Golden Vector Stars Corporation
- Based in
- Oakland
- On San Francisco permits
- Mar 2014 to May 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 15 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued Jul 2026 | 255 Turk St | mechanical revision to pa# 202405172411: remove 10' (e) dryer exhaust duct. install (n) dryer booster fan, duct, control, mounting, connect to existing electrical. replace (e) transome glazing with louvers. change outlet louver.Details
mechanical revision to pa# 202405172411: remove 10' (e) dryer exhaust duct. install (n) dryer booster fan, duct, control, mounting, connect to existing electrical. replace (e) transome glazing with louvers. change outlet louver. | |
| Nov 4, 2025 | Completed final sign-off Nov 2025 | 147 Welsh St | removal of (4) 2x3 windows and 2 dryer vents. infill wall to match (e) construction, wood frame, exterior sheeting building wrap, paint, insulation, sheet rock taped and finshed to match existing.Details
removal of (4) 2x3 windows and 2 dryer vents. infill wall to match (e) construction, wood frame, exterior sheeting building wrap, paint, insulation, sheet rock taped and finshed to match existing. | $18,000 |
| Mar 11, 2025 | Completed final sign-off Aug 2025 | 281 Turk St | ground floor- ti (e) 1386sf institutional community use to create 3 private offices. reconfgiure staff break area and improve ventitation. modify (e) disabled access features to enchance accessibility. continuatin of (e) use with no change in use or occupancy. no chamges to facade, except toDetails
ground floor- ti (e) 1386sf institutional community use to create 3 private offices. reconfgiure staff break area and improve ventitation. modify (e) disabled access features to enchance accessibility. continuatin of (e) use with no change in use or occupancy. no chamges to facade, except to | $45,000 |
| Nov 7, 2024 | Completed final sign-off Nov 2024 | 1820 Post St | unit #1842, 1846, and 1858: dry rot repair for exterior balconies at each unit in kind less than 50%Details
unit #1842, 1846, and 1858: dry rot repair for exterior balconies at each unit in kind less than 50% | $15,000 |
| Aug 29, 2024 | Completed final sign-off Sep 2024 | 935 Howard St | replacement of kitchen cabinets and countertop in kind. (ref bpa# 202408078191)Details
replacement of kitchen cabinets and countertop in kind. (ref bpa# 202408078191) | $7,500 |
| Aug 7, 2024 | Completed final sign-off Sep 2024 | 935 Howard St | residential bathroom & kitchen remodel. hvac replacement-new. new mini-split. window like for like replacment on 2/f.Details
residential bathroom & kitchen remodel. hvac replacement-new. new mini-split. window like for like replacment on 2/f. | $50,000 |
| Apr 30, 2024 | Completed final sign-off Sep 2024 | 933 Howard St | replace 2 windows in kind. (@ front of building)Details
replace 2 windows in kind. (@ front of building) | $1,500 |
| Apr 12, 2024 | Completed final sign-off May 2024 | 555 Noriega St | install new kitchen cabinets, countertop, and fixtures. new outlet.Details
install new kitchen cabinets, countertop, and fixtures. new outlet. | $10,000 |
| Aug 3, 2023 | Completed final sign-off Oct 2023 | 557 Pacific Av | commercial ti. reconfigure (e) toilet room, replace (e) kitchen cabinets. non-load bearing wall partitions. no exterior work. no work in public right of way.Details
commercial ti. reconfigure (e) toilet room, replace (e) kitchen cabinets. non-load bearing wall partitions. no exterior work. no work in public right of way. | $25,000 |
| Dec 12, 2017 | Completed final sign-off Mar 2018 | 137 Joost Av | replace 2' high concrete retaiing walls with new and reinforce entry bridge at front yard of residential property.Details
replace 2' high concrete retaiing walls with new and reinforce entry bridge at front yard of residential property. | $12,000 |
| Nov 6, 2017 | Completed final sign-off Oct 2018 | 1539 Grant Av | to comply with nov # 2012076941 .replace 20 (e) vinyl windows with all wood windows with ogee lugs . 20 windows to be replaced in existing openings at front of building, facing street.Details
to comply with nov # 2012076941 .replace 20 (e) vinyl windows with all wood windows with ogee lugs . 20 windows to be replaced in existing openings at front of building, facing street. | $15,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 1555 Jackson St | structural repair of 3 existing concrete piers for single family residence, na maherDetails
structural repair of 3 existing concrete piers for single family residence, na maher | $12,000 |
| Oct 25, 2016 | Never finaled issued Oct 2016, no final | 657 Clay St | street spaceDetails
street space | |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 657 Clay St | replace 2nd floor residential community shower waterproofing. replace leaking waste line in shower room. replace plumbing fixturesDetails
replace 2nd floor residential community shower waterproofing. replace leaking waste line in shower room. replace plumbing fixtures | $15,000 |
| Jul 7, 2016 | Completed final sign-off Nov 2016 | 552 Filbert St | add smoke detectors in unit to comply with nov#200847272, replace kitchen floor & wall tile, replace kitchen countertop, replace kitchen plumbing fixtures, aarecessed lights and gfci outlets.Details
add smoke detectors in unit to comply with nov#200847272, replace kitchen floor & wall tile, replace kitchen countertop, replace kitchen plumbing fixtures, aarecessed lights and gfci outlets. | $13,000 |
| Jun 23, 2015 | Completed final sign-off Jul 2016 | 401 Euclid Av | work includes the renovation and expansion of the kitchen to provide a new staff lounge, storage, and accessible clearances, as well as new finishes and cabinetry. work also includes new lighting in the staff lounge and structural shear walls in the staff lounge and kitchen.Details
work includes the renovation and expansion of the kitchen to provide a new staff lounge, storage, and accessible clearances, as well as new finishes and cabinetry. work also includes new lighting in the staff lounge and structural shear walls in the staff lounge and kitchen. | $30,000 |
| Feb 25, 2015 | Completed final sign-off May 2016 | 7 Clement St | disabled access barrier removal at entrances to 7 and 8 clement street including new level entrance and interior ramps.Details
disabled access barrier removal at entrances to 7 and 8 clement street including new level entrance and interior ramps. | $26,000 |
| Mar 4, 2014 | Completed final sign-off Jun 2016 | 1 Clement St | install moment framt & foundation (steel) at front of building to repair soft story condition. voluntary strengthening.Details
install moment framt & foundation (steel) at front of building to repair soft story condition. voluntary strengthening. | $25,000 |