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | replacing an (e) washer & disinfector to (e) medical office, same size, same equipment, cap mechanical duct.Details
replacing an (e) washer & disinfector to (e) medical office, same size, same equipment, cap mechanical duct. | $115,000 |
| Apr 11, 2011 | Completed final sign-off Nov 2011 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | french campus emergency power expansion; revision to appl.#201101078043.Details
french campus emergency power expansion; revision to appl.#201101078043. | $30,000 |
| Jan 31, 2011 | Completed final sign-off Nov 2011 | 450 06th Av | Kaiser Foundation Health Plan Inc | installation of emergency power system expansion throughout the french campus medical center @ 450-6th. ave. installation of emergency feeders, riser, electrical, panels, wall floor slab, conduit.Details
installation of emergency power system expansion throughout the french campus medical center @ 450-6th. ave. installation of emergency feeders, riser, electrical, panels, wall floor slab, conduit. | $135,000 |
| Jan 7, 2011 | Completed final sign-off Nov 2011 | 4131 Geary Bl | installation of emergency power system expansion throughout french medical center and parking facility. installation of emergency feeders, risers, elec panels, transformers, wall, floor slab, conduitDetails
installation of emergency power system expansion throughout french medical center and parking facility. installation of emergency feeders, risers, elec panels, transformers, wall, floor slab, conduit | $400,000 | |
| Nov 18, 2010 | Never finaled issued Nov 2010, no final | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | fire alarm replacement, new xlsv fire alarm control panel/batteryDetails
fire alarm replacement, new xlsv fire alarm control panel/battery | $200,000 |
| Aug 20, 2010 | Completed final sign-off Aug 2011 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | revision to pa#2009-0707-2082 valuntary ada; remove reference to voluntary sidewalk & cur ramp upgrade from scope of work. monument direction sigfn, pole mounted direction, handrail at sloping sidewalkDetails
revision to pa#2009-0707-2082 valuntary ada; remove reference to voluntary sidewalk & cur ramp upgrade from scope of work. monument direction sigfn, pole mounted direction, handrail at sloping sidewalk | |
| Jun 11, 2010 | Completed final sign-off Nov 2010 | 450 06th Av | Kaiser Foundation Health Plan Inc | barrier removal @ an (e) occupied medical offices. reconfigure ramp @ 1st. flr. corridor. partial upgrade w/ automatic door opener @ flr. 2, 3, 4, 5 life safety changes. revision to permits# 200704269759, 200911302187, 201003168354.Details
barrier removal @ an (e) occupied medical offices. reconfigure ramp @ 1st. flr. corridor. partial upgrade w/ automatic door opener @ flr. 2, 3, 4, 5 life safety changes. revision to permits# 200704269759, 200911302187, 201003168354. | $65,378 |
| May 6, 2010 | Completed final sign-off Sep 2010 | 450 06th Av | Kaiser Foundation Health Plan Inc | revision to permit #200906110266. use of panic hardware in lieu of door push-side clearance for south & north exit stair-doors.Details
revision to permit #200906110266. use of panic hardware in lieu of door push-side clearance for south & north exit stair-doors. | |
| Mar 16, 2010 | Completed final sign-off Jun 2010 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | remove/delete 1 existing strobe; add 1 new strobe; condition of final for this project requires that a plan of action be submitted that describes the timeline to bring the building's strobes to comply with synchronization per nfpa 72. existing fire alarm control panel is capable of synchronization.Details
remove/delete 1 existing strobe; add 1 new strobe; condition of final for this project requires that a plan of action be submitted that describes the timeline to bring the building's strobes to comply with synchronization per nfpa 72. existing fire alarm control panel is capable of synchronization. | $5,000 |
| Mar 16, 2010 | Completed final sign-off Nov 2010 | 450 06th Av | Kaiser Foundation Health Plan Inc | revision to permit# 200911302187. bathroom door moved from 1 side of wall to other side of wall door-automaitc opener (see enlarge plan a-3.2.0) width of wall revised to thicker wall.Details
revision to permit# 200911302187. bathroom door moved from 1 side of wall to other side of wall door-automaitc opener (see enlarge plan a-3.2.0) width of wall revised to thicker wall. | $1,000 |
| Mar 16, 2010 | Completed final sign-off Nov 2010 | 450 06th Av | Kaiser Foundation Health Plan Inc | install 10 new strobesDetails
install 10 new strobes | $10,000 |
| Feb 24, 2010 | Completed final sign-off Jun 2010 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | kaiser. revision to pa# 2009.09.21.7244. voluntary interior accessible upgrade ( barrier removal)Details
kaiser. revision to pa# 2009.09.21.7244. voluntary interior accessible upgrade ( barrier removal) | $10,000 |
| Feb 10, 2010 | Completed final sign-off Sep 2010 | 450 06th Av | revision to 201001114472. revision to exit door and wall. remove fixed side panels at new 3' door to be installed at 2-4 exits and exterior vestibulesDetails
revision to 201001114472. revision to exit door and wall. remove fixed side panels at new 3' door to be installed at 2-4 exits and exterior vestibules | $4,000 | |
| Feb 10, 2010 | Completed final sign-off Jun 2010 | 4131 Geary Bl | Potter Fire Protection | plug 1 fire sprinkler in toilet room on basement levelDetails
plug 1 fire sprinkler in toilet room on basement level | $480 |
| Jan 11, 2010 | Completed final sign-off Sep 2010 | 450 06th Av | Kaiser Foundation Health Plan Inc | revision to 200906110266. revise exit door and wall. (a2.,a3., a9.)Details
revision to 200906110266. revise exit door and wall. (a2.,a3., a9.) | |
| Nov 30, 2009 | Expired or cancelled cancelled Jan 2026 | 450 06th Av | barrier removal.Details
barrier removal. | ||
| Nov 30, 2009 | Completed final sign-off Nov 2010 | 450 06th Av | Kaiser Foundation Health Plan Inc | barrier remvoal.Details
barrier remvoal. | $1,117,135 |
| Nov 19, 2009 | Never finaled issued Dec 2009, no final | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | install 2 smoke detectors and install 4 strobes. 1st floor relocate 2 smoke detectorsDetails
install 2 smoke detectors and install 4 strobes. 1st floor relocate 2 smoke detectors | $5,000 |
| Sep 22, 2009 | Never finaled issued Sep 2009, no final | 4131 Geary Bl | Potter Fire Protection | install 16 new fire srpinklers in a remodeled office spaceDetails
install 16 new fire srpinklers in a remodeled office space | $3,600 |
| Sep 21, 2009 | Completed final sign-off Jun 2010 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | voluntary interior accessibility upgrades (barrier removal) at an existing non-oshpd medical office building.Details
voluntary interior accessibility upgrades (barrier removal) at an existing non-oshpd medical office building. | $601,831 |
| Jul 7, 2009 | Completed final sign-off Aug 2011 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | voluntary accessibility upgrades (barrier removal) at an (e) occupied parking garage. no change in occupancy or use. all work in parking garage (lot) onlyDetails
voluntary accessibility upgrades (barrier removal) at an (e) occupied parking garage. no change in occupancy or use. all work in parking garage (lot) only | $400,000 |
| Jun 18, 2009 | Completed final sign-off Feb 2010 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | new halth education yoga studio tenant improvement on 1st floor. two new rooms.Details
new halth education yoga studio tenant improvement on 1st floor. two new rooms. | $260,000 |
| Jun 11, 2009 | Completed final sign-off Sep 2010 | 450 06th Av | Kaiser Foundation Health Plan Inc | replace doors and frames on north and south exits.work includes replacing 30" door width to 36" and 48" door with no push side clearance to 36" wide exit only doors that provide 12" push side clearance.Details
replace doors and frames on north and south exits.work includes replacing 30" door width to 36" and 48" door with no push side clearance to 36" wide exit only doors that provide 12" push side clearance. | $50,000 |
| May 28, 2009 | Completed final sign-off Nov 2009 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | new washer desifector, new water purification unit in existing rooms. work includes minor architectural, mechanical, plumbing & electrical upgrades. structural work is limited to anchoring equipment to slab.Details
new washer desifector, new water purification unit in existing rooms. work includes minor architectural, mechanical, plumbing & electrical upgrades. structural work is limited to anchoring equipment to slab. | $115,000 |
| Dec 15, 2008 | Completed final sign-off Jan 2009 | 450 06th Av | Kaiser Foundation Health Plan Inc | replacement of fencing in kind with wood slates for cosmetic purposes. black vinyl cycline fencing to replace (e) galvenized cycline fencing. wood slates to replace (e) vinyl slates. no new liner footage, no new openings.Details
replacement of fencing in kind with wood slates for cosmetic purposes. black vinyl cycline fencing to replace (e) galvenized cycline fencing. wood slates to replace (e) vinyl slates. no new liner footage, no new openings. | $28,519 |
| Aug 14, 2008 | Never finaled issued Aug 2008, no final | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | install 4 new strobes and relocate 2 speakers & 2 smoke detectors.Details
install 4 new strobes and relocate 2 speakers & 2 smoke detectors. | $5,000 |
| Apr 23, 2008 | Completed final sign-off Sep 2008 | 4131 Geary Bl | new office suite tenant improvement on the 1st floorDetails
new office suite tenant improvement on the 1st floor | $580,000 | |
| Mar 4, 2008 | Completed final sign-off Jun 2008 | 4131 Geary Bl | Vintage Fire Protection | 1st floor-relocate 2 fire sprinklerDetails
1st floor-relocate 2 fire sprinkler | $750 |
| Feb 20, 2008 | Never finaled issued Feb 2008, no final | 4131 Geary Bl | Vintage Fire Protection | 1st floor - add 21 new fire sprinklers in existing shell space on first floor per nfpa 13.Details
1st floor - add 21 new fire sprinklers in existing shell space on first floor per nfpa 13. | $6,300 |
| Nov 19, 2007 | Completed final sign-off Jun 2008 | 4131 Geary Bl | 1st floor - replace x-ray equipment in rad room 7. demo/remove/replace partitions & caseworks. sprinkler work under spearate permit.Details
1st floor - replace x-ray equipment in rad room 7. demo/remove/replace partitions & caseworks. sprinkler work under spearate permit. | $250,000 | |
| Aug 30, 2007 | Never finaled issued Aug 2007, no final | 4131 Geary Bl | remove existing paver and install new concrete slab in an existing shell space on the 1/f, install new light way concrete slab over rigid insulation on top of (e) slab.Details
remove existing paver and install new concrete slab in an existing shell space on the 1/f, install new light way concrete slab over rigid insulation on top of (e) slab. | $28,000 | |
| Aug 29, 2007 | Completed final sign-off Nov 2007 | 4131 Geary Bl | Vintage Fire Protection | basement- relocate 2 and plug 2 existing fire sprinklers in endoscopy scope washer room in basement.Details
basement- relocate 2 and plug 2 existing fire sprinklers in endoscopy scope washer room in basement. | $1,500 |
| Jun 27, 2007 | Never finaled issued Jun 2007, no final | 4131 Geary Bl | Western Roofing Service | reroofingDetails
reroofing | $161,727 |
| Jun 18, 2007 | Completed final sign-off Nov 2007 | 4131 Geary Bl | installation of new scope washing machines in an existing room located at basement. installation of dryers and new cabinets @ room in basement. install sterilizer machine.Details
installation of new scope washing machines in an existing room located at basement. installation of dryers and new cabinets @ room in basement. install sterilizer machine. | $100,000 | |
| Apr 26, 2007 | Never finaled issued Apr 2007, no final | 450 06th Av | oti-1 interior ti, demo enlarge opening, mill workDetails
oti-1 interior ti, demo enlarge opening, mill work | $40,000 | |
| Jul 12, 2006 | Completed final sign-off Nov 2006 | 4131 Geary Bl | Vintage Fire Protection | relocat one fire sprinkler -basement.Details
relocat one fire sprinkler -basement. | $500 |
| Jun 29, 2006 | Never finaled issued Jun 2006, no final | 450 06th Av | renew for final inspection pa# 200508301557.Details
renew for final inspection pa# 200508301557. | $2,500 | |
| Apr 5, 2006 | Completed final sign-off Nov 2006 | 4131 Geary Bl | radiology rm 2x ray replacement project on 1st flr, demo of existing radiology rm - new sinks, equipment, walls (structural support) for hanging x-ray equipment, renovate mens & womens restrms (handicap access), mechanical relocation of diffusers, air ducts.Details
radiology rm 2x ray replacement project on 1st flr, demo of existing radiology rm - new sinks, equipment, walls (structural support) for hanging x-ray equipment, renovate mens & womens restrms (handicap access), mechanical relocation of diffusers, air ducts. | $250,000 | |
| Sep 12, 2005 | Never finaled issued Sep 2005, no final | 450 06th Av | replace exhaust fans and fan coils with new unit on roof, will connect to new ducts.Details
replace exhaust fans and fan coils with new unit on roof, will connect to new ducts. | $158,000 | |
| Aug 30, 2005 | Never finaled issued Aug 2005, no final | 450 06th Av | Kaiser Foundation Health Plan Inc | install 5 new smoke detectors, 1 @ level"a" rear. 2 at level"a" in fireman control rm. 1@ elevatorDetails
install 5 new smoke detectors, 1 @ level"a" rear. 2 at level"a" in fireman control rm. 1@ elevator | $2,500 |
| Jun 22, 2005 | Completed final sign-off Mar 2006 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only.Details
new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only. | $130,000 |
| Jun 22, 2005 | Completed final sign-off Mar 2006 | 450 06th Av | Kaiser Foundation Health Plan Inc | new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only.Details
new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only. | $150,000 |
| Aug 11, 2000 | Expired or cancelled expired Aug 2002 | 450 06th Av | street spaceDetails
street space | ||
| Jul 13, 2000 | Completed final sign-off Aug 2000 | 450 06th Av | fire alarm plans for student dormitory-entire bldgn-2000/05/12/9863-with device product dataDetails
fire alarm plans for student dormitory-entire bldgn-2000/05/12/9863-with device product data | $80,000 | |
| Jun 21, 2000 | Expired or cancelled expired Feb 2001 | 450 06th Av | Vintage Fire Protection | relocate existing fire sprinklersDetails
relocate existing fire sprinklers | $14,000 |
| May 12, 2000 | Completed final sign-off Aug 2000 | 450 06th Av | interior renovation of all floors and construction of toilet/shwrDetails
interior renovation of all floors and construction of toilet/shwr | $1,000,000 | |
| Apr 11, 2000 | Expired or cancelled expired Apr 2002 | 450 06th Av | street spaceDetails
street space | ||
| Apr 6, 2000 | Completed final sign-off Jul 2000 | 450 06th Av | interior non-structural demo, remove partitions,paint,carpet,plumbing &electricalDetails
interior non-structural demo, remove partitions,paint,carpet,plumbing &electrical | $12,000 | |
| Feb 3, 2000 | Completed final sign-off Jun 2001 | 4131 Geary Bl | Kaiser Foundtion Hosp | renewal of application 9611291Details
renewal of application 9611291 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kaiser Foundation Health Plan Inc (57), Siemens Industry, Inc. (11), Potter Fire Protection (6), Vintage Fire Protection (5), Ad Art Inc. (3), Acco Engineered Systems Inc. Dba Acco En (2), Booth Electric Inc (2), W. Bradley Electric (2), Western Roofing Service (2), Contra Costa Electric Inc, Del Monte Electric Co Inc, Kaiser Foundtion Hosp, Metropolitan Electrical Construction, Overland Contracting Inc, Peterson Mechanical Inc., Pioneer Contractors Inc, Rubicon Professional Services Llc, The Cbr Group
- Architects
- Mehrnoush Arsanjani (4), Darren Matano (3), Huntsman (2), Jason Brabo (2), Kevin Hinrichs (2), Megan J Ackerley (2), Albert Lee, Huntsman Arch, Kevin Hinrichs, Michelle Eaton, Natalie Thomas, Paul Martin, Reginald Hernandez, Richard Sambucetti, Rissell Meeks, Scott Alan Jensen, Shannon Bolick, Thomas Holland, Timothy Gerson
- Engineers
- John Bachoua (2), Kevin Kinoshita (2), Rickert C Henriksen (2), Abraham Oshana, Ali Mortazavi, Benson Ngo, Christopher Semaan, David Mcmillan, Gregg Miller, Harold A Hougham, James Lam, James Mogannam, Joyce Merrell Fuss, Malin R H Puckett, Nasib Pandey, Shereen Shokry Yacoub, Siemens Building Tech., Warren W. Cheng, Yu-Ning Chen
- Authorized agent-otherss
- Shen-I Chiou, Vernon Takasuka
- Designers
- David Michael Young (2)
- Pmt consultant/expediters
- Patrick Pelch, Shen-I Chiou
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.