Daniel Polivka
- License
- C79948
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C79948 at the Board for Professional Engineers
- Listed as
- authorized agent-others, engineer
- Firm
- Holmes
- Based in
- San Francisco
- On San Francisco permits
- Dec 2025 to Oct 2026
15 permits since 2000 (engineer on 14 permits, authorized agent-others on 1 permit): 13 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Durkin Inc. (2), The Toboni Group (2), Citidev Inc., Farallon General Contractors Inc., Fg Force Construction Inc, Mcguinness Mccann Group, Mueller Nicholls Inc, Superb Builders & Custom Made Cabinetry, Union Pierce Construction, Upscale Construction Inc.
- Architects
- Stephen Sutro (6), Eric Dumican (3), Greg Iboshi (2), Paravathy Nair
- Engineers
- Denny Kwan, Thomas H. Lutge
Where they worked
- Single-family 11
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2026 | In progress filed Oct 2026, not yet issued | 540 El Camino Del Mar | revision to bpa: 202507150799. structural revisions to stairwell due to arch finish changed from wood to stone stair treads and raisers.Details
revision to bpa: 202507150799. structural revisions to stairwell due to arch finish changed from wood to stone stair treads and raisers. | ||
| Oct 29, 2026 | In progress filed Oct 2026, not yet issued | 3650 21st St | construction of a new detached, 1 story, type v-b, residential adu in rear yard.Details
construction of a new detached, 1 story, type v-b, residential adu in rear yard. | $150,000 | |
| Sep 14, 2026 | In progress issued Sep 2026 | 3973 Clay St | Fg Force Construction Inc | voluntary structural alteration to remove intoier concrete parition in garage. install new stuctural beam and supporting posts per structural drawings. no changes to building footprint or exterior facade or occupancy.Details
voluntary structural alteration to remove intoier concrete parition in garage. install new stuctural beam and supporting posts per structural drawings. no changes to building footprint or exterior facade or occupancy. | $14,000 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 2634 Broderick St | Farallon General Contractors Inc. | renovation & addition to (e) sfh including vertical addition of 1' 8 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor. includes structural, geotech & landscape work. subject to all electric ordinance, per ab-112.Details
renovation & addition to (e) sfh including vertical addition of 1' 8 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor. includes structural, geotech & landscape work. subject to all electric ordinance, per ab-112. | $1,500,000 |
| Aug 6, 2026 | In progress issued Sep 2026 | 46 Saint Germain Av | Durkin Inc. | revision to pa # 202402266530 - alterations and expansion to an existing rear yard deckDetails
revision to pa # 202402266530 - alterations and expansion to an existing rear yard deck | $40,000 |
| Jul 8, 2026 | In progress issued Aug 2026 | 2615 Divisadero St | Citidev Inc. | revision to bpa: 202508263895 - replace steel beam at facade of property and replace (e) concrete pilaster and steel post supporting (e) beam. new beam to be supported by steel colmn embedded in drilled pier foundation in place of (e) steel post.Details
revision to bpa: 202508263895 - replace steel beam at facade of property and replace (e) concrete pilaster and steel post supporting (e) beam. new beam to be supported by steel colmn embedded in drilled pier foundation in place of (e) steel post. | $15,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 540 El Camino Del Mar | The Toboni Group | modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spaDetails
modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spa | $150,000 |
| Apr 14, 2026 | Expired or cancelled cancelled Apr 2026 | 2634 Broderick St | renovation & addition to (e) sfd including vertical addition of 18' 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor includes structural, geotech & landscape work.Details
renovation & addition to (e) sfd including vertical addition of 18' 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor includes structural, geotech & landscape work. | $1,500,000 | |
| Feb 22, 2026 | In progress issued Aug 2026 | 2780 Vallejo St | Upscale Construction Inc. | interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind.Details
interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind. | $1,375,000 |
| Feb 6, 2026 | In progress issued Mar 2026 | 3409 Jackson St | Mcguinness Mccann Group | renovation of existing 3 story sfd limited to partial modification to existing 1st floor and 2nd floors, including renovation of existing kitchen and living areas at rear of house, inner grading and low retaining wall at rear yard.Details
renovation of existing 3 story sfd limited to partial modification to existing 1st floor and 2nd floors, including renovation of existing kitchen and living areas at rear of house, inner grading and low retaining wall at rear yard. | $150,000 |
| Jan 24, 2026 | In progress issued May 2026 | 2672 Union St | Mueller Nicholls Inc | new horizontal addition, new vertical 4th story addition, add 1/f adu under state program and remodel of existing three stories.Details
new horizontal addition, new vertical 4th story addition, add 1/f adu under state program and remodel of existing three stories. | $1,300,000 |
| Jan 8, 2026 | In progress issued May 2026 | 46 Saint Germain Av | Durkin Inc. | new skylight and bathroom enlargement.Details
new skylight and bathroom enlargement. | $50,000 |
| Dec 31, 2025 | Expired or cancelled suspend Nov 2026 | 3973 Clay St | Union Pierce Construction | interior residential remodel & exterior infill adddition at rear yard. (e) stair connecting upper to lower unit to be demo, (n) private internal stair to be added. (n) sprinklers all 4 floors of building. doors and windows to be replaced. rear yard facade finish replace. mep will design-build.Details
interior residential remodel & exterior infill adddition at rear yard. (e) stair connecting upper to lower unit to be demo, (n) private internal stair to be added. (n) sprinklers all 4 floors of building. doors and windows to be replaced. rear yard facade finish replace. mep will design-build. | $280,000 |
| Dec 10, 2025 | In progress issued Mar 2026 | 2630 Divisadero St | Superb Builders & Custom Made Cabinetry | revision 202404049303- convert 223 sf of garage of habitable. add new 48 sq. ft. reconfigure interior stair and add (n) panty on 2nd floor. reconfigure closets and bathroom on 3rd floor. revision windows on 2nd floor.Details
revision 202404049303- convert 223 sf of garage of habitable. add new 48 sq. ft. reconfigure interior stair and add (n) panty on 2nd floor. reconfigure closets and bathroom on 3rd floor. revision windows on 2nd floor. | $30,000 |
| Dec 5, 2025 | In progress issued Feb 2026 | 540 El Camino Del Mar | The Toboni Group | structural revisions to pa 202507150799Details
structural revisions to pa 202507150799 |