Permit GraphShortlistSan Francisco building permits since 2000

Block 1308, lot 015

540 El Camino Del Mar

City’s use
Single Family Residential
Built
1926
Stories
2
Units
1
Rooms
4 bedrooms, 7 bathrooms
Building
9,310 sq ft
Lot
17,149 sq ft
Zoning
RH1D
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

11 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 30, 2026In progress
filed Oct 2026, not yet issued
540 El Camino Del Marrevision to bpa: 202507150799. structural revisions to stairwell due to arch finish changed from wood to stone stair treads and raisers.
Details
Permit
202610300171

revision to bpa: 202507150799. structural revisions to stairwell due to arch finish changed from wood to stone stair treads and raisers.

Open the permit page

Jun 2, 2026In progress
issued Jun 2026
540 El Camino Del MarThe Toboni Groupmodifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spa
Details
Permit
202606022349
Permit issued
Jun 18, 2026

modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spa

Open the permit page

$150,000
May 18, 2026In progress
issued Jun 2026
540 El Camino Del MarLuminalt Energy Corporationsolar permit: mounted: roof, ballasted: n, including 7 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | installation of energy storage system only. system includes: (1) tesla backup gateway 3, (4) tesla powerwall 3 battery/in
Details
Permit
S20260515612
Permit issued
Jun 23, 2026

solar permit: mounted: roof, ballasted: n, including 7 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | installation of energy storage system only. system includes: (1) tesla backup gateway 3, (4) tesla powerwall 3 battery/in

Open the permit page

Dec 5, 2025In progress
issued Feb 2026
540 El Camino Del MarThe Toboni Groupstructural revisions to pa 202507150799
Details
Permit
202511129471
Permit issued
Feb 25, 2026

structural revisions to pa 202507150799

Open the permit page

Nov 18, 2025In progress
issued Nov 2025
540 El Camino Del MarThe Toboni Groupshoring revisions to bpa# 202507150799
Details
Permit
202511189837
Permit issued
Nov 21, 2025

shoring revisions to bpa# 202507150799

Open the permit page

Jul 29, 2025In progress
issued Nov 2025
540 El Camino Del MarThe Toboni Groupinterior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075.
Details
Permit
202507150799
Permit issued
Nov 6, 2025

interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075.

Open the permit page

$650,000
Jun 11, 2025In progress
issued Jul 2025
540 El Camino Del MarThe Toboni Groupsubterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade.
Details
Permit
202506118499
Permit issued
Jul 2, 2025

subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade.

Open the permit page

$15,000
May 22, 2025In progress
issued Jun 2025
540 El Camino Del MarThe Toboni Groupremodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced.
Details
Permit
202505227075
Permit issued
Jun 12, 2025

remodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced.

Open the permit page

$250,000
Mar 11, 2024Completed
final sign-off Apr 2024
540 El Camino Del MarMcmahon Constructionremove kitchen countertops & install new tops, 2 new kitchen sinks & faucets, refinish hardwood floors on 2nd level, paint kitchen, playroom cabinets, landing and 2 bedrooms. all work in kitchen is replace in like kind.
Details
Permit
202403117540
Permit issued
Mar 11, 2024
Final sign-off
Apr 22, 2024

remove kitchen countertops & install new tops, 2 new kitchen sinks & faucets, refinish hardwood floors on 2nd level, paint kitchen, playroom cabinets, landing and 2 bedrooms. all work in kitchen is replace in like kind.

Open the permit page

$100,000
May 9, 2017Completed
final sign-off Jun 2017
540 El Camino Del MarOkell's Fireplaceremoval of (e) terra cotta chimney and replace with listed metal class a chimeny system. this is a repair not a reconstruction. no roof work seen from street.
Details
Permit
201705096053
Permit issued
May 9, 2017
Final sign-off
Jun 14, 2017

removal of (e) terra cotta chimney and replace with listed metal class a chimeny system. this is a repair not a reconstruction. no roof work seen from street.

Open the permit page

$10,000
Oct 27, 2015Never finaled
issued Oct 2015, no final
540 El Camino Del Marstreet space permit
Details
Permit
M633188
Permit issued
Oct 27, 2015

street space permit

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
The Toboni Group (6), Luminalt Energy Corporation, Mcmahon Construction, Okell's Fireplace
Architects
Stephen Sutro (6)
Engineers
Daniel Polivka (3), Denny Kwan (3), Erevan Oneil

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.