Block 1098, lot 050
2190 Ofarrell St
- City’s use
- Commercial Misc
- Lot
- 130,196 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
100 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 28, 2026 | In progress filed May 2026, not yet issued | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting.Details
modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting. | $2,623,126 |
| May 4, 2026 | Completed final sign-off May 2026 | 2190 Ofarrell St | W. Bradley Electric | revision to 202406134360 relocate the fire alarm control unit. (3 smoke detectors, 7 heat detectors, 18 strobes, 2 horn strobes, 16 horns)Details
revision to 202406134360 relocate the fire alarm control unit. (3 smoke detectors, 7 heat detectors, 18 strobes, 2 horn strobes, 16 horns) | |
| Apr 29, 2026 | In progress filed Apr 2026, not yet issued | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting.Details
modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting. | $2,356,955 |
| Mar 26, 2025 | Completed final sign-off Sep 2026 | 350 Saint Josephs Av | W. Bradley Electric, Turner Construction Co | fire alarm system migration at the kaiser (cn31-05) medical office building; migrating to new equipment - 1 control panel, 1 nac power supply, remote annunciator, 8 pull stations, 14 modules, 4 smoke detectors, 13 duct smoke detectors, 28 strobes, 22 horn/strobes, and 10 horns. no ref permit app#.Details
fire alarm system migration at the kaiser (cn31-05) medical office building; migrating to new equipment - 1 control panel, 1 nac power supply, remote annunciator, 8 pull stations, 14 modules, 4 smoke detectors, 13 duct smoke detectors, 28 strobes, 22 horn/strobes, and 10 horns. no ref permit app#. | $665,000 |
| Feb 18, 2025 | In progress filed Feb 2025, not yet issued | 2241 Geary Bl | replacement of two rooftop generator, associated fuel piping included in the scope. generator capacity to increase to also serve 2190 o'farell. new electrical closet proposed in the basement for new electrical equipmentDetails
replacement of two rooftop generator, associated fuel piping included in the scope. generator capacity to increase to also serve 2190 o'farell. new electrical closet proposed in the basement for new electrical equipment | $2,000,000 | |
| Feb 14, 2025 | In progress filed Feb 2025, not yet issued | 2190 Ofarrell St | removal of emergency generator equipment at 2190 o'farrell garage. emergency power to be suprised supplied by a new generator at 2241 geary. new electrical closet proposed for the rooftop to add electrical equipmentDetails
removal of emergency generator equipment at 2190 o'farrell garage. emergency power to be suprised supplied by a new generator at 2241 geary. new electrical closet proposed for the rooftop to add electrical equipment | $40,000 | |
| Jun 20, 2024 | In progress issued Mar 2025 | 2190 Ofarrell St | W. Bradley Electric | fire alarm system migration @ the kaiser(cn31-08)parking structure,migrating to new equipment.1 control panel,16 pull stations,6 modules,3 smoke detectors,7 heat detectors,18 strobes,2 horn/strobes & 16 horns.no ref permit app#(fire alarm additions only)Details
fire alarm system migration @ the kaiser(cn31-08)parking structure,migrating to new equipment.1 control panel,16 pull stations,6 modules,3 smoke detectors,7 heat detectors,18 strobes,2 horn/strobes & 16 horns.no ref permit app#(fire alarm additions only) | $317,704 |
| Apr 5, 2024 | In progress issued Apr 2024 | 2190 Ofarrell St | Potter Fire Protection | modify the fire sprinkler system above the new electric vehicle charging station on level. ref pa#202312283184Details
modify the fire sprinkler system above the new electric vehicle charging station on level. ref pa#202312283184 | $20,000 |
| Dec 28, 2023 | In progress issued Dec 2023 | 2190 Ofarrell St | Booth Electric Inc | installing 4 level 3 fast chargers, dual stall delivery in indoor parking garage, installing power feeds from existing switchgear in parking garage.Details
installing 4 level 3 fast chargers, dual stall delivery in indoor parking garage, installing power feeds from existing switchgear in parking garage. | $100,000 |
| Aug 31, 2023 | Completed final sign-off Oct 2024 | 2130 Ofarrell St | Booth Electric Inc | install 20 level 2 ev charging stations thoughout (e) parking structure and installing power feeds from (e) 6 switch gear in parking. details in plans provided.Details
install 20 level 2 ev charging stations thoughout (e) parking structure and installing power feeds from (e) 6 switch gear in parking. details in plans provided. | $150,000 |
| Jul 28, 2023 | Completed final sign-off Apr 2024 | 2241 Geary Bl | Siemens Industry, Inc. | fire alarm system replacement at the kp cn131-09 parking structure; additions are 1 panel, 1 horn/strobe power supply, 23 smoke detectors, 2 heat detectors, 7 duct detectors, 10 pull stations, 33 modules, 25 strobes and 13 horn/strobes, fire alarm additions only.Details
fire alarm system replacement at the kp cn131-09 parking structure; additions are 1 panel, 1 horn/strobe power supply, 23 smoke detectors, 2 heat detectors, 7 duct detectors, 10 pull stations, 33 modules, 25 strobes and 13 horn/strobes, fire alarm additions only. | $98,800 |
| Aug 9, 2021 | Completed final sign-off Nov 2022 | 2190 Ofarrell St | Mastec Network Solutions Inc | remove 3 (e) sprint antennas and installing 6 (n) t-mobile antennas, removing (e) radio and install 6 (n) radios, remove (3) cabinets and install 2 (n) ones, install 3 (n) 6x24 hybrid cables and isntall ancillary equipoment inside new cabinets.Details
remove 3 (e) sprint antennas and installing 6 (n) t-mobile antennas, removing (e) radio and install 6 (n) radios, remove (3) cabinets and install 2 (n) ones, install 3 (n) 6x24 hybrid cables and isntall ancillary equipoment inside new cabinets. | $25,000 |
| Oct 22, 2020 | Completed final sign-off Apr 2022 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | upgrade site lighting - outdoorsDetails
upgrade site lighting - outdoors | $30,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | upgrade outdoor site lighting.Details
upgrade outdoor site lighting. | $30,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2021 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | installation of hub parking pay machine equipementDetails
installation of hub parking pay machine equipement | $50,000 |
| Oct 21, 2019 | Completed final sign-off Feb 2021 | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | installation hub parking pay machine equipment n/a maherDetails
installation hub parking pay machine equipment n/a maher | $30,000 |
| Jun 10, 2019 | Completed final sign-off Mar 2021 | 2200 Ofarrell St | Herrero Builders Incorporated | reduce scope of wk 201708235646.eliminate trees, pathways,stairs&benches. delete retain wals&revise foundation for perimeter fencing at orchard&farmer market.eliminate seat bar&#of power outlets at farmers market.simplify handrails @ stairs&ramps. maher n/a.Details
reduce scope of wk 201708235646.eliminate trees, pathways,stairs&benches. delete retain wals&revise foundation for perimeter fencing at orchard&farmer market.eliminate seat bar&#of power outlets at farmers market.simplify handrails @ stairs&ramps. maher n/a. | |
| Mar 18, 2019 | Completed final sign-off Jan 2022 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | replace roof mounted cooling tower, replace roof mounted hydronic boiler, replace 2 water hydronic pumps, replace hydronic components, replace heat pumps, fan coil units. replace control systemDetails
replace roof mounted cooling tower, replace roof mounted hydronic boiler, replace 2 water hydronic pumps, replace hydronic components, replace heat pumps, fan coil units. replace control system | $200,000 |
| Jan 14, 2019 | Never finaled issued Jan 2019, no final | 2241 Geary Bl | street space w/ metered parking onlyDetails
street space w/ metered parking only | ||
| Dec 12, 2018 | Never finaled issued Dec 2018, no final | 2241 Geary Bl | Siemens Industry, Inc. | fire alarm work for the "freight elevator modernization" job on the basement level; additions are 3 smoke detectors, 3 heat detectors and 4 modules.Details
fire alarm work for the "freight elevator modernization" job on the basement level; additions are 3 smoke detectors, 3 heat detectors and 4 modules. | $5,800 |
| Nov 14, 2018 | Completed final sign-off Jan 2019 | 2241 Geary Bl | Potter Fire Protection | fire sprinkler: add 1 sprinkler at top of elevator shaft. ref pa #201708215444.Details
fire sprinkler: add 1 sprinkler at top of elevator shaft. ref pa #201708215444. | $980 |
| Sep 28, 2018 | Never finaled issued Sep 2018, no final | 2200 Ofarrell St | street spaceDetails
street space | ||
| Sep 21, 2018 | Completed final sign-off May 2019 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | revision to app#201708215444 to revise structural changes to freight elevator modernization. n/a for maherDetails
revision to app#201708215444 to revise structural changes to freight elevator modernization. n/a for maher | |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 2241 Geary Bl | street spaceDetails
street space | ||
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 2200 Ofarrell St | street spaceDetails
street space | ||
| Sep 22, 2017 | Completed final sign-off Sep 2018 | 2200 Ofarrell St | Kaiser Foundation Health Plan Inc | power feeder and panel for imaging trailers at 2200 ofarrell.Details
power feeder and panel for imaging trailers at 2200 ofarrell. | $90,000 |
| Sep 6, 2017 | Completed final sign-off Sep 2018 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | rerouting of emergency power for 350 st. joseph's ave. n/a maher ordinanceDetails
rerouting of emergency power for 350 st. joseph's ave. n/a maher ordinance | $79,750 |
| Aug 23, 2017 | Completed final sign-off Mar 2021 | 2200 Ofarrell St | Herrero Builders Incorporated, Kaiser Foundation Health Plan Inc | improvement after demo. previously occupied by multi-story medical offices - exterior lanscaping - market plaza. reference to demo appln #201705227277Details
improvement after demo. previously occupied by multi-story medical offices - exterior lanscaping - market plaza. reference to demo appln #201705227277 | $903,100 |
| Aug 21, 2017 | Completed final sign-off May 2019 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | modernization of freight elevator controls and machinery , widening one existing door; n/a maherDetails
modernization of freight elevator controls and machinery , widening one existing door; n/a maher | $80,000 |
| Jun 20, 2017 | Completed final sign-off Aug 2019 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | construction of 1 two story infill wall @ 350 saint joseph st. disconect build 2200 o'farrell @ 350 saint joseph st.Details
construction of 1 two story infill wall @ 350 saint joseph st. disconect build 2200 o'farrell @ 350 saint joseph st. | $40,000 |
| Mar 7, 2017 | Completed final sign-off Dec 2017 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | roof installation of new chiller and mechanical screen maher naDetails
roof installation of new chiller and mechanical screen maher na | $1,200,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2018 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | renovation of (e) retail and office space at 2241 geary blvd. to include: new millwork reception desk and work station, fixture display cases. lighting, new finishes and furniture. n/a maherDetails
renovation of (e) retail and office space at 2241 geary blvd. to include: new millwork reception desk and work station, fixture display cases. lighting, new finishes and furniture. n/a maher | $425,000 |
| Sep 9, 2016 | Completed final sign-off Oct 2016 | 350 Saint Josephs Av | Acco Engineered Systems Inc. Dba Acco En | replace ahu components with new, like for like ahu components. n/a ordinance #155-13Details
replace ahu components with new, like for like ahu components. n/a ordinance #155-13 | $205,000 |
| Jul 27, 2016 | Never finaled issued Jul 2016, no final | 350 Saint Josephs Av | Siemens Industry, Inc. | 1st floor: fire alarm add 1 strobe power supply. 10 chime/strobes and 8 strobes ref pa#2015-1218-5557. n/a for maher.Details
1st floor: fire alarm add 1 strobe power supply. 10 chime/strobes and 8 strobes ref pa#2015-1218-5557. n/a for maher. | $11,180 |
| Jul 11, 2016 | Expired or cancelled cancelled Mar 2017 | 350 Saint Josephs Av | Potter Fire Protection | 1st flr: relocate 6 fire sprinklers. ref pa 2015 1218 5557Details
1st flr: relocate 6 fire sprinklers. ref pa 2015 1218 5557 | $3,000 |
| Apr 12, 2016 | Completed final sign-off Feb 2017 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | basement level - upgrade restrooms for accessibility per cbc section 11b-202-4 & install new finish floors, walls, countertops, toilet, partitions in the (e) men's & women's restrooms. compliance with maher ordinance no 155-13 not required.Details
basement level - upgrade restrooms for accessibility per cbc section 11b-202-4 & install new finish floors, walls, countertops, toilet, partitions in the (e) men's & women's restrooms. compliance with maher ordinance no 155-13 not required. | $100,000 |
| Feb 10, 2016 | Completed final sign-off May 2017 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | install new platform lift (barrier removal) between floor 1 & 2, structural & electrical work as required. maher naDetails
install new platform lift (barrier removal) between floor 1 & 2, structural & electrical work as required. maher na | $350,000 |
| Dec 18, 2015 | Completed final sign-off Mar 2017 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | ti - interior walls, doors, interior glazing, ceilings and finishes maher not reqDetails
ti - interior walls, doors, interior glazing, ceilings and finishes maher not req | $800,000 |
| Sep 26, 2014 | Completed final sign-off Oct 2015 | 2130 Ofarrell St | Metropolitan Electrical Construction | sprint: remove(1)(e)sprint nv antenna at sector b,add(2)sprint 2.5 panel antennas(1)each at sectors a & c,add(1)tribano antenna at sector b,add (3) sprint rrhs(1)each at sectors a,b & c, add new coax jumper lines from rrhs to(n)antennas, add(n) antenna shroud(1)each at sectors a,b & c, re-use (e)Details
sprint: remove(1)(e)sprint nv antenna at sector b,add(2)sprint 2.5 panel antennas(1)each at sectors a & c,add(1)tribano antenna at sector b,add (3) sprint rrhs(1)each at sectors a,b & c, add new coax jumper lines from rrhs to(n)antennas, add(n) antenna shroud(1)each at sectors a,b & c, re-use (e) | $20,000 |
| Aug 26, 2014 | Completed final sign-off Sep 2014 | 2241 Geary Bl | Siemens Industry, Inc. | fire alarm work for basement communication room t.i. addition of 3 smoke detectors, 2 duct detectors, 4 modules, 1 horn/strobe, and 1 strobe for the fire alarm-to-pre-action system interface on the project. ref app#201312184449. preaction system permit #201402208936. n/a for the maher ordinance.Details
fire alarm work for basement communication room t.i. addition of 3 smoke detectors, 2 duct detectors, 4 modules, 1 horn/strobe, and 1 strobe for the fire alarm-to-pre-action system interface on the project. ref app#201312184449. preaction system permit #201402208936. n/a for the maher ordinance. | $5,300 |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 2190 Ofarrell St | street space permit permit (renewal of permit # m489687)Details
street space permit permit (renewal of permit # m489687) | ||
| May 20, 2014 | Never finaled issued May 2014, no final | 2190 Ofarrell St | street spaceDetails
street space | ||
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 2190 Ofarrell St | street space permitDetails
street space permit | ||
| Apr 23, 2014 | Completed final sign-off Oct 2014 | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | installation of it racks, ladder racks, ups replacement and mechanical split system. na for maher ordiance.Details
installation of it racks, ladder racks, ups replacement and mechanical split system. na for maher ordiance. | $8,960 |
| Mar 18, 2014 | Never finaled issued Mar 2014, no final | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | revision to appl #2013.0710.1467 & #2013.1113.1832 includes: revision #6 - removal of revision #5 it equipment racks & hvac split system & back to doctor's office. compliance with ordinance #155-13 not required.Details
revision to appl #2013.0710.1467 & #2013.1113.1832 includes: revision #6 - removal of revision #5 it equipment racks & hvac split system & back to doctor's office. compliance with ordinance #155-13 not required. | |
| Feb 20, 2014 | Completed final sign-off Sep 2014 | 2241 Geary Bl | Potter Fire Protection | 1st floor: install pre-action fire sprinkler system supplying (4) fire sprinklers. ref pa# 2013/12/18/4449. ** maher: compliance with ordinance no# 155-13 not required **Details
1st floor: install pre-action fire sprinkler system supplying (4) fire sprinklers. ref pa# 2013/12/18/4449. ** maher: compliance with ordinance no# 155-13 not required ** | $9,800 |
| Jan 23, 2014 | Completed final sign-off Feb 2014 | 2241 Geary Bl | C B F Inc | install 1 smoke detector, 1 booster panel, 3 wall strobes, 2 ceiling strobes, 2 ceiling horn strobes, 2 control relays for card reader system. maher ordinance 155-13 not requiredDetails
install 1 smoke detector, 1 booster panel, 3 wall strobes, 2 ceiling strobes, 2 ceiling horn strobes, 2 control relays for card reader system. maher ordinance 155-13 not required | $4,400 |
| Jan 8, 2014 | Completed final sign-off Jan 2014 | 350 Saint Josephs Av | Siemens Industry, Inc. | "compliance with ord. no. 155-13 not required": addition of 9 fsd duct detectors,10 modules, 6 chime/strobes, and 5 strobes for the " pathology lab" remodel on 1st floor. all new devices connect onto the fire alarm system.Details
"compliance with ord. no. 155-13 not required": addition of 9 fsd duct detectors,10 modules, 6 chime/strobes, and 5 strobes for the " pathology lab" remodel on 1st floor. all new devices connect onto the fire alarm system. | $16,800 |
| Dec 18, 2013 | Completed final sign-off Oct 2014 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | mechanical work, built out new bldg communication room, electrical, information technology and mechanical equipment and necessary supporting infrastructure. ie equipment racks, hvac equipments, metal shelves, cabinets. compliance w/ordinance # 155-13 not required, excavation <50 cu ydDetails
mechanical work, built out new bldg communication room, electrical, information technology and mechanical equipment and necessary supporting infrastructure. ie equipment racks, hvac equipments, metal shelves, cabinets. compliance w/ordinance # 155-13 not required, excavation <50 cu yd | $50,000 |
| Dec 9, 2013 | Completed final sign-off Mar 2014 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | install cement plaster on the concrete block east wall of the loading dock that was exposed by the demolition of the pink building. approximately 3,000 sq. ft.Details
install cement plaster on the concrete block east wall of the loading dock that was exposed by the demolition of the pink building. approximately 3,000 sq. ft. | $5,000 |
| Nov 13, 2013 | Never finaled issued Nov 2013, no final | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | revision 5 to 201307101467/201206253330. addition of it equipment racks and hvac split systemDetails
revision 5 to 201307101467/201206253330. addition of it equipment racks and hvac split system | $60,000 |
| Nov 5, 2013 | Completed final sign-off Jan 2014 | 2241 Geary Bl | Potter Fire Protection | 1st floor:relocate 8 fire sprinklers. ref app#201304013453Details
1st floor:relocate 8 fire sprinklers. ref app#201304013453 | $3,850 |
| Sep 27, 2013 | Never finaled issued Sep 2013, no final | 350 Saint Josephs Av | street spaceDetails
street space | ||
| Jul 31, 2013 | Completed final sign-off May 2014 | 2190 Ofarrell St | Ad Art Inc. | one replacement of shuttle stop sign(non-illuminated)Details
one replacement of shuttle stop sign(non-illuminated) | $2,000 |
| Jul 31, 2013 | Completed final sign-off May 2014 | 2190 Ofarrell St | Ad Art Inc. | to erect one illuminated projecting sign.Details
to erect one illuminated projecting sign. | $5,000 |
| Jul 10, 2013 | Never finaled issued Jul 2013, no final | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | revision to 201305298110. framing details for additional headersDetails
revision to 201305298110. framing details for additional headers | $5,000 |
| May 29, 2013 | Never finaled issued May 2013, no final | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | revision to 3 shaft wall construction to jog corridor wall to maintain fire protection. revision to 201302019305Details
revision to 3 shaft wall construction to jog corridor wall to maintain fire protection. revision to 201302019305 | $10,000 |
| Apr 22, 2013 | Completed final sign-off Mar 2017 | 350 St Josephs Av | Potter Fire Protection | plans revised to app#201304114334. hanger detail modified.Details
plans revised to app#201304114334. hanger detail modified. | |
| Apr 11, 2013 | Completed final sign-off May 2017 | 350 St Josephs Av | Potter Fire Protection | install (38) new fire sprinkler to an existing unsprinkered area. bldg pa# 201302019305.Details
install (38) new fire sprinkler to an existing unsprinkered area. bldg pa# 201302019305. | $18,000 |
| Apr 1, 2013 | Completed final sign-off Apr 2014 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | construct new work room and new linen storage within existing general storage. fully sprinklered.Details
construct new work room and new linen storage within existing general storage. fully sprinklered. | $200,000 |
| Feb 1, 2013 | Never finaled issued May 2013, no final | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | revision to pa# 201206253330. revised location of transfer duct, addition of furred wall at east side of project area to avoid disruption to adjacent occupants and misc updates/clarification per bid addendum including new floor infill detail at existing depression.Details
revision to pa# 201206253330. revised location of transfer duct, addition of furred wall at east side of project area to avoid disruption to adjacent occupants and misc updates/clarification per bid addendum including new floor infill detail at existing depression. | $10,000 |
| Jan 23, 2013 | Completed final sign-off May 2014 | 350 St Josephs Av | Ad Art Inc. | replace 1 existing address sign with new sign address.Details
replace 1 existing address sign with new sign address. | $3,000 |
| Nov 13, 2012 | Never finaled issued Nov 2012, no final | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | revision to 201206253330. revise location of exhaust and return air relief from area of work into existing plenum above the rated corridor tunnel. ( revised sheets m211, m413)Details
revision to 201206253330. revise location of exhaust and return air relief from area of work into existing plenum above the rated corridor tunnel. ( revised sheets m211, m413) | $25,000 |
| Sep 28, 2012 | Expired or cancelled cancelled Jan 2026 | 350 St Josephs Av | Ad Art Inc. | to erect electrical sign.Details
to erect electrical sign. | $1,500 |
| Jun 25, 2012 | Completed final sign-off May 2014 | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | demolition of non-structural components with a 3400 sf area of the first floor. the proposed work will include new partitions, strengthening of (e) floor to accomodate laboratories, grossing areas, staining areas, support spaces & offices.Details
demolition of non-structural components with a 3400 sf area of the first floor. the proposed work will include new partitions, strengthening of (e) floor to accomodate laboratories, grossing areas, staining areas, support spaces & offices. | $1,523,029 |
| Apr 17, 2012 | Never finaled issued Apr 2012, no final | 350 St Josephs Av | street space permit.Details
street space permit. | ||
| Feb 16, 2012 | Never finaled issued Feb 2012, no final | 350 St Josephs Av | street space with 100sf sidewalk repair.work to be done on geary blvd, e/b side lanes, of hospital.Details
street space with 100sf sidewalk repair.work to be done on geary blvd, e/b side lanes, of hospital. | ||
| Jan 30, 2012 | Never finaled issued Feb 2012, no final | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | 1st floor - construct new work room, new clean linen storage within an (e) general storage & any new mechanical work associated with this projectDetails
1st floor - construct new work room, new clean linen storage within an (e) general storage & any new mechanical work associated with this project | $93,000 |
| Jul 25, 2011 | Never finaled issued Jul 2011, no final | 2241 Geary Bl | street spaceDetails
street space | ||
| Apr 12, 2011 | Never finaled issued Apr 2011, no final | 2241 Geary Bl | street space permitDetails
street space permit | ||
| Jul 12, 2010 | Never finaled issued Jul 2010, no final | 350 St Josephs Av | street space permitDetails
street space permit | ||
| Jun 14, 2010 | Completed final sign-off Dec 2010 | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | install (n) backboard @ (e) window, replacement of (e) hvac equipment. installation of (e) upc & maintenance bypass panel. installation of (e) grounding busbar & (n) twistlock receptacles (no sprinkler).Details
install (n) backboard @ (e) window, replacement of (e) hvac equipment. installation of (e) upc & maintenance bypass panel. installation of (e) grounding busbar & (n) twistlock receptacles (no sprinkler). | $102,324 |
| May 6, 2010 | Completed final sign-off Jul 2010 | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | demo of carpentry shop exhaust system. removal of existing exhaust fan and associated duct work. provision o fnew dust collection system serving wood/workshop tools. no changes to supply and duct workDetails
demo of carpentry shop exhaust system. removal of existing exhaust fan and associated duct work. provision o fnew dust collection system serving wood/workshop tools. no changes to supply and duct work | $85,000 |
| Apr 21, 2010 | Completed final sign-off Apr 2011 | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | re-roofing 6250 sq.ft. & relocate roof hatch, replace skylight, 44" guardrail around perimeter of roof.Details
re-roofing 6250 sq.ft. & relocate roof hatch, replace skylight, 44" guardrail around perimeter of roof. | $35,000 |
| Apr 6, 2010 | Never finaled issued Apr 2010, no final | 2241 Geary Bl | street space permitDetails
street space permit | ||
| Feb 25, 2010 | Never finaled issued Feb 2010, no final | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | roof-install 1 new duct detector in air handler unitDetails
roof-install 1 new duct detector in air handler unit | $5,000 |
| Jun 24, 2009 | Completed final sign-off Apr 2010 | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | replace air handling unit ahu-3 to new location on roof. remove existing air handling unit on 2nd floor per plan.Details
replace air handling unit ahu-3 to new location on roof. remove existing air handling unit on 2nd floor per plan. | $300,000 |
| Jul 27, 2007 | Completed final sign-off Nov 2007 | 350 St Josephs Av | replacement of aged plumbing fixtures - add electrical outlets for men and women at first floor.Details
replacement of aged plumbing fixtures - add electrical outlets for men and women at first floor. | $50,000 | |
| Jun 28, 2007 | Completed final sign-off Aug 2007 | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | install new cyclone fence around parking lot.Details
install new cyclone fence around parking lot. | $16,000 |
| May 21, 2007 | Completed final sign-off Mar 2008 | 350 St Josephs Av | replace ahu-1 and ah2 only mechanical only, no structuralDetails
replace ahu-1 and ah2 only mechanical only, no structural | $30,000 | |
| May 21, 2007 | Completed final sign-off Mar 2008 | 350 St Josephs Av | fire alarm for 2 replacement of ahu 1 and 2Details
fire alarm for 2 replacement of ahu 1 and 2 | $2,000 | |
| May 16, 2007 | Completed final sign-off Oct 2007 | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | add waiting room to parking office on 1st floor of parking garage, mech under sep permitDetails
add waiting room to parking office on 1st floor of parking garage, mech under sep permit | $40,000 |
| May 10, 2006 | Completed final sign-off May 2006 | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | renew expired pa# 2005/08/30/1554 for final inspection. add 2 smoke det. 1 at lobby. 1 at lobby in fire control room.Details
renew expired pa# 2005/08/30/1554 for final inspection. add 2 smoke det. 1 at lobby. 1 at lobby in fire control room. | |
| Aug 30, 2005 | Expired or cancelled expired May 2006 | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | add 2 smoke detectos, 1 at lobby level, 1 @ lobby level fireman control rm.Details
add 2 smoke detectos, 1 at lobby level, 1 @ lobby level fireman control rm. | $2,500 |
| Jun 22, 2005 | Completed final sign-off Jun 2006 | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only.Details
new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only. | $60,000 |
| Jun 22, 2005 | Expired or cancelled cancelled Mar 2006 | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only.Details
new electrical outlets, mechanical cooling equipment @ (e) telecommunication areas, mep permit only. | $65,000 |
| Jan 20, 2005 | Completed final sign-off Apr 2005 | 350 St Josephs Av | Mc Carthy Building Companies Inc | renew appl#200405214508 for final inspectionDetails
renew appl#200405214508 for final inspection | |
| Jan 11, 2005 | Completed final sign-off Apr 2005 | 350 St Josephs Av | Mc Carthy Building Companies Inc | renew appl#200309164961, 200303189986, 200307119292 for final inspectionDetails
renew appl#200309164961, 200303189986, 200307119292 for final inspection | |
| Jan 11, 2005 | Completed final sign-off Mar 2005 | 2190 Ofarrell St | Mc Carthy Building Companies Inc | renew for final inspecti#200303119332,200405214511 for final inspection.Details
renew for final inspecti#200303119332,200405214511 for final inspection. | |
| May 21, 2004 | Never finaled issued May 2004, no final | 350 St Josephs Av | Mc Carthy Building Companies Inc | scope limited to plumbing relocation and cabinet modification for ada compliance. work on both storiDetails
scope limited to plumbing relocation and cabinet modification for ada compliance. work on both stori | $7,000 |
| May 21, 2004 | Expired or cancelled expired May 2006 | 2190 Ofarrell St | Mc Carthy Building Companies Inc | scope limited to relocation of fire allarm, 6th fl pll to be lowered,1st flr replace existing drinkDetails
scope limited to relocation of fire allarm, 6th fl pll to be lowered,1st flr replace existing drink | $10,000 |
| Apr 7, 2004 | Never finaled issued Nov 2004, no final | 2241 Geary Bl | operate farmers mrt in accordance w/state&local laws.in a private parking lot w/no alteration site.Details
operate farmers mrt in accordance w/state&local laws.in a private parking lot w/no alteration site. | $1,000 | |
| Sep 16, 2003 | Never finaled issued Sep 2003, no final | 350 St Josephs Av | Mc Carthy Building Companies Inc | install new fire alarm devices for ada remediation under prev 200303189986.Details
install new fire alarm devices for ada remediation under prev 200303189986. | |
| Jul 11, 2003 | Completed final sign-off Oct 2003 | 350 St Josephs Av | Mc Carthy Building Companies Inc | ada compliance perediatim work-revised interior vamp to meet ada requirementsDetails
ada compliance perediatim work-revised interior vamp to meet ada requirements | $25,000 |
| May 2, 2003 | Completed final sign-off Oct 2003 | 350 St Josephs Av | remove e non load bearing partition and door, add new door, add ada compliant rails and auto door opDetails
remove e non load bearing partition and door, add new door, add ada compliant rails and auto door op | $60,000 | |
| Mar 18, 2003 | Expired or cancelled expired Jul 2005 | 350 St Josephs Av | Mc Carthy Building Companies Inc | ada compliance, remediation work.Details
ada compliance, remediation work. | $203,000 |
| Mar 11, 2003 | Completed final sign-off Oct 2003 | 2190 Ofarrell St | Mc Carthy Building Companies Inc | ada compliance, remediation workDetails
ada compliance, remediation work | $106,000 |
| Jan 14, 2003 | Expired or cancelled cancelled Oct 2003 | 350 St Josephs Av | rennovate (e0 office space to (n) pathology work area by removing non structural partition & (2) dooDetails
rennovate (e0 office space to (n) pathology work area by removing non structural partition & (2) doo | $60,000 | |
| Feb 3, 2000 | Expired or cancelled expired Oct 2000 | 350 St Josephs Av | Kaiser Foundtion Hosp | renew expired appl #9811218Details
renew expired appl #9811218 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kaiser Foundation Health Plan Inc (42), Mc Carthy Building Companies Inc (9), Potter Fire Protection (7), Siemens Industry, Inc. (5), Ad Art Inc. (4), W. Bradley Electric (3), Booth Electric Inc (2), Herrero Builders Incorporated (2), Acco Engineered Systems Inc. Dba Acco En, C B F Inc, Kaiser Foundtion Hosp, Mastec Network Solutions Inc, Metropolitan Electrical Construction, Turner Construction Co
- Architects
- Darren Matano (5), Alyosha Verzhbinsky (3), Megan J Ackerley (3), Rissell Meeks (3), Jason C Brabo (2), Jill Kuper, Lee Moulton, Matthew Johnson, Reginald Hernandez, Richard Sambucetti, Robert Mccormick
- Engineers
- Robert Henrksen (3), Sasa Vukovic (2), Ali Mortazavi, Bo Zhang, Brett Mccomb, John Bachoua, Joseph Bazzell, Kam Wing Yan, Sherry Chaumpluke, Siemens Building Tech., Yip Shing Donny Lee