Permit GraphShortlistSan Francisco building permits since 2000

Faisal Elhalis

License
36618
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, authorized agent-others, engineer, pmt consultant/expediter
Firm
Fm Group Inc.
Based in
Scottsdale
On San Francisco permits
Dec 2004 to Nov 2024

33 permits since 2000 (authorized agent-others on 24 permits, engineer on 4 permits, pmt consultant/expediter on 4 permits, architect on 1 permit): 24 completed, 6 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Gci, Inc (6), Build Group Inc. (3), K Bali Construction (3), Allied Construction Enterprises Inc (2), C C I Commercial Construction & Improv (2), Yama Construction (2), Bay C T Construction Inc., Bro Design And Remodeling Inc, Cyh Development Inc, Elliott Build Remodel Llc, Fisher Development Inc, J & K Project Mgmt Consultants Llc, Loi Electric Company, Marchetti Group, Onsite Construx, Radiant Construction Inc, S F Garage Company Inc., Trainor Commercial Construction Inc., William Spencer Company
Architects
David A. Udkow (2), Marzieh Emani Ghoreishi (2), Cortland Morgan, Fitch Architects, James Zak, Karen Curtiss, Mark De Malanta, Michael Thomas Fries
Engineers
Omid Ardebili (3), Patrick Cronan (2), Alexander Joseph Pacheco, Jayson Haines, Jesus Cabellon Jr.
Designers
David Udkow

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 33 have no building type on record and are shown as other.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 18, 2024Completed
final sign-off Feb 2025
5214 Diamond Heights BlBro Design And Remodeling Inc, Bay C T Construction Inc.ti new interior walls, ceiling system, mechanical new electrical, interior finishes, new millwork, new ada restroom, no exterior work
Details
Permit
202411185181
Permit issued
Dec 2, 2024
Final sign-off
Feb 19, 2025

ti new interior walls, ceiling system, mechanical new electrical, interior finishes, new millwork, new ada restroom, no exterior work

Open the permit page

$180,000
Jun 12, 2023Completed
final sign-off May 2025
1245 04th StOnsite Construxdeferred mep for permit 202302131874
Details
Permit
202306129890
Permit issued
Aug 30, 2023
Final sign-off
May 14, 2025

deferred mep for permit 202302131874

Open the permit page

$187,488
Jul 8, 2022Completed
final sign-off May 2024
350 Divisadero StCyh Development Inc, Allied Construction Enterprises Incchange of use from martial art school to dental office. creating new non bearing partition walls for reception area, 6 operatories consult room business office, steril lab, staff lounge and other supporting areas. n gyp bd. ceiling and soffits. operatories sinks and service sinks will be installed
Details
Permit
202207087998
Permit issued
Sep 9, 2022
Final sign-off
May 17, 2024

change of use from martial art school to dental office. creating new non bearing partition walls for reception area, 6 operatories consult room business office, steril lab, staff lounge and other supporting areas. n gyp bd. ceiling and soffits. operatories sinks and service sinks will be installed

Open the permit page

$204,021
Mar 4, 2021Completed
final sign-off Dec 2023
2226 Bush StAllied Construction Enterprises Incnew dental office. create non-load bearing walls for 1,948 sqft. gypsum ceiling. 2 accessible all-gender toilet. mechanical, electrical and plumbing work included.
Details
Permit
202103045903
Permit issued
Jun 22, 2021
Final sign-off
Dec 15, 2023

new dental office. create non-load bearing walls for 1,948 sqft. gypsum ceiling. 2 accessible all-gender toilet. mechanical, electrical and plumbing work included.

Open the permit page

$247,006
May 16, 2017Completed
final sign-off Sep 2018
2349 Lombard StJ & K Project Mgmt Consultants Llct.i. for a 2435 sq.ft. yoga studio. change of use from retail to yoga studio.
Details
Permit
201705166703
Permit issued
Aug 16, 2017
Final sign-off
Sep 19, 2018

t.i. for a 2435 sq.ft. yoga studio. change of use from retail to yoga studio.

Open the permit page

$225,000
Mar 31, 2017Never finaled
issued Apr 2017, no final
88 Montcalm Stas built drawing for pa#201405307105, new bath @ 2/f, remove fireplace @ 3/f, wood retaining wall (30") at yard, stair configuration at yard, bath configuration at 2/f
Details
Permit
201703312905
Permit issued
Apr 12, 2017

as built drawing for pa#201405307105, new bath @ 2/f, remove fireplace @ 3/f, wood retaining wall (30") at yard, stair configuration at yard, bath configuration at 2/f

Open the permit page

$10,000
Mar 15, 2017Completed
final sign-off Dec 2017
1475 Polk StLoi Electric Companyabatement o f nov 201760758. remove unpermitted wood framed awning at northwest of property
Details
Permit
201703151500
Permit issued
Mar 22, 2017
Final sign-off
Dec 4, 2017

abatement o f nov 201760758. remove unpermitted wood framed awning at northwest of property

Open the permit page

$3,000
Jan 27, 2017Completed
final sign-off Apr 2017
220 Post StFisher Development Incsoft demo ab-017. demoltion or removal of extg flooring, extg casework extg interior partition walls, extg ceiling lights and soffits, and extg cladding to structural. exit enclosure must remain.
Details
Permit
201701278121
Permit issued
Feb 1, 2017
Final sign-off
Apr 6, 2017

soft demo ab-017. demoltion or removal of extg flooring, extg casework extg interior partition walls, extg ceiling lights and soffits, and extg cladding to structural. exit enclosure must remain.

Open the permit page

$30,000
Dec 13, 2016Completed
final sign-off Mar 2017
1355 Market StK Bali Constructionreference app#201610039422. title 24 only. n/a for maher
Details
Permit
201612134844
Permit issued
Dec 19, 2016
Final sign-off
Mar 21, 2017

reference app#201610039422. title 24 only. n/a for maher

Open the permit page

Dec 13, 2016Expired or cancelled
expired Dec 2024
1540 Kirkwood AvS F Garage Company Inc.revision to app#201610170452. change per field condition. (n) foundation adjacent to (e) footing at side property lines.
Details
Permit
201612134847
Permit issued
Jan 5, 2017

revision to app#201610170452. change per field condition. (n) foundation adjacent to (e) footing at side property lines.

Open the permit page

Dec 13, 2016Never finaled
issued Dec 2016, no final
3003 03rd StWilliam Spencer Companytenant improvement for non-formula harware store. install display racks and shelving, include base anchorage for shelving. mep deferred. n/a for maher
Details
Permit
201612134820
Permit issued
Dec 22, 2016

tenant improvement for non-formula harware store. install display racks and shelving, include base anchorage for shelving. mep deferred. n/a for maher

Open the permit page

$30,000
Dec 7, 2016Completed
final sign-off Jan 2018
1125 Mission StC C I Commercial Construction & Improvspec suite mock-up at ground floor level. construction of meeting room walls, installation of doors and framed storefronts and finishes materials. temp casework. plmg fixtures mock up, no connections. hvac mock up, no connections. lighting installation, no controls. no scope of work on lower level,
Details
Permit
201612074405
Permit issued
Dec 13, 2016
Final sign-off
Jan 11, 2018

spec suite mock-up at ground floor level. construction of meeting room walls, installation of doors and framed storefronts and finishes materials. temp casework. plmg fixtures mock up, no connections. hvac mock up, no connections. lighting installation, no controls. no scope of work on lower level,

Open the permit page

$5,000
Dec 6, 2016Expired or cancelled
cancelled Jan 2026
255 Sutter Stinterior remodeling / build-out of a mercantile/interior space contained within an existing shell bldg.
Details
Permit
201612064230

interior remodeling / build-out of a mercantile/interior space contained within an existing shell bldg.

Open the permit page

$3,000
Oct 24, 2016Completed
final sign-off Jan 2018
542 Central AvElliott Build Remodel Llcinterior remodel unit including kitchen, bathroom, and new finishes throughout. new windows not visible from street.
Details
Permit
201610241058
Permit issued
Dec 13, 2016
Final sign-off
Jan 17, 2018

interior remodel unit including kitchen, bathroom, and new finishes throughout. new windows not visible from street.

Open the permit page

$75,000
Oct 20, 2016Completed
final sign-off Dec 2016
224 Kearny StK Bali Constructionprovide new lighting and branch circuiting to extg panel. maintained some of the extg power and signal outlets and provided additional new power branch circuiting and raceway systems as required to new power and signal outlets. provide t-24 compliance forms.
Details
Permit
201610200844
Permit issued
Nov 7, 2016
Final sign-off
Dec 12, 2016

provide new lighting and branch circuiting to extg panel. maintained some of the extg power and signal outlets and provided additional new power branch circuiting and raceway systems as required to new power and signal outlets. provide t-24 compliance forms.

Open the permit page

Oct 20, 2016Completed
final sign-off Jun 2017
450 Hayes StK Bali Constructionall work to remain within the interior shell of the (e) building. no exterior work - no increase of sq footage. soft demo, ab-017
Details
Permit
201610200841
Permit issued
Oct 24, 2016
Final sign-off
Jun 19, 2017

all work to remain within the interior shell of the (e) building. no exterior work - no increase of sq footage. soft demo, ab-017

Open the permit page

$2,000
Oct 19, 2016Completed
final sign-off Dec 2016
300 Montgomery StMarchetti Groupsuite #201: this is a commercial t.i. on a single floor. work includes demolition of extg partitions, new sidelites, ceiling and finishes. n/a for maher.
Details
Permit
201610190708
Permit issued
Nov 16, 2016
Final sign-off
Dec 16, 2016

suite #201: this is a commercial t.i. on a single floor. work includes demolition of extg partitions, new sidelites, ceiling and finishes. n/a for maher.

Open the permit page

$82,550
Oct 11, 2016Completed
final sign-off Mar 2017
118 Grant AvBuild Group Inc.revision to 201607051605: removal of light fixtures at ground floor. revised t24 lighting.
Details
Permit
201610119996
Permit issued
Oct 19, 2016
Final sign-off
Mar 14, 2017

revision to 201607051605: removal of light fixtures at ground floor. revised t24 lighting.

Open the permit page

Sep 14, 2016Completed
final sign-off Sep 2016
149 02nd StYama Constructionrevision to app#201604053950. document dropped ceiling framing per inspector request. in lieu of metal studs per detail 1/ao1, use wood studs throughout per detail 8/s2. n/a for maher.
Details
Permit
201609147709
Permit issued
Sep 14, 2016
Final sign-off
Sep 16, 2016

revision to app#201604053950. document dropped ceiling framing per inspector request. in lieu of metal studs per detail 1/ao1, use wood studs throughout per detail 8/s2. n/a for maher.

Open the permit page

$2,000
Sep 8, 2016Completed
final sign-off Sep 2016
149 02nd StYama Constructionchange type of construction from 1 to 3 for record keeping. ref pa 201604053950 revision
Details
Permit
201609087142
Permit issued
Sep 8, 2016
Final sign-off
Sep 15, 2016

change type of construction from 1 to 3 for record keeping. ref pa 201604053950 revision

Open the permit page

Sep 2, 2016Completed
final sign-off Feb 2020
301 Howard StTrainor Commercial Construction Inc.change of occupancy from m to a2 ground floor: interior demo with an (e) retail store and full tenant improvement, work on hte ground floor
Details
Permit
201609026720
Permit issued
Dec 15, 2016
Final sign-off
Feb 13, 2020

change of occupancy from m to a2 ground floor: interior demo with an (e) retail store and full tenant improvement, work on hte ground floor

Open the permit page

$425,000
Aug 24, 2016Never finaled
issued Aug 2016, no final
420 Montgomery Ststreet space
Details
Permit
M716247
Permit issued
Aug 24, 2016

street space

Open the permit page

Aug 15, 2016Completed
final sign-off Nov 2016
343 Sansome StGci, Inc7th and 8th floor:new electrified furniture whip connections. new wire mold power distibution to new furniture, new plug load shut off to new circuiting.
Details
Permit
201608155028
Permit issued
Aug 17, 2016
Final sign-off
Nov 17, 2016

7th and 8th floor:new electrified furniture whip connections. new wire mold power distibution to new furniture, new plug load shut off to new circuiting.

Open the permit page

$41,000
Aug 15, 2016Completed
final sign-off Apr 2017
153 Kearny StC C I Commercial Construction & Improvinterior improvement: new finishes and lighting, a new glass security door, and a new security closet. n/a for maher.
Details
Permit
201608155034
Permit issued
Sep 22, 2016
Final sign-off
Apr 6, 2017

interior improvement: new finishes and lighting, a new glass security door, and a new security closet. n/a for maher.

Open the permit page

$20,000
Jul 21, 2016Expired or cancelled
cancelled Jan 2026
555 California Stplace temporary cafe unit on extg exterior plaza and connect to extg power water and waste locations. place a temporary back of house unit containing storage and service equipment to support cafe unit. n/a for maher
Details
Permit
201607212939

place temporary cafe unit on extg exterior plaza and connect to extg power water and waste locations. place a temporary back of house unit containing storage and service equipment to support cafe unit. n/a for maher

Open the permit page

$10,000
Jul 12, 2016Completed
final sign-off Nov 2016
303 02nd StGci, Incste s-137 - demolish (e) non-load bearing walls, drop ceilings, (e) toilet room fixtures & finish ceramic tiles. remove mortar bed at & around (e) toilet room tile floors to (e) conc. slab in grade (per ab-017). space to remain vacant
Details
Permit
201607122165
Permit issued
Jul 15, 2016
Final sign-off
Nov 15, 2016

ste s-137 - demolish (e) non-load bearing walls, drop ceilings, (e) toilet room fixtures & finish ceramic tiles. remove mortar bed at & around (e) toilet room tile floors to (e) conc. slab in grade (per ab-017). space to remain vacant

Open the permit page

$10,000
Jul 12, 2016Never finaled
issued Jul 2016, no final
699 08th StGci, Increvision to pa 2016 0412 4540: addition of electrical room in (e) office space, suite 476
Details
Permit
201607122154
Permit issued
Jul 14, 2016

revision to pa 2016 0412 4540: addition of electrical room in (e) office space, suite 476

Open the permit page

Jul 5, 2016Completed
final sign-off Mar 2017
118 Grant AvBuild Group Inc.partial interior improvements to (e) retail. replacement of (e) hvac unit and its ductwork with a new water source heat pump to serve: renovated space & remote storage area. new lighting new receptacles and some new equipment, as powered off existing electrical panel boards
Details
Permit
201607051605
Permit issued
Aug 10, 2016
Final sign-off
Mar 14, 2017

partial interior improvements to (e) retail. replacement of (e) hvac unit and its ductwork with a new water source heat pump to serve: renovated space & remote storage area. new lighting new receptacles and some new equipment, as powered off existing electrical panel boards

Open the permit page

$185,000
Jun 10, 2016Never finaled
issued Jun 2016, no final
201 California StGci, Incstrengthening of 16th floor for added weight of proposed ups. only required strengthening of floor is added channels between extg composite steel beams. pa# 201603222729. n/a for maher
Details
Permit
201606109692
Permit issued
Jun 22, 2016

strengthening of 16th floor for added weight of proposed ups. only required strengthening of floor is added channels between extg composite steel beams. pa# 201603222729. n/a for maher

Open the permit page

$4,000
Jun 6, 2016Completed
final sign-off Oct 2019
345 California StGci, Incarch/mep construction of new non-structural partitions, doors, frames & hard ware, ceiling grid & tiles, millwork and new men's restroom. there is no change in area. life safety & sprinklers under separate permit. demo under separate permit 2016-0412-4535. maher na
Details
Permit
201606069162
Permit issued
Jun 16, 2016
Final sign-off
Oct 4, 2019

arch/mep construction of new non-structural partitions, doors, frames & hard ware, ceiling grid & tiles, millwork and new men's restroom. there is no change in area. life safety & sprinklers under separate permit. demo under separate permit 2016-0412-4535. maher na

Open the permit page

$1,645,680
May 31, 2016Never finaled
issued Jun 2016, no final
118 Grant AvBuild Group Inc.soft demo non-structural ab-017
Details
Permit
201605318716
Permit issued
Jun 9, 2016

soft demo non-structural ab-017

Open the permit page

$10,000
Apr 4, 2016Completed
final sign-off May 2017
736 Mission StGci, Inc2nd floor t.i. for extg admin offices with in the contemporary jewish museum. the space was left as a shell space after the 2008 museum completion and the project will extend the current admin. space into the shell. mep & life safety deferred.
Details
Permit
201604043864
Permit issued
Jul 15, 2016
Final sign-off
May 31, 2017

2nd floor t.i. for extg admin offices with in the contemporary jewish museum. the space was left as a shell space after the 2008 museum completion and the project will extend the current admin. space into the shell. mep & life safety deferred.

Open the permit page

$363,000
Dec 14, 2004Completed
final sign-off Jan 2005
121 Spear StRadiant Construction Increvision to permit 200409093692 use new hood & flue system by vent master
Details
Permit
200412141431
Permit issued
Dec 14, 2004
Final sign-off
Jan 28, 2005

revision to permit 200409093692 use new hood & flue system by vent master

Open the permit page