Back to bathroom remodel contractors
De Brus Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Sep 2026
- Last 24 months
- 47 permits filed
236 permits since 2000: 187 completed, 27 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 7 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 21 completed, 10 in progress, 2 never finaled, 2 expired or cancelled. Typically 23 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 1772 Church St | bathroom remodel: new flooring , new sheetrock as needed, return ceiling to original 10 feet height throughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)5.Details
bathroom remodel: new flooring , new sheetrock as needed, return ceiling to original 10 feet height throughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)5. | $45,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 311 Mangels Av | interior remodel of (e) sfh. 1/f: remodel & expand (e) master bath & closet, add 95 sf conditioned space. 2/f: replace (e) rear window & sliding door in kind, new range hoodDetails
interior remodel of (e) sfh. 1/f: remodel & expand (e) master bath & closet, add 95 sf conditioned space. 2/f: replace (e) rear window & sliding door in kind, new range hood | $75,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 2021 California St | unit 101 & 103 - remodel (e) bathroom & (e) kitchen; unit 102 - relocation of (e) bathroom & (e) kitchen; unit 104 - remodel (e) bathroom, relocation of (e) kitchen, conversion of (e) kitchen into (n) office, addition of (n) bathroomDetails
unit 101 & 103 - remodel (e) bathroom & (e) kitchen; unit 102 - relocation of (e) bathroom & (e) kitchen; unit 104 - remodel (e) bathroom, relocation of (e) kitchen, conversion of (e) kitchen into (n) office, addition of (n) bathroom | $300,000 |
| Feb 25, 2026 | Completed final sign-off Apr 2026 | 1158 Green St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 711 Hampshire St | (n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors.Details
(n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors. | $306,308 |
| Jan 14, 2026 | In progress issued Mar 2026 | 2021 California St | unit 201: remodel existing bathroom, relocation of e kitchen, conversion e kitchen into new office. unit 202:remodel e bathroom & e kitchen. unit #203: remodel e bathroom & e kitchen. unit 204: remodel e bathoom, relocation of e kitchen, conversion of e kitchen into office, addition of nw bathroomDetails
unit 201: remodel existing bathroom, relocation of e kitchen, conversion e kitchen into new office. unit 202:remodel e bathroom & e kitchen. unit #203: remodel e bathroom & e kitchen. unit 204: remodel e bathoom, relocation of e kitchen, conversion of e kitchen into office, addition of nw bathroom | $300,000 |
| Dec 16, 2025 | In progress issued Jan 2026 | 2021 California St | unit 301: remodel existing bathroom, relocation existing kitchen. conversion existing kitchen into new office. unit 303: remodel existing bathroom and existing kitchen. unit 304: remodel existing bathroom, relocation (e)kitchen, conversion existing kitchen into new office, addition of new bathroom.Details
unit 301: remodel existing bathroom, relocation existing kitchen. conversion existing kitchen into new office. unit 303: remodel existing bathroom and existing kitchen. unit 304: remodel existing bathroom, relocation (e)kitchen, conversion existing kitchen into new office, addition of new bathroom. | $225,000 |
| Nov 12, 2025 | In progress issued Jan 2026 | 2021 California St | unit 401-remodel existing bathroom, relocate existing kitchen, new office unit 402-remodel existing bathroom and kitchen unit 403-remodel existing bathroom and kitchen unit 404-remodel existing bathroom, relocate kitchen, new office and new bathroomDetails
unit 401-remodel existing bathroom, relocate existing kitchen, new office unit 402-remodel existing bathroom and kitchen unit 403-remodel existing bathroom and kitchen unit 404-remodel existing bathroom, relocate kitchen, new office and new bathroom | $200,000 |
| Aug 12, 2025 | In progress issued Aug 2025 | 1749 Stockton St | for exploratory demo to include making small openings as needed in the kitchen and bathroom areas. no construction work to be done. future ti permit will be filed. patch back in kind.Details
for exploratory demo to include making small openings as needed in the kitchen and bathroom areas. no construction work to be done. future ti permit will be filed. patch back in kind. | $300 |
| Jul 17, 2025 | In progress issued Oct 2025 | 100 Green St | revision and deferred electrical for office ti permit 202410233581. reconfigure previously approved ada bathroom #2. replace entry door at 120 green. remove non load bearing walls at ground floor meeting rooms.Details
revision and deferred electrical for office ti permit 202410233581. reconfigure previously approved ada bathroom #2. replace entry door at 120 green. remove non load bearing walls at ground floor meeting rooms. | |
| Oct 31, 2024 | Completed final sign-off May 2025 | 2263 Chestnut St | revision to pa# #202409170978 and 202407297443 -modify layout of bathrooms and associated structural previously approved under permit #202409170978 and 202407297443. no other changes.Details
revision to pa# #202409170978 and 202407297443 -modify layout of bathrooms and associated structural previously approved under permit #202409170978 and 202407297443. no other changes. | $5,000 |
| Oct 23, 2024 | In progress issued Mar 2025 | 100 Green St | commercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada complianceDetails
commercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada compliance | $300,000 |
| Jul 29, 2024 | Completed final sign-off May 2025 | 2261 Chestnut St | restaurant t.i. to existing restaurant, include relocate bathroom, making bar accessible and new bar and kitchen equipment. mep under seperate permit.Details
restaurant t.i. to existing restaurant, include relocate bathroom, making bar accessible and new bar and kitchen equipment. mep under seperate permit. | $415,000 |
| Jun 5, 2024 | Completed final sign-off Mar 2025 | 3491 20th St | 2nd floor: remodel (2) (e) bathrooms with new finishes and fixtures: no work on commercial ground floor spaces.Details
2nd floor: remodel (2) (e) bathrooms with new finishes and fixtures: no work on commercial ground floor spaces. | $42,000 |
| Apr 5, 2024 | Completed final sign-off Aug 2025 | 2415 Mission St | renovation/remodeling of two common bathrooms in kind and one common kitchenDetails
renovation/remodeling of two common bathrooms in kind and one common kitchen | $92,700 |
| Aug 10, 2023 | Completed final sign-off Feb 2026 | 224 27th St | legalize dwelling unit - as-built plans of existing duplex. adding unit from existing ground floor space with 1 bed, 1 bath, kitchen, living, and storage area.Details
legalize dwelling unit - as-built plans of existing duplex. adding unit from existing ground floor space with 1 bed, 1 bath, kitchen, living, and storage area. | $80,000 |
| Dec 29, 2022 | Completed final sign-off Jul 2023 | 1485 Dolores St | 1485 dolores: remodel 1 kitchen and 1 bathroom with new fixtures and fittings throughout. 1487 dolores: remodel bathroom with new fixtures and fittings throughout. (e) kitchen cabinets to remain. new glass block windows in storage and laundry. new double hung windows in kitchen. (same opening size)Details
1485 dolores: remodel 1 kitchen and 1 bathroom with new fixtures and fittings throughout. 1487 dolores: remodel bathroom with new fixtures and fittings throughout. (e) kitchen cabinets to remain. new glass block windows in storage and laundry. new double hung windows in kitchen. (same opening size) | $50,000 |
| Nov 28, 2022 | Completed final sign-off May 2026 | 35 Rico Wy | project includes structural and seismic upgrade. 1st fl: addition of 147 sf, guest mud play rm, relocate powder, furnace, water heater, bath, new windows 2nd fl: relocate kitchen, bdrms, baths, remodel dining, laundry, new deck, family rm, new windows. 3rd flr additionDetails
project includes structural and seismic upgrade. 1st fl: addition of 147 sf, guest mud play rm, relocate powder, furnace, water heater, bath, new windows 2nd fl: relocate kitchen, bdrms, baths, remodel dining, laundry, new deck, family rm, new windows. 3rd flr addition | $615,000 |
| Jul 27, 2022 | Never finaled issued Feb 2023, no final | 2644 Larkin St | expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd flDetails
expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd fl | $105,000 |
| Apr 25, 2022 | Completed final sign-off Nov 2022 | 435 Duncan St | remodel bathroom. replace electrical / plumbing in several rooms. new sheetrock as shown on plans. all work is non-structural only.Details
remodel bathroom. replace electrical / plumbing in several rooms. new sheetrock as shown on plans. all work is non-structural only. | $50,000 |
| Oct 12, 2021 | Completed final sign-off Jul 2024 | 818 Arguello Bl | convert existing storage area into living space on the ground floor 430 sf; remodel existing kitchen and bathroom. add new washer & dryer. add heated floor and replace water heater with tankless wh. sprinkler entire ground floor and garage w/ sprinkler monitoring under separate permit.Details
convert existing storage area into living space on the ground floor 430 sf; remodel existing kitchen and bathroom. add new washer & dryer. add heated floor and replace water heater with tankless wh. sprinkler entire ground floor and garage w/ sprinkler monitoring under separate permit. | $80,000 |
| Aug 30, 2021 | Completed final sign-off Jul 2024 | 818 Arguello Bl | remodel (e) kitchen and bathroom. add 1 full bath and one half bath. add washer and dryer inside the unit. add new heated floorDetails
remodel (e) kitchen and bathroom. add 1 full bath and one half bath. add washer and dryer inside the unit. add new heated floor | $90,000 |
| Oct 21, 2020 | Completed final sign-off Sep 2021 | 2921 Washington St | kitchen and bathroom remodel. replace electric & plumbing throughout. all replacements in kind.Details
kitchen and bathroom remodel. replace electric & plumbing throughout. all replacements in kind. | $100,000 |
| Oct 21, 2020 | Completed final sign-off Jul 2024 | 818 Arguello Bl | kitchen and bathroom remodel in 818 & 818a. rewiring & plumbing replacement throughout. all replacements in kind.Details
kitchen and bathroom remodel in 818 & 818a. rewiring & plumbing replacement throughout. all replacements in kind. | $105,000 |
| Sep 22, 2020 | Completed final sign-off Feb 2021 | 208 Lily St | paint cabinets & walls, replace lights and receptacles in kitchen. install new shower, new tub & new vanity in bathrooms. replce lights and receptacles in apt. paint interior walls & install new floors. all work to be in-kind. no layout changes or wall modifications.Details
paint cabinets & walls, replace lights and receptacles in kitchen. install new shower, new tub & new vanity in bathrooms. replce lights and receptacles in apt. paint interior walls & install new floors. all work to be in-kind. no layout changes or wall modifications. | $50,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2021 | 2285 Broadway | unit #1: relocate and remodel existing kitchen. remodel existing bathroom. add washer and dryer to the unit. no structural work.Details
unit #1: relocate and remodel existing kitchen. remodel existing bathroom. add washer and dryer to the unit. no structural work. | $35,000 |
| Jul 31, 2020 | Expired or cancelled cancelled Apr 2022 | 2285 Broadway | apt 2: remodel of (e) kitchen (10x10) & bathroom (6x9). no change in floor plan.Details
apt 2: remodel of (e) kitchen (10x10) & bathroom (6x9). no change in floor plan. | $25,000 |
| Mar 4, 2020 | Expired or cancelled expired Mar 2023 | 2286 15th St | remodel (e) kitchen & 2 (e) bathrooms. add washer & dryer. add plywood wallsDetails
remodel (e) kitchen & 2 (e) bathrooms. add washer & dryer. add plywood walls | $70,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2020 | 635 Scott St | unit # 5: replace sinks, toilets, repair framing, repair sheetrock, refinish floors, paint cabinets and walls. replace furnace, install new appliances & associated electrical work. kitchen and bath remodel in kind.Details
unit # 5: replace sinks, toilets, repair framing, repair sheetrock, refinish floors, paint cabinets and walls. replace furnace, install new appliances & associated electrical work. kitchen and bath remodel in kind. | $20,000 |
| Apr 15, 2019 | Completed final sign-off Jun 2020 | 820 Arguello Bl | 3rd fl unit - remodel (e) kitchen & bath; add new bathroom; add wall to create new bedroom at front side of living room; replace front window with new wood window @ 2nd & 3rd floorsDetails
3rd fl unit - remodel (e) kitchen & bath; add new bathroom; add wall to create new bedroom at front side of living room; replace front window with new wood window @ 2nd & 3rd floors | $160,000 |
| Dec 13, 2018 | Never finaled issued Dec 2018, no final | 820 Arguello Bl | remodel kitchen & bath in kind, new finishes throughout unit.Details
remodel kitchen & bath in kind, new finishes throughout unit. | $35,000 |
| Oct 29, 2018 | Completed final sign-off Mar 2019 | 1067 Francisco St | 1 kitchen & 2 bathroom remodel on 2nf fl. changing cabinets, cosmetic work everything in same location.Details
1 kitchen & 2 bathroom remodel on 2nf fl. changing cabinets, cosmetic work everything in same location. | $50,000 |
| Feb 6, 2018 | Completed final sign-off Jun 2018 | 1440 Sacramento St | unit 14: kitchen remodel in-kind approx 110 sq. ft., remodel bathroom in-kind approx. 60 sq. ft.Details
unit 14: kitchen remodel in-kind approx 110 sq. ft., remodel bathroom in-kind approx. 60 sq. ft. | $8,000 |
| Oct 12, 2017 | Completed final sign-off Dec 2021 | 2285 Broadway | add unit per ordinance# 162-16. add 3 new units on the ground floor of an (e) 6 units building. 2 studio & 1 one bedroom unit. a bath & kitchen in each. soft story pa# 2017/09/06/6951. ** maher: n/a **Details
add unit per ordinance# 162-16. add 3 new units on the ground floor of an (e) 6 units building. 2 studio & 1 one bedroom unit. a bath & kitchen in each. soft story pa# 2017/09/06/6951. ** maher: n/a ** | $90,000 |
| Jun 21, 2017 | Completed final sign-off Jun 2021 | 248 Page St | add 3 adu's per ordinance# 162-16 @ ground floor. unit"a": 2 bedroom & 2 baths. unit"b": 1 bedroom & 1 bath. unit "c": 1 bedroom & 1 bath.Details
add 3 adu's per ordinance# 162-16 @ ground floor. unit"a": 2 bedroom & 2 baths. unit"b": 1 bedroom & 1 bath. unit "c": 1 bedroom & 1 bath. | $306,000 |