Matt Frantz
- Listed as
- engineer
- Firm
- Zfa Structural Engineers
- Based in
- Redwood City
- On San Francisco permits
- Jul 2021 to Aug 2025
8 permits since 2000 (engineer on 8 permits): 4 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2025 | In progress issued Feb 2026 | 283 Farallones St | Acme Builders | rear 825 sf horiz addition at lvs 1 & 2 and interior alterations to (e) group e childcare facility. change of use & occupancy from group e daycare to group i-4 & e daycare. inclds: seismic upgrde, (n) mep, (n) lvl 2 deck with 2 (n) exterior exit stairs, (n) platform lift, and (n) outdoor play areas.Details
rear 825 sf horiz addition at lvs 1 & 2 and interior alterations to (e) group e childcare facility. change of use & occupancy from group e daycare to group i-4 & e daycare. inclds: seismic upgrde, (n) mep, (n) lvl 2 deck with 2 (n) exterior exit stairs, (n) platform lift, and (n) outdoor play areas. | $2,200,000 |
| Nov 14, 2024 | In progress issued Nov 2024 | 1017 Fell St | De Brus Construction Inc | ref pa # 201702179707 repairs to (e) structural framing uncovered during construction including floor framing strengthening (n) framing under (e) floor members & foundation to support. also continuity improvements to header bracing at (1) location. work occurs on gr fl in 3 discrete locationsDetails
ref pa # 201702179707 repairs to (e) structural framing uncovered during construction including floor framing strengthening (n) framing under (e) floor members & foundation to support. also continuity improvements to header bracing at (1) location. work occurs on gr fl in 3 discrete locations | $20,000 |
| Jun 11, 2024 | Expired or cancelled withdrawn Sep 2024 | 111 Pine St | deferred submittal for permit# 202402075406: for structural framing of walls. all work is interior only, no change of use or occupancy. no change of building height or footprint is limited to structural only.Details
deferred submittal for permit# 202402075406: for structural framing of walls. all work is interior only, no change of use or occupancy. no change of building height or footprint is limited to structural only. | $100,000 | |
| Nov 27, 2023 | In progress issued Jul 2026 | 301 King St | conversion of un-used parking spots on the 2nd & 3rd floor into 10 new accessory dwelling units (adus) with (n) kitchen, bedroom, living room and new bathroomDetails
conversion of un-used parking spots on the 2nd & 3rd floor into 10 new accessory dwelling units (adus) with (n) kitchen, bedroom, living room and new bathroom | $300,000 | |
| Jun 6, 2023 | Completed final sign-off Oct 2023 | 49 South Van Ness Av | vertical railing extension at (e) guard rail at 3rd fl terrace outside (e) day care center.Details
vertical railing extension at (e) guard rail at 3rd fl terrace outside (e) day care center. | $275,000 | |
| Mar 1, 2023 | Completed final sign-off Jul 2023 | 135 Mississippi St | Lusardi Construction Co | revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lotDetails
revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lot | $12,500 |
| Dec 28, 2022 | Completed final sign-off Apr 2026 | 340 Fell St | Gci, Inc | renovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit.Details
renovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit. | $5,000,000 |
| Jul 9, 2021 | Completed final sign-off Feb 2023 | 1401 Lyon St | Seth Bernstein | to comply with nov 202178723 to provide (temporary)Details
to comply with nov 202178723 to provide (temporary) | $15,000 |