Permit GraphShortlistSan Francisco building permits since 2000

Harold A Hougham

License
M24969
Look the license up with the state
Listed as
engineer
Firm
R & A Engineering
Based in
Oakland
On San Francisco permits
Mar 2021 to Sep 2025

8 permits since 2000 (engineer on 8 permits): 4 completed, 4 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 25, 2025In progress
issued Jul 2026
2238 Geary BlKaiser Foundation Health Plan Incremodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate...
Details
Permit
202508213665
Status
issued
Filed
Sep 25, 2025
Permit issued
Jul 20, 2026
Declared cost
$6,000,000
Address
2238 Geary Bl

remodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate...

Open the permit page

$6,000,000
Jul 11, 2024In progress
filed Jul 2024, not yet issued
4131 Geary Blreplace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinet
Details
Permit
202407116287
Status
filed
Filed
Jul 11, 2024
Declared cost
$35,000
Address
4131 Geary Bl

replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinet

Open the permit page

$35,000
Nov 20, 2023In progress
issued May 2026
2238 Geary BlKaiser Foundation Health Plan Increfresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldg
Details
Permit
202311201161
Status
issued
Filed
Nov 20, 2023
Permit issued
May 13, 2026
Declared cost
$50,000
Address
2238 Geary Bl

refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldg

Open the permit page

$50,000
Oct 12, 2023In progress
filed Oct 2023, not yet issued
45 Castro Stselective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems.
Details
Permit
202310128571
Status
filed
Filed
Oct 12, 2023
Declared cost
$900,000
Address
45 Castro St

selective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems.

Open the permit page

$900,000
May 8, 2023Completed
final sign-off May 2025
2238 Geary BlKaiser Foundation Health Plan Incroom 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishes
Details
Permit
202305087281
Status
complete
Filed
May 8, 2023
Permit issued
Feb 12, 2024
Final sign-off
May 15, 2025
Declared cost
$300,000
Address
2238 Geary Bl

room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishes

Open the permit page

$300,000
Dec 20, 2021Completed
final sign-off Aug 2025
2238 Geary BlThe Whiting-Turner Contracting Companyrevision to pa#2021-0312-6502 and 2021-0830-7389. required redesign of ventilation requirement fr level b-5 elevator machine rm based on a revision of heat loads from elevator manufacturer (fc-1 and cu-1). add'l constructability comments from gc related to bedesign. added access control sheets to
Details
Permit
202112204733
Status
complete
Filed
Dec 20, 2021
Permit issued
Feb 15, 2022
Final sign-off
Aug 13, 2025
Declared cost
$45,000
Address
2238 Geary Bl

revision to pa#2021-0312-6502 and 2021-0830-7389. required redesign of ventilation requirement fr level b-5 elevator machine rm based on a revision of heat loads from elevator manufacturer (fc-1 and cu-1). add'l constructability comments from gc related to bedesign. added access control sheets to

Open the permit page

$45,000
Mar 12, 2021Completed
final sign-off Jul 2025
2238 Geary BlThe Whiting-Turner Contracting Companymodernization of 2 existing hydraulic elevators and 6 traction elevators new air handling units to service elevator machine room and sprinklers to be removed top of hoistways to comply with cbc 2019.
Details
Permit
202103126502
Status
complete
Filed
Mar 12, 2021
Permit issued
Aug 11, 2021
Final sign-off
Jul 28, 2025
Declared cost
$300,000
Address
2238 Geary Bl

modernization of 2 existing hydraulic elevators and 6 traction elevators new air handling units to service elevator machine room and sprinklers to be removed top of hoistways to comply with cbc 2019.

Open the permit page

$300,000
Mar 10, 2021Completed
final sign-off Aug 2022
185 Berry StDfi Construction Companysuite 290: remodel of (e) storage space to install new liquid nitrogen freezer storage and supply tanks. new floor finishes, painting. modifications to mep seismic anchorage for new equipment. ok to remove sffd from this permit. ucsf - not under sffd jurisdiction. retain all fees for work done - jl
Details
Permit
202103106237
Status
complete
Filed
Mar 10, 2021
Permit issued
May 20, 2021
Final sign-off
Aug 29, 2022
Declared cost
$50,000
Address
185 Berry St

suite 290: remodel of (e) storage space to install new liquid nitrogen freezer storage and supply tanks. new floor finishes, painting. modifications to mep seismic anchorage for new equipment. ok to remove sffd from this permit. ucsf - not under sffd jurisdiction. retain all fees for work done - jl

Open the permit page

$50,000
Harold A Hougham, license M24969 | Permit Graph