Darren Matano
- Listed as
- architect
- Firm
- Matnokang Architects
- Based in
- Berkeley
- On San Francisco permits
- Nov 2005 to Feb 2025
18 permits since 2000 (architect on 18 permits): 11 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2025 | In progress filed Feb 2025, not yet issued | 2241 Geary Bl | replacement of two rooftop generator, associated fuel piping included in the scope. generator capacity to increase to also serve 2190 o'farell. new electrical closet proposed in the basement for new electrical equipmentDetails
replacement of two rooftop generator, associated fuel piping included in the scope. generator capacity to increase to also serve 2190 o'farell. new electrical closet proposed in the basement for new electrical equipment | $2,000,000 | |
| Feb 14, 2025 | In progress filed Feb 2025, not yet issued | 2190 Ofarrell St | removal of emergency generator equipment at 2190 o'farrell garage. emergency power to be suprised supplied by a new generator at 2241 geary. new electrical closet proposed for the rooftop to add electrical equipmentDetails
removal of emergency generator equipment at 2190 o'farrell garage. emergency power to be suprised supplied by a new generator at 2241 geary. new electrical closet proposed for the rooftop to add electrical equipment | $40,000 | |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 4131 Geary Bl | replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinetDetails
replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinet | $35,000 | |
| Nov 20, 2023 | In progress issued May 2026 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldgDetails
refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldg | $50,000 |
| Oct 22, 2020 | Completed final sign-off Apr 2022 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | upgrade site lighting - outdoorsDetails
upgrade site lighting - outdoors | $30,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 450 06th Av | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 4141 Geary Bl | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Sep 28, 2012 | Never finaled issued Sep 2012, no final | 845 Market St | #283- demo only - interior, non structural, camper-space 283. all work comply with ab-017.Details
#283- demo only - interior, non structural, camper-space 283. all work comply with ab-017. | $9,500 | |
| Dec 18, 2008 | Completed final sign-off Jan 2010 | 2350 Geary Bl | replace 133 existing windows - single panel aluminum. 133 new double panel - low efficiency windows-aluminumDetails
replace 133 existing windows - single panel aluminum. 133 new double panel - low efficiency windows-aluminum | $30,000 | |
| Dec 16, 2008 | Completed final sign-off Jan 2010 | 4141 Geary Bl | replace boiler at penthouse-equipment pad will be enlarged to accomodate new boiler-new wall with door and louver will be installed to enclosed the boiler area.Details
replace boiler at penthouse-equipment pad will be enlarged to accomodate new boiler-new wall with door and louver will be installed to enclosed the boiler area. | $50,000 | |
| Sep 3, 2008 | Completed final sign-off Apr 2009 | 2238 Geary Bl | removal of extg equipment on 3rd floor x-ray room. replace with new equipment in room 3e063Details
removal of extg equipment on 3rd floor x-ray room. replace with new equipment in room 3e063 | $100,000 | |
| Sep 3, 2008 | Completed final sign-off Nov 2008 | 2238 Geary Bl | removal of extg equipment in bone density room. 3rd floor replace with new equipment. room #3w406Details
removal of extg equipment in bone density room. 3rd floor replace with new equipment. room #3w406 | $35,000 | |
| Jun 12, 2008 | Expired or cancelled expired Nov 2011 | 1245 Fillmore St | Kaiser Foundation Health Plan Inc | ground floor, install full height furniture panels to define (4) new offices. the previous use of the room was a conference room.Details
ground floor, install full height furniture panels to define (4) new offices. the previous use of the room was a conference room. | $99,172 |
| Nov 27, 2007 | Never finaled issued Nov 2007, no final | 1330 Fillmore St | Qualogy Constrution Inc. | 1st floor jazz club: occupancy verification only for sf fire assembly permit - yoshi's tanent improvement. plan check according to 2007 california building codes. ref. previously appl.# 2006.07.05.5674 - 1300 fillmore st. no change to max. occ. load of 311 approved in p/a 2006.07.05.5674.Details
1st floor jazz club: occupancy verification only for sf fire assembly permit - yoshi's tanent improvement. plan check according to 2007 california building codes. ref. previously appl.# 2006.07.05.5674 - 1300 fillmore st. no change to max. occ. load of 311 approved in p/a 2006.07.05.5674. | |
| Nov 17, 2005 | Completed final sign-off Apr 2006 | 2200 Ofarrell St | Kaiser Foundation Health Plan Inc | remove 2 (e)film processors,install 1 new film processor.remove (e)door to darkroom,install ada complaint door in its place install mechanical exhaust fan to serve darkroom,remove (e)casework,install new casework to comply with ada.remove (e)film processor chemical tanks & replace w/new smaller tankDetails
remove 2 (e)film processors,install 1 new film processor.remove (e)door to darkroom,install ada complaint door in its place install mechanical exhaust fan to serve darkroom,remove (e)casework,install new casework to comply with ada.remove (e)film processor chemical tanks & replace w/new smaller tank | $63,924 |