- 47 permits filed
236 permits since 2000: 187 completed, 27 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 7 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 236.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | Completed final sign-off Sep 2026 | 60 Winfield St | to comply w/ nov 202661478: front deck repair less than 50%.Details
to comply w/ nov 202661478: front deck repair less than 50%. | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1627 Beach St | to obtain final inspection for work approved under pa# 202407267392. all work is complete.Details
to obtain final inspection for work approved under pa# 202407267392. all work is complete. | |
| Sep 2, 2026 | In progress issued Sep 2026 | 1772 Church St | bathroom remodel: new flooring , new sheetrock as needed, return ceiling to original 10 feet height throughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)5.Details
bathroom remodel: new flooring , new sheetrock as needed, return ceiling to original 10 feet height throughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)5. | $45,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 1657 North Point St | balcony repair at the front of the bldg. replace framing and dry rot in kind less than 50% repairs.Details
balcony repair at the front of the bldg. replace framing and dry rot in kind less than 50% repairs. | $8,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 75 Barcelona Av | reconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code complyDetails
reconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code comply | $225,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 311 Mangels Av | interior remodel of (e) sfh. 1/f: remodel & expand (e) master bath & closet, add 95 sf conditioned space. 2/f: replace (e) rear window & sliding door in kind, new range hoodDetails
interior remodel of (e) sfh. 1/f: remodel & expand (e) master bath & closet, add 95 sf conditioned space. 2/f: replace (e) rear window & sliding door in kind, new range hood | $75,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 433 Pierce St | recommencement and completion of work approved under pa# 201702179705.Details
recommencement and completion of work approved under pa# 201702179705. | $70,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 1009 Fell St | recommencement and completion of work approved under pa# 201702179707.Details
recommencement and completion of work approved under pa# 201702179707. | $6,500 |
| May 11, 2026 | In progress issued Jun 2026 | 1551 Vallejo St | voluntary strengthening on the ground floor. add steel moment frame and plywood shear walls w/ concrete grade beams. replace concrete foundation in the alley in kind. remove partition wall in the top unit.Details
voluntary strengthening on the ground floor. add steel moment frame and plywood shear walls w/ concrete grade beams. replace concrete foundation in the alley in kind. remove partition wall in the top unit. | $120,000 |
| Apr 29, 2026 | In progress issued Jun 2026 | 1017 Fell St | recommencement and completion of work approved under pa# 201701137165.Details
recommencement and completion of work approved under pa# 201701137165. | $9,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 2021 California St | supplemental structural drawings to permits 202511129473, 202512161945, 202601143821, and 202604018713. add new header beams and posts to remove same bearing walls in the units.Details
supplemental structural drawings to permits 202511129473, 202512161945, 202601143821, and 202604018713. add new header beams and posts to remove same bearing walls in the units. | $15,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 1405 Van Ness Av | replace existing metal egress stairs in kind. in the lightwell @ the south side of the building, visible from the street, due to significant corrosionDetails
replace existing metal egress stairs in kind. in the lightwell @ the south side of the building, visible from the street, due to significant corrosion | $75,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 2021 California St | unit 101 & 103 - remodel (e) bathroom & (e) kitchen; unit 102 - relocation of (e) bathroom & (e) kitchen; unit 104 - remodel (e) bathroom, relocation of (e) kitchen, conversion of (e) kitchen into (n) office, addition of (n) bathroomDetails
unit 101 & 103 - remodel (e) bathroom & (e) kitchen; unit 102 - relocation of (e) bathroom & (e) kitchen; unit 104 - remodel (e) bathroom, relocation of (e) kitchen, conversion of (e) kitchen into (n) office, addition of (n) bathroom | $300,000 |
| Mar 30, 2026 | Completed final sign-off Jul 2026 | 1405 Van Ness Av | repair and restore the north side outdoor stairs, replacing the deteriorated material in kind (10% replacement), not facing the street. only serving the r-2 occDetails
repair and restore the north side outdoor stairs, replacing the deteriorated material in kind (10% replacement), not facing the street. only serving the r-2 occ | $7,000 |
| Feb 25, 2026 | Completed final sign-off Apr 2026 | 1158 Green St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Feb 17, 2026 | Completed final sign-off Feb 2026 | 543 Frederick St | to obtain final inspection for work approved under pa#202104158677 all work is complete.Details
to obtain final inspection for work approved under pa#202104158677 all work is complete. | |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 711 Hampshire St | (n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors.Details
(n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors. | $306,308 |
| Jan 27, 2026 | Completed final sign-off Feb 2026 | 2021 California St | to comply with nov #202079907. 1) removal of unpermitted cinder blocks atep 20' high retaining wall with no rebar. 2) new 6' high fence setback 3'-0" from property line.Details
to comply with nov #202079907. 1) removal of unpermitted cinder blocks atep 20' high retaining wall with no rebar. 2) new 6' high fence setback 3'-0" from property line. | $1,600 |
| Jan 15, 2026 | Completed final sign-off Feb 2026 | 224 27th St | revision for pa# 202308104178. change in layout for laundry area. revision for pa# 202308104178 at ground level.Details
revision for pa# 202308104178. change in layout for laundry area. revision for pa# 202308104178 at ground level. | |
| Jan 14, 2026 | In progress issued Mar 2026 | 2021 California St | unit 201: remodel existing bathroom, relocation of e kitchen, conversion e kitchen into new office. unit 202:remodel e bathroom & e kitchen. unit #203: remodel e bathroom & e kitchen. unit 204: remodel e bathoom, relocation of e kitchen, conversion of e kitchen into office, addition of nw bathroomDetails
unit 201: remodel existing bathroom, relocation of e kitchen, conversion e kitchen into new office. unit 202:remodel e bathroom & e kitchen. unit #203: remodel e bathroom & e kitchen. unit 204: remodel e bathoom, relocation of e kitchen, conversion of e kitchen into office, addition of nw bathroom | $300,000 |
| Dec 18, 2025 | Completed final sign-off May 2026 | 2395 29th Av | dry rot repairs 100 sq ft, street visible, stucco removal between ground flr and 1st flr. repairs in kindDetails
dry rot repairs 100 sq ft, street visible, stucco removal between ground flr and 1st flr. repairs in kind | $5,000 |
| Dec 16, 2025 | In progress issued Jan 2026 | 2021 California St | unit 301: remodel existing bathroom, relocation existing kitchen. conversion existing kitchen into new office. unit 303: remodel existing bathroom and existing kitchen. unit 304: remodel existing bathroom, relocation (e)kitchen, conversion existing kitchen into new office, addition of new bathroom.Details
unit 301: remodel existing bathroom, relocation existing kitchen. conversion existing kitchen into new office. unit 303: remodel existing bathroom and existing kitchen. unit 304: remodel existing bathroom, relocation (e)kitchen, conversion existing kitchen into new office, addition of new bathroom. | $225,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 711 Hampshire St | foundation replacement and seismic stregtheningDetails
foundation replacement and seismic stregthening | $108,000 |
| Nov 21, 2025 | In progress issued Dec 2025 | 240 Carl St | revision to pa #202307111838 to include: remove framing at garage and new slab to match existing garage elevation. new steel beam to replace existing bearing line to be removed. new foundation at east property line.Details
revision to pa #202307111838 to include: remove framing at garage and new slab to match existing garage elevation. new steel beam to replace existing bearing line to be removed. new foundation at east property line. | $10,000 |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 2901 Geary Bl | to obtain final inspection for work approved under pa# 201906143404. all work is complete.Details
to obtain final inspection for work approved under pa# 201906143404. all work is complete. | |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 205 Collins St | to obtain final inspection for work approved under pa# 201904107668. all work is complete.Details
to obtain final inspection for work approved under pa# 201904107668. all work is complete. | |
| Nov 17, 2025 | Completed final sign-off Nov 2025 | 205 Collins St | to obtain final inspection for work approved under pa# 201904107667. all work is complete.Details
to obtain final inspection for work approved under pa# 201904107667. all work is complete. | |
| Nov 12, 2025 | In progress issued Jan 2026 | 2021 California St | unit 401-remodel existing bathroom, relocate existing kitchen, new office unit 402-remodel existing bathroom and kitchen unit 403-remodel existing bathroom and kitchen unit 404-remodel existing bathroom, relocate kitchen, new office and new bathroomDetails
unit 401-remodel existing bathroom, relocate existing kitchen, new office unit 402-remodel existing bathroom and kitchen unit 403-remodel existing bathroom and kitchen unit 404-remodel existing bathroom, relocate kitchen, new office and new bathroom | $200,000 |
| Oct 16, 2025 | Completed final sign-off Feb 2026 | 224 27th St | updating structural plan. revision to pa# 202407307596 & 202308104178Details
updating structural plan. revision to pa# 202407307596 & 202308104178 | $30,000 |
| Sep 18, 2025 | Completed final sign-off May 2026 | 35 Rico Wy | revision to 202211287193, 1st fl new sauna, relocate furnace, 2nd fl remove wall between nook and kitchen. new stl beam, new simpson strong wallDetails
revision to 202211287193, 1st fl new sauna, relocate furnace, 2nd fl remove wall between nook and kitchen. new stl beam, new simpson strong wall | |
| Aug 25, 2025 | Completed final sign-off Aug 2025 | 2263 Chestnut St | legalize projectiong sign (bar darling)Details
legalize projectiong sign (bar darling) | $350 |
| Aug 12, 2025 | In progress issued Aug 2025 | 1749 Stockton St | for exploratory demo to include making small openings as needed in the kitchen and bathroom areas. no construction work to be done. future ti permit will be filed. patch back in kind.Details
for exploratory demo to include making small openings as needed in the kitchen and bathroom areas. no construction work to be done. future ti permit will be filed. patch back in kind. | $300 |
| Jul 17, 2025 | In progress issued Oct 2025 | 100 Green St | revision and deferred electrical for office ti permit 202410233581. reconfigure previously approved ada bathroom #2. replace entry door at 120 green. remove non load bearing walls at ground floor meeting rooms.Details
revision and deferred electrical for office ti permit 202410233581. reconfigure previously approved ada bathroom #2. replace entry door at 120 green. remove non load bearing walls at ground floor meeting rooms. | |
| May 22, 2025 | Completed final sign-off May 2026 | 35 Rico Wy | revision to permit #202211287193: window change recording per planning request.Details
revision to permit #202211287193: window change recording per planning request. | |
| May 9, 2025 | Completed final sign-off Oct 2025 | 2300 22nd Av | revision to 201709016796 r1 per field inspector's request, document location of water heater and furnaces for each unit 1st fl, eero windows for bedrooms on each unit 1st floor. no material change to previously approved p/a.Details
revision to 201709016796 r1 per field inspector's request, document location of water heater and furnaces for each unit 1st fl, eero windows for bedrooms on each unit 1st floor. no material change to previously approved p/a. | |
| May 5, 2025 | Completed final sign-off May 2025 | 2263 Chestnut St | reference ti permit 202407297443 to include install mechanical type 1 hood for the rear kitchen building.Details
reference ti permit 202407297443 to include install mechanical type 1 hood for the rear kitchen building. | |
| Apr 23, 2025 | Completed final sign-off Nov 2025 | 205 Collins St | revision to pa#'s 201904107667 and 201904107668: relocating the shear wall along gridline 5 and providing the wood shear wall above steel moment frame to connection with floor. changes are proposed due to on site conditions.Details
revision to pa#'s 201904107667 and 201904107668: relocating the shear wall along gridline 5 and providing the wood shear wall above steel moment frame to connection with floor. changes are proposed due to on site conditions. | |
| Apr 22, 2025 | Completed final sign-off Oct 2025 | 2465 Union St | replace (e) wood retaining wall due to tiling with new reinforced concrete 8ft high retaining wall. comply with nov 202289559.Details
replace (e) wood retaining wall due to tiling with new reinforced concrete 8ft high retaining wall. comply with nov 202289559. | $35,000 |
| Apr 4, 2025 | Completed final sign-off Jul 2025 | 250 Page St | unit# 17: corrective work performed without permit, tenant performed electrical work, sheetrock demolition without owner's consent. area of sheetrock demolition no more than 275 sqft, repatch to match existing. all new sheetrock shall be 5/8" type x gyp board, no new wall & stud replacement.Details
unit# 17: corrective work performed without permit, tenant performed electrical work, sheetrock demolition without owner's consent. area of sheetrock demolition no more than 275 sqft, repatch to match existing. all new sheetrock shall be 5/8" type x gyp board, no new wall & stud replacement. | $8,000 |
| Apr 4, 2025 | Completed final sign-off Jun 2025 | 1530 Hayes St | to obtain final inspection for work approved under pa#200508160424 and pa#200508241136. all work is complete. (cc8580)Details
to obtain final inspection for work approved under pa#200508160424 and pa#200508241136. all work is complete. (cc8580) | |
| Mar 26, 2025 | Completed final sign-off Jun 2025 | 1530 Hayes St | to comply with physical inspetion report cc-8580Details
to comply with physical inspetion report cc-8580 | |
| Mar 14, 2025 | Completed final sign-off Dec 2025 | 192 Laidley St | replace the (e) collapsed stone retaining wall in the backyard with new reinforced concrete retaining, adding new wood guardrails. replace existing fence and gate in-kind, less than 6-ft in height.Details
replace the (e) collapsed stone retaining wall in the backyard with new reinforced concrete retaining, adding new wood guardrails. replace existing fence and gate in-kind, less than 6-ft in height. | $70,000 |
| Dec 11, 2024 | In progress issued Dec 2024 | 1017 Fell St | recommencement & completion of work approved under pa # 201701137165Details
recommencement & completion of work approved under pa # 201701137165 | $60,000 |
| Nov 19, 2024 | In progress issued Sep 2025 | 1749 Stockton St | remodel (e) kitchen. remove load bearing wall and add new posts and beams.Details
remodel (e) kitchen. remove load bearing wall and add new posts and beams. | $80,000 |
| Nov 14, 2024 | In progress issued Nov 2024 | 1017 Fell St | ref pa # 201702179707 repairs to (e) structural framing uncovered during construction including floor framing strengthening (n) framing under (e) floor members & foundation to support. also continuity improvements to header bracing at (1) location. work occurs on gr fl in 3 discrete locationsDetails
ref pa # 201702179707 repairs to (e) structural framing uncovered during construction including floor framing strengthening (n) framing under (e) floor members & foundation to support. also continuity improvements to header bracing at (1) location. work occurs on gr fl in 3 discrete locations | $20,000 |
| Oct 31, 2024 | Completed final sign-off May 2025 | 2263 Chestnut St | revision to pa# #202409170978 and 202407297443 -modify layout of bathrooms and associated structural previously approved under permit #202409170978 and 202407297443. no other changes.Details
revision to pa# #202409170978 and 202407297443 -modify layout of bathrooms and associated structural previously approved under permit #202409170978 and 202407297443. no other changes. | $5,000 |
| Oct 23, 2024 | In progress issued Mar 2025 | 100 Green St | commercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada complianceDetails
commercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada compliance | $300,000 |
| Oct 3, 2024 | Completed final sign-off Nov 2024 | 4085 Cesar Chavez St | replacement of approx 80 sq. ft. of composite siding in kind, ground floor level on east side of the building, not street visible.Details
replacement of approx 80 sq. ft. of composite siding in kind, ground floor level on east side of the building, not street visible. | $5,000 |
| Sep 17, 2024 | Completed final sign-off May 2025 | 2261 Chestnut St | deferred electrical, t-24 energy, skylight and structural framiing in reference to permit 202407297443. skylight not visible from the streetDetails
deferred electrical, t-24 energy, skylight and structural framiing in reference to permit 202407297443. skylight not visible from the street | $26,000 |
| Aug 14, 2024 | Completed final sign-off Sep 2024 | 341 Valley St | correcting drainage in the backyard by raising level of pavers. miscellaneous repair of cracking in foundation with simpson set-3g in 4(four) locations in crownspace and adding approx. 10(ten) ufp10 anchors in crownspace. repair in kind; voluntary strengthening.Details
correcting drainage in the backyard by raising level of pavers. miscellaneous repair of cracking in foundation with simpson set-3g in 4(four) locations in crownspace and adding approx. 10(ten) ufp10 anchors in crownspace. repair in kind; voluntary strengthening. | $12,000 |
| Jul 30, 2024 | Completed final sign-off Feb 2026 | 224 27th St | revision to pa# 202308104178: removing the (e) slab in the living room and back of the bedroom. excavate to achieve code minimum height required - pour and underpin new footings, pour new slab.Details
revision to pa# 202308104178: removing the (e) slab in the living room and back of the bedroom. excavate to achieve code minimum height required - pour and underpin new footings, pour new slab. | $130,000 |
| Jul 29, 2024 | Completed final sign-off May 2025 | 2261 Chestnut St | restaurant t.i. to existing restaurant, include relocate bathroom, making bar accessible and new bar and kitchen equipment. mep under seperate permit.Details
restaurant t.i. to existing restaurant, include relocate bathroom, making bar accessible and new bar and kitchen equipment. mep under seperate permit. | $415,000 |
| Jun 5, 2024 | Completed final sign-off Mar 2025 | 3491 20th St | 2nd floor: remodel (2) (e) bathrooms with new finishes and fixtures: no work on commercial ground floor spaces.Details
2nd floor: remodel (2) (e) bathrooms with new finishes and fixtures: no work on commercial ground floor spaces. | $42,000 |
| May 23, 2024 | In progress issued Jul 2026 | 1340 Clay St | improvement in porte cochern: n) entry portal elevation. addition of metal panels at east & west ends, n) lighting, relocated sffd signal booster & security camera locations, install a recirculating foundainDetails
improvement in porte cochern: n) entry portal elevation. addition of metal panels at east & west ends, n) lighting, relocated sffd signal booster & security camera locations, install a recirculating foundain | $100,000 |
| May 20, 2024 | Completed final sign-off Dec 2024 | 1061 Filbert St | add a new concrete retaining wall adjacent to the existing brick wall due to cracking in the backyard.Details
add a new concrete retaining wall adjacent to the existing brick wall due to cracking in the backyard. | $40,000 |
| May 17, 2024 | Completed final sign-off May 2024 | 2950 21st St | adrressing complaints #202297330 & 202294954. returnn front of the building to original condition. replacing patch in the siding in front of the building. (approx area 80sqft)Details
adrressing complaints #202297330 & 202294954. returnn front of the building to original condition. replacing patch in the siding in front of the building. (approx area 80sqft) | $10,115 |
| May 8, 2024 | Completed final sign-off May 2024 | 2080 Vallejo St | repair of dry rotted siding in the rear decks. less than 20% of the existing siding.Details
repair of dry rotted siding in the rear decks. less than 20% of the existing siding. | $10,000 |
| Apr 5, 2024 | Completed final sign-off Aug 2025 | 2415 Mission St | renovation/remodeling of two common bathrooms in kind and one common kitchenDetails
renovation/remodeling of two common bathrooms in kind and one common kitchen | $92,700 |
| Mar 5, 2024 | Completed final sign-off May 2024 | 735 Cortland Av | dry rot repair on north wall approx 90sf. refinish existing floor of unit. paint throughout unit.Details
dry rot repair on north wall approx 90sf. refinish existing floor of unit. paint throughout unit. | $49,943 |
| Feb 7, 2024 | Completed final sign-off Nov 2024 | 435 Duncan St | revision to pa# 202208261365 reduced scope of sheet walls & foundation work noted on plans. structural foundation work and sheer wall on garage level only (1st fl). east lightwell infill at garage level onlyDetails
revision to pa# 202208261365 reduced scope of sheet walls & foundation work noted on plans. structural foundation work and sheer wall on garage level only (1st fl). east lightwell infill at garage level only | |
| Dec 4, 2023 | Completed final sign-off Jan 2024 | 55 Mccoppin St | unit#55 replace kitchen cabinets in kind. refinish existing wood floor, interior paint and hardware doors replacement (front and interior doors)Details
unit#55 replace kitchen cabinets in kind. refinish existing wood floor, interior paint and hardware doors replacement (front and interior doors) | $23,154 |
| Dec 1, 2023 | Completed final sign-off Mar 2024 | 1430 California St | revision to permits 201809139959 (commercial) and 201809139962 (residential): soft story retrofit to comply with 2016 sfebc chapter 4d per 2016 cebc appendix a-4 standards.Details
revision to permits 201809139959 (commercial) and 201809139962 (residential): soft story retrofit to comply with 2016 sfebc chapter 4d per 2016 cebc appendix a-4 standards. | |
| Nov 7, 2023 | Completed final sign-off Nov 2023 | 1304 Francisco St | reinforce (e) wood beam as per engineer's report. reroute (e) utilities to accommodate construction. all the work in garage level.Details
reinforce (e) wood beam as per engineer's report. reroute (e) utilities to accommodate construction. all the work in garage level. | $16,580 |
| Oct 4, 2023 | Completed final sign-off Mar 2025 | 1415 Indiana St | structural repairs on the roof framing due to fire damage.replace damaged roof joists, roofing and steel beam in kindDetails
structural repairs on the roof framing due to fire damage.replace damaged roof joists, roofing and steel beam in kind | $15,000 |
| Oct 4, 2023 | Completed final sign-off Jul 2024 | 1415 Indiana St | do structural repairs on the roof framing due to fire damage.replace damage roof joists, roofing and steel beam in kindDetails
do structural repairs on the roof framing due to fire damage.replace damage roof joists, roofing and steel beam in kind | $15,000 |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 2940 Laguna St | replacement of approx 120 sq ft of exterior siding in kind. adding anchor holdowns and plywood to rear wall in basement. replacement of approx 6 treads in rear stairs. all not work visible from street.Details
replacement of approx 120 sq ft of exterior siding in kind. adding anchor holdowns and plywood to rear wall in basement. replacement of approx 6 treads in rear stairs. all not work visible from street. | $39,590 |
| Aug 14, 2023 | Completed final sign-off Nov 2023 | 715 Hampshire St | dry rot siding replacement (non facing frontage). 200 sq ft.Details
dry rot siding replacement (non facing frontage). 200 sq ft. | $19,600 |
| Aug 10, 2023 | Completed final sign-off Feb 2026 | 224 27th St | legalize dwelling unit - as-built plans of existing duplex. adding unit from existing ground floor space with 1 bed, 1 bath, kitchen, living, and storage area.Details
legalize dwelling unit - as-built plans of existing duplex. adding unit from existing ground floor space with 1 bed, 1 bath, kitchen, living, and storage area. | $80,000 |
| Jul 20, 2023 | Completed final sign-off Nov 2023 | 2300 22nd Av | revision to 201709016796. remove new footing from approved permit. eisting footing in good condition to remain.Details
revision to 201709016796. remove new footing from approved permit. eisting footing in good condition to remain. | |
| Jul 11, 2023 | In progress issued Apr 2025 | 240 Carl St | vertical addition. to comply with nov 202037711. dmg foundation caused by work at adj prop., (e) foundation will be replaced by adding a basement lv. two units on 3rd lv will be combined w/ 1 of the units relocated to basement lv. 1st fl remodel. rebuilt 50% of (e) rear stair in-kind.Details
vertical addition. to comply with nov 202037711. dmg foundation caused by work at adj prop., (e) foundation will be replaced by adding a basement lv. two units on 3rd lv will be combined w/ 1 of the units relocated to basement lv. 1st fl remodel. rebuilt 50% of (e) rear stair in-kind. | $467,564 |
| Apr 27, 2023 | Completed final sign-off Oct 2023 | 616 Hayes St | voluntary seismic retrofit of the ground flr at the rear of the bldg, utilizing wood braces, exsiting beams, posts and post footings to be replaced.Details
voluntary seismic retrofit of the ground flr at the rear of the bldg, utilizing wood braces, exsiting beams, posts and post footings to be replaced. | $20,000 |
| Apr 5, 2023 | Completed final sign-off Jul 2023 | 560 26th Av | revision "2" to pa 202301099845. revise the collector detail for steel moment framesDetails
revision "2" to pa 202301099845. revise the collector detail for steel moment frames | |
| Mar 27, 2023 | Completed final sign-off Aug 2023 | 1429 Castro St | dry rot repair in kind at roof approx 200 sqft at rear. exterior wall approx 200 sqft at rear nothing is visable from the public way. all repair in like kindDetails
dry rot repair in kind at roof approx 200 sqft at rear. exterior wall approx 200 sqft at rear nothing is visable from the public way. all repair in like kind | $5,000 |
| Mar 20, 2023 | Completed final sign-off Jul 2023 | 1485 Dolores St | rev to pa# 202301311065: replace (e) concrete pad footings and concerte foundation in-kind at few locatoins due to significant deteriation of (e) foundationsDetails
rev to pa# 202301311065: replace (e) concrete pad footings and concerte foundation in-kind at few locatoins due to significant deteriation of (e) foundations | $20,000 |
| Mar 10, 2023 | Never finaled issued Jul 2023, no final | 2644 Larkin St | temporary excavation shoring system to alllow construction, ref pa# 202207279411. scope involves constructing an extention of (e) basement & 2nd lvl 1' to 2' below (e) flr lvls. where portions of new foundations are below (e) foundations, new construction will be performed sequentially in hand-dugDetails
temporary excavation shoring system to alllow construction, ref pa# 202207279411. scope involves constructing an extention of (e) basement & 2nd lvl 1' to 2' below (e) flr lvls. where portions of new foundations are below (e) foundations, new construction will be performed sequentially in hand-dug | $22,000 |
| Mar 10, 2023 | Completed final sign-off Sep 2023 | 1226 Church St | rev to pa201709087440: update shearwall layout per field condition.Details
rev to pa201709087440: update shearwall layout per field condition. | |
| Mar 10, 2023 | Completed final sign-off Jul 2023 | 51 Mccoppin St | replace siding and 6 windows in both lightwells approx 800 sqft- replace siding at top level on east and west sides of building approx 800 sqft.Details
replace siding and 6 windows in both lightwells approx 800 sqft- replace siding at top level on east and west sides of building approx 800 sqft. | $4,000 |
| Mar 3, 2023 | Completed final sign-off Mar 2023 | 2286 15th St | to obtain final inspection for work approved under pa# 202003046148 and 202008041021. all work is complete.Details
to obtain final inspection for work approved under pa# 202003046148 and 202008041021. all work is complete. | |
| Feb 17, 2023 | Completed final sign-off Jul 2023 | 560 26th Av | revision to pa# 202301099845, revise the shearwall length due to existing field condition.Details
revision to pa# 202301099845, revise the shearwall length due to existing field condition. | |
| Feb 9, 2023 | Completed final sign-off Mar 2024 | 311 Mangels Av | complywith building violation 202286387 and planning violation case no 2022001640enf. legalize new deck added without a permit. reduce it's size and move the stairs. add 2 new retaining walls.Details
complywith building violation 202286387 and planning violation case no 2022001640enf. legalize new deck added without a permit. reduce it's size and move the stairs. add 2 new retaining walls. | $80,000 |
| Feb 6, 2023 | In progress issued Jan 2025 | 2717 Union St | add a private roof deck and stack new exterior access stairs to the roof above the (e) stair hall add a skylight above stair hall, replace (e) skylightsDetails
add a private roof deck and stack new exterior access stairs to the roof above the (e) stair hall add a skylight above stair hall, replace (e) skylights | $50,000 |
| Jan 31, 2023 | Completed final sign-off Jul 2023 | 1485 Dolores St | voluntary stregthening on the ground flr, adding new plywood shearwalls, adding 1 new skylight on flat roof.Details
voluntary stregthening on the ground flr, adding new plywood shearwalls, adding 1 new skylight on flat roof. | $60,000 |
| Jan 13, 2023 | Completed final sign-off Mar 2023 | 1158 Green St | kitchen remodel in kind. replace floor,cabinets and countertops.Details
kitchen remodel in kind. replace floor,cabinets and countertops. | $30,000 |
| Jan 9, 2023 | Completed final sign-off Jul 2023 | 560 26th Av | madatory soft story retrofit per 2022 sfebc app a4, add 2 steel moment frames with concrete foundation and add plywood shear walls.Details
madatory soft story retrofit per 2022 sfebc app a4, add 2 steel moment frames with concrete foundation and add plywood shear walls. | $100,000 |
| Dec 29, 2022 | Completed final sign-off Jul 2023 | 1485 Dolores St | 1485 dolores: remodel 1 kitchen and 1 bathroom with new fixtures and fittings throughout. 1487 dolores: remodel bathroom with new fixtures and fittings throughout. (e) kitchen cabinets to remain. new glass block windows in storage and laundry. new double hung windows in kitchen. (same opening size)Details
1485 dolores: remodel 1 kitchen and 1 bathroom with new fixtures and fittings throughout. 1487 dolores: remodel bathroom with new fixtures and fittings throughout. (e) kitchen cabinets to remain. new glass block windows in storage and laundry. new double hung windows in kitchen. (same opening size) | $50,000 |
| Dec 16, 2022 | Completed final sign-off May 2023 | 3620 Mission St | repair exterior front facade in kind. damage caused by automobile collision. approx 50sqftDetails
repair exterior front facade in kind. damage caused by automobile collision. approx 50sqft | $2,500 |
| Dec 16, 2022 | Completed final sign-off May 2023 | 1725 Hyde St | dryrot repair on rear wall of building (west side) and south return wall, on multiple levels. approx. 750sf of sidingDetails
dryrot repair on rear wall of building (west side) and south return wall, on multiple levels. approx. 750sf of siding | $25,000 |
| Nov 28, 2022 | Completed final sign-off Jan 2023 | 51 Mccoppin St | 51 mccoppin-fire damage - complaint#202292774: repair damaged flooring, insulation, sheetrock, paint, ext siding in-kind. 53a mccoppin - water damage - complaint#202289571: repair damaged insulation, sheetrock, paint, ext siding in-kind. 53 mccoppin - repair rear door to stairs- complaint#202297494.Details
51 mccoppin-fire damage - complaint#202292774: repair damaged flooring, insulation, sheetrock, paint, ext siding in-kind. 53a mccoppin - water damage - complaint#202289571: repair damaged insulation, sheetrock, paint, ext siding in-kind. 53 mccoppin - repair rear door to stairs- complaint#202297494. | $9,000 |
| Nov 28, 2022 | Completed final sign-off May 2026 | 35 Rico Wy | project includes structural and seismic upgrade. 1st fl: addition of 147 sf, guest mud play rm, relocate powder, furnace, water heater, bath, new windows 2nd fl: relocate kitchen, bdrms, baths, remodel dining, laundry, new deck, family rm, new windows. 3rd flr additionDetails
project includes structural and seismic upgrade. 1st fl: addition of 147 sf, guest mud play rm, relocate powder, furnace, water heater, bath, new windows 2nd fl: relocate kitchen, bdrms, baths, remodel dining, laundry, new deck, family rm, new windows. 3rd flr addition | $615,000 |
| Nov 16, 2022 | Completed final sign-off Dec 2022 | 560 Moultrie St | repair dry rot damage in-kind on 2nd level at rear of building approx. 50-100 sqft. of framing & sidingDetails
repair dry rot damage in-kind on 2nd level at rear of building approx. 50-100 sqft. of framing & siding | $8,000 |
| Nov 1, 2022 | Completed final sign-off Dec 2025 | 279 Randall St | (n) 735 sf garage in (e) sfd. (n) 246 sf office. modification of front planter for (n) driveway & garage door below front bayDetails
(n) 735 sf garage in (e) sfd. (n) 246 sf office. modification of front planter for (n) driveway & garage door below front bay | $67,332 |
| Aug 26, 2022 | Completed final sign-off Nov 2024 | 435 Duncan St | consists of structural foundation work and structural shear walls on garage and first floor(no changes to bldg envelope)Details
consists of structural foundation work and structural shear walls on garage and first floor(no changes to bldg envelope) | $150,000 |
| Aug 26, 2022 | Completed final sign-off Apr 2023 | 53 Mccoppin St | to comply with nov202289571: repair rear stairs per place.Details
to comply with nov202289571: repair rear stairs per place. | $60,000 |
| Jul 27, 2022 | Never finaled issued Feb 2023, no final | 2644 Larkin St | expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd flDetails
expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd fl | $105,000 |
| Jul 7, 2022 | Completed final sign-off Mar 2023 | 40 Alta St | revision to 201709056929. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-137.Details
revision to 201709056929. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-137. | $5,000 |
| Jul 7, 2022 | Completed final sign-off Aug 2023 | 50 Alta St | revision to 201705307888. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-135.Details
revision to 201705307888. board of appeal revision: relocate column and beam to be concealed within (e) wall and (e) floor framing per notice of decicion and order of appeal # 19-135. | $5,000 |
| Jul 6, 2022 | Completed final sign-off Jun 2023 | 1530 Hayes St | voluntary strengthening on ground fl, add steel moment frame/plywood shear walls. remove fireplace on ground floor, remove (e) posts/add new framing in garage. replace garage doors in kind w/wood garage doors, no change in size.Details
voluntary strengthening on ground fl, add steel moment frame/plywood shear walls. remove fireplace on ground floor, remove (e) posts/add new framing in garage. replace garage doors in kind w/wood garage doors, no change in size. | $100,000 |
| Jun 16, 2022 | Completed final sign-off Jan 2024 | 820 Arguello Bl | replace existing fire egress stairs in-kind with non-conforming stairs in the lightwell. no firewall construction. not visible from street.Details
replace existing fire egress stairs in-kind with non-conforming stairs in the lightwell. no firewall construction. not visible from street. | $20,000 |
| Apr 25, 2022 | Completed final sign-off Nov 2022 | 435 Duncan St | remodel bathroom. replace electrical / plumbing in several rooms. new sheetrock as shown on plans. all work is non-structural only.Details
remodel bathroom. replace electrical / plumbing in several rooms. new sheetrock as shown on plans. all work is non-structural only. | $50,000 |
| Feb 4, 2022 | Completed final sign-off Nov 2022 | 181 14th St | residential soft story retrofit per sfebc chapter 4d, kenneally cebc appendix a4.Details
residential soft story retrofit per sfebc chapter 4d, kenneally cebc appendix a4. | $100,000 |