Permit GraphShortlistSan Francisco building permits since 2000

Srdjan Rebraca

License
M28498
Look the license up with the state
Listed as
architect, engineer
Firm
Acies Engineering
Based in
Santa Clara
On San Francisco permits
Mar 2006 to Sep 2026

138 permits since 2000 (engineer on 136 permits, architect on 2 permits): 91 completed, 19 in progress, 18 never finaled, 10 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 138.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 23, 2026In progress
filed Sep 2026, not yet issued
731 Columbus Av1/f t.i. w/ added drink service and ext mods. int:(n) mercantile and espresso bar layout, new pvt loung space; ada upgrades. add ada restroom; new moment frames. ext: new finishes & tile, add canopy at entry, new exterior signage (sep); shift entry doors/config.
Details
Permit
202609027604
Status
filed
Filed
Sep 23, 2026
Declared cost
$1,942,026
Address
731 Columbus Av

1/f t.i. w/ added drink service and ext mods. int:(n) mercantile and espresso bar layout, new pvt loung space; ada upgrades. add ada restroom; new moment frames. ext: new finishes & tile, add canopy at entry, new exterior signage (sep); shift entry doors/config.

Open the permit page

$1,942,026
May 14, 2026In progress
issued Aug 2026
1569 Sloat BlOak Park Constructionproposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit).
Details
Permit
202605141304
Status
issued
Filed
May 14, 2026
Permit issued
Aug 5, 2026
Declared cost
$100,000
Address
1569 Sloat Bl

proposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit).

Open the permit page

$100,000
Apr 14, 2026In progress
issued May 2026
211 Jefferson StEmbree Construction Group Increvision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes
Details
Permit
202604149371
Status
issued
Filed
Apr 14, 2026
Permit issued
May 11, 2026
Declared cost
$7,000
Address
211 Jefferson St

revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes

Open the permit page

$7,000
Apr 6, 2026In progress
issued Jul 2026
5260 Diamond Heights BlT J Nisbet Construction Incorporatedadd new elevator and machine room to replace exiting elements along the side of an existing 2 story shopping center. gross sf is 19,322. overall footprint remains generally unchanged as the elevator will replace an existing kiosk. upgrades to mep as req. addition of mech unit on the roof.
Details
Permit
202604068976
Status
issued
Filed
Apr 6, 2026
Permit issued
Jul 31, 2026
Declared cost
$500,000
Address
5260 Diamond Heights Bl

add new elevator and machine room to replace exiting elements along the side of an existing 2 story shopping center. gross sf is 19,322. overall footprint remains generally unchanged as the elevator will replace an existing kiosk. upgrades to mep as req. addition of mech unit on the roof.

Open the permit page

$500,000
Mar 16, 2026In progress
issued Mar 2026
1251 Connecticut Stinstall heating and air conditioning in (e) warehouse. hvac less than 400 lbs.
Details
Permit
202603167619
Status
issued
Filed
Mar 16, 2026
Permit issued
Mar 31, 2026
Declared cost
$48,000
Address
1251 Connecticut St

install heating and air conditioning in (e) warehouse. hvac less than 400 lbs.

Open the permit page

$48,000
Mar 13, 2026Completed
final sign-off Mar 2026
350 11th StEwsf Inc.floor 2, 3, 4 offices: deferred mechanical modification to permit 202411134880.
Details
Permit
202603137574
Status
complete
Filed
Mar 13, 2026
Permit issued
Mar 13, 2026
Final sign-off
Mar 25, 2026
Declared cost
$3,000
Address
350 11th St

floor 2, 3, 4 offices: deferred mechanical modification to permit 202411134880.

Open the permit page

$3,000
Mar 10, 2026In progress
issued Apr 2026
255 Winston DrForesite Construction Increvision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changes
Details
Permit
202603107225
Status
issued
Filed
Mar 10, 2026
Permit issued
Apr 15, 2026
Declared cost
$10,000
Address
255 Winston Dr

revision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changes

Open the permit page

$10,000
Mar 4, 2026In progress
issued Apr 2026
1314 Fitzgerald AvMcdevitt Construction Partners Incgraffeo coffee roasting: t.i. within an existing 3,176 sq ft commercial tenant space (unit 2). scope of work to include installation of coffe roasting equipments and construction of new break room. no change to building footprint and no exterior
Details
Permit
202603046947
Status
issued
Filed
Mar 4, 2026
Permit issued
Apr 2, 2026
Declared cost
$83,000
Address
1314 Fitzgerald Av

graffeo coffee roasting: t.i. within an existing 3,176 sq ft commercial tenant space (unit 2). scope of work to include installation of coffe roasting equipments and construction of new break room. no change to building footprint and no exterior

Open the permit page

$83,000
Jan 12, 2026In progress
filed Jan 2026, not yet issued
3900 Geary Blremodel of (e) restaurant & offices to incorporate mixed-use conversion. (e) restaurant formula retail (burger king) shall remain while (e) office space will be converted into 9 residential units. 1.5 story vertical addition with a total of 4 stories will be constructed to accomodate new residential
Details
Permit
202512171994
Status
filed
Filed
Jan 12, 2026
Declared cost
$5,619,200
Address
3900 Geary Bl

remodel of (e) restaurant & offices to incorporate mixed-use conversion. (e) restaurant formula retail (burger king) shall remain while (e) office space will be converted into 9 residential units. 1.5 story vertical addition with a total of 4 stories will be constructed to accomodate new residential

Open the permit page

$5,619,200
Jan 5, 2026In progress
issued Mar 2026
211 Jefferson StEmbree Construction Group Increference to pa#202412176961, owner reflected exterior and interior changes.
Details
Permit
202511199949
Status
issued
Filed
Jan 5, 2026
Permit issued
Mar 27, 2026
Declared cost
$50,000
Address
211 Jefferson St

reference to pa#202412176961, owner reflected exterior and interior changes.

Open the permit page

$50,000
Dec 11, 2025Completed
final sign-off Aug 2026
2727 Mariposa St2/fl- ti continuation for previous use . upgrade restrooms to meet accessibility code for (n) partitions, lighting, mep
Details
Permit
202512111601
Status
complete
Filed
Dec 11, 2025
Permit issued
Dec 22, 2025
Final sign-off
Aug 6, 2026
Declared cost
$300,000
Address
2727 Mariposa St

2/fl- ti continuation for previous use . upgrade restrooms to meet accessibility code for (n) partitions, lighting, mep

Open the permit page

$300,000
Nov 10, 2025Completed
final sign-off Dec 2025
28 02nd StInfinium Air Incground floor: furnish and install mechanical equipments which consist of 2 outdoor heat pumps, 3 indoor fan coils, and 2 exhaust fans. all associated ductwork per plans. ref t.i permit 202505287421
Details
Permit
202511109290
Status
complete
Filed
Nov 10, 2025
Permit issued
Nov 12, 2025
Final sign-off
Dec 19, 2025
Declared cost
$30,000
Address
28 02nd St

ground floor: furnish and install mechanical equipments which consist of 2 outdoor heat pumps, 3 indoor fan coils, and 2 exhaust fans. all associated ductwork per plans. ref t.i permit 202505287421

Open the permit page

$30,000
Oct 21, 2025In progress
issued Jan 2026
211 Jefferson StEmbree Construction Group Inc1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work.
Details
Permit
202510217812
Status
issued
Filed
Oct 21, 2025
Permit issued
Jan 2, 2026
Declared cost
$100,000
Address
211 Jefferson St

1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work.

Open the permit page

$100,000
Oct 14, 2025Completed
final sign-off May 2026
1010 16th StAcg Construction Incinterior build out of an (e) ground fl space at 1010 16th st for cracked & battered. subject unit 13 "retail 1". work includes: (n) restrooms, (n) kitchen equipment, (n) coffee bar & equipment, (n) interior finishes, (n) associated plumbing & electrical.
Details
Permit
202510147334
Status
complete
Filed
Oct 14, 2025
Permit issued
Nov 13, 2025
Final sign-off
May 27, 2026
Declared cost
$900,000
Address
1010 16th St

interior build out of an (e) ground fl space at 1010 16th st for cracked & battered. subject unit 13 "retail 1". work includes: (n) restrooms, (n) kitchen equipment, (n) coffee bar & equipment, (n) interior finishes, (n) associated plumbing & electrical.

Open the permit page

$900,000
Jul 16, 2025In progress
issued Dec 2025
255 Winston DrForesite Construction Incremoval of existing non operable freight elevator & associate equipment. also installation of a new lula elevator within the existing shaft & all associated equipment. this work to be performed concurrently with tenant improvement work for pa 202504285369
Details
Permit
202507160988
Status
issued
Filed
Jul 16, 2025
Permit issued
Dec 11, 2025
Declared cost
$150,000
Address
255 Winston Dr

removal of existing non operable freight elevator & associate equipment. also installation of a new lula elevator within the existing shaft & all associated equipment. this work to be performed concurrently with tenant improvement work for pa 202504285369

Open the permit page

$150,000
May 12, 2025In progress
issued Nov 2025
211 Jefferson StEmbree Construction Group Incchange of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements
Details
Permit
202412176961
Status
issued
Filed
May 12, 2025
Permit issued
Nov 7, 2025
Declared cost
$6,000,000
Address
211 Jefferson St

change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements

Open the permit page

$6,000,000
Apr 28, 2025In progress
issued Dec 2025
255 Winston DrForesite Construction Incthe proposed project is tenant improvement & facade work for 4019 square ft restaurant this includes work in existing basement (additional) 2599 sq ft & exterior facade work. certificate of final completeion not to be issued prior to issuance and final of pa# 2025-0716-0988.
Details
Permit
202504285369
Status
issued
Filed
Apr 28, 2025
Permit issued
Dec 11, 2025
Declared cost
$800,000
Address
255 Winston Dr

the proposed project is tenant improvement & facade work for 4019 square ft restaurant this includes work in existing basement (additional) 2599 sq ft & exterior facade work. certificate of final completeion not to be issued prior to issuance and final of pa# 2025-0716-0988.

Open the permit page

$800,000
Feb 26, 2025Completed
final sign-off Dec 2025
90 Charter Oak AvJohn A Lehman Dba Lehman Constructionk14/k15 1/f: interior ti of a portion of the first floor of (e) facility. combining (2) kitchens for single operator w/ fse install, plumbing, and electrical. no structural.
Details
Permit
202502261177
Status
complete
Filed
Feb 26, 2025
Permit issued
Oct 20, 2025
Final sign-off
Dec 23, 2025
Declared cost
$55,000
Address
90 Charter Oak Av

k14/k15 1/f: interior ti of a portion of the first floor of (e) facility. combining (2) kitchens for single operator w/ fse install, plumbing, and electrical. no structural.

Open the permit page

$55,000
Jan 30, 2025In progress
issued Feb 2025
201 Bay Shore BlColbear Contracting Group Llcrevision to pa 202310138659 (n) mechanical room w/equipment. no structural work
Details
Permit
202501309413
Status
issued
Filed
Jan 30, 2025
Permit issued
Feb 21, 2025
Declared cost
$50,000
Address
201 Bay Shore Bl

revision to pa 202310138659 (n) mechanical room w/equipment. no structural work

Open the permit page

$50,000
Jan 16, 2025Completed
final sign-off Oct 2025
720 Terry A Francois BlSkyline Constructionspace #28: new interior t.i. inclusive of partitions, ceiling, lighting, finishes, and millwork. new bar area with equipment and millwork. new bar area with equipment and storage area with 3-compartment sink for dishwashing/hot water heater. new ventilation to support kitchen storage/dish area.
Details
Permit
202501168507
Status
complete
Filed
Jan 16, 2025
Permit issued
Apr 11, 2025
Final sign-off
Oct 31, 2025
Declared cost
$313,225
Address
720 Terry A Francois Bl

space #28: new interior t.i. inclusive of partitions, ceiling, lighting, finishes, and millwork. new bar area with equipment and millwork. new bar area with equipment and storage area with 3-compartment sink for dishwashing/hot water heater. new ventilation to support kitchen storage/dish area.

Open the permit page

$313,225
Aug 15, 2024Completed
final sign-off Feb 2026
2343 Fillmore StVertex Builders Dba Signal Hill Buildersnon structural interior improvement of (e) animal hospital. non-structural reconfiguration of lvl 1 & 2. ada compliance maintained throughout bldg. upgrade of (e) storefront windows to improve thermal performance & enhance storefront transparency in visibility zone. fire life safety deferred.
Details
Permit
202407257315
Status
complete
Filed
Aug 15, 2024
Permit issued
Mar 11, 2025
Final sign-off
Feb 3, 2026
Declared cost
$2,650,000
Address
2343 Fillmore St

non structural interior improvement of (e) animal hospital. non-structural reconfiguration of lvl 1 & 2. ada compliance maintained throughout bldg. upgrade of (e) storefront windows to improve thermal performance & enhance storefront transparency in visibility zone. fire life safety deferred.

Open the permit page

$2,650,000
Aug 5, 2024In progress
issued Aug 2024
177 Stillman StHp Buildref pa # 2024-0226-6507 utilities installed the fpw line not to our instruction. this permit is to get the information in the record
Details
Permit
202408057957
Status
issued
Filed
Aug 5, 2024
Permit issued
Aug 27, 2024
Address
177 Stillman St

ref pa # 2024-0226-6507 utilities installed the fpw line not to our instruction. this permit is to get the information in the record

Open the permit page

Jun 24, 2024Completed
final sign-off Oct 2025
1 Warriors WyHathaway Dinwiddie Co.space 22: new ti inclusive of partitions, ceilings, lighting, finishes, and millwork. new commercial kitchen w/ new equipment and plumbing for prep area, scullery, dry storage, walk-in fridge and freezer. new mech equipment to support kitchen, including type 1 and 2 exhaust. single occupant bathroom
Details
Permit
202406245076
Status
complete
Filed
Jun 24, 2024
Permit issued
Oct 15, 2024
Final sign-off
Oct 28, 2025
Declared cost
$705,820
Address
1 Warriors Wy

space 22: new ti inclusive of partitions, ceilings, lighting, finishes, and millwork. new commercial kitchen w/ new equipment and plumbing for prep area, scullery, dry storage, walk-in fridge and freezer. new mech equipment to support kitchen, including type 1 and 2 exhaust. single occupant bathroom

Open the permit page

$705,820
Feb 27, 2024Completed
final sign-off Dec 2024
163 West Portal AvMone Construction Co Incdeferred mep work associated w/ approved ti pa# 202311140752.
Details
Permit
202402276682
Status
complete
Filed
Feb 27, 2024
Permit issued
Apr 19, 2024
Final sign-off
Dec 4, 2024
Declared cost
$122,000
Address
163 West Portal Av

deferred mep work associated w/ approved ti pa# 202311140752.

Open the permit page

$122,000
Feb 26, 2024Completed
final sign-off Sep 2024
177 Stillman StCosco Fire Protection Inc.ref pa# 202302172168 connect (n) 6 "fpw line to existing water meter. (n) 6" riser fire riser stubbed up from floor below.
Details
Permit
202402266507
Status
complete
Filed
Feb 26, 2024
Permit issued
Mar 8, 2024
Final sign-off
Sep 26, 2024
Address
177 Stillman St

ref pa# 202302172168 connect (n) 6 "fpw line to existing water meter. (n) 6" riser fire riser stubbed up from floor below.

Open the permit page

Feb 6, 2024Completed
final sign-off Feb 2025
2343 Fillmore StBlueline Associates Increnovation of existing interior garage for use in medical imaging.
Details
Permit
202402065323
Status
complete
Filed
Feb 6, 2024
Permit issued
Jul 23, 2024
Final sign-off
Feb 25, 2025
Declared cost
$200,399
Address
2343 Fillmore St

renovation of existing interior garage for use in medical imaging.

Open the permit page

$200,399
Oct 20, 2023In progress
issued Oct 2023
701 03rd StCookline Construction Increvision to bpa# 202304256420 (t.i. of g/f bar/restaurant), revised mechanical equipment/duct layout.
Details
Permit
202310209178
Status
issued
Filed
Oct 20, 2023
Permit issued
Oct 26, 2023
Address
701 03rd St

revision to bpa# 202304256420 (t.i. of g/f bar/restaurant), revised mechanical equipment/duct layout.

Open the permit page

Oct 13, 2023In progress
issued Jan 2025
201 Bay Shore BlColbear Contracting Group Llcti new rooftop mechanical equipment, new insulation, new security gates, new equipment pad
Details
Permit
202310138659
Status
issued
Filed
Oct 13, 2023
Permit issued
Jan 7, 2025
Declared cost
$280,000
Address
201 Bay Shore Bl

ti new rooftop mechanical equipment, new insulation, new security gates, new equipment pad

Open the permit page

$280,000
Aug 4, 2023Completed
final sign-off May 2024
2575 Ocean AvMethod Construction Inc.change of use from health studio/meditation into office use. interior partition. update mechanical, electrical, and plumbing.
Details
Permit
202308043783
Status
complete
Filed
Aug 4, 2023
Permit issued
Dec 20, 2023
Final sign-off
May 22, 2024
Declared cost
$100,000
Address
2575 Ocean Av

change of use from health studio/meditation into office use. interior partition. update mechanical, electrical, and plumbing.

Open the permit page

$100,000
Jul 24, 2023In progress
issued Dec 2023
915 North Point StJs Sullivan Construction Incstorm water control plan submittal for pa#201912200210-s.
Details
Permit
202307242773
Status
issued
Filed
Jul 24, 2023
Permit issued
Dec 20, 2023
Address
915 North Point St

storm water control plan submittal for pa#201912200210-s.

Open the permit page

Jun 29, 2023Completed
final sign-off Feb 2025
275 South Van Ness AvC C I Commercial Construction & Improvrevision to 202304206090 & 202304106091 at dist plumbing inspector req to memorialize plumbing changes per plan
Details
Permit
202306291231
Status
complete
Filed
Jun 29, 2023
Permit issued
Jul 10, 2023
Final sign-off
Feb 25, 2025
Address
275 South Van Ness Av

revision to 202304206090 & 202304106091 at dist plumbing inspector req to memorialize plumbing changes per plan

Open the permit page

Jun 29, 2023Completed
final sign-off Feb 2025
275 South Van Ness AvC C I Commercial Construction & Improvrevision to 202304206090 & 202304106091 at dist plumbing inspector req to memorialize plumbing changes per plan
Details
Permit
202306291229
Status
complete
Filed
Jun 29, 2023
Permit issued
Jul 10, 2023
Final sign-off
Feb 25, 2025
Address
275 South Van Ness Av

revision to 202304206090 & 202304106091 at dist plumbing inspector req to memorialize plumbing changes per plan

Open the permit page

Jun 9, 2023Completed
final sign-off Jan 2026
335 27th Stcomply w/nov#202182998.-rear structure-provide a space heating system for the proposed provide kitchen throught the additon of an oven, hood& vent.replace the studio alternating tread device w/ a compliant staircase. replace driveway(e)driveway of the main residence.ordinance #95-17(add 1 state adu)
Details
Permit
202306099741
Status
complete
Filed
Jun 9, 2023
Permit issued
Mar 25, 2025
Final sign-off
Jan 7, 2026
Declared cost
$25,000
Address
335 27th St

comply w/nov#202182998.-rear structure-provide a space heating system for the proposed provide kitchen throught the additon of an oven, hood& vent.replace the studio alternating tread device w/ a compliant staircase. replace driveway(e)driveway of the main residence.ordinance #95-17(add 1 state adu)

Open the permit page

$25,000
May 31, 2023Completed
final sign-off Feb 2025
275 South Van Ness AvC C I Commercial Construction & Improvchange of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after associated permits receive certificate of occupancy.
Details
Permit
202305198219
Status
complete
Filed
May 31, 2023
Permit issued
May 21, 2024
Final sign-off
Feb 25, 2025
Declared cost
$324,000
Address
275 South Van Ness Av

change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after associated permits receive certificate of occupancy.

Open the permit page

$324,000
May 23, 2023Completed
final sign-off Feb 2025
275 South Van Ness AvC C I Commercial Construction & Improvchange of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after certificate of occupancy for associated permits.
Details
Permit
202305238412
Status
complete
Filed
May 23, 2023
Permit issued
May 21, 2024
Final sign-off
Feb 25, 2025
Declared cost
$324,000
Address
275 South Van Ness Av

change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after certificate of occupancy for associated permits.

Open the permit page

$324,000
Apr 25, 2023Completed
final sign-off Mar 2024
701 03rd StCookline Construction Increvision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit.
Details
Permit
202304256420
Status
complete
Filed
Apr 25, 2023
Permit issued
Sep 5, 2023
Final sign-off
Mar 28, 2024
Declared cost
$244,228
Address
701 03rd St

revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit.

Open the permit page

$244,228
Apr 20, 2023Completed
final sign-off Feb 2025
275 South Van Ness AvC C I Commercial Construction & Improvdeferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798.
Details
Permit
202304206090
Status
complete
Filed
Apr 20, 2023
Permit issued
May 17, 2023
Final sign-off
Feb 25, 2025
Address
275 South Van Ness Av

deferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798.

Open the permit page

Apr 20, 2023Completed
final sign-off Feb 2025
275 South Van Ness AvC C I Commercial Construction & Improvdeferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798.
Details
Permit
202304206091
Status
complete
Filed
Apr 20, 2023
Permit issued
May 17, 2023
Final sign-off
Feb 25, 2025
Address
275 South Van Ness Av

deferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798.

Open the permit page

Feb 21, 2023Completed
final sign-off Feb 2025
988 Harrison StJs Sullivan Construction Incstorm water control plan submittal for bpa# 2019-1212-9351
Details
Permit
202302212281
Status
complete
Filed
Feb 21, 2023
Permit issued
May 30, 2023
Final sign-off
Feb 20, 2025
Address
988 Harrison St

storm water control plan submittal for bpa# 2019-1212-9351

Open the permit page

Jan 19, 2023Expired or cancelled
expired Mar 2024
1200 Market StK Bali Constructionrevision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104.
Details
Permit
202301190368
Status
expired
Filed
Jan 19, 2023
Permit issued
Jan 27, 2023
Address
1200 Market St

revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104.

Open the permit page

Dec 28, 2022Completed
final sign-off Apr 2026
340 Fell StGci, Increnovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit.
Details
Permit
202212289303
Status
complete
Filed
Dec 28, 2022
Permit issued
Jun 26, 2024
Final sign-off
Apr 3, 2026
Declared cost
$5,000,000
Address
340 Fell St

renovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit.

Open the permit page

$5,000,000
Dec 23, 2022Never finaled
issued Jul 2023, no final
3352 Steiner StR 3 Builders Inc.interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work.
Details
Permit
202212239078
Status
issued
Filed
Dec 23, 2022
Permit issued
Jul 6, 2023
Declared cost
$180,000
Address
3352 Steiner St

interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work.

Open the permit page

$180,000
Dec 19, 2022In progress
issued Feb 2025
228 Jersey St415 Remodeling Inc, Aaron Gordon Construction Increnovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doors
Details
Permit
202212198610
Status
issued
Filed
Dec 19, 2022
Permit issued
Feb 5, 2025
Declared cost
$400,000
Address
228 Jersey St

renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doors

Open the permit page

$400,000
Dec 6, 2022Completed
final sign-off Jan 2024
120 Folsom StBarrett Karber Built Llcwe are building a coffee shop inside a newly constructed commercial condo at 120 folsom st. includes coffee bar & service counter w/seating for the sale + consumption of coffee and pastry. first time t.i.
Details
Permit
202212067724
Status
complete
Filed
Dec 6, 2022
Permit issued
Apr 25, 2023
Final sign-off
Jan 9, 2024
Declared cost
$250,000
Address
120 Folsom St

we are building a coffee shop inside a newly constructed commercial condo at 120 folsom st. includes coffee bar & service counter w/seating for the sale + consumption of coffee and pastry. first time t.i.

Open the permit page

$250,000
Nov 30, 2022Never finaled
issued Feb 2023, no final
701 08th StE.A.Davidovits &Co.,Inc.mercantile tenant improvement for ground floor space in a newly constructed existing shell building includes open showeroom space, smaller display spaces, employee offices, office support areas, and restrooms.
Details
Permit
202211307435
Status
issued
Filed
Nov 30, 2022
Permit issued
Feb 7, 2023
Declared cost
$1,200,000
Address
701 08th St

mercantile tenant improvement for ground floor space in a newly constructed existing shell building includes open showeroom space, smaller display spaces, employee offices, office support areas, and restrooms.

Open the permit page

$1,200,000
Nov 1, 2022Expired or cancelled
cancelled Jan 2026
2840 16th St1/f: t.i. for proposed gallery in vacant retail space, (e) bldg w/ground floor entrance. (3) accessible restrooms (e) & permitted under bpa#201707051030-s. f/s & f/a to be design build separate permits
Details
Permit
202211015619
Status
cancelled
Filed
Nov 1, 2022
Declared cost
$970,200
Address
2840 16th St

1/f: t.i. for proposed gallery in vacant retail space, (e) bldg w/ground floor entrance. (3) accessible restrooms (e) & permitted under bpa#201707051030-s. f/s & f/a to be design build separate permits

Open the permit page

$970,200
Oct 19, 2022Completed
final sign-off Oct 2023
555 Larkin StZone 4 Power Inc1/f: t.i. ground floor storefront. metal stud framing w/painted gyp bd, ceiling treatments, offices, break/copy room, & flex room. change of use to b-office. deferred submittal: signage
Details
Permit
202210194742
Status
complete
Filed
Oct 19, 2022
Permit issued
Jan 23, 2023
Final sign-off
Oct 4, 2023
Declared cost
$925,000
Address
555 Larkin St

1/f: t.i. ground floor storefront. metal stud framing w/painted gyp bd, ceiling treatments, offices, break/copy room, & flex room. change of use to b-office. deferred submittal: signage

Open the permit page

$925,000
Sep 22, 2022Expired or cancelled
cancelled Jan 2026
88 Kearny StRichlen Construction7/f: demo/construction of toilet partitions, new plumbing & finishes
Details
Permit
202209222934
Status
cancelled
Filed
Sep 22, 2022
Declared cost
$10,000
Address
88 Kearny St

7/f: demo/construction of toilet partitions, new plumbing & finishes

Open the permit page

$10,000
Apr 26, 2022Completed
final sign-off Apr 2023
201 Powell StWells Construction Inct.i. for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades.
Details
Permit
202204263011
Status
complete
Filed
Apr 26, 2022
Permit issued
Jan 10, 2023
Final sign-off
Apr 13, 2023
Declared cost
$192,800
Address
201 Powell St

t.i. for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades.

Open the permit page

$192,800
Apr 8, 2022Completed
final sign-off Nov 2024
299 02nd StPrecision Hotel Interiors Incexpansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.
Details
Permit
202204081881
Status
complete
Filed
Apr 8, 2022
Permit issued
Jul 19, 2022
Final sign-off
Nov 15, 2024
Declared cost
$900,000
Address
299 02nd St

expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.

Open the permit page

$900,000
Feb 3, 2022Expired or cancelled
expired Mar 2024
1200 Market StApg Plumbingplumbing review only for work associated with food hall and kitchens under pa 202109158511, 202109158499 & 202109148433
Details
Permit
202202037307
Status
expired
Filed
Feb 3, 2022
Permit issued
Sep 19, 2022
Address
1200 Market St

plumbing review only for work associated with food hall and kitchens under pa 202109158511, 202109158499 & 202109148433

Open the permit page

Feb 3, 2022Completed
final sign-off Mar 2024
1200 Market StK Bali Constructiont.i. mechanical & electrical work associated with food hall and kitchens.
Details
Permit
202202037293
Status
complete
Filed
Feb 3, 2022
Permit issued
Sep 22, 2022
Final sign-off
Mar 25, 2024
Declared cost
$175,000
Address
1200 Market St

t.i. mechanical & electrical work associated with food hall and kitchens.

Open the permit page

$175,000
Jan 18, 2022Completed
final sign-off Sep 2022
2100 Chestnut StParadigm General Contractorstenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargo
Details
Permit
202201186133
Status
complete
Filed
Jan 18, 2022
Permit issued
Mar 9, 2022
Final sign-off
Sep 26, 2022
Declared cost
$561,470
Address
2100 Chestnut St

tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargo

Open the permit page

$561,470
Dec 22, 2021Completed
final sign-off Nov 2022
3820 24th StSphinx Inc Dba Pharaoh Constructiontenant improvement for veterinary clinic. new partition, new ceilings, new lighting, new m&p, new accessible restroom, and new finishes. the possible future expansion of the clinic by constructing a shaft for a future elevator b/t the street and basement levels.
Details
Permit
202112224898
Status
complete
Filed
Dec 22, 2021
Permit issued
May 10, 2022
Final sign-off
Nov 2, 2022
Declared cost
$400,000
Address
3820 24th St

tenant improvement for veterinary clinic. new partition, new ceilings, new lighting, new m&p, new accessible restroom, and new finishes. the possible future expansion of the clinic by constructing a shaft for a future elevator b/t the street and basement levels.

Open the permit page

$400,000
Nov 29, 2021Completed
final sign-off Feb 2022
1110 04th StBay Area Builders Inc.revision to permit 202009265080. work includes layout revision to pet washing and isolation suite. added handwash sink station in the corridor. multiple doors to be switced from hinged to sliding doors
Details
Permit
202111293195
Status
complete
Filed
Nov 29, 2021
Permit issued
Dec 20, 2021
Final sign-off
Feb 3, 2022
Address
1110 04th St

revision to permit 202009265080. work includes layout revision to pet washing and isolation suite. added handwash sink station in the corridor. multiple doors to be switced from hinged to sliding doors

Open the permit page

Nov 5, 2021Completed
final sign-off Jan 2022
701 03rd StYum's Mechanical Co Incinstall type ii (2) condensate hood, exhaust fan and make-up air fan, ref pa20190013240.
Details
Permit
202111051934
Status
complete
Filed
Nov 5, 2021
Permit issued
Dec 23, 2021
Final sign-off
Jan 31, 2022
Declared cost
$14,600
Address
701 03rd St

install type ii (2) condensate hood, exhaust fan and make-up air fan, ref pa20190013240.

Open the permit page

$14,600
Jul 13, 2021Completed
final sign-off Jul 2023
1580 Pacific AvJs Sullivan Construction Incplumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 2019.12.12.9356 s
Details
Permit
202107134239
Status
complete
Filed
Jul 13, 2021
Permit issued
Jul 23, 2021
Final sign-off
Jul 24, 2023
Declared cost
$1,000
Address
1580 Pacific Av

plumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 2019.12.12.9356 s

Open the permit page

$1,000
Jul 12, 2021Completed
final sign-off Sep 2023
4033 Judah StConcore Development Groupunit a: 15ft rear yard addition, single story, and commercial ti. no work to 2nd flr residential, no work to front facade,project includes plumbing, new lighting,new doors and roof w/ skylight.
Details
Permit
202107124192
Status
complete
Filed
Jul 12, 2021
Permit issued
Mar 17, 2022
Final sign-off
Sep 26, 2023
Declared cost
$85,000
Address
4033 Judah St

unit a: 15ft rear yard addition, single story, and commercial ti. no work to 2nd flr residential, no work to front facade,project includes plumbing, new lighting,new doors and roof w/ skylight.

Open the permit page

$85,000
Jun 25, 2021Completed
final sign-off Aug 2021
8 Boardman PlMartin Building Comep/ t24 for addition of non structural interior office spaces and restroom. ref pa 202106021457
Details
Permit
202106253246
Status
complete
Filed
Jun 25, 2021
Permit issued
Jul 8, 2021
Final sign-off
Aug 18, 2021
Declared cost
$10,000
Address
8 Boardman Pl

mep/ t24 for addition of non structural interior office spaces and restroom. ref pa 202106021457

Open the permit page

$10,000
Jun 16, 2021Completed
final sign-off Oct 2021
7 Drumm StWells Construction Increvision to app#202012221572 store front and interior changes. (minimum)
Details
Permit
202106162579
Status
complete
Filed
Jun 16, 2021
Permit issued
Jul 6, 2021
Final sign-off
Oct 1, 2021
Declared cost
$2,000
Address
7 Drumm St

revision to app#202012221572 store front and interior changes. (minimum)

Open the permit page

$2,000
May 28, 2021Never finaled
issued Jun 2021, no final
2797 16th StEcotechnikosrevision to pa 202102235191. change to mechanical specifications and layout. ansul fire suppression permit already issued.
Details
Permit
202105281314
Status
issued
Filed
May 28, 2021
Permit issued
Jun 8, 2021
Address
2797 16th St

revision to pa 202102235191. change to mechanical specifications and layout. ansul fire suppression permit already issued.

Open the permit page

May 4, 2021Completed
final sign-off Jul 2022
1100 Van Ness AvT C B Builders Incg/f: interior t.i. for coffee shop in (e) shell.new non-structural partitions, new electrical plans and remote transformer at back of house. new equipment, lighting fixtures, furniture and finishes. maher n/a.
Details
Permit
202105049788
Status
complete
Filed
May 4, 2021
Permit issued
Sep 9, 2021
Final sign-off
Jul 15, 2022
Declared cost
$182,700
Address
1100 Van Ness Av

g/f: interior t.i. for coffee shop in (e) shell.new non-structural partitions, new electrical plans and remote transformer at back of house. new equipment, lighting fixtures, furniture and finishes. maher n/a.

Open the permit page

$182,700
May 4, 2021Completed
final sign-off Jun 2022
3595 California StWells Construction Incg/f: interior t.i. into (e) starbucks. new non-structural partitions, update restrooms, new equipment, new cabinets and new finishes, upate (e) lighting and electrical. no exterior work. no increase in square footage. maher n/a.
Details
Permit
202105049789
Status
complete
Filed
May 4, 2021
Permit issued
Mar 2, 2022
Final sign-off
Jun 2, 2022
Declared cost
$117,500
Address
3595 California St

g/f: interior t.i. into (e) starbucks. new non-structural partitions, update restrooms, new equipment, new cabinets and new finishes, upate (e) lighting and electrical. no exterior work. no increase in square footage. maher n/a.

Open the permit page

$117,500
Apr 26, 2021Never finaled
issued May 2021, no final
160 Spear StSc Builders, Inc15th fl: revision to pa# 202010317929. mep for the project.
Details
Permit
202104269365
Status
issued
Filed
Apr 26, 2021
Permit issued
May 18, 2021
Declared cost
$50,000
Address
160 Spear St

15th fl: revision to pa# 202010317929. mep for the project.

Open the permit page

$50,000
Apr 6, 2021Completed
final sign-off Nov 2021
495 Beach StExcel Hotel Servicesrevision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work.
Details
Permit
202104067955
Status
complete
Filed
Apr 6, 2021
Permit issued
Jun 30, 2021
Final sign-off
Nov 2, 2021
Declared cost
$465,000
Address
495 Beach St

revision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work.

Open the permit page

$465,000
Mar 17, 2021Never finaled
issued Apr 2022, no final
430 Folsom StR 3 Builders Inc.tenant improvement for proposed restaurant & bar located at current vacant retail space 2 & 5. including full commercial kitchen, 2 ada restrooms, and sushi bar at retail 2, and full bar & seating at retail 5. upgrade existing path of travel from folsom st with new 1:20 ramp.
Details
Permit
202103176730
Status
issued
Filed
Mar 17, 2021
Permit issued
Apr 12, 2022
Declared cost
$467,000
Address
430 Folsom St

tenant improvement for proposed restaurant & bar located at current vacant retail space 2 & 5. including full commercial kitchen, 2 ada restrooms, and sushi bar at retail 2, and full bar & seating at retail 5. upgrade existing path of travel from folsom st with new 1:20 ramp.

Open the permit page

$467,000
Jan 13, 2021Completed
final sign-off Sep 2022
198 Valencia StJs Sullivan Construction Incplumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 202007109964 s & pa# 201408053094 s.
Details
Permit
202101132542
Status
complete
Filed
Jan 13, 2021
Permit issued
Feb 9, 2021
Final sign-off
Sep 26, 2022
Address
198 Valencia St

plumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 202007109964 s & pa# 201408053094 s.

Open the permit page

Dec 22, 2020Completed
final sign-off Mar 2022
7 Drumm StWells Construction Inctenant improvement for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades.
Details
Permit
202012221572
Status
complete
Filed
Dec 22, 2020
Permit issued
Jun 1, 2021
Final sign-off
Mar 3, 2022
Declared cost
$96,500
Address
7 Drumm St

tenant improvement for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades.

Open the permit page

$96,500
Nov 24, 2020Completed
final sign-off Mar 2021
555 Golden Gate AvJs Sullivan Construction Increvision to pa #201712156653s2 (arch & mep), revised plans to show fsd matrix, include smoke control panel, design.
Details
Permit
202011249561
Status
complete
Filed
Nov 24, 2020
Permit issued
Jan 16, 2021
Final sign-off
Mar 10, 2021
Address
555 Golden Gate Av

revision to pa #201712156653s2 (arch & mep), revised plans to show fsd matrix, include smoke control panel, design.

Open the permit page

Sep 23, 2020Completed
final sign-off Oct 2021
495 Beach StAcco Engineered Systems Inc. Dba Acco Ennew toilet exhaust fans & ductwork in rooms. ref t.i. pa201909303101. maher n/a.
Details
Permit
202009234804
Status
complete
Filed
Sep 23, 2020
Permit issued
Oct 15, 2020
Final sign-off
Oct 29, 2021
Declared cost
$12,000
Address
495 Beach St

new toilet exhaust fans & ductwork in rooms. ref t.i. pa201909303101. maher n/a.

Open the permit page

$12,000
Jun 23, 2020Completed
final sign-off Feb 2024
42 Walter StArbor Homes Inc, Modern Craft Construction4 vertical and horizontal addition at rear, full renovation of interior.
Details
Permit
202006239023
Status
complete
Filed
Jun 23, 2020
Permit issued
Aug 26, 2021
Final sign-off
Feb 29, 2024
Declared cost
$450,000
Address
42 Walter St

4 vertical and horizontal addition at rear, full renovation of interior.

Open the permit page

$450,000
Feb 20, 2020Completed
final sign-off Dec 2021
230 07th StJs Sullivan Construction Incstrom water control plan review only. for pa# 2019/03/29/6630-s1 & pa# 2018/06/26/3029-s1. ** maher: n/a **
Details
Permit
202002204941
Status
complete
Filed
Feb 20, 2020
Permit issued
Sep 16, 2020
Final sign-off
Dec 21, 2021
Address
230 07th St

strom water control plan review only. for pa# 2019/03/29/6630-s1 & pa# 2018/06/26/3029-s1. ** maher: n/a **

Open the permit page

Dec 27, 2019Never finaled
issued Jul 2023, no final
723 Larkin StAligned Technologies Llc Dba Aligned Devbringing warm shell space to occupy a restaruant n/a maher
Details
Permit
201912270793
Status
issued
Filed
Dec 27, 2019
Permit issued
Jul 25, 2023
Declared cost
$100,000
Address
723 Larkin St

bringing warm shell space to occupy a restaruant n/a maher

Open the permit page

$100,000
Dec 18, 2019Completed
final sign-off Nov 2020
2190 Market StAllsite Corp Goods/Services Constructionrev to pa201902253723: change to mechanical ducts configuration, minor electrical changes.
Details
Permit
201912189878
Status
complete
Filed
Dec 18, 2019
Permit issued
Dec 18, 2019
Final sign-off
Nov 6, 2020
Address
2190 Market St

rev to pa201902253723: change to mechanical ducts configuration, minor electrical changes.

Open the permit page

Dec 9, 2019Never finaled
issued Jan 2020, no final
1115 Polk St2 Y Construction Inc.rev to pa# 201901281428; mech revision
Details
Permit
201912099021
Status
issued
Filed
Dec 9, 2019
Permit issued
Jan 24, 2020
Declared cost
$12,000
Address
1115 Polk St

rev to pa# 201901281428; mech revision

Open the permit page

$12,000
Oct 30, 2019Completed
final sign-off May 2020
75 Boardman PlSkyline Constructionreplace lighting in e space, add outlets and elec connections. add elec fixtures, camaras reconfigure e restrooms, add 3 small meeting rooms
Details
Permit
201910305958
Status
complete
Filed
Oct 30, 2019
Permit issued
Dec 11, 2019
Final sign-off
May 8, 2020
Declared cost
$75,000
Address
75 Boardman Pl

replace lighting in e space, add outlets and elec connections. add elec fixtures, camaras reconfigure e restrooms, add 3 small meeting rooms

Open the permit page

$75,000
Oct 7, 2019Expired or cancelled
cancelled Jan 2026
49 Stevenson Sttenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing.
Details
Permit
201910073706
Status
cancelled
Filed
Oct 7, 2019
Declared cost
$285,000
Address
49 Stevenson St

tenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing.

Open the permit page

$285,000
Oct 7, 2019Completed
final sign-off Dec 2021
49 Stevenson StTerra Nova Industriestenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.
Details
Permit
201910073701
Status
complete
Filed
Oct 7, 2019
Permit issued
Mar 2, 2021
Final sign-off
Dec 15, 2021
Declared cost
$230,000
Address
49 Stevenson St

tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.

Open the permit page

$230,000
Sep 18, 2019Completed
final sign-off Sep 2021
495 Beach StExcel Hotel Servicespartial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen included
Details
Permit
201909181934
Status
complete
Filed
Sep 18, 2019
Permit issued
May 18, 2020
Final sign-off
Sep 30, 2021
Declared cost
$1,500,000
Address
495 Beach St

partial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen included

Open the permit page

$1,500,000
Aug 7, 2019Never finaled
issued Nov 2019, no final
2797 16th StEcotechnikos, Lindquist Custom Construction Inctenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included.
Details
Permit
201908078156
Status
issued
Filed
Aug 7, 2019
Permit issued
Nov 15, 2019
Declared cost
$7,000
Address
2797 16th St

tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included.

Open the permit page

$7,000
Feb 25, 2019Completed
final sign-off Jul 2021
8 Boardman PlMartin Building Codeferred mep associated with pa #201810092631.
Details
Permit
201902253703
Status
complete
Filed
Feb 25, 2019
Permit issued
Mar 22, 2019
Final sign-off
Jul 29, 2021
Declared cost
$35,000
Address
8 Boardman Pl

deferred mep associated with pa #201810092631.

Open the permit page

$35,000
Feb 19, 2019Completed
final sign-off Sep 2019
101 01st StEric F Anderson Incorporated5/f: revision to smoke control for adding a 3rd acd. revision to app#201901251278. n/a for maher
Details
Permit
201902193293
Status
complete
Filed
Feb 19, 2019
Permit issued
Feb 20, 2019
Final sign-off
Sep 20, 2019
Declared cost
$10,000
Address
101 01st St

5/f: revision to smoke control for adding a 3rd acd. revision to app#201901251278. n/a for maher

Open the permit page

$10,000
Jan 25, 2019Completed
final sign-off Sep 2019
101 01st StEric F Anderson Incorporatedmep revision to 2010805148996
Details
Permit
201901251278
Status
complete
Filed
Jan 25, 2019
Permit issued
Feb 6, 2019
Final sign-off
Sep 20, 2019
Declared cost
$10,000
Address
101 01st St

mep revision to 2010805148996

Open the permit page

$10,000
Jan 17, 2019Expired or cancelled
cancelled Sep 2020
101 01st StDome Construction Corpproject is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge.
Details
Permit
201901170631
Status
cancelled
Filed
Jan 17, 2019
Permit issued
Sep 4, 2019
Declared cost
$600,000
Address
101 01st St

project is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge.

Open the permit page

$600,000
Dec 11, 2018Completed
final sign-off Aug 2026
1224 Funston AvWoods Const Co, Kohlmyererect (n) 4-story single family residence, this is a front building.
Details
Permit
201812118001
Status
complete
Filed
Dec 11, 2018
Permit issued
Aug 4, 2021
Final sign-off
Aug 27, 2026
Declared cost
$831,000
Address
1224 Funston Av

erect (n) 4-story single family residence, this is a front building.

Open the permit page

$831,000
Oct 5, 2018Completed
final sign-off Sep 2020
241 10th StJs Sullivan Construction Incg/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing.
Details
Permit
201810052404
Status
complete
Filed
Oct 5, 2018
Permit issued
Nov 27, 2018
Final sign-off
Sep 25, 2020
Declared cost
$80,000
Address
241 10th St

g/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing.

Open the permit page

$80,000
Sep 21, 2018Never finaled
issued Oct 2018, no final
2444 Lombard StJs Sullivan Construction Incplumbing review for stormwater planters
Details
Permit
201809211039
Status
issued
Filed
Sep 21, 2018
Permit issued
Oct 25, 2018
Address
2444 Lombard St

plumbing review for stormwater planters

Open the permit page

Jun 15, 2018Completed
final sign-off Jan 2019
1945 Irving StG Swanson Constr. Inc.t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository.
Details
Permit
201806152072
Status
complete
Filed
Jun 15, 2018
Permit issued
Aug 8, 2018
Final sign-off
Jan 28, 2019
Declared cost
$750,000
Address
1945 Irving St

t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository.

Open the permit page

$750,000
May 10, 2018Completed
final sign-off Oct 2019
1750 Taylor StBlack Mountain Development#2301: interior remodel of one unit in a multi-family apt building. scope of work all interior-remodel, proposed work in non-structural & does not affect envelope. replacement of glazing & windows in kind only.
Details
Permit
201805108771
Status
complete
Filed
May 10, 2018
Permit issued
May 23, 2018
Final sign-off
Oct 15, 2019
Declared cost
$366,000
Address
1750 Taylor St

#2301: interior remodel of one unit in a multi-family apt building. scope of work all interior-remodel, proposed work in non-structural & does not affect envelope. replacement of glazing & windows in kind only.

Open the permit page

$366,000
Apr 23, 2018Completed
final sign-off Jul 2018
2200 Market StWestern Construction Incto comply nov 201499071 - revise location of grease exhaust fan unit on roof from originally issued permit 201404294447 to new location with duct work installation.
Details
Permit
201804237110
Status
complete
Filed
Apr 23, 2018
Permit issued
May 16, 2018
Final sign-off
Jul 27, 2018
Declared cost
$3,000
Address
2200 Market St

to comply nov 201499071 - revise location of grease exhaust fan unit on roof from originally issued permit 201404294447 to new location with duct work installation.

Open the permit page

$3,000
Feb 15, 2018Completed
final sign-off Apr 2020
2224 Clement StL P Constructionrevision to pa #201611213210. gas meter relocation - minor changes to first floor adding insulation on roof.
Details
Permit
201802151354
Status
complete
Filed
Feb 15, 2018
Permit issued
Mar 2, 2018
Final sign-off
Apr 20, 2020
Address
2224 Clement St

revision to pa #201611213210. gas meter relocation - minor changes to first floor adding insulation on roof.

Open the permit page

Dec 20, 2017Never finaled
issued Feb 2018, no final
1439 Egbert AvD B Group Construction Incunit c, addition of food service & addition & relocation of production equipment. less than 1452 sf maher n/a.
Details
Permit
201712207017
Status
issued
Filed
Dec 20, 2017
Permit issued
Feb 7, 2018
Declared cost
$30,000
Address
1439 Egbert Av

unit c, addition of food service & addition & relocation of production equipment. less than 1452 sf maher n/a.

Open the permit page

$30,000
Dec 19, 2017Expired or cancelled
withdrawn Nov 2023
3300 Mission Stto comply w/nov 201623526.remodel(e)a-2 occupancies on 1/fl&bsmt&r-2 occupancies on 2nd,3rd&roof.proj incl struc seismic,new exit stairs& elevator,new mep&fixtures&finishes.roof penthouse&mech,&1/fl commercial storefrt under sep #201712156602. priority permit processing.
Details
Permit
201712196935
Status
withdrawn
Filed
Dec 19, 2017
Declared cost
$1,300,000
Address
3300 Mission St

to comply w/nov 201623526.remodel(e)a-2 occupancies on 1/fl&bsmt&r-2 occupancies on 2nd,3rd&roof.proj incl struc seismic,new exit stairs& elevator,new mep&fixtures&finishes.roof penthouse&mech,&1/fl commercial storefrt under sep #201712156602. priority permit processing.

Open the permit page

$1,300,000
Dec 19, 2017Completed
final sign-off Sep 2019
2301 Mission StL C Builders Inc.interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.
Details
Permit
201712196847
Status
complete
Filed
Dec 19, 2017
Permit issued
Jan 23, 2018
Final sign-off
Sep 20, 2019
Declared cost
$200,000
Address
2301 Mission St

interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.

Open the permit page

$200,000
Dec 19, 2017Completed
final sign-off Sep 2019
2301 Mission StL C Builders Inc.interior remodel of (e) commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel.
Details
Permit
201712196855
Status
complete
Filed
Dec 19, 2017
Permit issued
Jun 19, 2018
Final sign-off
Sep 20, 2019
Declared cost
$125,000
Address
2301 Mission St

interior remodel of (e) commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel.

Open the permit page

$125,000
Dec 15, 2017Expired or cancelled
withdrawn Nov 2023
3300 Mission Stremodel to (e) a-2 occupancies on 1st fl & basement, and r-2 occupancies on 2nd, 3rd and roof. project includes structural seismic, new exit stairs and elevator, new mep and fixtures and finishes. roof penthouse and mechanical, and 1st fl commercial storefront. to comply with nov 201623526
Details
Permit
201712156602
Status
withdrawn
Filed
Dec 15, 2017
Declared cost
$300,000
Address
3300 Mission St

remodel to (e) a-2 occupancies on 1st fl & basement, and r-2 occupancies on 2nd, 3rd and roof. project includes structural seismic, new exit stairs and elevator, new mep and fixtures and finishes. roof penthouse and mechanical, and 1st fl commercial storefront. to comply with nov 201623526

Open the permit page

$300,000
Dec 14, 2017Completed
final sign-off Feb 2025
377 06th StJs Sullivan Construction Incto erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s)
Details
Permit
201712146448
Status
complete
Filed
Dec 14, 2017
Permit issued
Nov 30, 2018
Final sign-off
Feb 20, 2025
Declared cost
$26,068,060
Address
377 06th St

to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s)

Open the permit page

$26,068,060
Nov 9, 2017Completed
final sign-off Jan 2018
4343 03rd StInfinium Air Incinstallation of two inline fans with duct work. n/a ordinance #155-13
Details
Permit
201711093577
Status
complete
Filed
Nov 9, 2017
Permit issued
Nov 13, 2017
Final sign-off
Jan 8, 2018
Declared cost
$6,000
Address
4343 03rd St

installation of two inline fans with duct work. n/a ordinance #155-13

Open the permit page

$6,000
Nov 7, 2017Never finaled
issued Nov 2017, no final
650 California StBcci Construction Company30th floor - interior tenant improvement of an existing space. new partitions, new millwork, countertops, fixtures, m.e.p., card reader in elevator lobby. n/a maher ordinance
Details
Permit
201711073284
Status
issued
Filed
Nov 7, 2017
Permit issued
Nov 22, 2017
Declared cost
$1,500,000
Address
650 California St

30th floor - interior tenant improvement of an existing space. new partitions, new millwork, countertops, fixtures, m.e.p., card reader in elevator lobby. n/a maher ordinance

Open the permit page

$1,500,000
Nov 1, 2017Completed
final sign-off May 2019
455 Market StT C B Builders Incsuite #100 - renovation of existing unit "starbucks coffee" - remove existing & install new walls, doors, casework, furniture, finishes, ceilings & lighting. new restrooms fixtures & accessories for compliance. permit 201605036413 is to be cancelled. maher na
Details
Permit
201711012838
Status
complete
Filed
Nov 1, 2017
Permit issued
Dec 5, 2017
Final sign-off
May 23, 2019
Declared cost
$129,245
Address
455 Market St

suite #100 - renovation of existing unit "starbucks coffee" - remove existing & install new walls, doors, casework, furniture, finishes, ceilings & lighting. new restrooms fixtures & accessories for compliance. permit 201605036413 is to be cancelled. maher na

Open the permit page

$129,245