Parvathy Nair
- License
- C38498
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others, designer
- Firm
- Pn A+D
- Based in
- San Francisco
- On San Francisco permits
- Apr 2025 to Sep 2026
10 permits since 2000 (architect on 8 permits, authorized agent-others on 1 permit, designer on 1 permit): 3 completed, 6 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hasz Construction Inc (3), Union Pierce Construction (2), Bg Builders Inc, Daaron Builders, Edl Construction Corp, Principal Builders Inc., Skye Builders
- Architects
- Anand Sheth
- Engineers
- Leonard M. Rose (2), Prabhjeet Grewal (2), Andre Mozaffari, Daniel Polivka
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 6
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 3239 22nd St | tenant improvement of an existing restaurant & bar, includes new interior non structural partitions, finishes, lighting, millwork, and kitchen equipment. replace exterior storefront windows & entry doors. provide associated mep upgrades.Details
tenant improvement of an existing restaurant & bar, includes new interior non structural partitions, finishes, lighting, millwork, and kitchen equipment. replace exterior storefront windows & entry doors. provide associated mep upgrades. | $700,000 | |
| Sep 18, 2026 | In progress issued Oct 2026 | 2901 Geary Bl | Daaron Builders | 1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included.Details
1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included. | $393,600 |
| Aug 24, 2026 | Completed final sign-off Sep 2026 | 850 Brannan St | Principal Builders Inc. | interior tenant improvement consisting of new interior partitions.Details
interior tenant improvement consisting of new interior partitions. | $57,000 |
| Jul 9, 2026 | Completed final sign-off Oct 2026 | 652 Duncan St | Edl Construction Corp | a restroom remodel including new interior finishes., plumbing fixtures, and lighting. work also includes the proposed infill of an (e) lightwell to allow restroom expansion, with installation of a new fire rated skylight aboveDetails
a restroom remodel including new interior finishes., plumbing fixtures, and lighting. work also includes the proposed infill of an (e) lightwell to allow restroom expansion, with installation of a new fire rated skylight above | $60,000 |
| Mar 5, 2026 | In progress issued Jun 2026 | 2065 Polk St | Hasz Construction Inc | tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades.Details
tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades. | $500,000 |
| Dec 31, 2025 | Expired or cancelled suspend Nov 2026 | 3973 Clay St | Union Pierce Construction | interior residential remodel & exterior infill adddition at rear yard. (e) stair connecting upper to lower unit to be demo, (n) private internal stair to be added. (n) sprinklers all 4 floors of building. doors and windows to be replaced. rear yard facade finish replace. mep will design-build.Details
interior residential remodel & exterior infill adddition at rear yard. (e) stair connecting upper to lower unit to be demo, (n) private internal stair to be added. (n) sprinklers all 4 floors of building. doors and windows to be replaced. rear yard facade finish replace. mep will design-build. | $280,000 |
| Dec 17, 2025 | In progress issued Jan 2026 | 2065 Polk St | Hasz Construction Inc | demolish existing walk-in cooler.Details
demolish existing walk-in cooler. | $1,000 |
| Nov 3, 2025 | In progress issued Nov 2025 | 1326 09th Av | Hasz Construction Inc | tenant improvement of an (e) restaurant and bar including new interior non-structural partitions, finishes, lighting, millwork, and kitchen equipment. provide associated mep upgrades. fire sprinkler is design/build under a separate permit. replace (e) maintenance ladder with (n) maintenance stair.Details
tenant improvement of an (e) restaurant and bar including new interior non-structural partitions, finishes, lighting, millwork, and kitchen equipment. provide associated mep upgrades. fire sprinkler is design/build under a separate permit. replace (e) maintenance ladder with (n) maintenance stair. | $500,000 |
| Oct 10, 2025 | Completed final sign-off Sep 2026 | 701 03rd St | Bg Builders Inc, Skye Builders | ti of a roof level bar/lounge- addition to (e) sunshade. (n) lighting. no change to egress componets. mep are design build. fire sprinkler is design. build under a seperate permitDetails
ti of a roof level bar/lounge- addition to (e) sunshade. (n) lighting. no change to egress componets. mep are design build. fire sprinkler is design. build under a seperate permit | $50,000 |
| Apr 28, 2025 | In progress filed Apr 2025, not yet issued | 55 Ashbury Tr | Union Pierce Construction | (n) electric chair lift to be installed at entry stair to provide accessible path to entrance door. no interior work.Details
(n) electric chair lift to be installed at entry stair to provide accessible path to entrance door. no interior work. | $3,000 |