Permit GraphShortlistSan Francisco building permits since 2000

Bo Zhang

License
E24379
Look the license up with the state
Listed as
engineer
On San Francisco permits
Aug 2023 to Aug 2023

1 permit since 2000 (engineer on 1 permit): 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 31, 2023Completed
final sign-off Oct 2024
2130 Ofarrell StBooth Electric Incinstall 20 level 2 ev charging stations thoughout (e) parking structure and installing power feeds from (e) 6 switch gear in parking. details in plans provided.
Details
Permit
202308315742
Status
complete
Filed
Aug 31, 2023
Permit issued
Dec 22, 2023
Final sign-off
Oct 22, 2024
Declared cost
$150,000
Address
2130 Ofarrell St

install 20 level 2 ev charging stations thoughout (e) parking structure and installing power feeds from (e) 6 switch gear in parking. details in plans provided.

Open the permit page

$150,000