Harold A Hougham
- Listed as
- engineer
- Firm
- R & A Engineering
- Based in
- Oakland
- On San Francisco permits
- Mar 2021 to Sep 2025
8 permits since 2000 (engineer on 8 permits): 4 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2025 | In progress issued Jul 2026 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate...Details
remodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate... | $6,000,000 |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 4131 Geary Bl | replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinetDetails
replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinet | $35,000 | |
| Nov 20, 2023 | In progress issued May 2026 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldgDetails
refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldg | $50,000 |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 45 Castro St | selective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems.Details
selective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems. | $900,000 | |
| May 8, 2023 | Completed final sign-off May 2025 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishesDetails
room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishes | $300,000 |
| Dec 20, 2021 | Completed final sign-off Aug 2025 | 2238 Geary Bl | The Whiting-Turner Contracting Company | revision to pa#2021-0312-6502 and 2021-0830-7389. required redesign of ventilation requirement fr level b-5 elevator machine rm based on a revision of heat loads from elevator manufacturer (fc-1 and cu-1). add'l constructability comments from gc related to bedesign. added access control sheets toDetails
revision to pa#2021-0312-6502 and 2021-0830-7389. required redesign of ventilation requirement fr level b-5 elevator machine rm based on a revision of heat loads from elevator manufacturer (fc-1 and cu-1). add'l constructability comments from gc related to bedesign. added access control sheets to | $45,000 |
| Mar 12, 2021 | Completed final sign-off Jul 2025 | 2238 Geary Bl | The Whiting-Turner Contracting Company | modernization of 2 existing hydraulic elevators and 6 traction elevators new air handling units to service elevator machine room and sprinklers to be removed top of hoistways to comply with cbc 2019.Details
modernization of 2 existing hydraulic elevators and 6 traction elevators new air handling units to service elevator machine room and sprinklers to be removed top of hoistways to comply with cbc 2019. | $300,000 |
| Mar 10, 2021 | Completed final sign-off Aug 2022 | 185 Berry St | Dfi Construction Company | suite 290: remodel of (e) storage space to install new liquid nitrogen freezer storage and supply tanks. new floor finishes, painting. modifications to mep seismic anchorage for new equipment. ok to remove sffd from this permit. ucsf - not under sffd jurisdiction. retain all fees for work done - jlDetails
suite 290: remodel of (e) storage space to install new liquid nitrogen freezer storage and supply tanks. new floor finishes, painting. modifications to mep seismic anchorage for new equipment. ok to remove sffd from this permit. ucsf - not under sffd jurisdiction. retain all fees for work done - jl | $50,000 |