Kam Wing Yan
- Listed as
- engineer
- Firm
- Kam Yan & Assoc.
- Based in
- Oakland
- On San Francisco permits
- Dec 2004 to Aug 2026
29 permits since 2000 (engineer on 29 permits): 19 completed, 4 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 676 Noe St | renovation/ restoration of (e) 1 fmaily dwelling due to fire. (e) roof frame to remain. interiors to be reconstructed similar to (e). replacement of all windows, doors in similar locations, replacement of all lighting and hvac.Details
renovation/ restoration of (e) 1 fmaily dwelling due to fire. (e) roof frame to remain. interiors to be reconstructed similar to (e). replacement of all windows, doors in similar locations, replacement of all lighting and hvac. | $390,000 | |
| May 5, 2026 | In progress issued May 2026 | 1558 15th St | Citidev Inc. | change of use approved under 202512161870. t.i. improvements include soft demo, mezzanine structure, partitions, accessible features, and restrooms, elect and lights. mechanial deferred.Details
change of use approved under 202512161870. t.i. improvements include soft demo, mezzanine structure, partitions, accessible features, and restrooms, elect and lights. mechanial deferred. | $460,000 |
| Feb 18, 2025 | In progress filed Feb 2025, not yet issued | 2241 Geary Bl | replacement of two rooftop generator, associated fuel piping included in the scope. generator capacity to increase to also serve 2190 o'farell. new electrical closet proposed in the basement for new electrical equipmentDetails
replacement of two rooftop generator, associated fuel piping included in the scope. generator capacity to increase to also serve 2190 o'farell. new electrical closet proposed in the basement for new electrical equipment | $2,000,000 | |
| Sep 20, 2022 | Never finaled issued Sep 2022, no final | 2068 14th Av | Kalix Inc Dbalara Construction | replace leaking (e) skylight with new metal roofDetails
replace leaking (e) skylight with new metal roof | $25,000 |
| Jul 7, 2022 | Completed final sign-off Aug 2023 | 50 Alta St | De Brus Construction Inc | revision to 201705307888. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-135.Details
revision to 201705307888. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-135. | $5,000 |
| Jul 7, 2022 | Completed final sign-off Mar 2023 | 40 Alta St | De Brus Construction Inc | revision to 201709056929. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-137.Details
revision to 201709056929. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-137. | $5,000 |
| Sep 30, 2020 | In progress issued Aug 2025 | 2765 Hyde St | Terra Nova Industries | repair damaged structural members.repair damages in 2/f & 3/f apts, replace fire/smoke alarm. renovate restaurant kitchen, bar plumbing & applicatons. renovate hvac system.new unisex ada restroom, remodel (e) womens resetroom for ada compliance. remodel mens restroom. replace & add handrails.Details
repair damaged structural members.repair damages in 2/f & 3/f apts, replace fire/smoke alarm. renovate restaurant kitchen, bar plumbing & applicatons. renovate hvac system.new unisex ada restroom, remodel (e) womens resetroom for ada compliance. remodel mens restroom. replace & add handrails. | $825,000 |
| Aug 17, 2020 | Completed final sign-off Jun 2023 | 1327 Columbus Av | Molina And Associates Inc Dba Molari Con | new revised retaining walls structural design. as after demolition, site condition is different than the original structure design of the retaining wall.Details
new revised retaining walls structural design. as after demolition, site condition is different than the original structure design of the retaining wall. | $500 |
| Feb 27, 2020 | Never finaled issued Dec 2021, no final | 135 Van Ness Av | Bana Builders Inc | replacement of fire pumpDetails
replacement of fire pump | $750,000 |
| Aug 30, 2018 | Completed final sign-off Oct 2020 | 11 Glenview Dr | L A S A L Construction Inc | provide shoring on north sitde of the bld for new addition. ref pa#201507091010.Details
provide shoring on north sitde of the bld for new addition. ref pa#201507091010. | $2,100 |
| Oct 23, 2017 | Never finaled issued Oct 2017, no final | 583 Haight St | Avalon Construction Co | to comply with nov #201705341: 585 haight st rear side wall replacement due to dry rot damage. (unsafe)work not to include the stairs with this permit app. revision permit of applicaiton # 201604198147Details
to comply with nov #201705341: 585 haight st rear side wall replacement due to dry rot damage. (unsafe)work not to include the stairs with this permit app. revision permit of applicaiton # 201604198147 | $10,000 |
| Sep 5, 2017 | Completed final sign-off Mar 2023 | 40 Alta St | Miann Builder | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 501 47th Av | Miann Builder | voluntary strengthening of existing building foundationDetails
voluntary strengthening of existing building foundation | $15,000 |
| May 30, 2017 | Completed final sign-off Aug 2023 | 50 Alta St | Miann Builder | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. steel moment frame, plywood sheer walls, foundationDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. steel moment frame, plywood sheer walls, foundation | $50,000 |
| Apr 14, 2017 | Completed final sign-off May 2018 | 2007 Buchanan St | soft story retrofit #41-13 mandatory program tier 3Details
soft story retrofit #41-13 mandatory program tier 3 | $50,000 | |
| Apr 6, 2017 | Completed final sign-off Jan 2018 | 1422 Noriega St | Transworld Construction | remove (e) partywall,partitoins,ceiling/suffit, entry dr & back stair & install partiitons, finishes, gym bd ceilings,casework, elec power,lighting,mech air distr, replace window. create reception area, member svcs area & exam areas. relocate & upgrade (e) restrm & 1 (n) restrm. footing, shearwallDetails
remove (e) partywall,partitoins,ceiling/suffit, entry dr & back stair & install partiitons, finishes, gym bd ceilings,casework, elec power,lighting,mech air distr, replace window. create reception area, member svcs area & exam areas. relocate & upgrade (e) restrm & 1 (n) restrm. footing, shearwall | $200,000 |
| Dec 22, 2016 | Completed final sign-off Oct 2019 | 2235 Hayes St | City Building Inc. | ada barrier removal. (no exterior work). to remove architectural barriers to provide a greater degree of accessibility to the features & amenties @ the dignity health, st. mary's medical center which includes: elevator control panel adj., signage replacement, restroom remodel & door hardward updatesDetails
ada barrier removal. (no exterior work). to remove architectural barriers to provide a greater degree of accessibility to the features & amenties @ the dignity health, st. mary's medical center which includes: elevator control panel adj., signage replacement, restroom remodel & door hardward updates | $115,230 |
| Sep 14, 2016 | Completed final sign-off Aug 2019 | 3431 Taraval St | Transworld Construction | renov(e)1st story of a type 5 bldg.upgrade(e)foundation to support 1 new story add above(e)1st story.install a new elevator,an auto.sprinklr sym,(n)stair/intr parti/acoustical ceilings/lighting access.restrms, upgrade(e)pwr distribution/plumb/mech sym(n)roof/roof deck (n)flring,windows,drs&storefrtDetails
renov(e)1st story of a type 5 bldg.upgrade(e)foundation to support 1 new story add above(e)1st story.install a new elevator,an auto.sprinklr sym,(n)stair/intr parti/acoustical ceilings/lighting access.restrms, upgrade(e)pwr distribution/plumb/mech sym(n)roof/roof deck (n)flring,windows,drs&storefrt | $600,000 |
| May 23, 2016 | Completed final sign-off Jan 2017 | 1019 Clement St | Amone Corp | revision to pa #201604124578: revise column & foundation detail. n/a maher ordinanceDetails
revision to pa #201604124578: revise column & foundation detail. n/a maher ordinance | |
| Aug 11, 2015 | Completed final sign-off Jun 2017 | 865 San Jose Av | Seismic Retrofitters Inc. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $40,000 |
| Apr 3, 2014 | Expired or cancelled withdrawn Apr 2014 | 31 28th St | install shear wall and foundtion at front of building. to repair soft story condition. compy sfbc 34b soft storyDetails
install shear wall and foundtion at front of building. to repair soft story condition. compy sfbc 34b soft story | $15,000 | |
| Mar 4, 2014 | Completed final sign-off Jun 2016 | 1 Clement St | Golden Vector Stars Corporation | install moment framt & foundation (steel) at front of building to repair soft story condition. voluntary strengthening.Details
install moment framt & foundation (steel) at front of building to repair soft story condition. voluntary strengthening. | $25,000 |
| May 25, 2011 | Completed final sign-off Dec 2015 | 140 09th St | L & D Devlopment.Inc. | change of occupancy from retail furniture store to mixed use(art studio, art gallery, congregate living facility and efficiency apartments. seismic upgrade per 3403.5.- partitions, plumbing,mechanical, electrical & finish work. auto sprinkler system nfpa 13 under separate permit.Details
change of occupancy from retail furniture store to mixed use(art studio, art gallery, congregate living facility and efficiency apartments. seismic upgrade per 3403.5.- partitions, plumbing,mechanical, electrical & finish work. auto sprinkler system nfpa 13 under separate permit. | $750,000 |
| Jul 17, 2008 | Completed final sign-off Jul 2008 | 115 Clement St | reduce (e) wall by 4ft. reinforce the wall with 9ft of shear wallDetails
reduce (e) wall by 4ft. reinforce the wall with 9ft of shear wall | $2,000 | |
| Oct 28, 2005 | Completed final sign-off May 2006 | 3812 22nd St | interior remodel only.no added sq.footage,no exterior modifications,kitchen remodel & master bath remodel,replace interior finishes & minor reconfiguration of rooms.Details
interior remodel only.no added sq.footage,no exterior modifications,kitchen remodel & master bath remodel,replace interior finishes & minor reconfiguration of rooms. | $150,000 | |
| May 17, 2005 | Completed final sign-off Dec 2005 | 278 15th Av | addendum to appl#200403098176 additional foundations repair to (e)foundation due to substandardDetails
addendum to appl#200403098176 additional foundations repair to (e)foundation due to substandard | $5,000 | |
| Apr 20, 2005 | Expired or cancelled expired Apr 2007 | 48 Mars St | revision to app#200305084109. complete rebuild or rear deck & stairs- previsously apprvded for lessDetails
revision to app#200305084109. complete rebuild or rear deck & stairs- previsously apprvded for less | $2,000 | |
| Apr 11, 2005 | Completed final sign-off Feb 2006 | 4367 24th St | addendum to appl#200404141229 repair/replace 15'(e)foundation wall along west property line.Details
addendum to appl#200404141229 repair/replace 15'(e)foundation wall along west property line. | $10,000 | |
| Dec 7, 2004 | Never finaled issued Dec 2004, no final | 909 Montgomery St | remove the existing stair which connects the 2nd and 3rd floor close the (e) hole with compositeDetails
remove the existing stair which connects the 2nd and 3rd floor close the (e) hole with composite | $22,500 |