Block 0266, lot 001
111 Pine St
- City’s use
- Commercial Office
- Built
- 1963
- Stories
- 19
- Rooms
- 34 bathrooms
- Building
- 206,034 sq ft
- Lot
- 12,614 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 111 Pine St | 10th fl: full floor (10th) renovations. carpet finish replacement and partial existing office demolition. new office partition construction, as well as new bathroom construction.Details
10th fl: full floor (10th) renovations. carpet finish replacement and partial existing office demolition. new office partition construction, as well as new bathroom construction. | $170,466 | |
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 111 Pine St | 8th fl: full floor renovations. carpet finish replacement and partial existing office demolition. new office partition construction, as well as new bathroom construction.Details
8th fl: full floor renovations. carpet finish replacement and partial existing office demolition. new office partition construction, as well as new bathroom construction. | $170,466 | |
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 111 Pine St | 11th fl: full floor (11th) renovations. carpet finish replacement and partial existing office demolition. new office partition construction, as well as new bathroom construction.Details
11th fl: full floor (11th) renovations. carpet finish replacement and partial existing office demolition. new office partition construction, as well as new bathroom construction. | $170,466 | |
| Dec 2, 2025 | In progress filed Dec 2025, not yet issued | 111 Pine St | 9th fl: interior tenant improvement. new partitoins, ceiling, carpet finiash replacement new bathroomDetails
9th fl: interior tenant improvement. new partitoins, ceiling, carpet finiash replacement new bathroom | $170,466 | |
| Nov 21, 2025 | Completed final sign-off May 2026 | 111 Pine St | revision to pa#2022-1229-9343 based on minor field changes. sheet a2.0 storefront is returning to existing tiles to proposed terrazzo.Details
revision to pa#2022-1229-9343 based on minor field changes. sheet a2.0 storefront is returning to existing tiles to proposed terrazzo. | $50,000 | |
| Oct 30, 2025 | In progress issued Nov 2025 | 111 Pine St | Rise Rigging Llc | repair existing facade at highrise building. existing exterior precast concrete panel repairs including spall repairs crack injections, loose/cracked tiles, delaminated morter, and corroded rain forcing steel. per ab-110Details
repair existing facade at highrise building. existing exterior precast concrete panel repairs including spall repairs crack injections, loose/cracked tiles, delaminated morter, and corroded rain forcing steel. per ab-110 | $30,000 |
| Oct 27, 2025 | Completed final sign-off Jan 2026 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | 1/f: fire alarm t.i - to existing notifier nfs2-3030, replacing (1) smoke detector and (1) strobe, relocating lcd annunicator to new security desk.Details
1/f: fire alarm t.i - to existing notifier nfs2-3030, replacing (1) smoke detector and (1) strobe, relocating lcd annunicator to new security desk. | $5,000 |
| Sep 18, 2025 | Completed final sign-off Dec 2025 | 111 Pine St | Pribuss Engineering Inc | modify sprinkler head locations to accomadate new ceiling for lobby renovations. ref pa# 2022-1229-9343 total sprinklers 9 total sprinklersDetails
modify sprinkler head locations to accomadate new ceiling for lobby renovations. ref pa# 2022-1229-9343 total sprinklers 9 total sprinklers | $4,950 |
| Aug 4, 2025 | Completed final sign-off Nov 2025 | 111 Pine St | Paganini Electric Corp(See Signatories) | deferred electrical for office ti permit 202505307634. floor 18, suite 1815; minor lighting and power upgrades in four offices.Details
deferred electrical for office ti permit 202505307634. floor 18, suite 1815; minor lighting and power upgrades in four offices. | $39,700 |
| Jul 21, 2025 | Completed final sign-off Aug 2025 | 111 Pine St | Pribuss Engineering Inc | 14th floor: ref gc arch #202505307633. modify sprinkler heads to accomodate new wall layout in suite 1400. total sprinkleker heads = 1Details
14th floor: ref gc arch #202505307633. modify sprinkler heads to accomodate new wall layout in suite 1400. total sprinkleker heads = 1 | $550 |
| Jul 14, 2025 | Completed final sign-off Aug 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | 14th fl- fire alarm ti: adding 1 speaker on existing notifier nfs2-3030 fire alarm system. ref pa# 2025-0530-7633Details
14th fl- fire alarm ti: adding 1 speaker on existing notifier nfs2-3030 fire alarm system. ref pa# 2025-0530-7633 | $6,475 |
| Jul 14, 2025 | Completed final sign-off Aug 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: adding(3) speaker-strobes to existing notifier nfs2-3030 fire alarm system and relocate 2 speaker strobes ref pa# 2025-0509-6192Details
fire alarm ti: adding(3) speaker-strobes to existing notifier nfs2-3030 fire alarm system and relocate 2 speaker strobes ref pa# 2025-0509-6192 | $5,125 |
| Jul 14, 2025 | Completed final sign-off Jul 2025 | 111 Pine St | Everon Llc | 13th floor: add/relocate 4 sprinklers to accomodate t.i.Details
13th floor: add/relocate 4 sprinklers to accomodate t.i. | $3,580 |
| Jul 14, 2025 | Completed final sign-off Aug 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | 18th fl- fire alarm ti: relocating 1 speaker on existing notifier nfs2-3030 fire alarm system. ref pa # 2025-0530-7634Details
18th fl- fire alarm ti: relocating 1 speaker on existing notifier nfs2-3030 fire alarm system. ref pa # 2025-0530-7634 | $6,270 |
| Jun 30, 2025 | In progress issued Jun 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i. demo project. remove 1 monitor module from exisiting notifier nf s2-3030 fire alarm system. ref. #202405313422Details
fire alarm t.i. demo project. remove 1 monitor module from exisiting notifier nf s2-3030 fire alarm system. ref. #202405313422 | $5,125 |
| Jun 23, 2025 | Completed final sign-off Oct 2025 | 111 Pine St | Paganini Electric Corp(See Signatories) | 13th fl suite 1300 & 1305 ref pa # 2025-0509-6192: rewiring/relocating (e) light fixtures affected by new demising wall. adding receptacles for conversion of larger suite to smaller suite ref 202505096192Details
13th fl suite 1300 & 1305 ref pa # 2025-0509-6192: rewiring/relocating (e) light fixtures affected by new demising wall. adding receptacles for conversion of larger suite to smaller suite ref 202505096192 | $39,700 |
| May 30, 2025 | Completed final sign-off Nov 2025 | 111 Pine St | The Whiting-Turner Contracting Company | 18/fl- addition of two new offices in suite 1815. new floor finishes and wall painintg. (e) ceiling to remain , reloation of elements based on new wall location. (e) doors and kitchen to remain. mep deferred.Details
18/fl- addition of two new offices in suite 1815. new floor finishes and wall painintg. (e) ceiling to remain , reloation of elements based on new wall location. (e) doors and kitchen to remain. mep deferred. | $55,000 |
| May 30, 2025 | Completed final sign-off Oct 2025 | 111 Pine St | The Whiting-Turner Contracting Company | 14/fl- demo of 2 non strucrual partitions for larger offices. adding a rated entrance door to the main entry patching carpet finishes in kind. elc deferred.Details
14/fl- demo of 2 non strucrual partitions for larger offices. adding a rated entrance door to the main entry patching carpet finishes in kind. elc deferred. | $33,000 |
| May 9, 2025 | Completed final sign-off Oct 2025 | 111 Pine St | The Whiting-Turner Contracting Company | 13th fl- demising suite 1300 into two suites (1300 & 1305). adding a rated entrance door to the newly created suite (1305). replacement of millwork and carpet finishes in kind.Details
13th fl- demising suite 1300 into two suites (1300 & 1305). adding a rated entrance door to the newly created suite (1305). replacement of millwork and carpet finishes in kind. | $99,312 |
| Apr 10, 2025 | Completed final sign-off Apr 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | level 2 and 3; fire alarm ti: relocation (1) strobe on existing notifier nfs2-3030 fire alarm system.Details
level 2 and 3; fire alarm ti: relocation (1) strobe on existing notifier nfs2-3030 fire alarm system. | $6,650 |
| Apr 7, 2025 | Completed final sign-off Jun 2025 | 111 Pine St | Paganini Electric Corp(See Signatories) | minor electrical modifications and lighting additions for stair project for l2 and l3. ref permit pa#202502210874Details
minor electrical modifications and lighting additions for stair project for l2 and l3. ref permit pa#202502210874 | $55,000 |
| Mar 28, 2025 | Completed final sign-off Apr 2025 | 111 Pine St | Pribuss Engineering Inc | 2nd/fl: ref 202502210874 relcoate 2 sprinklers for infill of stair opening on 2nd flDetails
2nd/fl: ref 202502210874 relcoate 2 sprinklers for infill of stair opening on 2nd fl | $1,100 |
| Mar 3, 2025 | Completed final sign-off Apr 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | basement - fire alarm ti delete existing monitor modules associated with pre-action and fm-200n systems from existing notifier nfs2-3030 fire alarm system. ref pa 202502110113Details
basement - fire alarm ti delete existing monitor modules associated with pre-action and fm-200n systems from existing notifier nfs2-3030 fire alarm system. ref pa 202502110113 | $3,000 |
| Feb 21, 2025 | Completed final sign-off Jun 2025 | 111 Pine St | The Whiting-Turner Contracting Company | demo communicating stairs from l2 to l3. slab infill at l3.restroom finishes upgrade for ada complianceDetails
demo communicating stairs from l2 to l3. slab infill at l3.restroom finishes upgrade for ada compliance | $77,960 |
| Feb 11, 2025 | Completed final sign-off Apr 2025 | 111 Pine St | Pribuss Engineering Inc | demo (e) pre-action sprinkler cabinet and tie-in preaction system to (e) wet overhead system on basement floor.Details
demo (e) pre-action sprinkler cabinet and tie-in preaction system to (e) wet overhead system on basement floor. | $3,500 |
| Jan 15, 2025 | In progress issued Jan 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | 2/f: fire alarm ti - adding (5) relay modules to existing notifier nfs2.3030 fire alarm system. ref mech permit 202412177001. ref arch permit 202406275356 original job.Details
2/f: fire alarm ti - adding (5) relay modules to existing notifier nfs2.3030 fire alarm system. ref mech permit 202412177001. ref arch permit 202406275356 original job. | $1,130 |
| Dec 17, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | revision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room.Details
revision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room. | $20,000 |
| Nov 6, 2024 | Completed final sign-off Jan 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | 2/f: fire alarm ti. adding 9 speakers and 4 speaker-strobes to existing notifier nfs2.3030 fire alarm system. ref ti permit 202406275356.Details
2/f: fire alarm ti. adding 9 speakers and 4 speaker-strobes to existing notifier nfs2.3030 fire alarm system. ref ti permit 202406275356. | $12,840 |
| Nov 6, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | as built record drawings: superceded permit listed below. change operational matrix to indicate duct detector as supervisory, not alarm. ref original 202406134387, rev 1. 202408289608Details
as built record drawings: superceded permit listed below. change operational matrix to indicate duct detector as supervisory, not alarm. ref original 202406134387, rev 1. 202408289608 | |
| Oct 28, 2024 | Completed final sign-off Dec 2024 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 2nd floor: add (7) relocate (13) fire sprinkler per t.i. job#: 24-631. ref#: 202409251567Details
2nd floor: add (7) relocate (13) fire sprinkler per t.i. job#: 24-631. ref#: 202409251567 | $12,422 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | 2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates.Details
2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates. | $50,000 |
| Sep 3, 2024 | Completed final sign-off Sep 2024 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti. resubmittal to 202408289608 device type changed from in duct smoke detectors to duct detectors for psd (7). revision of flr in scope deleted basement 2nd flr. orignial fire alarm 202406134387Details
fire alarm ti. resubmittal to 202408289608 device type changed from in duct smoke detectors to duct detectors for psd (7). revision of flr in scope deleted basement 2nd flr. orignial fire alarm 202406134387 | |
| Aug 28, 2024 | In progress filed Aug 2024, not yet issued | 111 Pine St | install two digital signs inside commercial space. tvs will be mounted on the wallDetails
install two digital signs inside commercial space. tvs will be mounted on the wall | $10,000 | |
| Aug 28, 2024 | Completed final sign-off Sep 2024 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i resubmittal-quantities of devices changing. adding 3 s/d and 1 speak strobe to previously approved fa project. existing notifiers nfs2-3030 file alarm system. ref pa# 202406134387Details
fire alarm t.i resubmittal-quantities of devices changing. adding 3 s/d and 1 speak strobe to previously approved fa project. existing notifiers nfs2-3030 file alarm system. ref pa# 202406134387 | |
| Aug 28, 2024 | In progress filed Aug 2024, not yet issued | 33 Front St | install two digital signs inside commercial space. tvs will be mounted on the wallDetails
install two digital signs inside commercial space. tvs will be mounted on the wall | $10,000 | |
| Aug 28, 2024 | In progress filed Aug 2024, not yet issued | 33 Front St | install two digital signs inside commercial space. tvs will be mounted on the wallDetails
install two digital signs inside commercial space. tvs will be mounted on the wall | $10,000 | |
| Aug 28, 2024 | In progress filed Aug 2024, not yet issued | 111 Pine St | install two digital signs inside commercial space. tvs will be mounted on the wallDetails
install two digital signs inside commercial space. tvs will be mounted on the wall | $10,000 | |
| Aug 9, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Turner Construction Co | revision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only.Details
revision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only. | |
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 111 Pine St | Signtech Electrical Advertising Inc. | install (2) illuminated wall signs: "j.p. morgan" 1'6" x 17'5"Details
install (2) illuminated wall signs: "j.p. morgan" 1'6" x 17'5" | $16,000 |
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 111 Pine St | Signtech Electrical Advertising Inc. | install (1) illuminated wall sign: "j.p. morgan" 12'4" x 3'8"Details
install (1) illuminated wall sign: "j.p. morgan" 12'4" x 3'8" | $8,000 |
| Jul 30, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Signtech Electrical Advertising Inc. | remove (1) existing awning and replace with wall sign under separate permit (ref. 202407307536). replace (7) existing wall sign panels with (7) blank non-illuminated wall panels.Details
remove (1) existing awning and replace with wall sign under separate permit (ref. 202407307536). replace (7) existing wall sign panels with (7) blank non-illuminated wall panels. | $24,000 |
| Jun 27, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | 2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.Details
2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical. | $960,000 |
| Jun 26, 2024 | Completed final sign-off Sep 2024 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 1st fl. add (5) relocate (42) fire sprinkler per ti job # 24-631 ref pa# 2024-0207-5406Details
1st fl. add (5) relocate (42) fire sprinkler per ti job # 24-631 ref pa# 2024-0207-5406 | $29,192 |
| Jun 13, 2024 | In progress issued Jun 2024 | 111 Pine St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti adding 4 smoke detectors, 6 relay modules, 26 speaker strobes to existing notifier nfs2-3030 fire alarm systemDetails
fire alarm ti adding 4 smoke detectors, 6 relay modules, 26 speaker strobes to existing notifier nfs2-3030 fire alarm system | $21,280 |
| Jun 11, 2024 | Expired or cancelled withdrawn Sep 2024 | 111 Pine St | deferred submittal for permit# 202402075406: for structural framing of walls. all work is interior only, no change of use or occupancy. no change of building height or footprint is limited to structural only.Details
deferred submittal for permit# 202402075406: for structural framing of walls. all work is interior only, no change of use or occupancy. no change of building height or footprint is limited to structural only. | $100,000 | |
| Jun 7, 2024 | Completed final sign-off Mar 2025 | 111 Pine St | Turner Construction Co | tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevationsDetails
tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevations | $308,000 |
| May 31, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Turner Construction Co | revision to permit 202402075406. revision will be on 1/f and cellar interiorDetails
revision to permit 202402075406. revision will be on 1/f and cellar interior | |
| Feb 7, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.Details
gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical. | $2,100,000 |
| Jan 23, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Turner Construction Co | work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i.Details
work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i. | $80,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 111 Pine St | Paganini Electric Corp(See Signatories) | replacement of 2 condenser units on roof. breaker replacement for updated loads. ref 202312202826Details
replacement of 2 condenser units on roof. breaker replacement for updated loads. ref 202312202826 | $28,000 |
| Dec 20, 2023 | Completed final sign-off Sep 2024 | 111 Pine St | Western Allied Mechanical Inc. | replace (2) existing rooftop condensing units.Details
replace (2) existing rooftop condensing units. | $150,000 |
| Jul 7, 2023 | In progress issued Apr 2024 | 111 Pine St | W. Bradley Electric | replace electrical switch gear and electrical equipmemt on the tenant floors provide minor plumbing and mechanical alterations to support the electrical replacement, structural details provided for the electrical equipment. fire alarm/sprinklers under sep permits.Details
replace electrical switch gear and electrical equipmemt on the tenant floors provide minor plumbing and mechanical alterations to support the electrical replacement, structural details provided for the electrical equipment. fire alarm/sprinklers under sep permits. | $1,500,000 |
| Dec 29, 2022 | Completed final sign-off Sep 2026 | 111 Pine St | The Whiting-Turner Contracting Company | grd fl: int tenant improvement of (e) lobby. int demo of nonstructural walls, partitions millwork & decorative finishes / elements. new lighting, finishes, and guard desk location. existing storefront to be replaced w/ new. mep:minor lobby hvac repair / upgrades.new lobby lighting and receptaclesDetails
grd fl: int tenant improvement of (e) lobby. int demo of nonstructural walls, partitions millwork & decorative finishes / elements. new lighting, finishes, and guard desk location. existing storefront to be replaced w/ new. mep:minor lobby hvac repair / upgrades.new lobby lighting and receptacles | $250,000 |
| Oct 25, 2022 | Completed final sign-off Jun 2023 | 111 Pine St | Pacific Auxiliary Fire Alarm | fire alarm t.i.: adding (1) errcs annunciator panel and (5) monitor modules to existing notifier nfs2-3030 fire alarm system.Details
fire alarm t.i.: adding (1) errcs annunciator panel and (5) monitor modules to existing notifier nfs2-3030 fire alarm system. | $6,280 |
| Oct 5, 2022 | Never finaled issued Dec 2022, no final | 111 Pine St | Swinerton Builders | ste 1200 & 1250. demo non structual partitions, ceilings - flooring, finishes, millworks, construct new non structural partions, new lights, millwork, doors finishes, mech to accomodate space.Details
ste 1200 & 1250. demo non structual partitions, ceilings - flooring, finishes, millworks, construct new non structural partions, new lights, millwork, doors finishes, mech to accomodate space. | $69,840 |
| Aug 23, 2022 | Completed final sign-off Feb 2024 | 111 Pine St | Paganini Electric Corp(See Signatories) | install emergency responder radio coverage system. (errcs)Details
install emergency responder radio coverage system. (errcs) | $50,000 |
| May 27, 2022 | Completed final sign-off Jun 2023 | 111 Pine St | Pacific Auxiliary Fire Alarm | fire alarm - voluntary replacement of an (e) simplex fire alarm panel with a notifier nfs2-3030 fire alarm panel. devices will be replace on a 1-for-1 basis. new 2-way emergency communication system is being installed.Details
fire alarm - voluntary replacement of an (e) simplex fire alarm panel with a notifier nfs2-3030 fire alarm panel. devices will be replace on a 1-for-1 basis. new 2-way emergency communication system is being installed. | $179,500 |
| May 16, 2022 | Completed final sign-off Sep 2023 | 111 Pine St | Johnson Controls Fire | 5th fl: modify (e) fire alarm system. remove & replace notification devices. remove & replace initiating devices. remove & replace relay modules. ref pa# 202111303261.Details
5th fl: modify (e) fire alarm system. remove & replace notification devices. remove & replace initiating devices. remove & replace relay modules. ref pa# 202111303261. | $10,900 |
| Apr 27, 2022 | Completed final sign-off Mar 2023 | 111 Pine St | Paganini Electric Corp(See Signatories) | 2nd fl: furnish & install (92) 2x2 fixtures, (8) 4" downlights. 100' core lighting, (3) decorative doom lights.Details
2nd fl: furnish & install (92) 2x2 fixtures, (8) 4" downlights. 100' core lighting, (3) decorative doom lights. | $175,000 |
| Apr 5, 2022 | Completed final sign-off Sep 2022 | 111 Pine St | Peacock Construction | alterations and improvements to (e) interior walls, new demising wall.Details
alterations and improvements to (e) interior walls, new demising wall. | $30,000 |
| Mar 31, 2022 | Completed final sign-off Jun 2022 | 111 Pine St | Golden Gate Fire Protection Inc | 5th floor: 53 concealed pendent sprinklers. ref pa202111303261Details
5th floor: 53 concealed pendent sprinklers. ref pa202111303261 | $27,825 |
| Nov 30, 2021 | Completed final sign-off Mar 2024 | 111 Pine St | Swinerton Builders | 5/f: demo non structural partitions, flooring, finishes construct new partions lightsmillwork finishes, relocated mech for new layoutDetails
5/f: demo non structural partitions, flooring, finishes construct new partions lightsmillwork finishes, relocated mech for new layout | $155,000 |
| Nov 2, 2021 | Completed final sign-off Dec 2021 | 111 Pine St | Johnson Controls Fire | 14th flr - modify (e) fire alarm system: install 1 smoke detector, install 3 strobes, install 7 speaker/strobes. ref ti 202102013751.Details
14th flr - modify (e) fire alarm system: install 1 smoke detector, install 3 strobes, install 7 speaker/strobes. ref ti 202102013751. | $6,500 |
| Oct 14, 2021 | Completed final sign-off Nov 2021 | 111 Pine St | Golden Gate Fire Protection Inc | 14th fl: fire sprinklers. relocate 30 pendent sprinklers. t.i. ref#202102013751Details
14th fl: fire sprinklers. relocate 30 pendent sprinklers. t.i. ref#202102013751 | $6,000 |
| Aug 11, 2021 | Completed final sign-off Sep 2023 | 111 Pine St | Johnson Controls Fire | modify existing fire alarm system. provide and install 2 duct detectors, 4 speakerstorbes as shown on drawing. ref app#202008101483Details
modify existing fire alarm system. provide and install 2 duct detectors, 4 speakerstorbes as shown on drawing. ref app#202008101483 | $1,500 |
| Jun 11, 2021 | Completed final sign-off Aug 2021 | 111 Pine St | Anderson, Rowe & Buckley, Inc. | tenant improvements to the existing fire sprinkler ystem. delete 1 sprinkler, relocate 11 sprinklers. 2021-0201-3751Details
tenant improvements to the existing fire sprinkler ystem. delete 1 sprinkler, relocate 11 sprinklers. 2021-0201-3751 | $2,500 |
| Feb 1, 2021 | Completed final sign-off Mar 2022 | 111 Pine St | Swinerton Builders | demo non strucutral partitions, flooring, finishes construct new none structural partitions, lights, finishes millwork relocate, mech for new layout.Details
demo non strucutral partitions, flooring, finishes construct new none structural partitions, lights, finishes millwork relocate, mech for new layout. | $145,000 |
| Dec 21, 2020 | Completed final sign-off Aug 2022 | 111 Pine St | Skyline Capital Builders Llc | demo existing base-building centrifugal supply fans (x4) & replace with new fan wall technology with new vfd drive controller & power connections. new structural support for access platform for the fan wall.Details
demo existing base-building centrifugal supply fans (x4) & replace with new fan wall technology with new vfd drive controller & power connections. new structural support for access platform for the fan wall. | $715,000 |
| Dec 21, 2020 | Completed final sign-off Aug 2022 | 111 Pine St | Skyline Capital Builders Llc | demo existing water-cooled chiller plants & towers and replace with new air-cooled chiller plant on the roof. new structural support on roof with distribution pumps and hydronic specialties on penthouse level.Details
demo existing water-cooled chiller plants & towers and replace with new air-cooled chiller plant on the roof. new structural support on roof with distribution pumps and hydronic specialties on penthouse level. | $1,350,000 |
| Sep 14, 2020 | Completed final sign-off Mar 2021 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 11th fl: add (4) and relocate (1) sprinkler per t.i. ref 2019-0625-4316, job #20-629.Details
11th fl: add (4) and relocate (1) sprinkler per t.i. ref 2019-0625-4316, job #20-629. | $2,325 |
| Aug 10, 2020 | Completed final sign-off Mar 2024 | 111 Pine St | Swinerton Builders | 2/f -office tenant improvement of e office suite to add 2 new conference rooms,pantry, and one new office. total improvement 1100 sf. revise e mep for new oti. nonew floor area added to suite, converted existing office floor into new program areaDetails
2/f -office tenant improvement of e office suite to add 2 new conference rooms,pantry, and one new office. total improvement 1100 sf. revise e mep for new oti. nonew floor area added to suite, converted existing office floor into new program area | $141,900 |
| Jun 25, 2020 | Completed final sign-off Nov 2020 | 111 Pine St | Johnson Controls Fire | 11th floor: install new strobe ceiling bathroom for fire alarm system. ref app#201906254316Details
11th floor: install new strobe ceiling bathroom for fire alarm system. ref app#201906254316 | |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 111 Pine St | street space | ||
| Oct 10, 2019 | Completed final sign-off Jun 2020 | 111 Pine St | Western Allied Mechanical Inc. | like for like cooling tower & pumps replacement.Details
like for like cooling tower & pumps replacement. | $350,000 |
| Jun 25, 2019 | Completed final sign-off Dec 2020 | 111 Pine St | Swinerton Builders | 11th fl: demo millwork construct new non-structural partitions finishes, accomodate, mech & electrical for new layout, install toilets & lavatory fixtures.Details
11th fl: demo millwork construct new non-structural partitions finishes, accomodate, mech & electrical for new layout, install toilets & lavatory fixtures. | $50,000 |
| May 3, 2019 | Never finaled issued May 2019, no final | 111 Pine St | Western Allied Mechanical Inc. | 3/f: furnish & install (1) water source heat pump and associated duct & piping on 3rd fl. maher n/a.Details
3/f: furnish & install (1) water source heat pump and associated duct & piping on 3rd fl. maher n/a. | $40,000 |
| Mar 13, 2019 | Expired or cancelled withdrawn Jun 2019 | 111 Pine St | Swinerton Builders | demo and construct new non-structural partition doors, frames, finishes. relocate lights, receptacles to accommodate new layoutDetails
demo and construct new non-structural partition doors, frames, finishes. relocate lights, receptacles to accommodate new layout | $136,500 |
| Jun 20, 2017 | Completed final sign-off Jul 2017 | 111 Pine St | Johnson Controls Fire | 14th flr: fire alarm ti 201705025436 suite 1400 4 new speaker/strobes maher naDetails
14th flr: fire alarm ti 201705025436 suite 1400 4 new speaker/strobes maher na | $3,500 |
| Jun 15, 2017 | Never finaled issued Jun 2017, no final | 111 Pine St | Johnson Controls Fire | fire alarm for t.i. on 14th floor: add 2 duct detectors. as built for app#201609147644. n/a for maherDetails
fire alarm for t.i. on 14th floor: add 2 duct detectors. as built for app#201609147644. n/a for maher | |
| Jun 2, 2017 | Completed final sign-off Jul 2017 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 14th floor, ste. 1400 - add 1, relocate 22 and plug 6 sprinklers to conform with the new layout of the ti. ref pa 2017-0502-5436. maher naDetails
14th floor, ste. 1400 - add 1, relocate 22 and plug 6 sprinklers to conform with the new layout of the ti. ref pa 2017-0502-5436. maher na | $12,088 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 111 Pine St | Swinerton Builders | 14/f -demo (e) non structural partitions & finishes. construct new non structural partitions, new lights & mechanical casework doors & finishes. maher naDetails
14/f -demo (e) non structural partitions & finishes. construct new non structural partitions, new lights & mechanical casework doors & finishes. maher na | $129,500 |
| Apr 14, 2017 | Completed final sign-off Apr 2017 | 111 Pine St | Johnson Controls Fire | 6th fl ti consist of adding 2 smoke detectors, 1 relay module, 2 duct detectors, 15 speaker strobes & 2 speakers. t.i. #2017-01-30-8180Details
6th fl ti consist of adding 2 smoke detectors, 1 relay module, 2 duct detectors, 15 speaker strobes & 2 speakers. t.i. #2017-01-30-8180 | $13,000 |
| Mar 20, 2017 | Completed final sign-off Nov 2017 | 111 Pine St | Swinerton Builders | 4th flr: install new fan coil unit and ductwork. instll and relocate data and power for new furnace configuration maher naDetails
4th flr: install new fan coil unit and ductwork. instll and relocate data and power for new furnace configuration maher na | $48,000 |
| Mar 14, 2017 | Expired or cancelled cancelled Jan 2026 | 111 Pine St | tenant improvement remodel. alteration to existing interior walls, add elec outlets, new breakroom, caasework (combining suite 1615 and 1620)Details
tenant improvement remodel. alteration to existing interior walls, add elec outlets, new breakroom, caasework (combining suite 1615 and 1620) | $88,000 | |
| Feb 17, 2017 | Completed final sign-off May 2017 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | add, relocate and remove fire sprinklers per ti (16 add), (66 relocate) (2 remove) 6th floor. ref pa 2016-0324-3022Details
add, relocate and remove fire sprinklers per ti (16 add), (66 relocate) (2 remove) 6th floor. ref pa 2016-0324-3022 | $43,050 |
| Jan 30, 2017 | Completed final sign-off Nov 2017 | 111 Pine St | Swinerton Builders | 6/f- demo (e) non-structural partitions, construct (n) non structural partitions, install new doors, millwork, carpet, paint, finishes, lights, accommodate mechanic for (n) wall layout. n/a ordinance #155-13Details
6/f- demo (e) non-structural partitions, construct (n) non structural partitions, install new doors, millwork, carpet, paint, finishes, lights, accommodate mechanic for (n) wall layout. n/a ordinance #155-13 | $625,000 |
| Sep 27, 2016 | Never finaled issued Oct 2016, no final | 111 Pine St | Pribuss Engineering Inc | 14th floor: fire sprinkler t.i. under t.i. #201603243027. relocate 21, adds 05, delete 26.Details
14th floor: fire sprinkler t.i. under t.i. #201603243027. relocate 21, adds 05, delete 26. | $13,450 |
| Sep 14, 2016 | Never finaled issued Sep 2016, no final | 111 Pine St | Johnson Controls Fire | fire alarm tenant improvement to 14th floor, suite 1405 & 1415 - 1 booster panel, 5 speaker/strobes. ref pa 2016-0324-3022. maher naDetails
fire alarm tenant improvement to 14th floor, suite 1405 & 1415 - 1 booster panel, 5 speaker/strobes. ref pa 2016-0324-3022. maher na | $5,000 |
| Mar 24, 2016 | Completed final sign-off Dec 2017 | 111 Pine St | Swinerton Builders | demo non structural partitions constuct new non structural partitions, doors, frames, hardward, new lights, finishes, caseworkDetails
demo non structural partitions constuct new non structural partitions, doors, frames, hardward, new lights, finishes, casework | $90,000 |
| Oct 20, 2015 | Completed final sign-off Mar 2016 | 111 Pine St | Peacock Construction | 17th floor, suite 1700: remodel of (e) office space. remove (e) partition and add new expansion of 5' of confrence room, remove (e) partition between 2 rooms & change a ceiling high wall to 42" wall. maher na. life safety deferred.Details
17th floor, suite 1700: remodel of (e) office space. remove (e) partition and add new expansion of 5' of confrence room, remove (e) partition between 2 rooms & change a ceiling high wall to 42" wall. maher na. life safety deferred. | $120,000 |
| Apr 23, 2015 | Completed final sign-off Apr 2016 | 111 Pine St | Westower Communications | remove all nextel radio equipment, antennas and above ground coax. maher - not req'd. work is on roof, 19th fl, and exterior of 4th fl.Details
remove all nextel radio equipment, antennas and above ground coax. maher - not req'd. work is on roof, 19th fl, and exterior of 4th fl. | $10,000 |
| Aug 19, 2014 | Completed final sign-off Sep 2014 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 1st flr: ref. 201406249213, add & relocate fir sprinklers per tenant improvements, 10 relocate, 6 add; maher n/aDetails
1st flr: ref. 201406249213, add & relocate fir sprinklers per tenant improvements, 10 relocate, 6 add; maher n/a | $8,224 |
| Aug 1, 2014 | Completed final sign-off Sep 2014 | 111 Pine St | Johnson Controls Fire | fire alarm work on ground floor cafteria, 2 new speaker/strobes. t.i. pa#201406249213. n/a ordinance #155-13Details
fire alarm work on ground floor cafteria, 2 new speaker/strobes. t.i. pa#201406249213. n/a ordinance #155-13 | $2,500 |
| Jul 17, 2014 | Completed final sign-off Feb 2015 | 111 Pine St | Swinerton Builders | minor revision to pa#201406249213 showing an existing panic hardware which does not exist. update plans to correct mistake and post new sign to comply with code. n/a ordinance #155-13.Details
minor revision to pa#201406249213 showing an existing panic hardware which does not exist. update plans to correct mistake and post new sign to comply with code. n/a ordinance #155-13. | |
| Jul 2, 2014 | Completed final sign-off Jul 2014 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 15/f: add and relocate fire sprinklers per t.i. (4 add) (46 relocate) 15th floor, suite 1500. reference pa 201404012144Details
15/f: add and relocate fire sprinklers per t.i. (4 add) (46 relocate) 15th floor, suite 1500. reference pa 201404012144 | $25,700 |
| Jun 26, 2014 | Completed final sign-off Feb 2015 | 111 Pine St | Swinerton Builders | mep for appl.# 201406249213 for interior ti for an existing employee cafteria, add a type 2 hoods w/hvac. update kitchen sinks, food service/seating area. construction cost includes in t.i. permit 201406249213.maher n/a.Details
mep for appl.# 201406249213 for interior ti for an existing employee cafteria, add a type 2 hoods w/hvac. update kitchen sinks, food service/seating area. construction cost includes in t.i. permit 201406249213.maher n/a. | |
| Jun 24, 2014 | Completed final sign-off Mar 2015 | 111 Pine St | Swinerton Builders | tenant improvement (interior only) for an existing employee cafeteria, work includes replacement, add kitchen sinks, re-arrange of food service & seating areas and install of type ii hood. mep under seperate permit. n/a ordinance #155-13.Details
tenant improvement (interior only) for an existing employee cafeteria, work includes replacement, add kitchen sinks, re-arrange of food service & seating areas and install of type ii hood. mep under seperate permit. n/a ordinance #155-13. | $160,000 |
| Jun 5, 2014 | Completed final sign-off Jul 2014 | 111 Pine St | Johnson Controls Fire | fire alarm t.i. to 15th floor. addition of new (1) smoke detector, (1) relay, (11) speaker/strobes, (1) strobe & (1) sync module.n/a for the maher ordinance #155-13Details
fire alarm t.i. to 15th floor. addition of new (1) smoke detector, (1) relay, (11) speaker/strobes, (1) strobe & (1) sync module.n/a for the maher ordinance #155-13 | $8,200 |
| Apr 11, 2014 | Never finaled issued Apr 2014, no final | 111 Pine St | street space | ||
| Apr 1, 2014 | Completed final sign-off Feb 2015 | 111 Pine St | Swinerton Builders | 15th floor - demo (e) non-structural partitions, doors,frames,ceilings, finishes, lights & construct new partitions, doors, frames, finishes modify, mep to accomodate new partition layout, sprinklers on separate permit. compliance with ordinance #155-13 not requiredDetails
15th floor - demo (e) non-structural partitions, doors,frames,ceilings, finishes, lights & construct new partitions, doors, frames, finishes modify, mep to accomodate new partition layout, sprinklers on separate permit. compliance with ordinance #155-13 not required | $498,000 |
| Feb 11, 2014 | Completed final sign-off Apr 2014 | 111 Pine St | Johnson Controls Fire | voluntary addition of 4 speaker strobes to basement storage roomsDetails
voluntary addition of 4 speaker strobes to basement storage rooms | $1,600 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 111 Pine St | street space | ||
| Oct 30, 2013 | Never finaled issued Oct 2013, no final | 111 Pine St | street space | ||
| Aug 21, 2013 | Never finaled issued Aug 2013, no final | 111 Pine St | Simplexgrinnell Lp. | 4th floor: fire alarm t.i., 5 new strobes, 8 speaker/strobes, 15 speakers, remove/demo 3 extg strobes. t.i. 201305237765Details
4th floor: fire alarm t.i., 5 new strobes, 8 speaker/strobes, 15 speakers, remove/demo 3 extg strobes. t.i. 201305237765 | $13,500 |
| Aug 21, 2013 | Never finaled issued Aug 2013, no final | 111 Pine St | Simplexgrinnell Lp. | 1st floor:fire alarm t.i. to eagle cafe. 1 new monitor modules for kitchen hood supervision and 1 new relay for fan shutdown. t. i. 201305167081Details
1st floor:fire alarm t.i. to eagle cafe. 1 new monitor modules for kitchen hood supervision and 1 new relay for fan shutdown. t. i. 201305167081 | $3,000 |
| Aug 19, 2013 | Completed final sign-off Oct 2013 | 111 Pine St | Certified Fire & Safety Co | hook up ul 300 ansul fire system to protect kitchen hood and cooking equipment. ref. to pa#201305167081Details
hook up ul 300 ansul fire system to protect kitchen hood and cooking equipment. ref. to pa#201305167081 | $3,000 |
| May 23, 2013 | Completed final sign-off Mar 2014 | 111 Pine St | Swinerton Builders | 4th floor-demo non structural partitons, flooring, doors, frames, glass. partial light fixtures. construct new partitions. install new doors, frames, finishes to accomodate new layoutDetails
4th floor-demo non structural partitons, flooring, doors, frames, glass. partial light fixtures. construct new partitions. install new doors, frames, finishes to accomodate new layout | $85,000 |
| May 16, 2013 | Completed final sign-off Nov 2013 | 111 Pine St | Swinerton Builders | ground floor add a type 1 hood to an existing kitchen of office kitchen.Details
ground floor add a type 1 hood to an existing kitchen of office kitchen. | $150,000 |
| May 10, 2013 | Completed final sign-off Dec 2015 | 111 Pine St | Swinerton Builders | 9th floor: remove existing non-structural portland cement plaster wall/ construct full height partitions, doors, ceiling, soffits and landing. fire alarm and sprinklers on seperate permit.Details
9th floor: remove existing non-structural portland cement plaster wall/ construct full height partitions, doors, ceiling, soffits and landing. fire alarm and sprinklers on seperate permit. | $100,000 |
| Apr 23, 2013 | Completed final sign-off May 2013 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 13th floor - add & relocate fire sprinkler heads per tenant improvements, 2 add, 35 relcoate. ref t.i. #2013.01.14.7899Details
13th floor - add & relocate fire sprinkler heads per tenant improvements, 2 add, 35 relcoate. ref t.i. #2013.01.14.7899 | $19,000 |
| Apr 17, 2013 | Completed final sign-off May 2013 | 111 Pine St | Simplexgrinnell Lp. | fire alarm t.i to 13th fl. ste 1300. 5 new speaker/strobes, 2 new speakers. t.i pa# 201301147899Details
fire alarm t.i to 13th fl. ste 1300. 5 new speaker/strobes, 2 new speakers. t.i pa# 201301147899 | $3,200 |
| Jan 14, 2013 | Completed final sign-off Nov 2013 | 111 Pine St | Swinerton Builders | 13th floor-demo non structural partition walls, doors, frames, partial ceiling grid, lights & finishes. construct new partitions, doors, frames, finishes, mechanical, ceiling to accomodate new layout. fire alarm, sprinkler on seperate permits. upgrade (e) restroomsDetails
13th floor-demo non structural partition walls, doors, frames, partial ceiling grid, lights & finishes. construct new partitions, doors, frames, finishes, mechanical, ceiling to accomodate new layout. fire alarm, sprinkler on seperate permits. upgrade (e) restrooms | $436,000 |
| Oct 31, 2012 | Never finaled issued Oct 2012, no final | 111 Pine St | Anderson, Rowe & Buckley, Inc. | 3rd floor:t.i. improvements to the extg fire sprinkler system. 75 relocated sprinkler. t.i. app#201008168816, new bracing.Details
3rd floor:t.i. improvements to the extg fire sprinkler system. 75 relocated sprinkler. t.i. app#201008168816, new bracing. | $37,500 |
| Jun 15, 2012 | Completed final sign-off Jul 2012 | 111 Pine St | Golden Gate Fire Protection Inc | 18th floor -fire system upgrade, relcoate 5 pendent sprinkler heads in suite 1815 & relocate 10 pendent sprinkelr in suite 1825Details
18th floor -fire system upgrade, relcoate 5 pendent sprinkler heads in suite 1815 & relocate 10 pendent sprinkelr in suite 1825 | $7,200 |
| Jun 15, 2012 | Never finaled issued Jun 2012, no final | 111 Pine St | Swinerton Builders | to obtain final inspection for work approved under pa# 201009100606. all work is complete.Details
to obtain final inspection for work approved under pa# 201009100606. all work is complete. | |
| Jun 15, 2012 | Never finaled issued Jun 2012, no final | 111 Pine St | Simplexgrinnell Lp. | 1815 and 1825: fire alarm system tenent improvement to suite 1815 and 1825, 7 new strobes, 13 new speakersDetails
1815 and 1825: fire alarm system tenent improvement to suite 1815 and 1825, 7 new strobes, 13 new speakers | $8,000 |
| May 23, 2012 | Never finaled issued Jun 2012, no final | 111 Pine St | Swinerton Builders | revision to app#201008168816. delete fan coil units on 3rd floor and 7th floor work superceded by permit app#201108112293 and work on 8th floor superceded by permit app#201106299202.Details
revision to app#201008168816. delete fan coil units on 3rd floor and 7th floor work superceded by permit app#201108112293 and work on 8th floor superceded by permit app#201106299202. | |
| May 23, 2012 | Completed final sign-off Oct 2012 | 111 Pine St | Peacock Construction Inc | suite 1825. remodel existing office space. new ceiling , finishes, modify existing mechanical/plumbing and electrical system per plan. modify e sprinkler system under separate permit if required.Details
suite 1825. remodel existing office space. new ceiling , finishes, modify existing mechanical/plumbing and electrical system per plan. modify e sprinkler system under separate permit if required. | $255,450 |
| May 23, 2012 | Completed final sign-off Feb 2013 | 111 Pine St | Peacock Construction Inc | suite 1815: demo existing non structural partitions, construct new non structural partitions to accomodate new layout. new or relocated doors and framesDetails
suite 1815: demo existing non structural partitions, construct new non structural partitions to accomodate new layout. new or relocated doors and frames | $38,000 |
| Apr 26, 2012 | Completed final sign-off Feb 2013 | 111 Pine St | Peacock Construction Inc | 18th floor:demo selected non structural partitions, construct new ceiling high partitions per new layout. install new door with side light.Details
18th floor:demo selected non structural partitions, construct new ceiling high partitions per new layout. install new door with side light. | $48,000 |
| Apr 18, 2012 | Expired or cancelled cancelled Oct 2012 | 111 Pine St | Simplexgrinnell Lp. | t.i of basement level. remove & cover (2) existing strobes and (2) combination speaker/strobes. install (8) new ceiling mount speaker/strobes, (3) duct detectors, & 1 control zam for fsds.Details
t.i of basement level. remove & cover (2) existing strobes and (2) combination speaker/strobes. install (8) new ceiling mount speaker/strobes, (3) duct detectors, & 1 control zam for fsds. | $5,000 |
| Feb 29, 2012 | Completed final sign-off Mar 2012 | 111 Pine St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade: relocate 6 pendents sprinkler heads on the 18th floor.Details
fire sprinkler system upgrade: relocate 6 pendents sprinkler heads on the 18th floor. | $3,090 |
| Feb 24, 2012 | Never finaled issued Feb 2012, no final | 111 Pine St | Simplexgrinnell Lp. | 18th floor suite 1800 tenant improvement - remove & cover (4) smoke detectors & (4) door holders, remove & replace existing (2) speaker/strobes & (2) strobe only with new. install new (6) strobes, (6) ceiling mount speakers & (5) duct detectors.Details
18th floor suite 1800 tenant improvement - remove & cover (4) smoke detectors & (4) door holders, remove & replace existing (2) speaker/strobes & (2) strobe only with new. install new (6) strobes, (6) ceiling mount speakers & (5) duct detectors. | $6,000 |
| Feb 3, 2012 | Completed final sign-off Mar 2012 | 111 Pine St | Simplexgrinnell Lp. | fire alarm system, tenant improvement of the 7th floor. 3 smoke detectors, 5 relay modules, 19 strobes, 25 speakers. existing iniating/detection devices to remain.Details
fire alarm system, tenant improvement of the 7th floor. 3 smoke detectors, 5 relay modules, 19 strobes, 25 speakers. existing iniating/detection devices to remain. | $15,000 |
| Feb 2, 2012 | Completed final sign-off Aug 2012 | 111 Pine St | Western Allied Mechanical Inc. | replace 2 existing 5500 mbh heating hot water boilers and 1 existing 200 mbh domestic water heater with 3 high efficiency low nox 2000 mbh boilers and 2 new high efficiency instantaneous domestic water heatersDetails
replace 2 existing 5500 mbh heating hot water boilers and 1 existing 200 mbh domestic water heater with 3 high efficiency low nox 2000 mbh boilers and 2 new high efficiency instantaneous domestic water heaters | $267,000 |
| Feb 2, 2012 | Completed final sign-off Oct 2012 | 111 Pine St | 18th floor interior tenant improvement work includes alteration of non-structural wall partitions, doors, a pantry area & their related items. upgrade existing restrooms to comply w/accessiblity requirements. fire alarm and sprinkler under separate permits if required.Details
18th floor interior tenant improvement work includes alteration of non-structural wall partitions, doors, a pantry area & their related items. upgrade existing restrooms to comply w/accessiblity requirements. fire alarm and sprinkler under separate permits if required. | $58,000 | |
| Jan 12, 2012 | Completed final sign-off Feb 2012 | 111 Pine St | fire sprinkler only. 1st republic band. 7th floor.relocate 86 heads,add 6 heads, remove 9 heads. total 92 heads.Details
fire sprinkler only. 1st republic band. 7th floor.relocate 86 heads,add 6 heads, remove 9 heads. total 92 heads. | $46,000 | |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 111 Pine St | Intelligent Technologies & Services Inc | upgrade extg detection and control for clean agent system on 5th floor computer room.Details
upgrade extg detection and control for clean agent system on 5th floor computer room. | $7,100 |
| Sep 30, 2011 | Completed final sign-off Dec 2011 | 111 Pine St | Simplex Grinnell | tenant improvement of 8th & 9th flr: provide & install new (1) mapnet card, (37) wall mount strobes, (4) ceiling mount speaker/strobes (51) ceiling mount speakers, (2) smoke detr'rs, 10 duct detectors & 9 relaysDetails
tenant improvement of 8th & 9th flr: provide & install new (1) mapnet card, (37) wall mount strobes, (4) ceiling mount speaker/strobes (51) ceiling mount speakers, (2) smoke detr'rs, 10 duct detectors & 9 relays | $35,000 |
| Aug 11, 2011 | Never finaled issued Aug 2011, no final | 111 Pine St | Ayoob & Peery Plumbing Co Inc | add relocate & remove fire sprinklers per tenant improvement 8th floor = 1 add , 84 relocate, 22 removed. 9th floor = 1 add , 95 relocate, 7 removed.Details
add relocate & remove fire sprinklers per tenant improvement 8th floor = 1 add , 84 relocate, 22 removed. 9th floor = 1 add , 95 relocate, 7 removed. | $60,000 |
| Aug 11, 2011 | Never finaled issued Aug 2011, no final | 111 Pine St | Swinerton Builders | demo non structural partitions, flooring, doors, frames, glass millwork, grid, light fixtures. construction new partitions, install ceiling, lights doors, finishes. 7th floor. sprinklers and fire alrm separate-Details
demo non structural partitions, flooring, doors, frames, glass millwork, grid, light fixtures. construction new partitions, install ceiling, lights doors, finishes. 7th floor. sprinklers and fire alrm separate- | $381,500 |
| Aug 1, 2011 | Completed final sign-off Sep 2011 | 111 Pine St | Anderson, Rowe & Buckley, Inc. | sprinkler ti on 12th floor. relocate 16 sprinklers on existing fire sprinkler system.Details
sprinkler ti on 12th floor. relocate 16 sprinklers on existing fire sprinkler system. | $8,000 |
| Jun 29, 2011 | Never finaled issued Jul 2011, no final | 111 Pine St | Swinerton Builders | demo non structural partitions, doors, frames, ceilings, lights, finishes, construct new non structural partitions, ceiling lights, bathrooms, finishes,modify mech.Details
demo non structural partitions, doors, frames, ceilings, lights, finishes, construct new non structural partitions, ceiling lights, bathrooms, finishes,modify mech. | $481,500 |
| Jun 24, 2011 | Completed final sign-off Sep 2011 | 111 Pine St | Simplex Grinnell | 12th floor-suite 10, fire alarm improvement-3 new speaker/strobes added to (e) speaker & strobe circuitsDetails
12th floor-suite 10, fire alarm improvement-3 new speaker/strobes added to (e) speaker & strobe circuits | $4,500 |
| May 13, 2011 | Never finaled issued Jun 2011, no final | 111 Pine St | Swinerton Builders | revision to 200903254817/r2 9th fl: add stairs and partition typs from sheetrock to glass.new 9th floor opening for new spiral stairs to 8th floorDetails
revision to 200903254817/r2 9th fl: add stairs and partition typs from sheetrock to glass.new 9th floor opening for new spiral stairs to 8th floor | $481,500 |
| May 3, 2011 | Completed final sign-off Dec 2011 | 111 Pine St | Swinerton Builders | 12th floor - construct new ceiling height, walls, ceilings, doors + frames, lights, mechancial system & finishes, electrical & plumbing.Details
12th floor - construct new ceiling height, walls, ceilings, doors + frames, lights, mechancial system & finishes, electrical & plumbing. | $72,000 |
| Mar 21, 2011 | Completed final sign-off Jan 2012 | 111 Pine St | Simplex Grinnell | replace of extg heat pumps. extg duct smoke detectors are to be removed from extg heat pumps and reinstall at new heat pumpsDetails
replace of extg heat pumps. extg duct smoke detectors are to be removed from extg heat pumps and reinstall at new heat pumps | $6,000 |
| Mar 11, 2011 | Completed final sign-off Jun 2011 | 101 Pine St | Gci, Inc | new ti construction to include non structural partitions finishes, ceilings, etc. on 31st fl mech, el, sp, ls on sep permitDetails
new ti construction to include non structural partitions finishes, ceilings, etc. on 31st fl mech, el, sp, ls on sep permit | $200,000 |
| Mar 11, 2011 | Completed final sign-off Jun 2011 | 101 Pine St | Gci, Inc | new ti construction to include non structural partitions, finishes, ceilings etc on 32nd fl mech/el/sp/ls on separate permitDetails
new ti construction to include non structural partitions, finishes, ceilings etc on 32nd fl mech/el/sp/ls on separate permit | $500,000 |
| Jan 6, 2011 | Completed final sign-off Jun 2011 | 111 Pine St | Pribuss Engineering Inc | t.i. fire sprinkler 1o flr- add 6 sprinklers, relocate 86. 11th floor - add 8 sprinklers relocate 86. total of 14 sprinklers & total of 172 relocate.Details
t.i. fire sprinkler 1o flr- add 6 sprinklers, relocate 86. 11th floor - add 8 sprinklers relocate 86. total of 14 sprinklers & total of 172 relocate. | $95,719 |
| Dec 31, 2010 | Completed final sign-off Jun 2011 | 111 Pine St | Simplex Grinnell | 10th & 11th floors-fire alarm system t.i-2 power supply w/batteries, 10 smokes, 18 duct smokes, 6 zam modules, 57 strobes, 58 speakers.Details
10th & 11th floors-fire alarm system t.i-2 power supply w/batteries, 10 smokes, 18 duct smokes, 6 zam modules, 57 strobes, 58 speakers. | $16,000 |
| Nov 16, 2010 | Completed final sign-off Mar 2011 | 111 Pine St | Peacock Construction Inc | revision to p.a. #2010-10-05-2348, new wall, doors, mechanical and lighting t-24 for p.a. 2010-10-05-2348Details
revision to p.a. #2010-10-05-2348, new wall, doors, mechanical and lighting t-24 for p.a. 2010-10-05-2348 | $12,000 |
| Nov 12, 2010 | Completed final sign-off Apr 2011 | 111 Pine St | Simplex Grinnell | addition of one ceiling speaker/strobe & relocation of one smoke detector and fire smoke damperDetails
addition of one ceiling speaker/strobe & relocation of one smoke detector and fire smoke damper | $2,880 |
| Nov 5, 2010 | Completed final sign-off Apr 2011 | 111 Pine St | Anderson, Rowe & Buckley, Inc. | 2nd floor - ti to existing sprinkler system, 5 relocated sprinklersDetails
2nd floor - ti to existing sprinkler system, 5 relocated sprinklers | $1,000 |
| Oct 29, 2010 | Completed final sign-off Mar 2011 | 111 Pine St | 17th floor - t.i. upgrade of exisitng fire sprinkler system. relocate 6 pendents, add 1 pendent & 1 upright.Details
17th floor - t.i. upgrade of exisitng fire sprinkler system. relocate 6 pendents, add 1 pendent & 1 upright. | $2,400 | |
| Oct 5, 2010 | Completed final sign-off Mar 2011 | 111 Pine St | Peacock Construction Inc | suite 1725: demolition (e) ceiling high walls, construct new ceiling high walls to archieve, new layout, relocate (e) light fixtures. sprinkler, life safety, mechanical, electrical under seperate permitDetails
suite 1725: demolition (e) ceiling high walls, construct new ceiling high walls to archieve, new layout, relocate (e) light fixtures. sprinkler, life safety, mechanical, electrical under seperate permit | $122,000 |
| Sep 30, 2010 | Completed final sign-off Jun 2011 | 111 Pine St | Swinerton Builders | 10th floor-demo extg stairs that go to 11th floor. demo bathrooms. construct new partitions, ceilings, finishes,bathrooms m, e, p lighting,doors and frames. fire alarm and sprinkler on seperate permit.Details
10th floor-demo extg stairs that go to 11th floor. demo bathrooms. construct new partitions, ceilings, finishes,bathrooms m, e, p lighting,doors and frames. fire alarm and sprinkler on seperate permit. | $481,500 |
| Sep 21, 2010 | Completed final sign-off Apr 2011 | 111 Pine St | Swinerton Builders | demo extg partitions, remove floor finishes, remove ceilings lighting and wiring in related area's. construct new partitions install lighting to accomodate new layout. fire alarm and sprinklers on seperate permit.Details
demo extg partitions, remove floor finishes, remove ceilings lighting and wiring in related area's. construct new partitions install lighting to accomodate new layout. fire alarm and sprinklers on seperate permit. | $97,000 |
| Sep 10, 2010 | Never finaled issued Sep 2010, no final | 111 Pine St | Swinerton Builders | modify extg finishes at 8th floor stair area. demo slab on 9,10,11 floors to construct new none emergency convenience stairs floors 9,10,11. revise/update existing stairwell signage as per 10(a-3) as per plans.Details
modify extg finishes at 8th floor stair area. demo slab on 9,10,11 floors to construct new none emergency convenience stairs floors 9,10,11. revise/update existing stairwell signage as per 10(a-3) as per plans. | $180,000 |
| Aug 31, 2010 | Completed final sign-off Jun 2011 | 111 Pine St | Swinerton Builders | office ti on the 11th floor. demo partitions, ceiling, mech, electrical and slab to install (n) stairs. construct (n) partitions. mech, elect. plumbing, (n) restrooms for ada.Details
office ti on the 11th floor. demo partitions, ceiling, mech, electrical and slab to install (n) stairs. construct (n) partitions. mech, elect. plumbing, (n) restrooms for ada. | $481,500 |
| Aug 18, 2010 | Completed final sign-off Apr 2011 | 111 Pine St | Swinerton Builders | 2nd floor-demo (e) partitions, finishes, mechanical & electrical of 4 offices, construct new tela presence conference room with new electrical, plumbing, hvac & finishesDetails
2nd floor-demo (e) partitions, finishes, mechanical & electrical of 4 offices, construct new tela presence conference room with new electrical, plumbing, hvac & finishes | $47,000 |
| Aug 16, 2010 | Never finaled issued Oct 2010, no final | 111 Pine St | Swinerton Builders | roof level-install new vrv supplemental cooling unit for floors 3rd through 8th, install heat recovery units on roof & ceiling fan co. units piping & controlsDetails
roof level-install new vrv supplemental cooling unit for floors 3rd through 8th, install heat recovery units on roof & ceiling fan co. units piping & controls | $585,000 |
| Apr 30, 2010 | Completed final sign-off Sep 2010 | 101 Pine St | Simplex Grinnell | addition of 13 strobes, 12 ceiling speakers and 3 pull stations. work on the 1st floorDetails
addition of 13 strobes, 12 ceiling speakers and 3 pull stations. work on the 1st floor | $7,000 |
| Apr 29, 2010 | Completed final sign-off Sep 2010 | 101 Pine St | Pribuss Engineering Inc | ground floor-fire sprinkler t.i.-relocate 42 fire sprinklersDetails
ground floor-fire sprinkler t.i.-relocate 42 fire sprinklers | $8,400 |
| Mar 12, 2010 | Completed final sign-off May 2010 | 111 Pine St | Simplex Grinnell | first republic bank. tenant improvement to fire alarm system on 7th floor. add 3 strobes, 2 speakers and 1 pull station.Details
first republic bank. tenant improvement to fire alarm system on 7th floor. add 3 strobes, 2 speakers and 1 pull station. | $4,000 |
| Mar 11, 2010 | Completed final sign-off May 2010 | 111 Pine St | Pribuss Engineering Inc | 7th floor-fire sprinkler t.i.-relocate 9 sprinkler headsDetails
7th floor-fire sprinkler t.i.-relocate 9 sprinkler heads | $1,800 |
| Mar 8, 2010 | Completed final sign-off May 2010 | 111 Pine St | Simplex Grinnell | construction of tenant improvement for 16th. flr. consist of additional 2-iam's for fm 200. revision to appl. #201002116360.Details
construction of tenant improvement for 16th. flr. consist of additional 2-iam's for fm 200. revision to appl. #201002116360. | $500 |
| Feb 24, 2010 | Never finaled issued Feb 2010, no final | 111 Pine St | Sabah International Incorporated | suite 1600: re-locate 1-(e) novec fire suppression system from 49 geary st. final & tested. 1-control panel, 4-smoke detectors, 1-pull station, 1-abort, 2-strobes, 2-strobes, 1-tank(195 lbs).Details
suite 1600: re-locate 1-(e) novec fire suppression system from 49 geary st. final & tested. 1-control panel, 4-smoke detectors, 1-pull station, 1-abort, 2-strobes, 2-strobes, 1-tank(195 lbs). | $22,854 |
| Feb 12, 2010 | Completed final sign-off May 2010 | 111 Pine St | 16th floor-t.i. upgrade on an (e) fire sprinkler system at 111 pine st 16th flr for suite #1600. relocate 1 head & add 2 heads, 3 totalDetails
16th floor-t.i. upgrade on an (e) fire sprinkler system at 111 pine st 16th flr for suite #1600. relocate 1 head & add 2 heads, 3 total | $600 | |
| Feb 11, 2010 | Completed final sign-off May 2010 | 111 Pine St | Simplex Grinnell | 16th floor-add 1 nac panel, add 5 strobes, add 5 ceiling mount spearker & add 1 signal zamDetails
16th floor-add 1 nac panel, add 5 strobes, add 5 ceiling mount spearker & add 1 signal zam | $5,000 |
| Feb 11, 2010 | Completed final sign-off Sep 2010 | 111 Pine St | Swinerton Builders | 1st floor t.i. - demo (e) partitions, finishes, construct new partition, finishes, relocate (e) light fixtures, sprinkler & fire alarm under separate permit.Details
1st floor t.i. - demo (e) partitions, finishes, construct new partition, finishes, relocate (e) light fixtures, sprinkler & fire alarm under separate permit. | $325,000 |
| Feb 4, 2010 | Completed final sign-off May 2010 | 111 Pine St | Swinerton Builders | 7th floor t.i. - relocate 4 locations demo (e) partitions, finishes, elect & plbg; construct new partitions, finishes, relcoate new elec & plbg.Details
7th floor t.i. - relocate 4 locations demo (e) partitions, finishes, elect & plbg; construct new partitions, finishes, relcoate new elec & plbg. | $50,000 |
| Jan 28, 2010 | Completed final sign-off May 2010 | 111 Pine St | Peacock Construction Inc | 16th floor-new ceiling high walls, infill door in corridor, new carpet & paint, relocate lights & add new power & dataDetails
16th floor-new ceiling high walls, infill door in corridor, new carpet & paint, relocate lights & add new power & data | $94,000 |
| Oct 15, 2009 | Never finaled issued Oct 2009, no final | 111 Pine St | Simplex Grinnell | 9th floor-install 2 ceiling mounted speakers/strobes, 21 wall mount strobes, 24 ceiling mounted speakers, 5 smoke detectors, 2 door holders, 1 control zam & 8 duct detectorsDetails
9th floor-install 2 ceiling mounted speakers/strobes, 21 wall mount strobes, 24 ceiling mounted speakers, 5 smoke detectors, 2 door holders, 1 control zam & 8 duct detectors | $10,000 |
| Jul 24, 2009 | Never finaled issued Jul 2009, no final | 111 Pine St | compliance with high rise sprinkler ordinance 377-93 umbrella permit.Details
compliance with high rise sprinkler ordinance 377-93 umbrella permit. | ||
| Jul 14, 2009 | Completed final sign-off Aug 2009 | 111 Pine St | Anderson, Rowe & Buckley, Inc. | to obtain final inspection for work approved under pa#200702013120. all work is complete.Details
to obtain final inspection for work approved under pa#200702013120. all work is complete. | |
| Jun 8, 2009 | Completed final sign-off Jun 2009 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | relcoate & remvoe fire spinklers per tenant improvements. (5 remove) (2 remove)Details
relcoate & remvoe fire spinklers per tenant improvements. (5 remove) (2 remove) | $750 |
| Jun 4, 2009 | Completed final sign-off Aug 2009 | 111 Pine St | Simplex Grinnell | 13th floor fire alarm system - install (3) new wall mounted strobes, relocate (1) existing, ceiling speakers & add (2) new ceiling mounted speakers.Details
13th floor fire alarm system - install (3) new wall mounted strobes, relocate (1) existing, ceiling speakers & add (2) new ceiling mounted speakers. | $5,000 |
| Jun 1, 2009 | Completed final sign-off Aug 2009 | 111 Pine St | Peacock Construction Inc | demo existing non bearing partitions. build back partitions to meet new office configuration including case work and new conference room. reduce size of project suite 1350 while increasing the adjacent suite 1300. mep and life safety under separate permit. work on 13th floorDetails
demo existing non bearing partitions. build back partitions to meet new office configuration including case work and new conference room. reduce size of project suite 1350 while increasing the adjacent suite 1300. mep and life safety under separate permit. work on 13th floor | $28,000 |
| Mar 25, 2009 | Never finaled issued Jun 2009, no final | 111 Pine St | Swinerton Builders | tenant improvement demo e partitions, ceilings, finishes. construct new partitions, ceilings, finishes, construct new convenience stairs to e convenience stairs from 8th fl to 9th fl. fire alarm and sprinkler sep permitDetails
tenant improvement demo e partitions, ceilings, finishes. construct new partitions, ceilings, finishes, construct new convenience stairs to e convenience stairs from 8th fl to 9th fl. fire alarm and sprinkler sep permit | $851,000 |
| Mar 12, 2009 | Completed final sign-off Apr 2009 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | floor 10th, 11th, 12th -install base building fire sprinkelr, install partial base building fire sprinkler at 12th floor, 104 heads at 10th floor, 100 heads at 11th, 16 heads.Details
floor 10th, 11th, 12th -install base building fire sprinkelr, install partial base building fire sprinkler at 12th floor, 104 heads at 10th floor, 100 heads at 11th, 16 heads. | $40,000 |
| Mar 10, 2009 | Completed final sign-off May 2009 | 111 Pine St | Peacock Construction Inc | full floor demolition down to the building core on 10th. & 11th. flr., partial 12th. flr. demo walls and ceiling. (per ab-o17)Details
full floor demolition down to the building core on 10th. & 11th. flr., partial 12th. flr. demo walls and ceiling. (per ab-o17) | $95,000 |
| Jan 29, 2009 | Never finaled issued Jan 2009, no final | 111 Pine St | Ayoob & Peery Plumbing Co Inc | at 14th fl: relocate & remove fire sprinkler heads per tenant improvements. 8 relocate, 1 remove.Details
at 14th fl: relocate & remove fire sprinkler heads per tenant improvements. 8 relocate, 1 remove. | $1,450 |
| Dec 31, 2008 | Completed final sign-off Apr 2009 | 111 Pine St | Peacock Construction Inc | minor demolition of non-structural partitions. re-work ceiling & walls to new configuration. mechanical-electrical-lighting.Details
minor demolition of non-structural partitions. re-work ceiling & walls to new configuration. mechanical-electrical-lighting. | $60,000 |
| May 28, 2008 | Completed final sign-off Sep 2008 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | 15th floor - relocate 10 sprinkler heads on the 15th floorDetails
15th floor - relocate 10 sprinkler heads on the 15th floor | $2,500 |
| May 22, 2008 | Completed final sign-off Jun 2009 | 111 Pine St | Peacock Construction Inc | 15th floor: demo ceiling high partitions, infill door, build new walls, demo existing ceiling & go back new to align with existing, demo (e) demising wall separating #ste 1530 & #1550 to combine into one large suite; mechanical & electrical eng. drawing.Details
15th floor: demo ceiling high partitions, infill door, build new walls, demo existing ceiling & go back new to align with existing, demo (e) demising wall separating #ste 1530 & #1550 to combine into one large suite; mechanical & electrical eng. drawing. | $44,000 |
| Apr 28, 2008 | Completed final sign-off May 2008 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements (total 11 heads).Details
relocate fire sprinkler heads per tenant improvements (total 11 heads). | $2,500 |
| Apr 21, 2008 | Completed final sign-off May 2008 | 111 Pine St | Simplex Grinnell | provide and install new 4 new speakers and 4 new strobes on the 12th floorDetails
provide and install new 4 new speakers and 4 new strobes on the 12th floor | $6,000 |
| Apr 1, 2008 | Completed final sign-off May 2008 | 111 Pine St | Peacock Construction Inc | demolition of int. walls and finishes. rework portion of corp. wall and rebuild new ceiling ht int. walls and electrical and mechanical drawingsDetails
demolition of int. walls and finishes. rework portion of corp. wall and rebuild new ceiling ht int. walls and electrical and mechanical drawings | $29,000 |
| Mar 20, 2008 | Completed final sign-off Jul 2008 | 111 Pine St | Western Allied Mechanical Inc. | replace 2 existing water cooling towers on the 19th floorDetails
replace 2 existing water cooling towers on the 19th floor | $400,000 |
| Dec 12, 2007 | Completed final sign-off Dec 2007 | 111 Pine St | Swinerton Builders | renew pa#200702013120,#200704179012 for final inspection.Details
renew pa#200702013120,#200704179012 for final inspection. | |
| Jun 26, 2007 | Expired or cancelled cancelled Jan 2026 | 111 Pine St | destination based elevator controls for cars #1 through #5 | ||
| Jun 26, 2007 | Completed final sign-off Apr 2008 | 111 Pine St | Otis Elevator Co | destination based elevator controls for cars #1 through #5.Details
destination based elevator controls for cars #1 through #5. | $62,000 |
| Jun 26, 2007 | Expired or cancelled cancelled Jan 2026 | 111 Pine St | destination based elevator controls for cabs #1 through #5Details
destination based elevator controls for cabs #1 through #5 | $62,000 | |
| May 22, 2007 | Never finaled issued May 2007, no final | 111 Pine St | Simplex Grinnell | adding 5 modules to monitor alarm, trouble and supervisory conditions on r/e new fm 200 panel basement. add to change to app#200702133994. permit #1111637Details
adding 5 modules to monitor alarm, trouble and supervisory conditions on r/e new fm 200 panel basement. add to change to app#200702133994. permit #1111637 | $3,125 |
| Apr 17, 2007 | Completed final sign-off Dec 2007 | 111 Pine St | Intelligent Technologies & Services Inc | basement - furnish and install fm 200 system and pre-action detection for basement level file storage vault.Details
basement - furnish and install fm 200 system and pre-action detection for basement level file storage vault. | $9,500 |
| Feb 13, 2007 | Never finaled issued Feb 2007, no final | 111 Pine St | Simplex Grinnell | adding 1 sd and 2 monitor modules to monitor alarm and trouble on new suppr panel (fbo). basement level only.Details
adding 1 sd and 2 monitor modules to monitor alarm and trouble on new suppr panel (fbo). basement level only. | $5,100 |
| Feb 1, 2007 | Never finaled issued Feb 2007, no final | 111 Pine St | Anderson, Rowe & Buckley, Inc. | pre action fire sprinkler system, 8 heads.Details
pre action fire sprinkler system, 8 heads. | $10,000 |
| Apr 28, 2006 | Completed final sign-off Dec 2006 | 111 Pine St | Ad Art Inc. | revision to extg permit 200412232031 change in material, relocatting to left entrance approx 10'Details
revision to extg permit 200412232031 change in material, relocatting to left entrance approx 10' | $2,500 |
| Dec 15, 2005 | Never finaled issued Dec 2005, no final | 111 Pine St | Ayoob & Peery Plumbing Co Inc | fire sprinkler system, 19/f -104 sprinklers, t.i. 1/f - 10 sprinklers.Details
fire sprinkler system, 19/f -104 sprinklers, t.i. 1/f - 10 sprinklers. | $22,000 |
| Nov 8, 2005 | Completed final sign-off Apr 2006 | 111 Pine St | Simplex Grinnell | a fire alarm t.i. on the basement level ups room adding 2 smoke det. 1 control zam, 1 am, 1 speaker strobe. basement ups room & 4th floor telco room.Details
a fire alarm t.i. on the basement level ups room adding 2 smoke det. 1 control zam, 1 am, 1 speaker strobe. basement ups room & 4th floor telco room. | $6,708 |
| Aug 26, 2005 | Completed final sign-off Apr 2006 | 111 Pine St | Swinerton Builders | elect upgrade at 5th fl, revision to pa 200506094639.Details
elect upgrade at 5th fl, revision to pa 200506094639. | $15,000 |
| Jun 9, 2005 | Completed final sign-off Apr 2006 | 111 Pine St | Swinerton Builders | interior electrical upgrade of 5th floor with supporting equip on floors 4th thru basement.Details
interior electrical upgrade of 5th floor with supporting equip on floors 4th thru basement. | $100,000 |
| Apr 13, 2005 | Completed final sign-off Jul 2005 | 111 Pine St | Ayoob & Peery Plumbing Co Inc | oti-3, 7th floor, sp.Details
oti-3, 7th floor, sp. | $22,500 |
| Feb 22, 2005 | Completed final sign-off Jul 2005 | 111 Pine St | Simplex Grinnell | install 1 nac panel + 2 batteries in the 7th/fl. install 5 smokes, 1 duct detectors, 2 control zam,Details
install 1 nac panel + 2 batteries in the 7th/fl. install 5 smokes, 1 duct detectors, 2 control zam, | $6,900 |
| Feb 9, 2005 | Completed final sign-off Jun 2005 | 111 Pine St | Simplex Grinnell | as-built submittal for app no. 200410126431 (permit no. 1040403) field changes added 2 smoke devicesDetails
as-built submittal for app no. 200410126431 (permit no. 1040403) field changes added 2 smoke devices | $7,890 |
| Jan 20, 2005 | Completed final sign-off Jun 2005 | 111 Pine St | Simplex Grinnell | fire alarm ti for suite 1225Details
fire alarm ti for suite 1225 | $4,600 |
| Jan 7, 2005 | Completed final sign-off Jun 2005 | 111 Pine St | Peacock Construction Inc | oti-3 12th/fl-spDetails
oti-3 12th/fl-sp | $9,000 |
| Jan 7, 2005 | Completed final sign-off Jun 2005 | 111 Pine St | Peacock Construction Inc | oti-2 12th/fl-el, meDetails
oti-2 12th/fl-el, me | $33,500 |
| Jan 7, 2005 | Completed final sign-off Jul 2005 | 111 Pine St | Swinerton Builders | oti-2, 7th floor, el, me.Details
oti-2, 7th floor, el, me. | $145,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Swinerton Builders (37), Simplex Grinnell (18), Ayoob & Peery Plumbing Co Inc (16), Peacock Construction Inc (13), Rapid Fire Safety&Security Llc Dba Pafa (13), Johnson Controls Fire (11), Pribuss Engineering Inc (8), Turner Construction Co (8), Simplexgrinnell Lp. (7), Anderson, Rowe & Buckley, Inc. (6), Paganini Electric Corp(See Signatories) (6), The Whiting-Turner Contracting Company (5), Western Allied Mechanical Inc. (5), Golden Gate Fire Protection Inc (4), Signtech Electrical Advertising Inc. (3), Gci, Inc (2), Intelligent Technologies & Services Inc (2), Pacific Auxiliary Fire Alarm (2), Peacock Construction (2), Skyline Capital Builders Llc (2), Ad Art Inc., Certified Fire & Safety Co, Everon Llc, Otis Elevator Co, Rise Rigging Llc, Sabah International Incorporated, W. Bradley Electric, Westower Communications
- Architects
- Wesley T. Fukumori (19), Anthony Roxas (7), Jeffery Schimier (5), Tong Chun Cheung (4), Henry H. Kwang (3), Isaac Ishak (3), Anthony Roxas, Julian White
- Engineers
- Julian White (5), Sami Khoury (3), Alexander Joseph Pacheco (2), David Hollas (2), Dorel Anghel (2), Kurt Kohler-Eeor (2), Stephen Harris (2), Wesley Fukumori (2), Acies Engineering, Alexander Pacheco, Anindya Dutta, Bradley Hollub, Christian Natalus Dalimarta, Donald D. Dammen, Elisabeth M Allen, Isaac Ishak, Jeffrey Schmierer, Joseph Williams, Kurt Kohler, Levi G. Abarte, Mario Carpanza, Matt Frantz, Todd Gottshall, Tong Cheung Arch, Wilson Lee, Yosief Philipos
- Authorized agents
- Mario Cabada, Ron Baxter
- Designers
- Rapid Fire Safety&Security Llc (2), Henry Kwong, Johnson Controls Fire, Julian White, Pacific Auxiliary Fire Alarm, Pribuss Engineering Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.