Kurt Kohler-Eeor
- Listed as
- engineer
- On San Francisco permits
- May 2018 to Dec 2020
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 21, 2020 | Completed final sign-off Aug 2022 | 111 Pine St | Skyline Capital Builders Llc | demo existing base-building centrifugal supply fans (x4) & replace with new fan wall technology with new vfd drive controller & power connections. new structural support for access platform for the fan wall.Details
demo existing base-building centrifugal supply fans (x4) & replace with new fan wall technology with new vfd drive controller & power connections. new structural support for access platform for the fan wall. | $715,000 |
| Dec 21, 2020 | Completed final sign-off Aug 2022 | 111 Pine St | Skyline Capital Builders Llc | demo existing water-cooled chiller plants & towers and replace with new air-cooled chiller plant on the roof. new structural support on roof with distribution pumps and hydronic specialties on penthouse level.Details
demo existing water-cooled chiller plants & towers and replace with new air-cooled chiller plant on the roof. new structural support on roof with distribution pumps and hydronic specialties on penthouse level. | $1,350,000 |
| Nov 26, 2019 | Completed final sign-off Feb 2021 | 420 Montgomery St | Skyline Construction | rev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridorDetails
rev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridor | $10,000 |
| May 4, 2018 | Completed final sign-off Mar 2021 | 420 Montgomery St | Skyline Construction | in whole building. electrical service replacement, elect distribution repair & replacement, associated architectural/plumbing and hvac work to accomodate new electrical equipment installation. maher n/aDetails
in whole building. electrical service replacement, elect distribution repair & replacement, associated architectural/plumbing and hvac work to accomodate new electrical equipment installation. maher n/a | $8,000,000 |