Bonnie Briges Becky Lam
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Boor Bridges Architecture
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Oct 2026
76 permits since 2000 (architect on 73 permits, authorized agent-others on 5 permits, designer on 1 permit, engineer on 1 permit): 58 completed, 3 in progress, 8 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 595 Mission St | Hp Build | ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment.Details
ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment. | $760,000 |
| May 28, 2026 | In progress issued May 2026 | 925 Cole St | Sf Building Group | deferred to pa #202511079146 for mep electrical and title 24Details
deferred to pa #202511079146 for mep electrical and title 24 | $10 |
| Mar 13, 2026 | Completed final sign-off Jul 2026 | 925 Cole St | revision 202511079146 for health department finishesDetails
revision 202511079146 for health department finishes | ||
| Nov 7, 2025 | Completed final sign-off Aug 2026 | 925 Cole St | Sf Building Group | remodel retail, new restroom, new coffee bar. deferred health submittalDetails
remodel retail, new restroom, new coffee bar. deferred health submittal | $100,000 |
| Sep 26, 2025 | In progress issued Oct 2025 | 925 Cole St | demo existing storefront facade. add new windows and double doors for new retailDetails
demo existing storefront facade. add new windows and double doors for new retail | $200,000 | |
| Apr 10, 2025 | Completed final sign-off Mar 2026 | 575 Ellsworth St | Alder Construction | kitchen, dining, and living room renovation including adding a skylight, replace windows. removing existing porch, relocating kitchen plumbing, recessed lighting, new rated door into garage and replace sectional garage door. kitchen remodel, new skylightDetails
kitchen, dining, and living room renovation including adding a skylight, replace windows. removing existing porch, relocating kitchen plumbing, recessed lighting, new rated door into garage and replace sectional garage door. kitchen remodel, new skylight | $132,598 |
| Feb 26, 2025 | Completed final sign-off Mar 2025 | 275 South Van Ness Av | (n) equipment in kitchen and dry storageDetails
(n) equipment in kitchen and dry storage | $10,000 | |
| Jul 19, 2023 | Completed final sign-off Apr 2024 | 40 Piedmont St | Alder Construction | 1st/f: kitchen remodel, new appliances, new built in bench @ dining. 2nd/f: convert bedroom 4 to master bath & walking closet. (e) bedroom 3 convert to master bedroom. master bathroom install two new windows.Details
1st/f: kitchen remodel, new appliances, new built in bench @ dining. 2nd/f: convert bedroom 4 to master bath & walking closet. (e) bedroom 3 convert to master bedroom. master bathroom install two new windows. | $150,000 |
| May 31, 2023 | Completed final sign-off Feb 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after associated permits receive certificate of occupancy.Details
change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after associated permits receive certificate of occupancy. | $324,000 |
| May 23, 2023 | Completed final sign-off Feb 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after certificate of occupancy for associated permits.Details
change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after certificate of occupancy for associated permits. | $324,000 |
| Apr 14, 2023 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | revision 202212229047. remove doors, pantry, shift skylights. revere door swing.Details
revision 202212229047. remove doors, pantry, shift skylights. revere door swing. | |
| Apr 14, 2023 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | revision to 202212229044. remove doors, pantry, shift skylights, reverse door swing.Details
revision to 202212229044. remove doors, pantry, shift skylights, reverse door swing. | |
| Mar 22, 2023 | Completed final sign-off Aug 2023 | 63 Park Hill Av | Saturn Construction Co | replace exterior stair (within property line) to code complaint, revision to 201905170915Details
replace exterior stair (within property line) to code complaint, revision to 201905170915 | $10,000 |
| Jan 18, 2023 | Completed final sign-off Apr 2023 | 415 Natoma St | M C S Construction Services | interior office t.i.: add glass walls & doors at rm 117Details
interior office t.i.: add glass walls & doors at rm 117 | $15,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2023 | 3991 24th St | Cookline Construction Inc | revision to 202204041466, sheet a2.2 only. convert area in basement for food prepDetails
revision to 202204041466, sheet a2.2 only. convert area in basement for food prep | $30,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | core and shell improvements. new platform lift , stairs. no lot merger for this project.Details
core and shell improvements. new platform lift , stairs. no lot merger for this project. | $400,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | core and shell improvements. no lot merger for this project. n lift, walls, stairs & associated structural and mep.Details
core and shell improvements. no lot merger for this project. n lift, walls, stairs & associated structural and mep. | $400,000 |
| Aug 18, 2022 | Completed final sign-off Sep 2022 | 415 Natoma St | M C S Construction Services | revision to bpa#202203220602 to convert micro kitchen to breakroomDetails
revision to bpa#202203220602 to convert micro kitchen to breakroom | |
| Apr 7, 2022 | Completed final sign-off Dec 2022 | 280 Spear St | Cookline Construction Inc | ground fl/ ste #1b t.i. non bearing interior walls- mep systems, wine bar and cabinets, brear room.Details
ground fl/ ste #1b t.i. non bearing interior walls- mep systems, wine bar and cabinets, brear room. | $142,000 |
| Apr 4, 2022 | Completed final sign-off Jan 2023 | 3991 24th St | Cookline Construction Inc | tenant improvement: remodel (e) restaurant, replace hood, new mep.Details
tenant improvement: remodel (e) restaurant, replace hood, new mep. | $100,000 |
| Mar 22, 2022 | Completed final sign-off Nov 2022 | 415 Natoma St | M C S Construction Services | tenant improvement consisting of (n) non rated full ht partitions huddle rooms, mtg rooms, break area, open office, phone rooms, lactation roomDetails
tenant improvement consisting of (n) non rated full ht partitions huddle rooms, mtg rooms, break area, open office, phone rooms, lactation room | $1,150,660 |
| Mar 23, 2021 | Completed final sign-off Jan 2024 | 2152 Larkin St | Saturn Construction Co | renovation of existing residence ground floor: replace existing windows of front facade, new windows, remodel entry, kitchen, and powder room to create better connection to existing courtyard. 2nd floor horizontal addition at rear on north and east facade for larger bedroom. courtyard fence.Details
renovation of existing residence ground floor: replace existing windows of front facade, new windows, remodel entry, kitchen, and powder room to create better connection to existing courtyard. 2nd floor horizontal addition at rear on north and east facade for larger bedroom. courtyard fence. | $400,000 |
| Sep 15, 2020 | Expired or cancelled withdrawn Dec 2021 | 812 Scott St | Saturn Construction Co | exterior: small addition at the rear of the house on upper floor; infill under rear deck on lower floor. raising the house 15.5" (to get code compliant head height in lower unit) and replace foundation replace and add new windows/doors interior: interior remodel on first and second floors.Details
exterior: small addition at the rear of the house on upper floor; infill under rear deck on lower floor. raising the house 15.5" (to get code compliant head height in lower unit) and replace foundation replace and add new windows/doors interior: interior remodel on first and second floors. | $650,000 |
| Aug 27, 2019 | Completed final sign-off Dec 2019 | 517 Clement St | Cookline Construction Inc | revision to app#201906143500. tank type toilet in new ada restroom instead of previously approved wall mounted toilet. no other changes to scope- toilet spec change only.Details
revision to app#201906143500. tank type toilet in new ada restroom instead of previously approved wall mounted toilet. no other changes to scope- toilet spec change only. | |
| Aug 15, 2019 | Completed final sign-off Feb 2020 | 120 Kearny St | Principal Builders Inc. | 20 fl: minore tenant improvement on 20th fl. (e) t.i. space to demo and consruct partitions, ceiling, finishes, mep sysmtems and new gender neutral restroomsDetails
20 fl: minore tenant improvement on 20th fl. (e) t.i. space to demo and consruct partitions, ceiling, finishes, mep sysmtems and new gender neutral restrooms | $633,314 |
| Jun 14, 2019 | Completed final sign-off Dec 2019 | 517 Clement St | Cookline Construction Inc | tenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations.Details
tenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations. | $251,000 |
| May 24, 2019 | Completed final sign-off Jun 2019 | 1226 09th Av | Cookline Construction Inc | change of use. convert (e) "limited restaurant" to a bonafide "restaurant" w/ nfs documentation. no changes are propsed to design or layout.Details
change of use. convert (e) "limited restaurant" to a bonafide "restaurant" w/ nfs documentation. no changes are propsed to design or layout. | |
| May 17, 2019 | Completed final sign-off Aug 2023 | 63 Park Hill Av | Marr B Olsen Inc, Saturn Construction Co | remodel within (e) foot print: interior renovations, replacement of exterior finishes in kind, (n) windows & doors. (n) basement excavation within (e) foot print.Details
remodel within (e) foot print: interior renovations, replacement of exterior finishes in kind, (n) windows & doors. (n) basement excavation within (e) foot print. | $920,000 |
| Jan 30, 2019 | Completed final sign-off Mar 2020 | 850 Brannan St | C C I Commercial Construction & Improv | install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669.Details
install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669. | $1,400,000 |
| Nov 15, 2018 | Completed final sign-off Mar 2020 | 850 Brannan St | C C I Commercial Construction & Improv | removal of (e) glazing at southern courtyard wall for future nanawall. no struc'l work. revision to pa 2018-0813-7227. all demo per ab-017. removal of wall and facade stucco @ brannan st to provide openings for future glazing (under separate permit). vertical & horizontal expansion of (e) taqueriaDetails
removal of (e) glazing at southern courtyard wall for future nanawall. no struc'l work. revision to pa 2018-0813-7227. all demo per ab-017. removal of wall and facade stucco @ brannan st to provide openings for future glazing (under separate permit). vertical & horizontal expansion of (e) taqueria | $70,000 |
| Oct 25, 2018 | Completed final sign-off Jul 2020 | 157 College Av | Elliott Build Remodel Llc | renovation of existing home. no expainsion of building envelope. seismic upgrade & foundation repair. replace existing windows at front facade, new windows & doors at rear facade. new master suite at ground fl.Details
renovation of existing home. no expainsion of building envelope. seismic upgrade & foundation repair. replace existing windows at front facade, new windows & doors at rear facade. new master suite at ground fl. | $175,000 |
| Oct 4, 2018 | Completed final sign-off May 2019 | 120 Kearny St | Principal Builders Inc. | 21st fl: tenant improvement to remove partitions, doors, and replace finishes. relocate mep. fire sprinkler and alarms on sep permit. maher naDetails
21st fl: tenant improvement to remove partitions, doors, and replace finishes. relocate mep. fire sprinkler and alarms on sep permit. maher na | $450,000 |
| Aug 13, 2018 | Completed final sign-off Mar 2020 | 850 Brannan St | C C I Commercial Construction & Improv | ab-017. demo of interior to include: non-bearing part. demo, interior ceiling grid demo: uptruned sprinkler heads upon removal of ceiling grid as required fire sprinklers deferred under separate permit. int. carpet demo. no structural work: (e) columns, k braces & load bearing walls to remain in (e)Details
ab-017. demo of interior to include: non-bearing part. demo, interior ceiling grid demo: uptruned sprinkler heads upon removal of ceiling grid as required fire sprinklers deferred under separate permit. int. carpet demo. no structural work: (e) columns, k braces & load bearing walls to remain in (e) | $162,240 |
| Dec 12, 2017 | Never finaled issued Jan 2018, no final | 561 Valencia St | Alsterlind Construction Inc. | electrical and architectural clarification regarding occupancy. revision to pa 2017-0620-9834.Details
electrical and architectural clarification regarding occupancy. revision to pa 2017-0620-9834. | |
| Nov 29, 2017 | Completed final sign-off Apr 2018 | 710 Montgomery St | Alsterlind Construction Inc. | mechanical & electrical revision to pa 2017-0921-9216Details
mechanical & electrical revision to pa 2017-0921-9216 | |
| Oct 20, 2017 | Expired or cancelled cancelled Jan 2019 | 755 Sanchez St | Jeff King And Company Inc, Deluxe Shotcrete & Concrete Construction | replace e garage with level fl and 12' w door. no horiz addition new dormer, new roof windows/skylights at 3rd fl. replace all windows and door, interior remodel all 3 fl, minor patio modifications at rear yardDetails
replace e garage with level fl and 12' w door. no horiz addition new dormer, new roof windows/skylights at 3rd fl. replace all windows and door, interior remodel all 3 fl, minor patio modifications at rear yard | $375,000 |
| Sep 28, 2017 | Completed final sign-off Feb 2018 | 724 Brannan St | C C I Commercial Construction & Improv | add storage room. replace chainlink fence and gates with metal fence and gates. add concrete walkway for ada access/egress. add exterior canopy @ entry. add exterior canopy at gateDetails
add storage room. replace chainlink fence and gates with metal fence and gates. add concrete walkway for ada access/egress. add exterior canopy @ entry. add exterior canopy at gate | $300,000 |
| Sep 22, 2017 | Completed final sign-off Feb 2018 | 374 Harriet St | C C I Commercial Construction & Improv | add testing and phone rooms.expand (e) bathrooms.add interior canopy at shipping/receiving. no sign on canopyDetails
add testing and phone rooms.expand (e) bathrooms.add interior canopy at shipping/receiving. no sign on canopy | $600,000 |
| Sep 21, 2017 | Completed final sign-off Apr 2018 | 710 Montgomery St | Alsterlind Construction Inc. | no change in use, no envelope change. interior kitchen & dining room remodel, relocate bar, new finishes at (e) ada restroom. exterior paint. maher naDetails
no change in use, no envelope change. interior kitchen & dining room remodel, relocate bar, new finishes at (e) ada restroom. exterior paint. maher na | $100,000 |
| Aug 24, 2017 | Completed final sign-off Jan 2018 | 1125 Mission St | C C I Commercial Construction & Improv | revision to pa #201612215649, ti to lowerl level ground fl, 2nd fl, and mezz. millwork, lighting, and kitchenettes. revision to pa 2016-1221-5649, correct verbage to "proposed work at lower & ground level." ref pa #201509308464. maher naDetails
revision to pa #201612215649, ti to lowerl level ground fl, 2nd fl, and mezz. millwork, lighting, and kitchenettes. revision to pa 2016-1221-5649, correct verbage to "proposed work at lower & ground level." ref pa #201509308464. maher na | $100,000 |
| Jun 20, 2017 | Never finaled issued Aug 2017, no final | 561 Valencia St | Alsterlind Construction Inc. | no change in use. remodel extg restaurant space. exterior minor work: replace tile and window to match extg at removed mechanical. replace extg rear alley window with new smaller.Details
no change in use. remodel extg restaurant space. exterior minor work: replace tile and window to match extg at removed mechanical. replace extg rear alley window with new smaller. | $320,000 |
| Dec 9, 2016 | Never finaled filed Dec 2016, never issued | 890 De Haro St | vert. addition fr 1 story over basemt to 2 stories over basemt. add 2 bathrms at new story. bldg tormain w/in allowable buildable area and req'd setbacks. no work at (e) cabana in rear yard.Details
vert. addition fr 1 story over basemt to 2 stories over basemt. add 2 bathrms at new story. bldg tormain w/in allowable buildable area and req'd setbacks. no work at (e) cabana in rear yard. | $815,000 | |
| Aug 23, 2016 | Never finaled issued Jan 2017, no final | 979 Bryant St | Novo Construction Inc | new front entry. demo extg interior non-bearing partitions and ceiling. new ada compliant restrooms and new lighting. n/a for maher. mep/life safety/t-24 deferred.Details
new front entry. demo extg interior non-bearing partitions and ceiling. new ada compliant restrooms and new lighting. n/a for maher. mep/life safety/t-24 deferred. | $75,000 |
| May 16, 2016 | Completed final sign-off Oct 2016 | 185 Berry St | Principal Builders Inc. | 4th floor: demo under separate permit #2016-0518-1183. construction of new walls/partitions, millwork, doors, glazing and finishes on 4th floor tenant space. extg food service area to remain with upgrade. mep, sprinklers and life safety under seperate permit. n/a for maherDetails
4th floor: demo under separate permit #2016-0518-1183. construction of new walls/partitions, millwork, doors, glazing and finishes on 4th floor tenant space. extg food service area to remain with upgrade. mep, sprinklers and life safety under seperate permit. n/a for maher | $2,441,600 |
| Mar 16, 2016 | Expired or cancelled withdrawn Jun 2016 | 619 Divisadero St | change of use only. no other work performed under this permit.Details
change of use only. no other work performed under this permit. | ||
| Dec 8, 2015 | Never finaled issued Aug 2016, no final | 979 Bryant St | Novo Construction Inc | change of use only. retire last permitted use (motor vehicle repair) and change to arts activity. change of occupancy from s-1 to f-1. n/a for maher ordinance no-155.13Details
change of use only. retire last permitted use (motor vehicle repair) and change to arts activity. change of occupancy from s-1 to f-1. n/a for maher ordinance no-155.13 | |
| Jun 2, 2015 | Completed final sign-off Dec 2015 | 250 Montgomery St | Northern Sun Associates | 1st floor: new mechanical, electrical & plmg & t-24 associated with interior restaurant renovation under seperate permit #201505055353. no change to bldg structure. sprnklr, lifesafety and hood fire supression under seperate permit (deferred). n/a for maher.Details
1st floor: new mechanical, electrical & plmg & t-24 associated with interior restaurant renovation under seperate permit #201505055353. no change to bldg structure. sprnklr, lifesafety and hood fire supression under seperate permit (deferred). n/a for maher. | $250,000 |
| May 18, 2015 | Never finaled issued Jun 2015, no final | 725 Grant Av | C & C General Engineering Inc. | interior remodel of an extg a-2 occup restaurant on single floor only on grade at waverly place(bldg 2nd floor). no exterior changes to facade at grant ave, add new on grade storefront to facade at waverly pl. n/a for the maher.mep, fire alarm and kitchen hood suppression syst under separate appl.Details
interior remodel of an extg a-2 occup restaurant on single floor only on grade at waverly place(bldg 2nd floor). no exterior changes to facade at grant ave, add new on grade storefront to facade at waverly pl. n/a for the maher.mep, fire alarm and kitchen hood suppression syst under separate appl. | $400,000 |
| May 18, 2015 | Completed final sign-off Feb 2016 | 1072 Sanchez St | Saturn Construction Co | revision to app#201310219769 to omit attic storage space only.Details
revision to app#201310219769 to omit attic storage space only. | |
| Sep 17, 2014 | Completed final sign-off Dec 2014 | 360 09th St | Jordan Hvac Dba Jordan Sheet Metal | single faced non-electric metal sign to (e) metal awning. n/a ordinance #155-13.Details
single faced non-electric metal sign to (e) metal awning. n/a ordinance #155-13. | $3,000 |
| Aug 15, 2014 | Expired or cancelled expired Jul 2023 | 1016 Pierce St | foundation replacement: remodel 1st (ground) floor from basement into habitable conditioned space including (1) bath, (1) family room & relocation kitchen from 2nd floor; new internal stair from 1st flr to 2nd flr; no changes to 3rd flr or roof, modify (e) front entry to 1st flr (mse)Details
foundation replacement: remodel 1st (ground) floor from basement into habitable conditioned space including (1) bath, (1) family room & relocation kitchen from 2nd floor; new internal stair from 1st flr to 2nd flr; no changes to 3rd flr or roof, modify (e) front entry to 1st flr (mse) | $150,000 | |
| Jun 3, 2014 | Completed final sign-off Nov 2014 | 500 Treat Av | Peacock Construction Inc | suite 100 & 200 - renovate non bearing interior partitions. renovate cabinets, appliances in ekitchenettes. elec under sep permit. no change to bldg envelope, no change to e wc's or shared corridorDetails
suite 100 & 200 - renovate non bearing interior partitions. renovate cabinets, appliances in ekitchenettes. elec under sep permit. no change to bldg envelope, no change to e wc's or shared corridor | $235,000 |
| Dec 19, 2013 | Completed final sign-off Oct 2014 | 596 Valley St | The Fine European Construction/Uwb Dober | revision to pa#2013-11-07-1422. add detail plan and section for footing at basement door to "a7-1 details" per field inspector (bldg) request on 12/11/2013.Details
revision to pa#2013-11-07-1422. add detail plan and section for footing at basement door to "a7-1 details" per field inspector (bldg) request on 12/11/2013. | $500 |
| Nov 7, 2013 | Completed final sign-off Sep 2019 | 596 Valley St | The Fine European Construction/Uwb Dober | remove dilapidated/rotting rear porch, replace (e) 2nd floor window, replace basement door & add windows & deck at rear. repair & remodel kitchen, add 1st floor powder room. replace fixtures & finishes in 2nd floor bathroomDetails
remove dilapidated/rotting rear porch, replace (e) 2nd floor window, replace basement door & add windows & deck at rear. repair & remodel kitchen, add 1st floor powder room. replace fixtures & finishes in 2nd floor bathroom | $48,000 |
| Oct 21, 2013 | Completed final sign-off Feb 2016 | 1072 Sanchez St | interior remodel: convert from 3 units to 2 units. infill (<12') under (e) 3rd flr @ sw corner. lower grade + /-8'-0" @ rear to create on grade patio @ ground floor. add balcony (@ rear) 3rd floor + 2nd floor bridge over lowe patio to access rear yard.Details
interior remodel: convert from 3 units to 2 units. infill (<12') under (e) 3rd flr @ sw corner. lower grade + /-8'-0" @ rear to create on grade patio @ ground floor. add balcony (@ rear) 3rd floor + 2nd floor bridge over lowe patio to access rear yard. | $900,000 | |
| Jul 26, 2013 | Completed final sign-off Nov 2013 | 3180 18th St | Peacock Construction Inc | installation of self supported bicycle storage rack in a private parking lot, not visible to the publicDetails
installation of self supported bicycle storage rack in a private parking lot, not visible to the public | $9,700 |
| Feb 14, 2013 | Completed final sign-off Aug 2013 | 3180 18th St | Peacock Construction Inc | t.i. on 3 floors including (n) restrooms, offices, break room, stairs, partitions, casework, closets, dining area. mep, sprinklers under separate permit.Details
t.i. on 3 floors including (n) restrooms, offices, break room, stairs, partitions, casework, closets, dining area. mep, sprinklers under separate permit. | $920,000 |
| Sep 21, 2012 | Completed final sign-off Dec 2012 | 4054 20th St | Saturn Construction Co | new rear deck and new firewallsDetails
new rear deck and new firewalls | $8,000 |
| Aug 2, 2012 | Never finaled issued Aug 2012, no final | 925 Larkin St | Hughes Mcginnis Builders Inc | repair damaged sheetrock - remove and replace 2 walls.Details
repair damaged sheetrock - remove and replace 2 walls. | $500 |
| Apr 30, 2012 | Completed final sign-off Oct 2013 | 3549 23rd St | voluntary foundation replacement & seismic strengthening. move rental unit from 3rd fl to 1st fl. change interior volume @ rear level 2 to exterior deck. new baths & level 2 & 3.Details
voluntary foundation replacement & seismic strengthening. move rental unit from 3rd fl to 1st fl. change interior volume @ rear level 2 to exterior deck. new baths & level 2 & 3. | $185,000 | |
| Jan 30, 2012 | Completed final sign-off Jun 2013 | 1041 Shrader St | Hughes Mcginnis Builders Inc | remodel & rear addition to (e) 3 story single family dwelling. minor changes to front facade: widen & replace garage door. replace front door, replace windows.Details
remodel & rear addition to (e) 3 story single family dwelling. minor changes to front facade: widen & replace garage door. replace front door, replace windows. | $375,000 |
| Jan 20, 2012 | Completed final sign-off Aug 2012 | 251 Hartford St | Saturn Construction Co, Associated Trucking Inc | minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard.Details
minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard. | $150,000 |
| Jun 7, 2011 | Completed final sign-off Nov 2011 | 2536 Post St | Kalix Inc Dbalara Construction | replace entrance stairs with open balustrade in kind, facade upgrade with matching trim and detail panels to existing historic cornice.Details
replace entrance stairs with open balustrade in kind, facade upgrade with matching trim and detail panels to existing historic cornice. | $35,000 |
| May 6, 2011 | Completed final sign-off Nov 2013 | 3977 25th St | Hughes Mcginnis Builders Inc | horizontal addition. add second unit (studio apt.). front addition & remodel @ 2nd fl. replacement of exterior entry stair. no change in use and occupancy.Details
horizontal addition. add second unit (studio apt.). front addition & remodel @ 2nd fl. replacement of exterior entry stair. no change in use and occupancy. | $100,000 |
| Feb 9, 2011 | Completed final sign-off Jun 2011 | 2949 Pacific Av | Hughes Mcginnis Builders Inc | legalize unit 2949-b. add kitchen approved variance #2010.08.04v.Details
legalize unit 2949-b. add kitchen approved variance #2010.08.04v. | $20,000 |
| Dec 28, 2010 | Completed final sign-off Aug 2011 | 4209 24th St | Moroso Construction Inc | demolish 2 stories, type 5, single family dwelling unit building.Details
demolish 2 stories, type 5, single family dwelling unit building. | $10,000 |
| Dec 28, 2010 | Completed final sign-off Aug 2012 | 4209 24th St | Moroso Construction Inc | erect 3 stories, 2 dwelling units, type 5 new building.Details
erect 3 stories, 2 dwelling units, type 5 new building. | $600,000 |
| Aug 16, 2010 | Completed final sign-off Jun 2012 | 2949 Pacific Av | remodel levels b1,3 and 4. finish and electrical work level 1. voluntary structural strengthening. fire sprinklers under separate permit. new windows front and back and light wells. new window @ basement studio. remove illegal kitchen in basement.Details
remodel levels b1,3 and 4. finish and electrical work level 1. voluntary structural strengthening. fire sprinklers under separate permit. new windows front and back and light wells. new window @ basement studio. remove illegal kitchen in basement. | $215,000 | |
| Dec 14, 2009 | Completed final sign-off Dec 2010 | 15 Mateo St | remodel ktichen & bathroom & bathroom expansion & infill lightwell. new bathroom skylight, new kitchen skylight.Details
remodel ktichen & bathroom & bathroom expansion & infill lightwell. new bathroom skylight, new kitchen skylight. | $50,000 | |
| Oct 20, 2009 | Expired or cancelled cancelled Feb 2011 | 4209 24th St | add a 3rd-story vertical addition to the existing 2-story bldg. one-story horizontal addition to the front and two-story horizontal addition to the rear. add a second unit to the existing single-family house. total sqft of unit 1: approx. 2,880 sqft. total sqft of unit 2: approx. 510 sqft.Details
add a 3rd-story vertical addition to the existing 2-story bldg. one-story horizontal addition to the front and two-story horizontal addition to the rear. add a second unit to the existing single-family house. total sqft of unit 1: approx. 2,880 sqft. total sqft of unit 2: approx. 510 sqft. | $600,000 | |
| May 28, 2009 | Never finaled issued May 2009, no final | 1740 20th St | Ken Hughes General Cont. | garden design fo r existing residence. new retaining wall, wood deck, stair within property line. remove existing fence on wisconsin st and replace with new. planting and planter box within existing planing area on wisconsin st sidewalk to be separate permitDetails
garden design fo r existing residence. new retaining wall, wood deck, stair within property line. remove existing fence on wisconsin st and replace with new. planting and planter box within existing planing area on wisconsin st sidewalk to be separate permit | $30,000 |
| Feb 22, 2008 | Expired or cancelled expired Jan 2010 | 908 Douglass St | Altman & Co General Contractors | remodel kitchen and bathroom on the 2nd floor. remove wall between living room and kitchen and replace with overhead beam.Details
remodel kitchen and bathroom on the 2nd floor. remove wall between living room and kitchen and replace with overhead beam. | $25,000 |
| Mar 20, 2007 | Completed final sign-off Jul 2007 | 66 27th Av | Mascheroni Construction | convert pantry into laundry room, remodel master bath, remodel bedroom, replace win.Details
convert pantry into laundry room, remodel master bath, remodel bedroom, replace win. | $55,000 |
| Apr 28, 2006 | Completed final sign-off Dec 2006 | 126 06th Av | Kalix Inc Dbalara Construction | 1st floor remodel: kitchen and bathroom. install new casework.2nd floor remodel: bathroom & install new casework. non-structural.Details
1st floor remodel: kitchen and bathroom. install new casework.2nd floor remodel: bathroom & install new casework. non-structural. | $40,000 |
| Jan 31, 2006 | Expired or cancelled expired May 2007 | 20 Santa Paula Av | Hughes Mcginnis Builders Inc | interior kitchedn remodel: driveway repave, replace windows(13 in kind repalcement window, minimun u factor 0.67) moinor secismic upgrade.Details
interior kitchedn remodel: driveway repave, replace windows(13 in kind repalcement window, minimun u factor 0.67) moinor secismic upgrade. | $35,000 |
| May 25, 2005 | Completed final sign-off Jul 2005 | 549 Guerrero St | Kalix Inc Dbalara Construction | revision to 200409275248s1- reduce scope of fence include hot tub in work 8 h. section of fence to 6Details
revision to 200409275248s1- reduce scope of fence include hot tub in work 8 h. section of fence to 6 |