Block 3780, lot 072
850 Brannan St
- City’s use
- Commercial Office
- Built
- 1986
- Stories
- 4
- Building
- 130,995 sq ft
- Lot
- 38,009 sq ft
- Zoning
- UMU
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
35 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 850 Brannan St | remove existing glass door and fixed glass panel at 2nd floor.Details
remove existing glass door and fixed glass panel at 2nd floor. | $1,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 850 Brannan St | interior tenant improvement. first floor: install new double doors at loading dock, including new landing, guardrails, and gate. remove existing guardrail at entry area and provide new guardrail and gate. second floor: remove existing glass door.Details
interior tenant improvement. first floor: install new double doors at loading dock, including new landing, guardrails, and gate. remove existing guardrail at entry area and provide new guardrail and gate. second floor: remove existing glass door. | $5,000 | |
| Sep 18, 2026 | In progress issued Sep 2026 | 850 Brannan St | Principal Builders Inc. | revision 202608146613 to modification of (e) stair handrail. removal of double doors @ loading dock from scope of work.Details
revision 202608146613 to modification of (e) stair handrail. removal of double doors @ loading dock from scope of work. | |
| Aug 24, 2026 | Completed final sign-off Sep 2026 | 850 Brannan St | Principal Builders Inc. | interior tenant improvement consisting of new interior partitions.Details
interior tenant improvement consisting of new interior partitions. | $57,000 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 850 Brannan St | interior t.i. . install new double doors to loading dock and new door to non-egress stair. no change to egress componentsDetails
interior t.i. . install new double doors to loading dock and new door to non-egress stair. no change to egress components | $5,000 | |
| Oct 25, 2024 | In progress issued Nov 2024 | 850 Brannan St | Sc Builders, Inc | 2nd flr. revision to 202403046994 structural.Details
2nd flr. revision to 202403046994 structural. | |
| Sep 19, 2024 | Completed final sign-off Mar 2025 | 850 Brannan St | Pyro-Comm Systems, Inc. | fire alarm: 4 ceiling speakers to be added to provide proper coverage. ref pa#202403046994Details
fire alarm: 4 ceiling speakers to be added to provide proper coverage. ref pa#202403046994 | $1,500 |
| Mar 4, 2024 | In progress issued Jun 2024 | 850 Brannan St | Sc Builders, Inc | 2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred.Details
2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred. | $987,468 |
| Feb 18, 2021 | Never finaled issued Apr 2021, no final | 850 Brannan St | 1/f atrium & courtyard: plans submitted for administrative permit - sffd review only. for review and approval prior to submittal for assembly permit. maher n/a.Details
1/f atrium & courtyard: plans submitted for administrative permit - sffd review only. for review and approval prior to submittal for assembly permit. maher n/a. | ||
| Feb 10, 2020 | Completed final sign-off Aug 2020 | 850 Brannan St | Thomas Swan Sign Co Inc | installation of one non-illuminated single-faced address number wall sign. (sign a)Details
installation of one non-illuminated single-faced address number wall sign. (sign a) | $5,000 |
| Feb 10, 2020 | Completed final sign-off Aug 2020 | 850 Brannan St | Thomas Swan Sign Co Inc | installation of one non-illuminated double-faced projecting sign. (sign c)Details
installation of one non-illuminated double-faced projecting sign. (sign c) | $5,000 |
| Aug 20, 2019 | Completed final sign-off Mar 2020 | 850 Brannan St | C C I Commercial Construction & Improv | electrical work only ref 201901301670. electrical work only. installation of indoor lighting in permittted pdr/busines use. installation of outdoor: lighting, controls, motion sensors, & shut-off controls. connect (n) lighting fixtures to (e) panels.Details
electrical work only ref 201901301670. electrical work only. installation of indoor lighting in permittted pdr/busines use. installation of outdoor: lighting, controls, motion sensors, & shut-off controls. connect (n) lighting fixtures to (e) panels. | $220,000 |
| Jun 25, 2019 | Never finaled issued Jun 2019, no final | 850 Brannan St | street space onlyDetails
street space only | ||
| Apr 19, 2019 | Never finaled issued Apr 2019, no final | 850 Brannan St | street spaceDetails
street space | ||
| Mar 28, 2019 | Never finaled filed Mar 2019, never issued | 850 Brannan St | demo all pendents and relocate 17 in area of new construction area of work for warm shell preparationDetails
demo all pendents and relocate 17 in area of new construction area of work for warm shell preparation | ||
| Mar 28, 2019 | Completed final sign-off Apr 2019 | 850 Brannan St | Eco Fire Sprinklers Inc | demo all pendents and relocate 17 in area of new construction area of work for warm shell preparationDetails
demo all pendents and relocate 17 in area of new construction area of work for warm shell preparation | $14,000 |
| Jan 30, 2019 | Completed final sign-off Mar 2020 | 850 Brannan St | C C I Commercial Construction & Improv | install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669.Details
install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669. | $1,400,000 |
| Nov 15, 2018 | Completed final sign-off Mar 2020 | 850 Brannan St | C C I Commercial Construction & Improv | removal of (e) glazing at southern courtyard wall for future nanawall. no struc'l work. revision to pa 2018-0813-7227. all demo per ab-017. removal of wall and facade stucco @ brannan st to provide openings for future glazing (under separate permit). vertical & horizontal expansion of (e) taqueriaDetails
removal of (e) glazing at southern courtyard wall for future nanawall. no struc'l work. revision to pa 2018-0813-7227. all demo per ab-017. removal of wall and facade stucco @ brannan st to provide openings for future glazing (under separate permit). vertical & horizontal expansion of (e) taqueria | $70,000 |
| Aug 13, 2018 | Completed final sign-off Mar 2020 | 850 Brannan St | C C I Commercial Construction & Improv | ab-017. demo of interior to include: non-bearing part. demo, interior ceiling grid demo: uptruned sprinkler heads upon removal of ceiling grid as required fire sprinklers deferred under separate permit. int. carpet demo. no structural work: (e) columns, k braces & load bearing walls to remain in (e)Details
ab-017. demo of interior to include: non-bearing part. demo, interior ceiling grid demo: uptruned sprinkler heads upon removal of ceiling grid as required fire sprinklers deferred under separate permit. int. carpet demo. no structural work: (e) columns, k braces & load bearing walls to remain in (e) | $162,240 |
| Jul 3, 2013 | Completed final sign-off Apr 2014 | 850 Brannan St | Martinelli Environmental Graph | to erect one illuminated electrical projeting sign. fastening to concrete.Details
to erect one illuminated electrical projeting sign. fastening to concrete. | $8,000 |
| Sep 8, 2011 | Completed final sign-off Jun 2014 | 850 Brannan St | Richlen Construction | remodel of extg restrooms to meet disabled access requirements at basement level. barrier removal.Details
remodel of extg restrooms to meet disabled access requirements at basement level. barrier removal. | $40,000 |
| May 4, 2011 | Completed final sign-off May 2011 | 850 Brannan St | Highland Commercial Roofing | to obtain final inspection for work approved under pa#200806124244 all work is complete.Details
to obtain final inspection for work approved under pa#200806124244 all work is complete. | $20,000 |
| Jun 15, 2010 | Never finaled issued Jun 2010, no final | 850 Brannan St | street spaceDetails
street space | ||
| Nov 4, 2008 | Never finaled issued Nov 2008, no final | 850 Brannan St | street space onlyDetails
street space only | ||
| Oct 17, 2008 | Expired or cancelled expired Feb 2012 | 850 Brannan St | Pacific Auxiliary Fire Alarm | addition of 1 new smoke detector and 1 new heat detector at the top of elevator hoistway to provide elevator recall and shunt trip.Details
addition of 1 new smoke detector and 1 new heat detector at the top of elevator hoistway to provide elevator recall and shunt trip. | $3,200 |
| Sep 26, 2008 | Never finaled issued Sep 2008, no final | 850 Brannan St | street space permitDetails
street space permit | ||
| Jun 12, 2008 | Expired or cancelled expired May 2011 | 850 Brannan St | Highland Commercial Roofing | roof maintainance, unclog drains (roof) re-seal all cracks & will coat the repairs with acrylic paint. coat roof with emulsian & paint while with acrylic coating.Details
roof maintainance, unclog drains (roof) re-seal all cracks & will coat the repairs with acrylic paint. coat roof with emulsian & paint while with acrylic coating. | $20,000 |
| May 8, 2007 | Completed final sign-off Jun 2007 | 850 Brannan St | Pacific Auxiliary Fire Alarm | additions to existing fire alarm system. additional include 1 speaker/strobe, 1 strobe, 1 monitoring module & 1 relay module due to a remodel of tenant space on g/f. also includes relocation of 2 smoke detectors.Details
additions to existing fire alarm system. additional include 1 speaker/strobe, 1 strobe, 1 monitoring module & 1 relay module due to a remodel of tenant space on g/f. also includes relocation of 2 smoke detectors. | $16,000 |
| Apr 23, 2007 | Expired or cancelled expired May 2009 | 850 Brannan St | relocate 8 ceiling fire sprinklersDetails
relocate 8 ceiling fire sprinklers | $3,000 | |
| Apr 20, 2007 | Completed final sign-off Jun 2007 | 850 Brannan St | H K Fire Protection Inc.* Check I.D. *** | installed automatic fire suppression system to the cooking hood. used range guard ul-300 wet chemical.Details
installed automatic fire suppression system to the cooking hood. used range guard ul-300 wet chemical. | $1,500 |
| Oct 16, 2006 | Never finaled issued Oct 2006, no final | 850 Brannan St | street space permitDetails
street space permit | ||
| Aug 14, 2006 | Completed final sign-off Jun 2007 | 850 Brannan St | All Applied Construction Inc | t.i. to existing vacant space- drywall partitions, acoustic ceilings, electrical, plumbing, hvac and finishes. note: sprinklers & kitchen fire suppression on seperate permit. change of occ. from m to b. located on 1/fDetails
t.i. to existing vacant space- drywall partitions, acoustic ceilings, electrical, plumbing, hvac and finishes. note: sprinklers & kitchen fire suppression on seperate permit. change of occ. from m to b. located on 1/f | $70,000 |
| Jan 21, 2004 | Never finaled issued May 2004, no final | 850 Brannan St | Pacific Auxiliary Fire Alarm | installation of new fire alarm system at 850 brannan stDetails
installation of new fire alarm system at 850 brannan st | $90,000 |
| Jan 27, 2003 | Completed final sign-off Oct 2003 | 850 Brannan St | Allan Automatic Sprinkler | fire sprinkler riser to be altered to have separate floor control valves and drains at each floorDetails
fire sprinkler riser to be altered to have separate floor control valves and drains at each floor | $9,532 |
| May 4, 2000 | Expired or cancelled expired Nov 2000 | 850 Brannan St | tenant development incl new non-bearing partition walls, doors & millwork at 3rd floorDetails
tenant development incl new non-bearing partition walls, doors & millwork at 3rd floor | $15,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.