Block 1090, lot 001
2901 Geary Blvd
- City’s use
- Multi-Family Residential
- Built
- 1979
- Stories
- 3
- Units
- 13
- Rooms
- 16 bathrooms
- Building
- 18,274 sq ft
- Lot
- 9,375 sq ft
- Zoning
- NC3
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 2901 Geary Bl | Daaron Builders | 1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included.Details
1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included. | $393,600 |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 2901 Geary Bl | De Brus Construction Inc | to obtain final inspection for work approved under pa# 201906143404. all work is complete.Details
to obtain final inspection for work approved under pa# 201906143404. all work is complete. | |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 205 Collins St | De Brus Construction Inc | to obtain final inspection for work approved under pa# 201904107668. all work is complete.Details
to obtain final inspection for work approved under pa# 201904107668. all work is complete. | |
| Nov 17, 2025 | Completed final sign-off Nov 2025 | 205 Collins St | De Brus Construction Inc | to obtain final inspection for work approved under pa# 201904107667. all work is complete.Details
to obtain final inspection for work approved under pa# 201904107667. all work is complete. | |
| Apr 23, 2025 | Completed final sign-off Nov 2025 | 205 Collins St | De Brus Construction Inc | revision to pa#'s 201904107667 and 201904107668: relocating the shear wall along gridline 5 and providing the wood shear wall above steel moment frame to connection with floor. changes are proposed due to on site conditions.Details
revision to pa#'s 201904107667 and 201904107668: relocating the shear wall along gridline 5 and providing the wood shear wall above steel moment frame to connection with floor. changes are proposed due to on site conditions. | |
| May 20, 2024 | Completed final sign-off Jul 2025 | 205 Collins St | Fog City Roofiing Llc | reroofingDetails
reroofing | $89,500 |
| Jul 31, 2019 | Never finaled issued Aug 2019, no final | 205 Collins St | apt 6: remodel kitchen in-kind.Details
apt 6: remodel kitchen in-kind. | $25,000 | |
| Jun 14, 2019 | Expired or cancelled expired Feb 2026 | 2901 Geary Bl | De Brus Construction Inc | compliance with accessible building entrance program ordinance 51-16, install power door operator & kick plate n/a maher. tsd abe #201812183126Details
compliance with accessible building entrance program ordinance 51-16, install power door operator & kick plate n/a maher. tsd abe #201812183126 | $5,000 |
| Apr 10, 2019 | Completed final sign-off Nov 2025 | 205 Collins St | De Brus Construction Inc | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201904107668.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201904107668. | $80,000 |
| Apr 10, 2019 | Expired or cancelled expired Feb 2026 | 205 Collins St | De Brus Construction Inc | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201904107667.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201904107667. | $80,000 |
| May 16, 2018 | Completed final sign-off Jun 2020 | 205 Collins St | Sol Builders | unit #5: relocate extg bath, add bath, create additional bedroom, relocate kitchen. n/a for maherDetails
unit #5: relocate extg bath, add bath, create additional bedroom, relocate kitchen. n/a for maher | $60,000 |
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 205 Collins St | A A Builders & Company | unit #4: replacement of kitchen cabinets, replacement of hardwood floors on entire unit #4. no change in wall layout and lighting.Details
unit #4: replacement of kitchen cabinets, replacement of hardwood floors on entire unit #4. no change in wall layout and lighting. | $18,500 |
| Jan 12, 2015 | Completed final sign-off Sep 2015 | 205 Collins St | Asap Roofing | reroofingDetails
reroofing | $8,000 |
| Jul 22, 2013 | Never finaled issued Jul 2013, no final | 2901 Geary Bl | remove banner in front of the storeDetails
remove banner in front of the store | ||
| May 7, 2009 | Completed final sign-off May 2009 | 2901 Geary Bl | Steve's Awning | erect two single faced electric wall signs.Details
erect two single faced electric wall signs. | $3,000 |
| Jan 15, 2004 | Completed final sign-off Jul 2004 | 205 Collins St | M M Roofing Co | reroofingDetails
reroofing | $16,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.