Permit GraphShortlistSan Francisco building permits since 2000

Parvathy Nair

License
C38498
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, authorized agent-others, designer
Firm
Pn A+D
Based in
San Francisco
On San Francisco permits
Apr 2025 to Sep 2026

10 permits since 2000 (architect on 8 permits, authorized agent-others on 1 permit, designer on 1 permit): 3 completed, 6 in progress, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Hasz Construction Inc (3), Union Pierce Construction (2), Bg Builders Inc, Daaron Builders, Edl Construction Corp, Principal Builders Inc., Skye Builders
Architects
Anand Sheth
Engineers
Leonard M. Rose (2), Prabhjeet Grewal (2), Andre Mozaffari, Daniel Polivka

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 25, 2026In progress
filed Sep 2026, not yet issued
3239 22nd Sttenant improvement of an existing restaurant & bar, includes new interior non structural partitions, finishes, lighting, millwork, and kitchen equipment. replace exterior storefront windows & entry doors. provide associated mep upgrades.
Details
Permit
202609258631

tenant improvement of an existing restaurant & bar, includes new interior non structural partitions, finishes, lighting, millwork, and kitchen equipment. replace exterior storefront windows & entry doors. provide associated mep upgrades.

Open the permit page

$700,000
Sep 18, 2026In progress
issued Oct 2026
2901 Geary BlDaaron Builders1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included.
Details
Permit
202609188320
Permit issued
Oct 20, 2026

1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included.

Open the permit page

$393,600
Aug 24, 2026Completed
final sign-off Sep 2026
850 Brannan StPrincipal Builders Inc.interior tenant improvement consisting of new interior partitions.
Details
Permit
202608247048
Permit issued
Aug 26, 2026
Final sign-off
Sep 24, 2026

interior tenant improvement consisting of new interior partitions.

Open the permit page

$57,000
Jul 9, 2026Completed
final sign-off Oct 2026
652 Duncan StEdl Construction Corpa restroom remodel including new interior finishes., plumbing fixtures, and lighting. work also includes the proposed infill of an (e) lightwell to allow restroom expansion, with installation of a new fire rated skylight above
Details
Permit
202607094771
Permit issued
Jul 16, 2026
Final sign-off
Oct 30, 2026

a restroom remodel including new interior finishes., plumbing fixtures, and lighting. work also includes the proposed infill of an (e) lightwell to allow restroom expansion, with installation of a new fire rated skylight above

Open the permit page

$60,000
Mar 5, 2026In progress
issued Jun 2026
2065 Polk StHasz Construction Inctenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades.
Details
Permit
202603056975
Permit issued
Jun 2, 2026

tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades.

Open the permit page

$500,000
Dec 31, 2025Expired or cancelled
suspend Nov 2026
3973 Clay StUnion Pierce Constructioninterior residential remodel & exterior infill adddition at rear yard. (e) stair connecting upper to lower unit to be demo, (n) private internal stair to be added. (n) sprinklers all 4 floors of building. doors and windows to be replaced. rear yard facade finish replace. mep will design-build.
Details
Permit
202411124804
Permit issued
Nov 2, 2026

interior residential remodel & exterior infill adddition at rear yard. (e) stair connecting upper to lower unit to be demo, (n) private internal stair to be added. (n) sprinklers all 4 floors of building. doors and windows to be replaced. rear yard facade finish replace. mep will design-build.

Open the permit page

$280,000
Dec 17, 2025In progress
issued Jan 2026
2065 Polk StHasz Construction Incdemolish existing walk-in cooler.
Details
Permit
202512171975
Permit issued
Jan 7, 2026

demolish existing walk-in cooler.

Open the permit page

$1,000
Nov 3, 2025In progress
issued Nov 2025
1326 09th AvHasz Construction Inctenant improvement of an (e) restaurant and bar including new interior non-structural partitions, finishes, lighting, millwork, and kitchen equipment. provide associated mep upgrades. fire sprinkler is design/build under a separate permit. replace (e) maintenance ladder with (n) maintenance stair.
Details
Permit
202511038744
Permit issued
Nov 19, 2025

tenant improvement of an (e) restaurant and bar including new interior non-structural partitions, finishes, lighting, millwork, and kitchen equipment. provide associated mep upgrades. fire sprinkler is design/build under a separate permit. replace (e) maintenance ladder with (n) maintenance stair.

Open the permit page

$500,000
Oct 10, 2025Completed
final sign-off Sep 2026
701 03rd StBg Builders Inc, Skye Buildersti of a roof level bar/lounge- addition to (e) sunshade. (n) lighting. no change to egress componets. mep are design build. fire sprinkler is design. build under a seperate permit
Details
Permit
202510107191
Permit issued
Nov 3, 2025
Final sign-off
Sep 11, 2026

ti of a roof level bar/lounge- addition to (e) sunshade. (n) lighting. no change to egress componets. mep are design build. fire sprinkler is design. build under a seperate permit

Open the permit page

$50,000
Apr 28, 2025In progress
filed Apr 2025, not yet issued
55 Ashbury TrUnion Pierce Construction(n) electric chair lift to be installed at entry stair to provide accessible path to entrance door. no interior work.
Details
Permit
202504285365

(n) electric chair lift to be installed at entry stair to provide accessible path to entrance door. no interior work.

Open the permit page

$3,000