Block 1168, lot 031
820 Arguello Blvd
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,520 sq ft
- Lot
- 2,400 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 16, 2022 | Completed final sign-off Jan 2024 | 820 Arguello Bl | De Brus Construction Inc | replace existing fire egress stairs in-kind with non-conforming stairs in the lightwell. no firewall construction. not visible from street.Details
replace existing fire egress stairs in-kind with non-conforming stairs in the lightwell. no firewall construction. not visible from street. | $20,000 |
| Mar 9, 2022 | Completed final sign-off Jul 2024 | 818 Arguello Bl | Crime Watch Security Sys Llc | installation of a new sprinkler monitoring system ref. 202201260648.Details
installation of a new sprinkler monitoring system ref. 202201260648. | $4,000 |
| Jan 26, 2022 | Never finaled issued Feb 2022, no final | 818 Arguello Bl | Flow Masters Plumbing Inc | installation of a new automatic fire sprinkler system in the ground level in existing 3 story bldg, 2" underground per nfpa24. overhead sprinkler system per nfpa 13 2016 including adapted standards by city of sf and cbc-903.3.1.3. 20 total heads.Details
installation of a new automatic fire sprinkler system in the ground level in existing 3 story bldg, 2" underground per nfpa24. overhead sprinkler system per nfpa 13 2016 including adapted standards by city of sf and cbc-903.3.1.3. 20 total heads. | $19,500 |
| Oct 12, 2021 | Completed final sign-off Jul 2024 | 818 Arguello Bl | De Brus Construction Inc | convert existing storage area into living space on the ground floor 430 sf; remodel existing kitchen and bathroom. add new washer & dryer. add heated floor and replace water heater with tankless wh. sprinkler entire ground floor and garage w/ sprinkler monitoring under separate permit.Details
convert existing storage area into living space on the ground floor 430 sf; remodel existing kitchen and bathroom. add new washer & dryer. add heated floor and replace water heater with tankless wh. sprinkler entire ground floor and garage w/ sprinkler monitoring under separate permit. | $80,000 |
| Aug 30, 2021 | Completed final sign-off Jul 2024 | 818 Arguello Bl | De Brus Construction Inc | remodel (e) kitchen and bathroom. add 1 full bath and one half bath. add washer and dryer inside the unit. add new heated floorDetails
remodel (e) kitchen and bathroom. add 1 full bath and one half bath. add washer and dryer inside the unit. add new heated floor | $90,000 |
| Dec 18, 2020 | Completed final sign-off Jul 2024 | 818 Arguello Bl | De Brus Construction Inc | foundation replacement and voluntary strengthening at the g/f. structural work only. replace (e) perimeter brick faoundation w/ concrete. add ply shear walls & hardy panels. add new posts & steel beams for framing. lower slab level in the storage area ~100 courtyard excavation.Details
foundation replacement and voluntary strengthening at the g/f. structural work only. replace (e) perimeter brick faoundation w/ concrete. add ply shear walls & hardy panels. add new posts & steel beams for framing. lower slab level in the storage area ~100 courtyard excavation. | $125,000 |
| Oct 21, 2020 | Completed final sign-off Jul 2024 | 818 Arguello Bl | De Brus Construction Inc | kitchen and bathroom remodel in 818 & 818a. rewiring & plumbing replacement throughout. all replacements in kind.Details
kitchen and bathroom remodel in 818 & 818a. rewiring & plumbing replacement throughout. all replacements in kind. | $105,000 |
| Oct 13, 2020 | Never finaled issued Oct 2020, no final | 818 Arguello Bl | per 3-r report dated 9/18/2018, add address to 3rd unit in block 1168, lot 031 as; 818a arguello blvd.Details
per 3-r report dated 9/18/2018, add address to 3rd unit in block 1168, lot 031 as; 818a arguello blvd. | ||
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 820 Arguello Bl | street spaceDetails
street space | ||
| Apr 15, 2019 | Completed final sign-off Jun 2020 | 820 Arguello Bl | De Brus Construction Inc | 3rd fl unit - remodel (e) kitchen & bath; add new bathroom; add wall to create new bedroom at front side of living room; replace front window with new wood window @ 2nd & 3rd floorsDetails
3rd fl unit - remodel (e) kitchen & bath; add new bathroom; add wall to create new bedroom at front side of living room; replace front window with new wood window @ 2nd & 3rd floors | $160,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 820 Arguello Bl | De Brus Construction Inc | remove chimneyDetails
remove chimney | $1,000 |
| Feb 21, 2019 | Never finaled issued Feb 2019, no final | 820 Arguello Bl | street spaceDetails
street space | ||
| Dec 13, 2018 | Never finaled issued Dec 2018, no final | 820 Arguello Bl | De Brus Construction Inc | remodel kitchen & bath in kind, new finishes throughout unit.Details
remodel kitchen & bath in kind, new finishes throughout unit. | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- De Brus Construction Inc (8), Crime Watch Security Sys Llc, Flow Masters Plumbing Inc
- Architects
- Andrew Rob Levine
- Engineers
- Engin Yagmur (4), Engin Yagmur
- Designers
- Alan Patrick Moran
Find contractors for work like this