Erevan Oneil
- License
- C95459
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C95459 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- One Design
- Based in
- San Francisco
- On San Francisco permits
- Oct 2024 to Nov 2026
11 permits since 2000 (engineer on 9 permits, architect on 2 permits): 3 completed, 8 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- D M Ravano Construction (2), Ak Brady Construction, Barker-O'donoghue Master Bldrs, J Farley Construction, Mccowan Berrones & Company Llc, The Toboni Group, Urban West Construction Inc
- Architects
- Stephen Sutro (2), Geoffrey Gibson
- Engineers
- Adam Azofeifa, Denny Kwan
- Subcontractors
- Dwaine T. Nolan
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 4
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 340 Bryant St | Urban West Construction Inc | revision to pa# 202606082785: removal of proposed staircase scope of work from project. cancel associated special inspection 5ai and 18a. stair was never installed.Details
revision to pa# 202606082785: removal of proposed staircase scope of work from project. cancel associated special inspection 5ai and 18a. stair was never installed. | |
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 107 Franconia St | demolition of 1 story single family dwelling,no basement.type-vDetails
demolition of 1 story single family dwelling,no basement.type-v | $905,500 | |
| Apr 15, 2026 | Completed final sign-off Aug 2026 | 675 Corbett Av | D M Ravano Construction | revision to permit#202511260504, scope added: dry rot removal & reinstall of framing; in kind window replacement; stucco patchingDetails
revision to permit#202511260504, scope added: dry rot removal & reinstall of framing; in kind window replacement; stucco patching | $15,000 |
| Dec 10, 2025 | In progress issued Jun 2026 | 30 Commonwealth Av | Mccowan Berrones & Company Llc | interior remodel & rear yard addition of (e) single family home includes structural & shoring work.Details
interior remodel & rear yard addition of (e) single family home includes structural & shoring work. | $462,000 |
| Nov 26, 2025 | Completed final sign-off Aug 2026 | 675 Corbett Av | D M Ravano Construction | exterior wall dry rot repair. like for like replacement of damaged material. new window (aluminum of white cladding). new stucco at dry rot areas. new framing at dry rot locationDetails
exterior wall dry rot repair. like for like replacement of damaged material. new window (aluminum of white cladding). new stucco at dry rot areas. new framing at dry rot location | $65,000 |
| Nov 18, 2025 | In progress issued Nov 2025 | 540 El Camino Del Mar | The Toboni Group | shoring revisions to bpa# 202507150799Details
shoring revisions to bpa# 202507150799 | |
| Sep 23, 2025 | In progress filed Sep 2025, not yet issued | 5000 Presidio | pilaster repair of the sidewalk gate entrance. | $2,000 | |
| Mar 13, 2025 | In progress filed Mar 2025, not yet issued | 785 Vermont St | revision 202107285305- relocation of moment frames. | ||
| Dec 2, 2024 | In progress issued Dec 2024 | 60 Russell St | Barker-O'donoghue Master Bldrs | temporary shoring & sequecing plan for foundation construction approved under 202205033444Details
temporary shoring & sequecing plan for foundation construction approved under 202205033444 | $30,000 |
| Nov 14, 2024 | In progress issued Mar 2026 | 1022 Cole St | Ak Brady Construction | to comply with dbi internal audit nov #202307024. to renew and recommence bpa# 2014-0423-3987 and bpa# 2014-0828-4986.revise original work approved under bpa# 2014-0423-3987 to compartmentalize the added storage area separate w/fire separation requirements.(n)storage area separate w/fire separation.Details
to comply with dbi internal audit nov #202307024. to renew and recommence bpa# 2014-0423-3987 and bpa# 2014-0828-4986.revise original work approved under bpa# 2014-0423-3987 to compartmentalize the added storage area separate w/fire separation requirements.(n)storage area separate w/fire separation. | $20,000 |
| Oct 7, 2024 | Completed final sign-off Mar 2025 | 382 Liberty St | J Farley Construction | replace (e) windows in front elevation at 1st floor, the same size, the same location.Details
replace (e) windows in front elevation at 1st floor, the same size, the same location. | $9,500 |