Permit GraphShortlistSan Francisco building permits since 2000

Erevan Oneil

License
C95459
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C95459 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
One Design
Based in
San Francisco
On San Francisco permits
Oct 2024 to Nov 2026

11 permits since 2000 (engineer on 9 permits, architect on 2 permits): 3 completed, 8 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
D M Ravano Construction (2), Ak Brady Construction, Barker-O'donoghue Master Bldrs, J Farley Construction, Mccowan Berrones & Company Llc, The Toboni Group, Urban West Construction Inc
Architects
Stephen Sutro (2), Geoffrey Gibson
Engineers
Adam Azofeifa, Denny Kwan
Subcontractors
Dwaine T. Nolan

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 12, 2026In progress
filed Nov 2026, not yet issued
340 Bryant StUrban West Construction Increvision to pa# 202606082785: removal of proposed staircase scope of work from project. cancel associated special inspection 5ai and 18a. stair was never installed.
Details
Permit
202611120630

revision to pa# 202606082785: removal of proposed staircase scope of work from project. cancel associated special inspection 5ai and 18a. stair was never installed.

Open the permit page

Aug 27, 2026In progress
filed Aug 2026, not yet issued
107 Franconia Stdemolition of 1 story single family dwelling,no basement.type-v
Details
Permit
202606112983

demolition of 1 story single family dwelling,no basement.type-v

Open the permit page

$905,500
Apr 15, 2026Completed
final sign-off Aug 2026
675 Corbett AvD M Ravano Constructionrevision to permit#202511260504, scope added: dry rot removal & reinstall of framing; in kind window replacement; stucco patching
Details
Permit
202604159469
Permit issued
Apr 16, 2026
Final sign-off
Aug 6, 2026

revision to permit#202511260504, scope added: dry rot removal & reinstall of framing; in kind window replacement; stucco patching

Open the permit page

$15,000
Dec 10, 2025In progress
issued Jun 2026
30 Commonwealth AvMccowan Berrones & Company Llcinterior remodel & rear yard addition of (e) single family home includes structural & shoring work.
Details
Permit
202511189828
Permit issued
Jun 11, 2026

interior remodel & rear yard addition of (e) single family home includes structural & shoring work.

Open the permit page

$462,000
Nov 26, 2025Completed
final sign-off Aug 2026
675 Corbett AvD M Ravano Constructionexterior wall dry rot repair. like for like replacement of damaged material. new window (aluminum of white cladding). new stucco at dry rot areas. new framing at dry rot location
Details
Permit
202511260504
Permit issued
Nov 26, 2025
Final sign-off
Aug 6, 2026

exterior wall dry rot repair. like for like replacement of damaged material. new window (aluminum of white cladding). new stucco at dry rot areas. new framing at dry rot location

Open the permit page

$65,000
Nov 18, 2025In progress
issued Nov 2025
540 El Camino Del MarThe Toboni Groupshoring revisions to bpa# 202507150799
Details
Permit
202511189837
Permit issued
Nov 21, 2025

shoring revisions to bpa# 202507150799

Open the permit page

Sep 23, 2025In progress
filed Sep 2025, not yet issued
5000 Presidiopilaster repair of the sidewalk gate entrance.
Details
Permit
202509235939

pilaster repair of the sidewalk gate entrance.

Open the permit page

$2,000
Mar 13, 2025In progress
filed Mar 2025, not yet issued
785 Vermont Strevision 202107285305- relocation of moment frames.
Details
Permit
202503132152

revision 202107285305- relocation of moment frames.

Open the permit page

Dec 2, 2024In progress
issued Dec 2024
60 Russell StBarker-O'donoghue Master Bldrstemporary shoring & sequecing plan for foundation construction approved under 202205033444
Details
Permit
202411134924
Permit issued
Dec 31, 2024

temporary shoring & sequecing plan for foundation construction approved under 202205033444

Open the permit page

$30,000
Nov 14, 2024In progress
issued Mar 2026
1022 Cole StAk Brady Constructionto comply with dbi internal audit nov #202307024. to renew and recommence bpa# 2014-0423-3987 and bpa# 2014-0828-4986.revise original work approved under bpa# 2014-0423-3987 to compartmentalize the added storage area separate w/fire separation requirements.(n)storage area separate w/fire separation.
Details
Permit
202411145059
Permit issued
Mar 2, 2026

to comply with dbi internal audit nov #202307024. to renew and recommence bpa# 2014-0423-3987 and bpa# 2014-0828-4986.revise original work approved under bpa# 2014-0423-3987 to compartmentalize the added storage area separate w/fire separation requirements.(n)storage area separate w/fire separation.

Open the permit page

$20,000
Oct 7, 2024Completed
final sign-off Mar 2025
382 Liberty StJ Farley Constructionreplace (e) windows in front elevation at 1st floor, the same size, the same location.
Details
Permit
202410072447
Permit issued
Nov 27, 2024
Final sign-off
Mar 17, 2025

replace (e) windows in front elevation at 1st floor, the same size, the same location.

Open the permit page

$9,500