De Brus Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Sep 2026
- Last 24 months
- 47 permits filed
236 permits since 2000: 187 completed, 27 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 7 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
15 stairs permits: 9 completed, 5 in progress, 1 never finaled. Typically 6 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jun 2026 | 75 Barcelona Av | reconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code complyDetails
reconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code comply | $225,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 1405 Van Ness Av | replace existing metal egress stairs in kind. in the lightwell @ the south side of the building, visible from the street, due to significant corrosionDetails
replace existing metal egress stairs in kind. in the lightwell @ the south side of the building, visible from the street, due to significant corrosion | $75,000 |
| Mar 30, 2026 | Completed final sign-off Jul 2026 | 1405 Van Ness Av | repair and restore the north side outdoor stairs, replacing the deteriorated material in kind (10% replacement), not facing the street. only serving the r-2 occDetails
repair and restore the north side outdoor stairs, replacing the deteriorated material in kind (10% replacement), not facing the street. only serving the r-2 occ | $7,000 |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 711 Hampshire St | (n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors.Details
(n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors. | $306,308 |
| Oct 23, 2024 | In progress issued Mar 2025 | 100 Green St | commercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada complianceDetails
commercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada compliance | $300,000 |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 2940 Laguna St | replacement of approx 120 sq ft of exterior siding in kind. adding anchor holdowns and plywood to rear wall in basement. replacement of approx 6 treads in rear stairs. all not work visible from street.Details
replacement of approx 120 sq ft of exterior siding in kind. adding anchor holdowns and plywood to rear wall in basement. replacement of approx 6 treads in rear stairs. all not work visible from street. | $39,590 |
| Jul 11, 2023 | In progress issued Apr 2025 | 240 Carl St | vertical addition. to comply with nov 202037711. dmg foundation caused by work at adj prop., (e) foundation will be replaced by adding a basement lv. two units on 3rd lv will be combined w/ 1 of the units relocated to basement lv. 1st fl remodel. rebuilt 50% of (e) rear stair in-kind.Details
vertical addition. to comply with nov 202037711. dmg foundation caused by work at adj prop., (e) foundation will be replaced by adding a basement lv. two units on 3rd lv will be combined w/ 1 of the units relocated to basement lv. 1st fl remodel. rebuilt 50% of (e) rear stair in-kind. | $467,564 |
| Feb 9, 2023 | Completed final sign-off Mar 2024 | 311 Mangels Av | complywith building violation 202286387 and planning violation case no 2022001640enf. legalize new deck added without a permit. reduce it's size and move the stairs. add 2 new retaining walls.Details
complywith building violation 202286387 and planning violation case no 2022001640enf. legalize new deck added without a permit. reduce it's size and move the stairs. add 2 new retaining walls. | $80,000 |
| Feb 6, 2023 | In progress issued Jan 2025 | 2717 Union St | add a private roof deck and stack new exterior access stairs to the roof above the (e) stair hall add a skylight above stair hall, replace (e) skylightsDetails
add a private roof deck and stack new exterior access stairs to the roof above the (e) stair hall add a skylight above stair hall, replace (e) skylights | $50,000 |
| Nov 28, 2022 | Completed final sign-off Jan 2023 | 51 Mccoppin St | 51 mccoppin-fire damage - complaint#202292774: repair damaged flooring, insulation, sheetrock, paint, ext siding in-kind. 53a mccoppin - water damage - complaint#202289571: repair damaged insulation, sheetrock, paint, ext siding in-kind. 53 mccoppin - repair rear door to stairs- complaint#202297494.Details
51 mccoppin-fire damage - complaint#202292774: repair damaged flooring, insulation, sheetrock, paint, ext siding in-kind. 53a mccoppin - water damage - complaint#202289571: repair damaged insulation, sheetrock, paint, ext siding in-kind. 53 mccoppin - repair rear door to stairs- complaint#202297494. | $9,000 |
| Aug 26, 2022 | Completed final sign-off Apr 2023 | 53 Mccoppin St | to comply with nov202289571: repair rear stairs per place.Details
to comply with nov202289571: repair rear stairs per place. | $60,000 |
| Jul 27, 2022 | Never finaled issued Feb 2023, no final | 2644 Larkin St | expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd flDetails
expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd fl | $105,000 |
| Jun 16, 2022 | Completed final sign-off Jan 2024 | 820 Arguello Bl | replace existing fire egress stairs in-kind with non-conforming stairs in the lightwell. no firewall construction. not visible from street.Details
replace existing fire egress stairs in-kind with non-conforming stairs in the lightwell. no firewall construction. not visible from street. | $20,000 |
| Nov 13, 2019 | Completed final sign-off Dec 2020 | 2041 Hyde St | repair the front entry stair case due to significant dry-rot and deterioration, replace staircase framing and brick steps in-kind. repair (e) stud wallDetails
repair the front entry stair case due to significant dry-rot and deterioration, replace staircase framing and brick steps in-kind. repair (e) stud wall | $20,000 |
| Oct 4, 2019 | Completed final sign-off Mar 2020 | 818 Congo St | refinish interior walls & floors, replace handrail on stairs, lights & receptacles in the interior. all work in-kindDetails
refinish interior walls & floors, replace handrail on stairs, lights & receptacles in the interior. all work in-kind | $95,000 |