- Jun 2024 to May 2026
5 permits since 2000 (engineer on 5 permits): 5 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2026 | In progress filed May 2026, not yet issued | 30 Onondaga Av | remove & install 4,000 gallon above ground storage tank. connect (e) underground double wall piping to new ast. upgrade tank monitoring panel.Details
remove & install 4,000 gallon above ground storage tank. connect (e) underground double wall piping to new ast. upgrade tank monitoring panel. | $200,000 | |
| Jan 23, 2026 | In progress issued Apr 2026 | 3318 Steiner St | Jv Services | revision tpo pa #202310047992. locally thicken existing grade beam on 2 different walls.Details
revision tpo pa #202310047992. locally thicken existing grade beam on 2 different walls. | $6,000 |
| Jul 2, 2025 | In progress issued Jul 2025 | 450 Hayes St | Aquatek Plumbing Inc | demo existing duplex sewage injector pumps and replace w/new. provide & install self contained duplex alternating ejector pumps in mechanical room. rotate & raise (e) sand interceptor & assoc piping to allow proper slope. provide & install (2) bath water valves.Details
demo existing duplex sewage injector pumps and replace w/new. provide & install self contained duplex alternating ejector pumps in mechanical room. rotate & raise (e) sand interceptor & assoc piping to allow proper slope. provide & install (2) bath water valves. | $10,000 |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 4131 Geary Bl | replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinetDetails
replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinet | $35,000 | |
| Jun 18, 2024 | In progress issued Mar 2025 | 3318 Steiner St | Jv Services | cold shell building for future restaurant build-out: facade renovation including moment frame, new restroom, new roof and skylight, seismic upgrade, new floor slab, new electrical service, new plumbing service. deferred electrical & mep permits.Details
cold shell building for future restaurant build-out: facade renovation including moment frame, new restroom, new roof and skylight, seismic upgrade, new floor slab, new electrical service, new plumbing service. deferred electrical & mep permits. | $375,000 |