Block 1278, lot 019
1022 Cole St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 3
- Rooms
- 5 bathrooms
- Building
- 4,725 sq ft
- Lot
- 2,748 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2026 | In progress issued Mar 2026 | 1022 Cole St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | installation of auto fire sprinkler system. underground work included. comply with nov #202307024 ref pa #2014-0423-3987Details
installation of auto fire sprinkler system. underground work included. comply with nov #202307024 ref pa #2014-0423-3987 | $20,000 |
| Nov 14, 2024 | In progress issued Mar 2026 | 1022 Cole St | Ak Brady Construction | to comply with dbi internal audit nov #202307024. to renew and recommence bpa# 2014-0423-3987 and bpa# 2014-0828-4986.revise original work approved under bpa# 2014-0423-3987 to compartmentalize the added storage area separate w/fire separation requirements.(n)storage area separate w/fire separation.Details
to comply with dbi internal audit nov #202307024. to renew and recommence bpa# 2014-0423-3987 and bpa# 2014-0828-4986.revise original work approved under bpa# 2014-0423-3987 to compartmentalize the added storage area separate w/fire separation requirements.(n)storage area separate w/fire separation. | $20,000 |
| Jun 8, 2023 | Expired or cancelled withdrawn Nov 2024 | 1022 Cole St | to comply with dbi internal audit nov #202307024. to renew and commence bpa# 2014-0423-3987 and bpa# 2014-0828-4986. revise original work approved under bpa# 2014-0423-3987 to address the need for sprinklers or compartmentalize the added storage area separate with separation requirements.Details
to comply with dbi internal audit nov #202307024. to renew and commence bpa# 2014-0423-3987 and bpa# 2014-0828-4986. revise original work approved under bpa# 2014-0423-3987 to address the need for sprinklers or compartmentalize the added storage area separate with separation requirements. | $20,000 | |
| Sep 30, 2016 | Never finaled issued Sep 2016, no final | 1026 Cole St | street spaceDetails
street space | ||
| Jun 29, 2016 | Never finaled issued Jun 2016, no final | 1026 Cole St | street spaceDetails
street space | ||
| Dec 2, 2015 | Completed final sign-off Apr 2016 | 1026 Cole St | Ak Brady Construction | remodel kitchen and 2 baths with like kind fixtures and additonal trim and flooring and tileDetails
remodel kitchen and 2 baths with like kind fixtures and additonal trim and flooring and tile | $50,000 |
| Aug 28, 2014 | Never finaled issued Sep 2014, no final | 1022 Cole St | Ak Brady Construction | remodel top floor (third floor) unit: add one new master bathroom and laundry, remodel (e) toilet and bath, relocation of kitchen, convert sitting room into new bedroom per plan. new recessed ceiling cans and dimmers and new hardwood flooring.Details
remodel top floor (third floor) unit: add one new master bathroom and laundry, remodel (e) toilet and bath, relocation of kitchen, convert sitting room into new bedroom per plan. new recessed ceiling cans and dimmers and new hardwood flooring. | $85,000 |
| Apr 23, 2014 | Never finaled issued Apr 2014, no final | 1022 Cole St | Ak Brady Construction | repair front staircase and front entry in kind. retaining wall at storage. sprinkler storage under separate permit.Details
repair front staircase and front entry in kind. retaining wall at storage. sprinkler storage under separate permit. | $30,000 |
| Feb 6, 2013 | Completed final sign-off Jun 2014 | 1024 Cole St | Mountain Bay Construction | revision to app #201212105799 to show drop ceiling in unit with framing notes.Details
revision to app #201212105799 to show drop ceiling in unit with framing notes. | $1,500 |
| Dec 19, 2012 | Completed final sign-off Jun 2014 | 1024 Cole St | Mountain Bay Construction | change out windows and replace at front elevation of building, replacement windows will be wood double hung single light wood with ogee lugs (quantity 13), one fixed same size same locationDetails
change out windows and replace at front elevation of building, replacement windows will be wood double hung single light wood with ogee lugs (quantity 13), one fixed same size same location | $9,000 |
| Dec 10, 2012 | Completed final sign-off Jun 2014 | 1024 Cole St | Mountain Bay Construction | no structural work. remove extg kitchen and bath relocate per plan. update electrical wiring and install new fixtures per plan. install new kitchen cabinets and tile. refinish floors and paint. intstall new window in the back.Details
no structural work. remove extg kitchen and bath relocate per plan. update electrical wiring and install new fixtures per plan. install new kitchen cabinets and tile. refinish floors and paint. intstall new window in the back. | $75,517 |
| Dec 8, 2006 | Never finaled issued Dec 2006, no final | 1022 Cole St | Westco Roofing Co. Inc. | reroofing.Details
reroofing. | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ak Brady Construction (4), Mountain Bay Construction (3), Steven Yeung Inc Dba Chung Wah Plbg&Fire, Westco Roofing Co. Inc.
- Architects
- Erevan Oneil, Santos & Urrutia
- Engineers
- Rodrigo Santos (2), Erevan O'neill
- Authorized agent-otherss
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.