Block 0239, lot 026
420 Montgomery St
- City’s use
- Commercial Office
- Built
- 1959
- Stories
- 12
- Units
- 2
- Rooms
- 59 bathrooms
- Building
- 409,013 sq ft
- Lot
- 30,775 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2025 | Completed final sign-off Nov 2025 | 420 Montgomery St | Rapid Fire Safety&Security Llc Dba Pafa | 8th floor: fire alarm t.i. - relocating 1 relay module on existing notifier nfs2-3030 fire alarm systemDetails
8th floor: fire alarm t.i. - relocating 1 relay module on existing notifier nfs2-3030 fire alarm system | $4,559 |
| Mar 19, 2024 | Expired or cancelled suspend Apr 2024 | 464 California St | Tracy Sign Inc | replace single illuminated channel letters "wells fargo" on east elevation called e06Details
replace single illuminated channel letters "wells fargo" on east elevation called e06 | $6,000 |
| Mar 19, 2024 | Expired or cancelled cancelled Sep 2026 | 464 California St | Tracy Sign Inc | to replace non illuminated double sided banner sign w/hardware on west elevation side of building for "wells fargo" e04Details
to replace non illuminated double sided banner sign w/hardware on west elevation side of building for "wells fargo" e04 | $1,500 |
| Mar 19, 2024 | Expired or cancelled suspend Jun 2026 | 464 California St | Tracy Sign Inc | replace double sided non illumintaed banner sign with hardware on the south elevation side of the building "wells fargo" called e09Details
replace double sided non illumintaed banner sign with hardware on the south elevation side of the building "wells fargo" called e09 | $1,500 |
| Mar 19, 2024 | In progress issued Apr 2024 | 464 California St | Tracy Sign Inc | to replace illuminated single sided channel letters "wells fargo" at south elevation facing street "e05"Details
to replace illuminated single sided channel letters "wells fargo" at south elevation facing street "e05" | $7,000 |
| Mar 19, 2024 | Expired or cancelled suspend Apr 2024 | 464 California St | Tracy Sign Inc | replace single non illuminated double faced banner channel letters "wells fargo" on west elevation called e03Details
replace single non illuminated double faced banner channel letters "wells fargo" on west elevation called e03 | $6,000 |
| Mar 19, 2024 | Expired or cancelled suspend Apr 2024 | 464 California St | Tracy Sign Inc | replace double sided non illumintaed banner sign with hardware on the south elevation side of the building "wells fargo" called e08Details
replace double sided non illumintaed banner sign with hardware on the south elevation side of the building "wells fargo" called e08 | $1,500 |
| Mar 19, 2024 | In progress issued Apr 2024 | 464 California St | Tracy Sign Inc | to replace illuminated channel letters "wells fargo" e01Details
to replace illuminated channel letters "wells fargo" e01 | $3,000 |
| Mar 19, 2024 | In progress issued Apr 2024 | 464 California St | Tracy Sign Inc | to replace illuminated channel letters "wells fargo" e07Details
to replace illuminated channel letters "wells fargo" e07 | $1,500 |
| Nov 28, 2023 | Completed final sign-off Jul 2024 | 420 Montgomery St | Skyline Construction | (n) metal fence to be added to the (e) roof at the roof parapet for security purposes. 20 sq ft areaDetails
(n) metal fence to be added to the (e) roof at the roof parapet for security purposes. 20 sq ft area | $50,000 |
| Oct 25, 2023 | Completed final sign-off May 2024 | 420 Montgomery St | Skyline Construction | stair replacement @ 2nd fl roof and machine room roofDetails
stair replacement @ 2nd fl roof and machine room roof | $220,000 |
| Jun 29, 2023 | Completed final sign-off Feb 2024 | 420 Montgomery St | Western Roofing Service | reroofing. to comply with cool roof requirements per 2022 california energy code 141.0(b)2b. crrc 0742-0018. remove/replace old roof.Details
reroofing. to comply with cool roof requirements per 2022 california energy code 141.0(b)2b. crrc 0742-0018. remove/replace old roof. | $350,000 |
| Jun 29, 2023 | Completed final sign-off Feb 2024 | 420 Montgomery St | Skyline Construction | rooftop: mechanical work to cinlude replacement of metal siding of the outside of an enclosure, outside air damer and 4 louves.Details
rooftop: mechanical work to cinlude replacement of metal siding of the outside of an enclosure, outside air damer and 4 louves. | $150,000 |
| Oct 6, 2022 | Never finaled filed Oct 2022, never issued | 420 Montgomery St | interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of useDetails
interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of use | $3,120,000 | |
| Sep 27, 2022 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | remodel of partial 1st fl conversion of e office space to new mail room, production center, and delivery area. new lighting in areas of costruction onlyl. new paint and carpet for new spaces. new mech, plumb, elec for new spacesDetails
remodel of partial 1st fl conversion of e office space to new mail room, production center, and delivery area. new lighting in areas of costruction onlyl. new paint and carpet for new spaces. new mech, plumb, elec for new spaces | $550,000 | |
| Sep 26, 2022 | Never finaled filed Sep 2022, never issued | 420 Montgomery St | 2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of useDetails
2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of use | $3,120,000 | |
| Sep 21, 2022 | Never finaled filed Sep 2022, never issued | 420 Montgomery St | partial ti to 4th floor in a 12 story hi-rise building. scope pf work includes selective demolition , new partitions, doors, ceilings, mechanical, electrical and plumbing. also includes work cape classified as employee break room/pantry. there is no change of use. kitchenette for employee use.Details
partial ti to 4th floor in a 12 story hi-rise building. scope pf work includes selective demolition , new partitions, doors, ceilings, mechanical, electrical and plumbing. also includes work cape classified as employee break room/pantry. there is no change of use. kitchenette for employee use. | $3,120,000 | |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 5/f: add 1 fire alarm spearker strobe to (e) noitifier nfs2-3030.Details
5/f: add 1 fire alarm spearker strobe to (e) noitifier nfs2-3030. | $1,980 |
| Jun 24, 2022 | Expired or cancelled cancelled Jan 2026 | 464 California St | Swinerton Builders | repair/replace sidewalk topping slab, 2 new curb ramps.Details
repair/replace sidewalk topping slab, 2 new curb ramps. | $125,000 |
| Sep 20, 2021 | Completed final sign-off Nov 2021 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 10/f: fire alarm ti: submitting record drawing reflecting field/as built conditions. ref. pa 201901039519.Details
10/f: fire alarm ti: submitting record drawing reflecting field/as built conditions. ref. pa 201901039519. | |
| Sep 9, 2021 | Completed final sign-off Mar 2022 | 420 Montgomery St | W. Bradley Electric | electrical branch modifications associated to the new sewer ejectors (2) & sump pump (2) replacement projectDetails
electrical branch modifications associated to the new sewer ejectors (2) & sump pump (2) replacement project | $20,000 |
| Jun 22, 2021 | Completed final sign-off Jul 2022 | 420 Montgomery St | Skyline Construction | existing boiler stack retrofit with new category 3 double wall 316l flue liner. one (1) new valuable speed draft inducedr fan and new boiler draft control system. associated structural and electrical included.Details
existing boiler stack retrofit with new category 3 double wall 316l flue liner. one (1) new valuable speed draft inducedr fan and new boiler draft control system. associated structural and electrical included. | $200,000 |
| Feb 5, 2021 | Completed final sign-off Sep 2021 | 420 Montgomery St | Skyline Construction | install new replacement sand filter skids for an existing cooling tower.Details
install new replacement sand filter skids for an existing cooling tower. | $50,000 |
| Feb 4, 2021 | Completed final sign-off Apr 2021 | 420 Montgomery St | Martin Sign Co Inc. | fabrication and installation of evacuation map for the 9th & 12th floors of 420 momtgomery streetDetails
fabrication and installation of evacuation map for the 9th & 12th floors of 420 momtgomery street | $3,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | remodel of 3rd fl: add new conference rooms, focus rooms, huddle rooms, break rooms & mother's room. new lighting in areas of construction. new paint & carpet for new open office area. new furniture where noted. new mech, plum, elec work for new spaces.Details
remodel of 3rd fl: add new conference rooms, focus rooms, huddle rooms, break rooms & mother's room. new lighting in areas of construction. new paint & carpet for new open office area. new furniture where noted. new mech, plum, elec work for new spaces. | ||
| Jul 13, 2020 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | typical scope of work mezz floor to 12th fl. adding (n) safety grilles to (e) exterior openings at (e) fire escape enclosures.Details
typical scope of work mezz floor to 12th fl. adding (n) safety grilles to (e) exterior openings at (e) fire escape enclosures. | $75,000 | |
| Jul 13, 2020 | Completed final sign-off Feb 2021 | 420 Montgomery St | T C B Builders Inc | adding exit signs to t.i project that was permitted under pa# 201704285136. adding exit signs in response to sffd inspector comments. see pre application meeting notes on sheet t2-0.Details
adding exit signs to t.i project that was permitted under pa# 201704285136. adding exit signs in response to sffd inspector comments. see pre application meeting notes on sheet t2-0. | $2,500 |
| Jul 13, 2020 | Completed final sign-off Feb 2021 | 420 Montgomery St | T C B Builders Inc | adding exit signs to t.i project that was permitted under pa# 201902263821. adding exit signs in response to sffd inspector comments. see pre application meeting notes on sheet t2-0.Details
adding exit signs to t.i project that was permitted under pa# 201902263821. adding exit signs in response to sffd inspector comments. see pre application meeting notes on sheet t2-0. | $2,500 |
| Nov 26, 2019 | Completed final sign-off Feb 2021 | 420 Montgomery St | Skyline Construction | rev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridorDetails
rev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridor | $10,000 |
| Oct 15, 2019 | Completed final sign-off Dec 2020 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | fire alarm full flr ti on (e) nsf2-3030. adding 2 addressable loop controller, fsd status panel of 5 fan/damper mod. 1 power supply. adding 18 duct dtectors, 72 dual monitor modules, 31 relay mod, 29 smoke detectors, 23 relays, 3 speakers and 5 speaker strobes.Details
fire alarm full flr ti on (e) nsf2-3030. adding 2 addressable loop controller, fsd status panel of 5 fan/damper mod. 1 power supply. adding 18 duct dtectors, 72 dual monitor modules, 31 relay mod, 29 smoke detectors, 23 relays, 3 speakers and 5 speaker strobes. | $65,000 |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 420 Montgomery St | Pribuss Engineering Inc | fire sprinkler ti on ll, 1st, 2nd, mezz and 11th floors total 46 heads. plug 7, add 1, relocate 1 upright, rleocate 25 pendent, add 19 pendent.Details
fire sprinkler ti on ll, 1st, 2nd, mezz and 11th floors total 46 heads. plug 7, add 1, relocate 1 upright, rleocate 25 pendent, add 19 pendent. | $23,644 |
| May 24, 2019 | Never finaled issued May 2019, no final | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 10th floor: fire alarm t.i. to extg notifier nf52-3030 for adding 1 smoke detector and 11 speaker-strobes. ref app#201901039519. n/a for maherDetails
10th floor: fire alarm t.i. to extg notifier nf52-3030 for adding 1 smoke detector and 11 speaker-strobes. ref app#201901039519. n/a for maher | $11,200 |
| May 20, 2019 | Expired or cancelled cancelled Oct 2020 | 420 Montgomery St | T C B Builders Inc | 12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a.Details
12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a. | $9,000 |
| May 8, 2019 | Completed final sign-off Feb 2021 | 420 Montgomery St | Skyline Construction | change to existing permit #201805048292-revision is electrical and consists of removing new panels and moving the loafs to other panels to reduce cost by $323,000Details
change to existing permit #201805048292-revision is electrical and consists of removing new panels and moving the loafs to other panels to reduce cost by $323,000 | $323,000 |
| May 8, 2019 | Completed final sign-off Sep 2019 | 420 Montgomery St | Pribuss Engineering Inc | re pa# 201805048292; modify sprinkler head locations to accomodate new ceiling & partition layout for renovated office space & electrical rooms for floors 2-10,12,13Details
re pa# 201805048292; modify sprinkler head locations to accomodate new ceiling & partition layout for renovated office space & electrical rooms for floors 2-10,12,13 | $10,000 |
| May 7, 2019 | Completed final sign-off Jun 2019 | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti add 2 sprinklers, relocate 7 sprinklers, ref pa 2019-0103-9519Details
existing fire sprinkler system ti add 2 sprinklers, relocate 7 sprinklers, ref pa 2019-0103-9519 | $4,500 |
| Apr 23, 2019 | Never finaled issued Apr 2019, no final | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 12th flr. as-builts for fire alarm pa 201904016811 to match previous approved pre-application meeting minutes, ref building pa 201902265821Details
12th flr. as-builts for fire alarm pa 201904016811 to match previous approved pre-application meeting minutes, ref building pa 201902265821 | $5,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 12th fl - fire alarm & 2 way comm ti - scope add 1 new relay module (1) new 2 way comm system call station ref#201902263821. n/a for maher.Details
12th fl - fire alarm & 2 way comm ti - scope add 1 new relay module (1) new 2 way comm system call station ref#201902263821. n/a for maher. | $7,000 |
| Feb 26, 2019 | Completed final sign-off Jun 2019 | 420 Montgomery St | T C B Builders Inc | 12th flr. add security hardware to (e) pair of doors.Details
12th flr. add security hardware to (e) pair of doors. | $2,000 |
| Jan 17, 2019 | Never finaled issued Feb 2019, no final | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 2 way communication system installation as part of a t.i. project. call station will be provided at elevator lobbies for flr# 9 & 12 only. system backbone & riser is being installed for future.Details
2 way communication system installation as part of a t.i. project. call station will be provided at elevator lobbies for flr# 9 & 12 only. system backbone & riser is being installed for future. | $30,000 |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 420 Montgomery St | Martin Sign Co Inc. | fabricate and provide (5) total evac maps, all for fl. 9Details
fabricate and provide (5) total evac maps, all for fl. 9 | |
| Jan 3, 2019 | Never finaled issued Mar 2019, no final | 420 Montgomery St | T C B Builders Inc | 10th flr. add new conference rooms, focus rooms, huddle rooms and mothers' room. new lighting in areas of construction. new paint and carpet for new open office area at california st. side only.Details
10th flr. add new conference rooms, focus rooms, huddle rooms and mothers' room. new lighting in areas of construction. new paint and carpet for new open office area at california st. side only. | $125,000 |
| Dec 24, 2018 | Never finaled issued Dec 2018, no final | 420 Montgomery St | Pacific Auxiliary Fire Alarm | revision of as-built fire alarm drawing required by eid & sffd inspectors. adding 2 control relays & 1 dual input modules. ref bpa #201704285136 & fa #201810092678. 9th fl.Details
revision of as-built fire alarm drawing required by eid & sffd inspectors. adding 2 control relays & 1 dual input modules. ref bpa #201704285136 & fa #201810092678. 9th fl. | $2,900 |
| Oct 11, 2018 | Completed final sign-off Oct 2018 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 12th flr - as builts fire alarm drawings for sffd ref 201801259517, 201805310545, 201807245411, 201809180832 maher naDetails
12th flr - as builts fire alarm drawings for sffd ref 201801259517, 201805310545, 201807245411, 201809180832 maher na | |
| Oct 9, 2018 | Completed final sign-off Jan 2019 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 9th flr - ref 201806273171 fire alarm ti to (e) nfs-3030 addining 1 strobe power supply, 36 speaker strobes, 29 speakers, 37 duct smk det, 3 control relays maher naDetails
9th flr - ref 201806273171 fire alarm ti to (e) nfs-3030 addining 1 strobe power supply, 36 speaker strobes, 29 speakers, 37 duct smk det, 3 control relays maher na | $28,400 |
| Oct 9, 2018 | Completed final sign-off Nov 2018 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | 9th flr ti - add 12 and relocate 166 sprinklers to confirm with the new wall/ceiling layout of the ti ref 201801259519 maher naDetails
9th flr ti - add 12 and relocate 166 sprinklers to confirm with the new wall/ceiling layout of the ti ref 201801259519 maher na | $43,650 |
| Sep 25, 2018 | Completed final sign-off Oct 2018 | 420 Montgomery St | Martin Sign Co Inc. | revision to app#201809170429Details
revision to app#201809170429 | |
| Sep 19, 2018 | Completed final sign-off Sep 2018 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | adding 1 smoke detector and 1 speaker strobe. revision to original fire permit #201807245411. building permit #201801259519. resubmittal building permit #201805310545. n/a for maher.Details
adding 1 smoke detector and 1 speaker strobe. revision to original fire permit #201807245411. building permit #201801259519. resubmittal building permit #201805310545. n/a for maher. | $4,616 |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 420 Montgomery St | Martin Sign Co Inc. | (4) evacuation maps - one floor only. (12th fl). fabricate & install. maher n/a.Details
(4) evacuation maps - one floor only. (12th fl). fabricate & install. maher n/a. | $1,000 |
| Sep 13, 2018 | Completed final sign-off Nov 2018 | 420 Montgomery St | T C B Builders Inc | 12th fl - revision to pa 2018-0531-0545 elevator vestibule lobbyDetails
12th fl - revision to pa 2018-0531-0545 elevator vestibule lobby | $1,000 |
| Jul 24, 2018 | Completed final sign-off Oct 2018 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 12/f: tenant improvement to e notifier nfs2 3030 adding 54 speaker strobe, 11 speakers, 4 strobes, 14 duct smoke detector, 14 control relays, 1 control relay for a/v shutdownDetails
12/f: tenant improvement to e notifier nfs2 3030 adding 54 speaker strobe, 11 speakers, 4 strobes, 14 duct smoke detector, 14 control relays, 1 control relay for a/v shutdown | $21,400 |
| Jul 13, 2018 | Completed final sign-off Aug 2018 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | ref pa # 20180125951912th fl: add (49) , relocate (144) and plug (38) sprinklers to conform with the new wall ceiling layout to the tiDetails
ref pa # 20180125951912th fl: add (49) , relocate (144) and plug (38) sprinklers to conform with the new wall ceiling layout to the ti | $58,125 |
| Jun 26, 2018 | Never finaled issued Jun 2018, no final | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 6th flr, for ti 201805038111 - 6 speaker strove and 2 duct smk det w/address control relay are being added to (e) notifier nfs2-3030 maher naDetails
6th flr, for ti 201805038111 - 6 speaker strove and 2 duct smk det w/address control relay are being added to (e) notifier nfs2-3030 maher na | $9,216 |
| Jun 14, 2018 | Completed final sign-off Jul 2018 | 420 Montgomery St | Pribuss Engineering Inc | ref # 201805038111; fire spprinkler ti on 6th fl, total 7 sprinklersDetails
ref # 201805038111; fire spprinkler ti on 6th fl, total 7 sprinklers | $3,598 |
| May 31, 2018 | Completed final sign-off Nov 2018 | 420 Montgomery St | T C B Builders Inc | revision to pa 2018-0125-9519 remove item from special inspection minor changes as noted, replaced glazing system remove structural stallDetails
revision to pa 2018-0125-9519 remove item from special inspection minor changes as noted, replaced glazing system remove structural stall | |
| May 4, 2018 | Completed final sign-off Mar 2021 | 420 Montgomery St | Skyline Construction | in whole building. electrical service replacement, elect distribution repair & replacement, associated architectural/plumbing and hvac work to accomodate new electrical equipment installation. maher n/aDetails
in whole building. electrical service replacement, elect distribution repair & replacement, associated architectural/plumbing and hvac work to accomodate new electrical equipment installation. maher n/a | $8,000,000 |
| May 3, 2018 | Completed final sign-off Nov 2018 | 420 Montgomery St | Rudolph Commercial Interiors Inc, Rci | remodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maherDetails
remodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maher | $50,000 |
| Jan 25, 2018 | Completed final sign-off Nov 2018 | 420 Montgomery St | T C B Builders Inc | interior tenant imrpovement on floor 12 inlcuding drywall ceilings, lighting electrical, mechanical finishes & plumbingDetails
interior tenant imrpovement on floor 12 inlcuding drywall ceilings, lighting electrical, mechanical finishes & plumbing | $3,146,240 |
| Nov 30, 2017 | Completed final sign-off Dec 2017 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | 2nd & 3rd flr: ti -hvac upgrade including (e) notifier nfs2-3030; 2 duct smoke detector with internal control relays to new supply fan, 3 duct smoke detectors with internal control relay to 3 new fsd, 2 pendent mounted smoke det and 1 control relay to 1 fsd 2 speaker/strobe. ref201711022908 maher naDetails
2nd & 3rd flr: ti -hvac upgrade including (e) notifier nfs2-3030; 2 duct smoke detector with internal control relays to new supply fan, 3 duct smoke detectors with internal control relay to 3 new fsd, 2 pendent mounted smoke det and 1 control relay to 1 fsd 2 speaker/strobe. ref201711022908 maher na | $8,300 |
| Nov 2, 2017 | Completed final sign-off Mar 2018 | 420 Montgomery St | Emcor Services/Mesa Energy Systems Inc | retrofit air conditioning replacement ductwork, replace 3 (e) fsd's with 3 (n) fsd's in kind. fire alarm under separate permit(s). n/a maherDetails
retrofit air conditioning replacement ductwork, replace 3 (e) fsd's with 3 (n) fsd's in kind. fire alarm under separate permit(s). n/a maher | $295,000 |
| Oct 19, 2017 | Completed final sign-off Dec 2017 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | 12/f- sprinkler permit per t.i. add (6), relocate (27), (164) change out, remove (23). maher na. ref pa# 201710040322Details
12/f- sprinkler permit per t.i. add (6), relocate (27), (164) change out, remove (23). maher na. ref pa# 201710040322 | $46,000 |
| Oct 4, 2017 | Completed final sign-off Mar 2018 | 420 Montgomery St | T C B Builders Inc | 12th fl: pre-construction interior soft demo of under ab-017. no required fire rated construction to be removed. maher naDetails
12th fl: pre-construction interior soft demo of under ab-017. no required fire rated construction to be removed. maher na | $127,775 |
| Apr 28, 2017 | Completed final sign-off Jan 2019 | 420 Montgomery St | T C B Builders Inc | remodel 9th fl, add new offices, new led lighging, finsihes for new offices area, offices, conference rooms, copy rooms, breakroom, restrooms no new plumbing fixtures added, elevator lobby. new mech plumbing, elec work new spaces. fire alarm/ls and fire sprinkelr under sep permit maher not reqDetails
remodel 9th fl, add new offices, new led lighging, finsihes for new offices area, offices, conference rooms, copy rooms, breakroom, restrooms no new plumbing fixtures added, elevator lobby. new mech plumbing, elec work new spaces. fire alarm/ls and fire sprinkelr under sep permit maher not req | $575,300 |
| Dec 15, 2016 | Completed final sign-off Jan 2017 | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | basement: replace the fire pump & jockey pump controller to (e) sprinkler system. add 2 sprinklers due to t.i. pa#201604134637.Details
basement: replace the fire pump & jockey pump controller to (e) sprinkler system. add 2 sprinklers due to t.i. pa#201604134637. | $8,000 |
| Dec 5, 2016 | Never finaled issued Dec 2016, no final | 420 Montgomery St | Pacific Auxiliary Fire Alarm | fire alarm add 2 duct detectors and 2 relay modules due to tenant improvement in the basement ref 201604134637 maher not reqDetails
fire alarm add 2 duct detectors and 2 relay modules due to tenant improvement in the basement ref 201604134637 maher not req | $2,900 |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 420 Montgomery St | street spaceDetails
street space | ||
| Aug 15, 2016 | Completed final sign-off Oct 2017 | 420 Montgomery St | Pacific Auxiliary Fire Alarm | fire alarm. voluntary one for one replacement of (e) fire alarm system. no associated building construction permitDetails
fire alarm. voluntary one for one replacement of (e) fire alarm system. no associated building construction permit | $560,000 |
| Aug 9, 2016 | Completed final sign-off Jan 2017 | 420 Montgomery St | T C B Builders Inc | install new granite clad concrete planter within property line and landscaping upgrade, replace existing sidewalk planters with new granite clad precast concrete planters, planters not attached to sidewalk. total area of work: 45 sq.ft. n/a ordinance #155-13Details
install new granite clad concrete planter within property line and landscaping upgrade, replace existing sidewalk planters with new granite clad precast concrete planters, planters not attached to sidewalk. total area of work: 45 sq.ft. n/a ordinance #155-13 | $20,000 |
| Jun 3, 2016 | Completed final sign-off Jul 2016 | 420 Montgomery St | Johnson Controls Fire | 1st floor: install 2 new relays for turnstile, reference ti 2016.03.24.2984 maher naDetails
1st floor: install 2 new relays for turnstile, reference ti 2016.03.24.2984 maher na | $1,500 |
| Apr 13, 2016 | Completed final sign-off Mar 2017 | 420 Montgomery St | Skyline Construction | provide the existing life safety fire pump with emergency power. extend power from existing generator to feed existing fire pump. expand existing fire pump room to accomodate new controller with ats.Details
provide the existing life safety fire pump with emergency power. extend power from existing generator to feed existing fire pump. expand existing fire pump room to accomodate new controller with ats. | $300,000 |
| Mar 24, 2016 | Completed final sign-off Jul 2016 | 420 Montgomery St | T C B Builders Inc | installation of new turnstiles on ground floor. minor relocation of existing lighting/museum displays. maher naDetails
installation of new turnstiles on ground floor. minor relocation of existing lighting/museum displays. maher na | $50,000 |
| Mar 16, 2016 | Completed final sign-off Mar 2016 | 420 Montgomery St | Johnson Controls Fire | 10th floor, as built record drawing for pa 2015-0929-8299 per field inspection comments. maher naDetails
10th floor, as built record drawing for pa 2015-0929-8299 per field inspection comments. maher na | |
| Nov 20, 2015 | Completed final sign-off Jan 2016 | 420 Montgomery St | Johnson Controls Fire | t.i. of basement to install new (1) nac panel, (1) smoke detector, (1) signal module & (5) speaker/strobes. remove & cover (5) speakers/strobes. t.i. pa#201505297511. n/a ordinance #155-13Details
t.i. of basement to install new (1) nac panel, (1) smoke detector, (1) signal module & (5) speaker/strobes. remove & cover (5) speakers/strobes. t.i. pa#201505297511. n/a ordinance #155-13 | $10,000 |
| Nov 4, 2015 | Completed final sign-off Jan 2016 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | ti: relocate fifty five sprinklers and plug nine outlets to conform with new wall/ceiling layout at 7th floor. ref pa 2015-0611-8730Details
ti: relocate fifty five sprinklers and plug nine outlets to conform with new wall/ceiling layout at 7th floor. ref pa 2015-0611-8730 | $11,000 |
| Oct 21, 2015 | Completed final sign-off Jan 2016 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | 10th floor: add, relocate and remove fire sprinkler heads per t.i. add 10, relocate 69, remove 1. ref app#201503302232Details
10th floor: add, relocate and remove fire sprinkler heads per t.i. add 10, relocate 69, remove 1. ref app#201503302232 | $14,075 |
| Oct 16, 2015 | Completed final sign-off Jan 2016 | 420 Montgomery St | Pribuss Engineering Inc | bsmnt sprinkler system, ref pa 2015-0529-7511: relocate 23 heads, add 1. maher naDetails
bsmnt sprinkler system, ref pa 2015-0529-7511: relocate 23 heads, add 1. maher na | $4,800 |
| Oct 16, 2015 | Completed final sign-off Jan 2016 | 420 Montgomery St | Johnson Controls Fire | fire alarm t.i. to 7/f- install new (17) speaker/strobes, (5) speakers, (9) strobes, (3) duct detectors & (3) relays. t.i. pa#201506118730. n/a ordinance #155-13Details
fire alarm t.i. to 7/f- install new (17) speaker/strobes, (5) speakers, (9) strobes, (3) duct detectors & (3) relays. t.i. pa#201506118730. n/a ordinance #155-13 | $12,000 |
| Sep 29, 2015 | Completed final sign-off Mar 2016 | 420 Montgomery St | Johnson Controls Fire | fire alarm tin to 10th floor. 1 new transponder, 1 new booster panel, 6 new smoke detectors, 3 new duct detectors, 14 relays with isolation relays. 1 signal module, 16 speaker/strobe, 5 strobes. ti 2015-0401-2502 and 2015-0330-2232Details
fire alarm tin to 10th floor. 1 new transponder, 1 new booster panel, 6 new smoke detectors, 3 new duct detectors, 14 relays with isolation relays. 1 signal module, 16 speaker/strobe, 5 strobes. ti 2015-0401-2502 and 2015-0330-2232 | $25,000 |
| Jun 11, 2015 | Completed final sign-off Jun 2016 | 420 Montgomery St | Richlen Construction | 7th floor: t.i. including drywall ceilings. furnishings and modification to hvac and electrical. n/a for maher. life safety deferred.Details
7th floor: t.i. including drywall ceilings. furnishings and modification to hvac and electrical. n/a for maher. life safety deferred. | $1,417,000 |
| May 29, 2015 | Completed final sign-off Mar 2016 | 420 Montgomery St | Richlen Construction | basement: upgrade wall and flr finishes in lobby. upgrade (e) bathrooms to ada. maher naDetails
basement: upgrade wall and flr finishes in lobby. upgrade (e) bathrooms to ada. maher na | $15,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 420 Montgomery St | Starlite Electric Inc. | delete door holders on museum side and security side located at lobby elevators. ref 201312113890, 201402108155Details
delete door holders on museum side and security side located at lobby elevators. ref 201312113890, 201402108155 | |
| Apr 21, 2015 | Never finaled issued May 2015, no final | 420 Montgomery St | Airco Mechanical Inc | installation of new hot water boiler. new gas piping, flue, supply and return piping to extg system infrastructure. ref app#201208227981.Details
installation of new hot water boiler. new gas piping, flue, supply and return piping to extg system infrastructure. ref app#201208227981. | $140,000 |
| Apr 1, 2015 | Completed final sign-off Oct 2015 | 420 Montgomery St | Restec Contractors Inc | 10th flr: partial demo - (e) walls, floor and ceiling of tenant space. plumb fixtures to be removed/salvaged for bld. cap plumb for new future plumb in demo area. ref pa# 2015 03330 2232Details
10th flr: partial demo - (e) walls, floor and ceiling of tenant space. plumb fixtures to be removed/salvaged for bld. cap plumb for new future plumb in demo area. ref pa# 2015 03330 2232 | $130,000 |
| Mar 30, 2015 | Completed final sign-off Feb 2016 | 420 Montgomery St | T C B Builders Inc | 10th floor: total area of work is 10140 sq ft. remodel of extg office space. including new lighting, finishes for new open office area, offices, conference rooms, copy room, breakroom elevator lobby. new toilet rms without addn' fixtures. new mep work. n/a for maher. demo permit # 2015-0401-2502Details
10th floor: total area of work is 10140 sq ft. remodel of extg office space. including new lighting, finishes for new open office area, offices, conference rooms, copy room, breakroom elevator lobby. new toilet rms without addn' fixtures. new mep work. n/a for maher. demo permit # 2015-0401-2502 | $320,000 |
| Feb 4, 2015 | Never finaled issued Feb 2015, no final | 464 California St | G L C Construction Company Inc | to obtain final inspection for work approved under pa# 201208177678. all work is complete.Details
to obtain final inspection for work approved under pa# 201208177678. all work is complete. | |
| Jan 8, 2015 | Completed final sign-off Aug 2015 | 420 Montgomery St | Hathaway Dinwiddie Co. | permit revision to pa# 201308073710, minor modification to ground floor elevator lobby doors, including fire/life safety modifications. n/a ordinance #155-13Details
permit revision to pa# 201308073710, minor modification to ground floor elevator lobby doors, including fire/life safety modifications. n/a ordinance #155-13 | |
| Oct 9, 2014 | Never finaled issued Oct 2014, no final | 420 Montgomery St | Starlite Electric Inc. | as built; ref. 201404294415, 201406279700; maher n/aDetails
as built; ref. 201404294415, 201406279700; maher n/a | |
| Aug 15, 2014 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | Hathaway Dinwiddie Co. | 1st flr/mez: modification to ground floor elevator lobby doors, proposing to affix elevator doors in place and disconnect them from the building's fire alarm system, per application 201308073710; maher n/aDetails
1st flr/mez: modification to ground floor elevator lobby doors, proposing to affix elevator doors in place and disconnect them from the building's fire alarm system, per application 201308073710; maher n/a | $7,500 |
| Aug 8, 2014 | Never finaled issued Aug 2014, no final | 420 Montgomery St | T C B Builders Inc | revision to 201404294415. area of work 120 sq ft. relocation of proposed electrical room 653 a. provide fire/smoke dampers. 1 hr rated walls and 20 min door/frame. 2 relocated light fixtures. revise millwork at copy room 653. revision to closet door 6008. maher not reqDetails
revision to 201404294415. area of work 120 sq ft. relocation of proposed electrical room 653 a. provide fire/smoke dampers. 1 hr rated walls and 20 min door/frame. 2 relocated light fixtures. revise millwork at copy room 653. revision to closet door 6008. maher not req | $2,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 420 Montgomery St | Starlite Electric Inc. | install (13) smoke, (7) pull stations, (18) control modules, (4) door holders, (40) ceiling speaker strobes, (2) wall speaker strobes, (2) ceiling strobes, (2) power supplies, (5) ceiling speakers, ref. to pa#201404294415. n/a ordinance #155-13.Details
install (13) smoke, (7) pull stations, (18) control modules, (4) door holders, (40) ceiling speaker strobes, (2) wall speaker strobes, (2) ceiling strobes, (2) power supplies, (5) ceiling speakers, ref. to pa#201404294415. n/a ordinance #155-13. | $31,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 420 Montgomery St | Starlite Electric Inc. | revision to 2013-0919-7225, fire alarm for pa# 201309197225. n/a ordinance #155-13.Details
revision to 2013-0919-7225, fire alarm for pa# 201309197225. n/a ordinance #155-13. | |
| May 28, 2014 | Completed final sign-off Oct 2014 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | add, relocate , remove fire sprinkler heads per tenant improvements. add 22, 181 relocates, 4 removed on the 6th flDetails
add, relocate , remove fire sprinkler heads per tenant improvements. add 22, 181 relocates, 4 removed on the 6th fl | $104,342 |
| May 21, 2014 | Never finaled issued May 2014, no final | 420 Montgomery St | street space & mtaDetails
street space & mta | ||
| Apr 29, 2014 | Completed final sign-off Nov 2014 | 420 Montgomery St | T C B Builders Inc | remodel (e) full floor office space, new lighting, & finishes for new open office area, offices, conference rooms, copy room, break room, & elevator looby, new mechanical, plumbing & electrical, work for new spaces, new toilet rooms with no additional fixtures. compliance with ord #155-13 not req.Details
remodel (e) full floor office space, new lighting, & finishes for new open office area, offices, conference rooms, copy room, break room, & elevator looby, new mechanical, plumbing & electrical, work for new spaces, new toilet rooms with no additional fixtures. compliance with ord #155-13 not req. | $2,404,000 |
| Feb 10, 2014 | Completed final sign-off Jul 2015 | 420 Montgomery St | Starlite Electric Inc. | fire alarm devices --as-builts to pa#201312113870 fire alarm devices: (1) ceiling speaker strobe, (1) smoke detector with relay & (3) pull station covers. delete (2) duct detectors & (3) control modules. maher ordinance # 155-13 does not applyDetails
fire alarm devices --as-builts to pa#201312113870 fire alarm devices: (1) ceiling speaker strobe, (1) smoke detector with relay & (3) pull station covers. delete (2) duct detectors & (3) control modules. maher ordinance # 155-13 does not apply | |
| Dec 11, 2013 | Completed final sign-off Jul 2015 | 420 Montgomery St | Starlite Electric Inc. | fire alarm devices: (1) smoke detector, (2) duct detectors, (5) ceiling speaker-smoke, (1) wm speaker-strobe, (1) strobe (wm), (4) control relays, (2) manual pulls. t.i.# 201308073710Details
fire alarm devices: (1) smoke detector, (2) duct detectors, (5) ceiling speaker-smoke, (1) wm speaker-strobe, (1) strobe (wm), (4) control relays, (2) manual pulls. t.i.# 201308073710 | $10,000 |
| Dec 2, 2013 | Never finaled issued Dec 2013, no final | 420 Montgomery St | Starlite Electric Inc. | (e) fire alarm ti, 5 control modules (basement, 2,4,9,roof). relocate card reader power supply (by others).Details
(e) fire alarm ti, 5 control modules (basement, 2,4,9,roof). relocate card reader power supply (by others). | $3,000 |
| Nov 27, 2013 | Completed final sign-off Mar 2014 | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | 1st floor: extg fire sprinkler system. 5 new sprinkler, 12 relocated sprinklers. ref app#201308073710Details
1st floor: extg fire sprinkler system. 5 new sprinkler, 12 relocated sprinklers. ref app#201308073710 | $8,500 |
| Oct 10, 2013 | Never finaled issued Oct 2013, no final | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | title 24 mech for existing occupied tenant space on 3rd and 9th floors to add 2 new transer fans and four (4) new fsd's. no new construction, life safety to follow.Details
title 24 mech for existing occupied tenant space on 3rd and 9th floors to add 2 new transer fans and four (4) new fsd's. no new construction, life safety to follow. | $2,500 |
| Oct 2, 2013 | Never finaled issued Oct 2013, no final | 420 Montgomery St | street space and mta parkingDetails
street space and mta parking | ||
| Sep 19, 2013 | Expired or cancelled cancelled Nov 2014 | 420 Montgomery St | Starlite Electric Inc. | fire alarm devices add (02) speaker-stobs and (04) control mod. fire alarm coordinate mechanical upgrade. approved mechanical 2013.1010.8987Details
fire alarm devices add (02) speaker-stobs and (04) control mod. fire alarm coordinate mechanical upgrade. approved mechanical 2013.1010.8987 | $2,000 |
| Aug 26, 2013 | Never finaled issued Aug 2013, no final | 420 Montgomery St | street spaceDetails
street space | ||
| Aug 7, 2013 | Completed final sign-off Mar 2015 | 420 Montgomery St | Hathaway Dinwiddie Co. | 1/f & mezz.- new entry vestibule, new exhibits and signage, refresher update of interior finishes and fixtures. new pa permit required for occupant load (296) max. jjcDetails
1/f & mezz.- new entry vestibule, new exhibits and signage, refresher update of interior finishes and fixtures. new pa permit required for occupant load (296) max. jjc | $1,000,000 |
| Aug 2, 2013 | Never finaled issued Sep 2013, no final | 420 Montgomery St | Sterling Environmental Corp. | 6/f - demolition of (e) walls, floor and ceiling of proposed tenant space under ab-017; ti under separate permit.Details
6/f - demolition of (e) walls, floor and ceiling of proposed tenant space under ab-017; ti under separate permit. | $100,000 |
| Jun 27, 2013 | Completed final sign-off Aug 2013 | 420 Montgomery St | Pribuss Engineering Inc | roof level-fire sprinkler ti-relocate 2 _ex. 5"3 - way roof manifold) (e) fire sprinklersDetails
roof level-fire sprinkler ti-relocate 2 _ex. 5"3 - way roof manifold) (e) fire sprinklers | $30,000 |
| May 9, 2013 | Completed final sign-off Nov 2013 | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | penthouse:fire sprinkler system extg t.i. 3 relocated sprinklers and 3 added sprinklersDetails
penthouse:fire sprinkler system extg t.i. 3 relocated sprinklers and 3 added sprinklers | $1,500 |
| Apr 25, 2013 | Completed final sign-off May 2013 | 420 Montgomery St | Golden Gate Fire Protection Inc | 1st floor - add 1 pendent sprinkler. t.i. #2012-1130-5211.Details
1st floor - add 1 pendent sprinkler. t.i. #2012-1130-5211. | $1,000 |
| Apr 22, 2013 | Completed final sign-off Nov 2013 | 420 Montgomery St | Starlite Electric Inc. | penthouse: add 3 smoke detectors, 2 door holders, 9 speaker-strobes, 1 ceiling strobe and 1 weather proof wall strobe, ref. id #201302210650; 1 manual pull station; 1 control moduleDetails
penthouse: add 3 smoke detectors, 2 door holders, 9 speaker-strobes, 1 ceiling strobe and 1 weather proof wall strobe, ref. id #201302210650; 1 manual pull station; 1 control module | $10,000 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 420 Montgomery St | T C B Builders Inc | administrative permit to correct valuation at job correct valuation $2,000.000 for app# 201210041346Details
administrative permit to correct valuation at job correct valuation $2,000.000 for app# 201210041346 | $1,998,000 |
| Apr 3, 2013 | Never finaled issued Apr 2013, no final | 420 Montgomery St | T C B Builders Inc | revision to pa# 1201-1004-1346-repairs to reinforced concrete beamDetails
revision to pa# 1201-1004-1346-repairs to reinforced concrete beam | $1,000 |
| Apr 3, 2013 | Completed final sign-off Nov 2013 | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | penthouse level fire sprinkler system (existing t.i.) - 4 added sprinklers, 7 relcoated sprinklers, 2 removed sprinklers, pa #2013.02.21.0650. remove fire house cabinet per plan penthouse.Details
penthouse level fire sprinkler system (existing t.i.) - 4 added sprinklers, 7 relcoated sprinklers, 2 removed sprinklers, pa #2013.02.21.0650. remove fire house cabinet per plan penthouse. | $5,500 |
| Mar 25, 2013 | Never finaled issued Mar 2013, no final | 420 Montgomery St | T C B Builders Inc | 11th floor revision to appl #2012.10.04.1346 - steel header for sliding pocket door. all fireproofing to be repaired in-kind on (e) beams/structure.Details
11th floor revision to appl #2012.10.04.1346 - steel header for sliding pocket door. all fireproofing to be repaired in-kind on (e) beams/structure. | $12,000 |
| Mar 8, 2013 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | penthouse level-revision to pa# 2013-0221-0650-proposed & (e) lighting to be revised to led lightingDetails
penthouse level-revision to pa# 2013-0221-0650-proposed & (e) lighting to be revised to led lighting | $75,000 | |
| Feb 27, 2013 | Never finaled issued Feb 2013, no final | 420 Montgomery St | street spaceDetails
street space | ||
| Feb 22, 2013 | Completed final sign-off Feb 2015 | 420 Montgomery St | Starlite Electric Inc. | 11th floor:add 4 smoke, 2 door holders, 20 speaker strobes, 6 strobe,3 speakers, 2 control modeles, 1 power supply to an extg fire alarm system. ref app#201210041346.Details
11th floor:add 4 smoke, 2 door holders, 20 speaker strobes, 6 strobe,3 speakers, 2 control modeles, 1 power supply to an extg fire alarm system. ref app#201210041346. | $20,000 |
| Feb 21, 2013 | Completed final sign-off Nov 2013 | 420 Montgomery St | Hathaway Dinwiddie Co. | penthouse level-remodel of partial penthouse level to include new accessible women's toilet & shower room. av booth & new rated elevator lobby doorsDetails
penthouse level-remodel of partial penthouse level to include new accessible women's toilet & shower room. av booth & new rated elevator lobby doors | $250,000 |
| Jan 14, 2013 | Completed final sign-off May 2013 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | 11th floor:add and relocate fire sprinkler heads per t.i., 12 heads add, 108 heads relocate, and 2 heads remove. t.i. app#201210041346Details
11th floor:add and relocate fire sprinkler heads per t.i., 12 heads add, 108 heads relocate, and 2 heads remove. t.i. app#201210041346 | $61,680 |
| Dec 19, 2012 | Never finaled issued Feb 2013, no final | 420 Montgomery St | Starlite Electric Inc. | basement level-fire alarm device-1 control module, ref pa #2012.0822.7981. fsd under separate permit.Details
basement level-fire alarm device-1 control module, ref pa #2012.0822.7981. fsd under separate permit. | $2,000 |
| Nov 30, 2012 | Completed final sign-off Jun 2013 | 420 Montgomery St | Skyline Construction | add two new tempered glass security doors in (e) lobby. add new tempered glass security panels in (e) lobby. sprinkler work on seperate permit if required.Details
add two new tempered glass security doors in (e) lobby. add new tempered glass security panels in (e) lobby. sprinkler work on seperate permit if required. | $10,000 |
| Nov 7, 2012 | Completed final sign-off Dec 2012 | 420 Montgomery St | Starlite Electric Inc. | mezzanine level - install (2) speakers & (1) wm strobe fire only, ref pa #2012.0919.0110.Details
mezzanine level - install (2) speakers & (1) wm strobe fire only, ref pa #2012.0919.0110. | $1,500 |
| Oct 19, 2012 | Completed final sign-off Nov 2012 | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | mezzanine level-tenant improvements to (e) fire sprinkler system-4 relocated sprinklers. ti pa# 2012-0919-0110Details
mezzanine level-tenant improvements to (e) fire sprinkler system-4 relocated sprinklers. ti pa# 2012-0919-0110 | $2,000 |
| Oct 5, 2012 | Never finaled issued Oct 2012, no final | 420 Montgomery St | street space with meters (renew of m322807)Details
street space with meters (renew of m322807) | ||
| Oct 4, 2012 | Completed final sign-off Dec 2013 | 420 Montgomery St | full floor tenant improvement (partial) non load bearing partitions, ceilings, finishes, modifications to mechanical, electrical & plumbing. adding 1 fsd 2 card reader locations, emergency lighting. sprinklers and fire alarm on separate permit. include detailed non infringement statement on ls.Details
full floor tenant improvement (partial) non load bearing partitions, ceilings, finishes, modifications to mechanical, electrical & plumbing. adding 1 fsd 2 card reader locations, emergency lighting. sprinklers and fire alarm on separate permit. include detailed non infringement statement on ls. | $1,526,000 | |
| Sep 19, 2012 | Completed final sign-off Dec 2012 | 420 Montgomery St | G L C Construction Company Inc | removal of existing office. demo (1) one wall, new furniture & finishes for new open office area. mep, life safety sep. permitsDetails
removal of existing office. demo (1) one wall, new furniture & finishes for new open office area. mep, life safety sep. permits | $35,000 |
| Sep 19, 2012 | Completed final sign-off Jan 2014 | 420 Montgomery St | Skyline Construction | basement level-mechanical pad for seperate permit #2012-0822-7981 for 2 boilers in the basementDetails
basement level-mechanical pad for seperate permit #2012-0822-7981 for 2 boilers in the basement | $5,000 |
| Aug 22, 2012 | Completed final sign-off Jan 2014 | 420 Montgomery St | Skyline Construction | basement tenant improvement to consist of new door & frame, replacement of low pressure steam boilers. sprinklers and fire alarm separate permitDetails
basement tenant improvement to consist of new door & frame, replacement of low pressure steam boilers. sprinklers and fire alarm separate permit | $600,000 |
| Aug 17, 2012 | Never finaled issued Sep 2012, no final | 464 California St | G L C Construction Company Inc | 300 sf partial remodel of e wells fargo branch. behind tellerline, demo existing glass wall/frame behind tellerline.demo existing ceiling grid lights above tellerline. new wall,ceiling, lighting behind tellerline. no hvac. relocate e sprinkler/life safety as requiredDetails
300 sf partial remodel of e wells fargo branch. behind tellerline, demo existing glass wall/frame behind tellerline.demo existing ceiling grid lights above tellerline. new wall,ceiling, lighting behind tellerline. no hvac. relocate e sprinkler/life safety as required | $20,000 |
| Jul 16, 2012 | Completed final sign-off Apr 2014 | 420 Montgomery St | Hathaway Dinwiddie Co. | new exterior maintenance system/window washing. new and modified guardrails are to be installed that are compliant with ca building code, additional structural steel added to e steel framing. 2 fire standpipes are new grating with support beams installed at top of sw smoke shaft. elec plumbing workDetails
new exterior maintenance system/window washing. new and modified guardrails are to be installed that are compliant with ca building code, additional structural steel added to e steel framing. 2 fire standpipes are new grating with support beams installed at top of sw smoke shaft. elec plumbing work | $1,855,000 |
| Jul 5, 2012 | Never finaled issued Jul 2012, no final | 420 Montgomery St | street spaceDetails
street space | ||
| Jun 12, 2012 | Completed final sign-off Nov 2012 | 420 Montgomery St | Starlite Electric Inc. | revision to 201204168342: 10th fl add 16 speaker strobes, 2 duct dectectors, 1 control module. delete powerbooster panel.Details
revision to 201204168342: 10th fl add 16 speaker strobes, 2 duct dectectors, 1 control module. delete powerbooster panel. | $1,500 |
| Jun 7, 2012 | Completed final sign-off Jul 2012 | 420 Montgomery St | Pioneer Fire Inc. | relocate 72 fire sprinklers, add 5 fire sprinklers, remove 12 fire sprinklersDetails
relocate 72 fire sprinklers, add 5 fire sprinklers, remove 12 fire sprinklers | $10,000 |
| May 21, 2012 | Never finaled issued Aug 2012, no final | 464 California St | G L C Construction Company Inc | add new non structural wall fascia in front of atm's. demo extg atm and partial demo of atm room. re install bldg closure. design build electrical work for new lighting for atm fascia.Details
add new non structural wall fascia in front of atm's. demo extg atm and partial demo of atm room. re install bldg closure. design build electrical work for new lighting for atm fascia. | $20,000 |
| Apr 16, 2012 | Completed final sign-off Nov 2012 | 420 Montgomery St | Starlite Electric Inc. | 10th floor - sacramento side reuse some existing & add new fire alarm devices & add a new power supply panel, pull electrical permit and fire alarm. 21 sp, 16 strobe, 1 hd, 11 sp/st, 1 wall sp/st, 5sdDetails
10th floor - sacramento side reuse some existing & add new fire alarm devices & add a new power supply panel, pull electrical permit and fire alarm. 21 sp, 16 strobe, 1 hd, 11 sp/st, 1 wall sp/st, 5sd | $73,000 |
| Mar 9, 2012 | Completed final sign-off Nov 2012 | 420 Montgomery St | remodel e office space. only partial floor. new lighting and finishes for new open office area, offices, conference rooms, copy room, breakroom, elevator lobbiesDetails
remodel e office space. only partial floor. new lighting and finishes for new open office area, offices, conference rooms, copy room, breakroom, elevator lobbies | $250,000 | |
| Mar 8, 2012 | Completed final sign-off Dec 2012 | 464 California St | Arrow Sign Company | to erect 2 projecting, non-electric, double faced sign.Details
to erect 2 projecting, non-electric, double faced sign. | $3,000 |
| Mar 8, 2012 | Completed final sign-off Dec 2012 | 464 California St | Arrow Sign Company | to erect electrical, illuminated, single faced, wall sign.Details
to erect electrical, illuminated, single faced, wall sign. | $3,000 |
| Mar 8, 2012 | Completed final sign-off Dec 2012 | 464 California St | Arrow Sign Company | to erect (2) electrical, single faced, wall sign.Details
to erect (2) electrical, single faced, wall sign. | $3,000 |
| Feb 15, 2012 | Completed final sign-off Mar 2012 | 420 Montgomery St | Starlite Electric Inc. | penthouse.install 2 smoke detectors. install 2 door holders.Details
penthouse.install 2 smoke detectors. install 2 door holders. | $2,500 |
| Jan 17, 2012 | Completed final sign-off Dec 2024 | 420 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 10th floor - demol (e) walls, floor, & ceiling of proposed tenant space per ab- 017.Details
10th floor - demol (e) walls, floor, & ceiling of proposed tenant space per ab- 017. | $30,000 |
| Aug 25, 2011 | Completed final sign-off Sep 2011 | 420 Montgomery St | Anderson, Rowe & Buckley, Inc. | extg fire sprinkler system. t.i.:4 removed sprinklers, and 4 relocated sprinklers in penthouseDetails
extg fire sprinkler system. t.i.:4 removed sprinklers, and 4 relocated sprinklers in penthouse | $4,000 |
| Aug 3, 2011 | Never finaled issued Aug 2011, no final | 420 Montgomery St | street space permit.Details
street space permit. | ||
| May 31, 2011 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | office ti on the 2nd floor wells fargo . demo interior glass partition, replace new, add wall, new lighting and finishes for 2 new officesDetails
office ti on the 2nd floor wells fargo . demo interior glass partition, replace new, add wall, new lighting and finishes for 2 new offices | $5,000 | |
| Mar 18, 2011 | Completed final sign-off Nov 2011 | 420 Montgomery St | T C B Builders Inc | penthouse level-upgrade (e) men's toilet room & add 1 unisex toilet room to current cbc & ada standardsDetails
penthouse level-upgrade (e) men's toilet room & add 1 unisex toilet room to current cbc & ada standards | $35,000 |
| Nov 16, 2010 | Completed final sign-off Apr 2011 | 420 Montgomery St | Potter Fire Protection | relocaete 73, add 1 and plug 4 fire sprinklers on the 11th floor onlyDetails
relocaete 73, add 1 and plug 4 fire sprinklers on the 11th floor only | $21,000 |
| Nov 3, 2010 | Never finaled issued Nov 2010, no final | 464 California St | street space permit.Details
street space permit. | ||
| Oct 29, 2010 | Completed final sign-off Apr 2011 | 420 Montgomery St | Starlite Electric Inc. | 11th floor - install (20) speakers, remove & reinstall (4) smoke detectors, install (20) strobes, (3) duct detectors, (1) smoke detectors.Details
11th floor - install (20) speakers, remove & reinstall (4) smoke detectors, install (20) strobes, (3) duct detectors, (1) smoke detectors. | $15,000 |
| Aug 13, 2010 | Completed final sign-off Apr 2011 | 420 Montgomery St | T C B Builders Inc | partial 11th floor - remodel of (e) office space (partial floor): (n) ceiling, lighting & finishes for (e) open office area, offices, conf. rooms, copy rm., pantry & elevator lobbies.Details
partial 11th floor - remodel of (e) office space (partial floor): (n) ceiling, lighting & finishes for (e) open office area, offices, conf. rooms, copy rm., pantry & elevator lobbies. | $150,000 |
| Feb 18, 2009 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | replace carpet, paint, lightfixtures on 1/2 of 11th floor, move 1 wall add divider wall. existing open area, offices, conference rooms, copy room, pantry, elevator lobby, remodel glass sidelites on 4 rooms, add 1 wall.Details
replace carpet, paint, lightfixtures on 1/2 of 11th floor, move 1 wall add divider wall. existing open area, offices, conference rooms, copy room, pantry, elevator lobby, remodel glass sidelites on 4 rooms, add 1 wall. | $150,000 | |
| Feb 2, 2009 | Completed final sign-off Mar 2012 | 420 Montgomery St | Ayoob & Peery Plumbing Co Inc | 9th floor relocate & remove fire sprinkler heads per tenant improvements, 60 relocate, 25 remove.Details
9th floor relocate & remove fire sprinkler heads per tenant improvements, 60 relocate, 25 remove. | $10,800 |
| Jan 30, 2009 | Completed final sign-off May 2009 | 420 Montgomery St | Starlite Electric Inc. | floor 9 fire alarm: 14 ceiling mounted speakers, 13 wall mount strobes, 1 control moduleDetails
floor 9 fire alarm: 14 ceiling mounted speakers, 13 wall mount strobes, 1 control module | $12,000 |
| Jan 23, 2009 | Completed final sign-off May 2009 | 420 Montgomery St | T C B Builders Inc | mep only for 9th floor partial floor tenant improvement for wells fargoDetails
mep only for 9th floor partial floor tenant improvement for wells fargo | $441,047 |
| Dec 22, 2008 | Never finaled issued Dec 2008, no final | 420 Montgomery St | Starlite Electric Inc. | install 1 speaker, 1 strobe at floor 12.Details
install 1 speaker, 1 strobe at floor 12. | $2,000 |
| Dec 19, 2008 | Completed final sign-off May 2009 | 420 Montgomery St | T C B Builders Inc | at 9th fl: partial floor tenant improvement on single tenant floor including: selective demolition, partition, ceiling, finishes.Details
at 9th fl: partial floor tenant improvement on single tenant floor including: selective demolition, partition, ceiling, finishes. | $441,047 |
| Nov 25, 2008 | Never finaled issued Nov 2008, no final | 420 Montgomery St | street space only.Details
street space only. | ||
| Nov 25, 2008 | Completed final sign-off Feb 2009 | 420 Montgomery St | G L C Construction Company Inc | 12th floor mechanical/electrical work only - heat pump w/distribution ductwork, air outlets, circulating pumps, condenser water piping to be provided.Details
12th floor mechanical/electrical work only - heat pump w/distribution ductwork, air outlets, circulating pumps, condenser water piping to be provided. | $10,000 |
| Nov 6, 2008 | Never finaled issued Nov 2008, no final | 464 California St | street space permit only.Details
street space permit only. | ||
| Sep 19, 2008 | Never finaled issued Sep 2008, no final | 464 California St | street space & sidewalkDetails
street space & sidewalk | ||
| Apr 23, 2008 | Never finaled issued Apr 2008, no final | 420 Montgomery St | 2nd floor-revision to pa# 200709253615-change corridor "s" doors to single 20 min door. change swing of corridor to lobby (elevator) doors.Details
2nd floor-revision to pa# 200709253615-change corridor "s" doors to single 20 min door. change swing of corridor to lobby (elevator) doors. | ||
| Mar 24, 2008 | Completed final sign-off Jul 2008 | 420 Montgomery St | Paradigm General Contractors | revision to pa# 2006/04/13/8927 to provide emergency evacuation plan per bldg inspector request.Details
revision to pa# 2006/04/13/8927 to provide emergency evacuation plan per bldg inspector request. | |
| Mar 13, 2008 | Completed final sign-off Mar 2008 | 420 Montgomery St | Hathaway Dinwiddie Co. | renew pa# 2007/10/17/5669 & pa# 2007/05/25/2348 for final inspection only.Details
renew pa# 2007/10/17/5669 & pa# 2007/05/25/2348 for final inspection only. | |
| Jan 10, 2008 | Expired or cancelled expired Jun 2009 | 420 Montgomery St | Pribuss Engineering Inc | 2nd floor - fire sprinkler tenant improvement, relocate 76 sprinklers, add 33 sprinklers, total 109 sprinklers.Details
2nd floor - fire sprinkler tenant improvement, relocate 76 sprinklers, add 33 sprinklers, total 109 sprinklers. | $23,450 |
| Jan 4, 2008 | Completed final sign-off Jul 2008 | 420 Montgomery St | Paradigm General Contractors | renew pa#200606083458,#200606133819 for final inspection.Details
renew pa#200606083458,#200606133819 for final inspection. | |
| Nov 16, 2007 | Never finaled issued Nov 2007, no final | 420 Montgomery St | Starlite Electric Inc. | 2nd floor - install 1 booster panel, 12 wall mount strobes, 12 ceiling mount speakers, 1 relay module on 2nd floor.Details
2nd floor - install 1 booster panel, 12 wall mount strobes, 12 ceiling mount speakers, 1 relay module on 2nd floor. | $7,000 |
| Oct 17, 2007 | Expired or cancelled expired Mar 2008 | 420 Montgomery St | Starlite Electric Inc. | revision to app# 200705221920/ add 4 smk.det,3 relay mod., 1 control mod.,9 strobes,11 speakers.Details
revision to app# 200705221920/ add 4 smk.det,3 relay mod., 1 control mod.,9 strobes,11 speakers. | |
| Oct 15, 2007 | Expired or cancelled expired May 2009 | 420 Montgomery St | R L H Fire Protection Inc | fire sprinkler tenant improvement on 7th fl.renew pa#200610124773 for final inspection.Details
fire sprinkler tenant improvement on 7th fl.renew pa#200610124773 for final inspection. | |
| Oct 15, 2007 | Completed final sign-off Jan 2009 | 420 Montgomery St | Swinerton Builders | renew pa#200608179709,& 3200608088833 for final inspection.Details
renew pa#200608179709,& 3200608088833 for final inspection. | |
| Oct 9, 2007 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | revision to approved building permit application 3200705221920; install 1 smoke detector, 9 strobes, 11 speakers, 2 relays, 1 control moduleDetails
revision to approved building permit application 3200705221920; install 1 smoke detector, 9 strobes, 11 speakers, 2 relays, 1 control module | ||
| Sep 27, 2007 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | revision to appl. #200705221920. install (16) strobes, (1) smoke detector, (2) pam relays, (20) speakers, (1) control modules total. add (9) strobes to original (7), add (11) speakers to original (9), add (1) smoke detector, add (2) relays, (1) module.Details
revision to appl. #200705221920. install (16) strobes, (1) smoke detector, (2) pam relays, (20) speakers, (1) control modules total. add (9) strobes to original (7), add (11) speakers to original (9), add (1) smoke detector, add (2) relays, (1) module. | $25,000 | |
| Sep 25, 2007 | Never finaled issued Nov 2007, no final | 420 Montgomery St | office tenant improvement on 2nd floor ( wells fargo bank). reconfigure non-load bearing interior partition, upgrade 1 set of non-conforming restrooms, finish, paint, carpet,(n)ceiling light fixtuires, hvac.Details
office tenant improvement on 2nd floor ( wells fargo bank). reconfigure non-load bearing interior partition, upgrade 1 set of non-conforming restrooms, finish, paint, carpet,(n)ceiling light fixtuires, hvac. | $724,000 | |
| Jun 20, 2007 | Completed final sign-off Mar 2008 | 420 Montgomery St | R L H Fire Protection Inc | tenant improvement upgrade of fire sprinkler system; relocate 185 sprinkler heads. fourth floor.Details
tenant improvement upgrade of fire sprinkler system; relocate 185 sprinkler heads. fourth floor. | $32,500 |
| May 25, 2007 | Expired or cancelled expired Mar 2008 | 420 Montgomery St | Starlite Electric Inc. | install 3 smoke detectors, 19 speakers, 15 strobes, 2 door holders, relcoate 1 pull station.Details
install 3 smoke detectors, 19 speakers, 15 strobes, 2 door holders, relcoate 1 pull station. | $20,000 |
| May 22, 2007 | Never finaled issued May 2007, no final | 420 Montgomery St | Starlite Electric Inc. | install 7 strobes, 9 speakers.Details
install 7 strobes, 9 speakers. | $10,000 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 420 Montgomery St | Starlite Electric Inc. | install 2 smoke detectors, 1 monitor module and relocate 1 smoke detector on basement, ground floor and penthouse.Details
install 2 smoke detectors, 1 monitor module and relocate 1 smoke detector on basement, ground floor and penthouse. | $5,000 |
| Dec 8, 2006 | Completed final sign-off Mar 2008 | 420 Montgomery St | oti-2, wells fargo bank, 4th fl, el,meDetails
oti-2, wells fargo bank, 4th fl, el,me | $75,000 | |
| Dec 4, 2006 | Completed final sign-off Mar 2008 | 420 Montgomery St | Hathaway Dinwiddie Co. | oti-1, wells fargo, 4/fl, el, ls, sp.Details
oti-1, wells fargo, 4/fl, el, ls, sp. | $500,000 |
| Oct 12, 2006 | Expired or cancelled expired Apr 2009 | 420 Montgomery St | R L H Fire Protection Inc | fire sprinkler tenant improvements of 7th floor. relocate 53, add 32 & delete 2 pendant heads.Details
fire sprinkler tenant improvements of 7th floor. relocate 53, add 32 & delete 2 pendant heads. | $15,900 |
| Aug 17, 2006 | Never finaled issued Aug 2006, no final | 420 Montgomery St | street spaceDetails
street space | ||
| Aug 17, 2006 | Completed final sign-off Feb 2008 | 420 Montgomery St | R L H Fire Protection Inc | 8th floor-fire sprinkler tenant improvements to 8th floor, relocate 63, add 23, delete 6, total 86 heads.Details
8th floor-fire sprinkler tenant improvements to 8th floor, relocate 63, add 23, delete 6, total 86 heads. | $13,000 |
| Aug 8, 2006 | Never finaled issued Aug 2006, no final | 420 Montgomery St | Starlite Electric Inc. | install 13 speakers, 20 strobes, relocate 3 pull stations, 6 smoke detectors, 7 speakers, 10 strobes,remove and replace 32 strobes, remove 5 speaker/strobesDetails
install 13 speakers, 20 strobes, relocate 3 pull stations, 6 smoke detectors, 7 speakers, 10 strobes,remove and replace 32 strobes, remove 5 speaker/strobes | $106,000 |
| Jul 24, 2006 | Never finaled issued Jul 2006, no final | 420 Montgomery St | Rfi Enterprises Inc. | car access upgrades to elevator lobbies on 7th & 8th fls card access on it room on 98lth floor. rfi will install requiered sinage & door releases pull statrions as per sf administrative bullitianDetails
car access upgrades to elevator lobbies on 7th & 8th fls card access on it room on 98lth floor. rfi will install requiered sinage & door releases pull statrions as per sf administrative bullitian | $10,000 |
| Jul 24, 2006 | Never finaled issued Jul 2006, no final | 420 Montgomery St | Rfi Enterprises Inc. | card accerss upgrades to eelevator lobbies & file room door on 9th floor. rei will instaqll requiared inate & door release, pull statios as per sf administrative bulletinsDetails
card accerss upgrades to eelevator lobbies & file room door on 9th floor. rei will instaqll requiared inate & door release, pull statios as per sf administrative bulletins | $8,000 |
| Jun 13, 2006 | Expired or cancelled expired Jul 2008 | 420 Montgomery St | Starlite Electric Inc. | remove (e) ceiling speaker / strobe units, remove (e) booster panel. install 1 booster panel, 23 ceiling speakers. 18 wall momt strobes, 2 duct detectors, 4 relay modules, 4 smoke detectors, 3 speaker / strobe units.Details
remove (e) ceiling speaker / strobe units, remove (e) booster panel. install 1 booster panel, 23 ceiling speakers. 18 wall momt strobes, 2 duct detectors, 4 relay modules, 4 smoke detectors, 3 speaker / strobe units. | $75,000 |
| Jun 8, 2006 | Expired or cancelled expired Jul 2008 | 420 Montgomery St | R L H Fire Protection Inc | 9th floor fire sprinkler tenant improvement - relocate 22 heads, add 21 heads, delete 3 heads, total 43 headsDetails
9th floor fire sprinkler tenant improvement - relocate 22 heads, add 21 heads, delete 3 heads, total 43 heads | $6,400 |
| Apr 13, 2006 | Completed final sign-off Jul 2008 | 420 Montgomery St | Paradigm General Contractors | remove (e) partitions, ceiling & lights. build new offices with new ceiling, lighting, carpet & paint. upgrade (e) toilets to comply with ada & title 24. life safety. sprinklers under separate permit.Details
remove (e) partitions, ceiling & lights. build new offices with new ceiling, lighting, carpet & paint. upgrade (e) toilets to comply with ada & title 24. life safety. sprinklers under separate permit. | $375,000 |
| Apr 4, 2006 | Never finaled issued Apr 2006, no final | 420 Montgomery St | street space permitDetails
street space permit | ||
| Mar 16, 2006 | Expired or cancelled expired Feb 2009 | 420 Montgomery St | R L H Fire Protection Inc | fire sprinkler tenant improvements to 3rd floor. reloc 12,add 3 & delete 4 heads.Details
fire sprinkler tenant improvements to 3rd floor. reloc 12,add 3 & delete 4 heads. | $2,200 |
| Mar 7, 2006 | Completed final sign-off Jan 2009 | 420 Montgomery St | Swinerton Builders | reconfigure of non-bearing partition walls (interior), construct a new non-rated stairway between 7th & 8th floor, upgrade (1) one non-conforming set of restrooms, finishes, paint, carpet, (n) ceiling, light fixtures scope of work only on 7th and 8th floorsDetails
reconfigure of non-bearing partition walls (interior), construct a new non-rated stairway between 7th & 8th floor, upgrade (1) one non-conforming set of restrooms, finishes, paint, carpet, (n) ceiling, light fixtures scope of work only on 7th and 8th floors | $1,000,000 |
| Mar 7, 2006 | Never finaled issued Apr 2006, no final | 420 Montgomery St | Paradigm General Contractors | oti-2 3rd floor el meDetails
oti-2 3rd floor el me | $122,000 |
| Mar 7, 2006 | Never finaled issued Mar 2006, no final | 420 Montgomery St | Starlite Electric Inc. | oti-2 3rd floor lsDetails
oti-2 3rd floor ls | $40,000 |
| Jan 26, 2006 | Completed final sign-off Mar 2006 | 420 Montgomery St | R L H Fire Protection Inc | correct fire sprinkler deficiencies on 2nd, 3rd,4th,5th, 8th, 10th & 11th flrs total 88 heads. work being done in construction with retrofit work on permit #200502115321. install new heads.Details
correct fire sprinkler deficiencies on 2nd, 3rd,4th,5th, 8th, 10th & 11th flrs total 88 heads. work being done in construction with retrofit work on permit #200502115321. install new heads. | $19,800 |
| Jan 19, 2006 | Never finaled issued Mar 2006, no final | 420 Montgomery St | Paradigm General Contractors | oti-1, 3rd floor, el, me, ls, sp.Details
oti-1, 3rd floor, el, me, ls, sp. | $246,500 |
| Nov 22, 2005 | Completed final sign-off Jan 2006 | 420 Montgomery St | Starlite Electric Inc. | relocate 3 speakers, 2 strobes, and install 1 duct detector and relayDetails
relocate 3 speakers, 2 strobes, and install 1 duct detector and relay | $6,000 |
| Oct 27, 2005 | Completed final sign-off Jan 2006 | 420 Montgomery St | R L H Fire Protection Inc | fire sprinkler tenant improvements to 5th floor. relocate 7 heads, add 6 heads.Details
fire sprinkler tenant improvements to 5th floor. relocate 7 heads, add 6 heads. | $3,200 |
| Sep 29, 2005 | Completed final sign-off Jan 2006 | 420 Montgomery St | remove (e) furniture workstations. construct new office, modify hual & electrical.Details
remove (e) furniture workstations. construct new office, modify hual & electrical. | $96,000 | |
| Sep 15, 2005 | Never finaled issued Sep 2005, no final | 420 Montgomery St | street space permit only.Details
street space permit only. | ||
| Apr 21, 2005 | Completed final sign-off Mar 2006 | 420 Montgomery St | Starlite Electric Inc. | install 9 smoke detectors, 30 heat detectors, 4 monitor module; 2 control moduel; work in elevator sDetails
install 9 smoke detectors, 30 heat detectors, 4 monitor module; 2 control moduel; work in elevator s | $30,000 |
| Apr 4, 2005 | Never finaled issued Apr 2005, no final | 420 Montgomery St | streetspaceDetails
streetspace | ||
| Mar 29, 2005 | Never finaled issued Mar 2005, no final | 420 Montgomery St | R L H Fire Protection Inc | fire sprinkler t/i to 10th/fl-840 sqft. add 4 reloc 3 sprinkler.Details
fire sprinkler t/i to 10th/fl-840 sqft. add 4 reloc 3 sprinkler. | $3,000 |
| Mar 4, 2005 | Completed final sign-off May 2005 | 420 Montgomery St | 833 s f tenant improvement - includes partial demolition of interior partitions, and addition of 3 nDetails
833 s f tenant improvement - includes partial demolition of interior partitions, and addition of 3 n | $25,000 | |
| Feb 11, 2005 | Completed final sign-off Mar 2006 | 420 Montgomery St | R L H Fire Protection Inc | install fire sprinklers on 6/f,9/f,penthouse,mech.penthouse.partial g/f per high rise retrofit ord.Details
install fire sprinklers on 6/f,9/f,penthouse,mech.penthouse.partial g/f per high rise retrofit ord. | $139,470 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Starlite Electric Inc. (28), T C B Builders Inc (22), Pacific Auxiliary Fire Alarm (16), Skyline Construction (12), R L H Fire Protection Inc (10), Anderson, Rowe & Buckley, Inc. (8), Ayoob & Peery Plumbing Co Inc (8), Tracy Sign Inc (8), Hathaway Dinwiddie Co. (7), Pribuss Engineering Inc (6), G L C Construction Company Inc (5), Johnson Controls Fire (5), Paradigm General Contractors (5), Martin Sign Co Inc. (4), Arrow Sign Company (3), Swinerton Builders (3), Rfi Enterprises Inc. (2), Richlen Construction (2), Rudolph Commercial Interiors Inc, Rci (2), Airco Mechanical Inc, Emcor Services/Mesa Energy Systems Inc, Golden Gate Fire Protection Inc, Pioneer Fire Inc., Potter Fire Protection, Rapid Fire Safety&Security Llc Dba Pafa, Restec Contractors Inc, Sterling Environmental Corp., W. Bradley Electric, Western Roofing Service
- Architects
- Erin Uesugi (17), Douglas Zucker (5), Joseph Mendoza (4), Alan Johansen (3), Donnie Lam (3), Fred Powell (2), Kling Stubbins (2), Daniel Uesugi, David Thomas Crotty, Erin Vesugi, Julian White, Stewart Green
- Engineers
- Amit Wadhwa (9), Christopher Llyod (3), Alan C. Burr (2), Kurt Kohler-Eeor (2), Alan Charles Burr, Carl Milsum, Craig B Goings, Julian White, Julian White, Kurt Kohler, Levi G. Abarte, Patrick Buscovich, Rlh Fire Design Rlh Fire Design, Satwant Bhatia, Stephen Harris-Seor, Steve Curry
- Authorized agent-otherss
- Fabian Valdiosera, Faisal Elhalis, Jonathan Owens
- Designers
- Erin Uesugi (2), Julian White
Find contractors for work like this