Permit GraphShortlistSan Francisco building permits since 2000

James Zak

License
C21506
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, designer
Firm
Wz Architecture
Based in
San Francisco
On San Francisco permits
Apr 2005 to May 2026

94 permits since 2000 (architect on 90 permits, designer on 4 permits): 64 completed, 1 in progress, 22 never finaled, 7 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
C C I Commercial Construction & Improv (31), Fisher Development Inc (10), Singular Builders (6), Culvert Pps (5), Premier Structures Inc (5), Bsm Construction Inc (2), Michilli Inc (2), Northern Sun Associates (2), P 3 Construction & Remodeling Inc (2), Pacific General Construction (2), Peacock Construction (2), Bridger Construction Company Inc., Cci Com'l Constr & Improv**See 985808***, H & M Fire Protection, Inc., Paul Ryan Associates, Plant Construction Company Lp, Rudolph Commercial Interiors Inc, Rci, Skyline Construction, Swinerton Builders
Engineers
Benson Balan (2), Evan Wan Hin Cheung (2), Jose Herrera (2), Alan Charles Burr, Ben Au, Jon E. Brody, Ranko Koprivica, Westley Anastasio, Yee Cheung Lasso
Authorized agents
Joey Rodriguez, Michael Baker, Travuth Mock
Pmt consultant/expediters
Faisal Elhalis

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 19, 2026In progress
issued May 2026
240 Post StC C I Commercial Construction & Improvrevision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demo
Details
Permit
202605191535
Permit issued
May 21, 2026

revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demo

Open the permit page

Mar 25, 2026Completed
final sign-off Sep 2026
240 Stockton StC C I Commercial Construction & Improv10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and glazing partitions per plan for 3 new private office rooms, (1) new conference room. addition of new drywall drop
Details
Permit
202603258236
Permit issued
May 21, 2026
Final sign-off
Sep 21, 2026

10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and glazing partitions per plan for 3 new private office rooms, (1) new conference room. addition of new drywall drop

Open the permit page

$160,000
Mar 25, 2026Completed
final sign-off Sep 2026
240 Stockton StC C I Commercial Construction & Improv3/f: partial office tenant improvement. arch - addition of new non-structural, non-rated drywall partitions per plan for existing office reception area with new floor finish and new drywall drop ceiling. electrical under separate permit.
Details
Permit
202603258240
Permit issued
May 20, 2026
Final sign-off
Sep 21, 2026

3/f: partial office tenant improvement. arch - addition of new non-structural, non-rated drywall partitions per plan for existing office reception area with new floor finish and new drywall drop ceiling. electrical under separate permit.

Open the permit page

$150,000
Mar 9, 2026Completed
final sign-off Sep 2026
180 Geary StC C I Commercial Construction & Improvt.i. of existing floor at 1st floor lobby, non structural partition
Details
Permit
202603097187
Permit issued
Mar 11, 2026
Final sign-off
Sep 22, 2026

t.i. of existing floor at 1st floor lobby, non structural partition

Open the permit page

$180,000
Feb 10, 2026Completed
final sign-off May 2026
240 Post StC C I Commercial Construction & Improvdemolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors.
Details
Permit
202602105669
Permit issued
Feb 17, 2026
Final sign-off
May 26, 2026

demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors.

Open the permit page

$250,000
Nov 10, 2025Completed
final sign-off Feb 2026
146 Geary StC C I Commercial Construction & Improvrevision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of house
Details
Permit
202511109282
Permit issued
Nov 20, 2025
Final sign-off
Feb 2, 2026

revision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of house

Open the permit page

Oct 8, 2025Completed
final sign-off Mar 2026
801 Market StC C I Commercial Construction & Improv2 and 3 /fl- partial ti of (e) floor retail addition of (n) non structural, non rated drywall partition enclose ground (e) escalator from floor 2 -3 with drywall soffit extension under escalator for separtition of floor 3 retail from floor 1 to 2 retail
Details
Permit
202510086982
Permit issued
Jan 20, 2026
Final sign-off
Mar 3, 2026

2 and 3 /fl- partial ti of (e) floor retail addition of (n) non structural, non rated drywall partition enclose ground (e) escalator from floor 2 -3 with drywall soffit extension under escalator for separtition of floor 3 retail from floor 1 to 2 retail

Open the permit page

$24,221
Oct 8, 2025Completed
final sign-off Jan 2026
149 Maiden LnC C I Commercial Construction & Improv3rd fl - partial ti of (e) 3rd office. addition of (n) non-structural, non-rated drywall and glazing partitions per plan or 2 (n) meeting rooms and 1 (n) conference room; addition (n) drywall drop ceiling over the (n) conference room deferred fire & mep
Details
Permit
202510087004
Permit issued
Dec 18, 2025
Final sign-off
Jan 29, 2026

3rd fl - partial ti of (e) 3rd office. addition of (n) non-structural, non-rated drywall and glazing partitions per plan or 2 (n) meeting rooms and 1 (n) conference room; addition (n) drywall drop ceiling over the (n) conference room deferred fire & mep

Open the permit page

$30,000
Jul 9, 2025Completed
final sign-off Oct 2025
2197 Chestnut StC C I Commercial Construction & Improvpartial ti of (e) 1st floor retail for addition of new cafe and boh (back house) cafe service room
Details
Permit
202507090471
Permit issued
Aug 28, 2025
Final sign-off
Oct 9, 2025

partial ti of (e) 1st floor retail for addition of new cafe and boh (back house) cafe service room

Open the permit page

$8,000
May 30, 2025Completed
final sign-off Feb 2026
146 Geary StC C I Commercial Construction & Improvbasement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remain
Details
Permit
202505307632
Permit issued
Sep 3, 2025
Final sign-off
Feb 2, 2026

basement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remain

Open the permit page

$200,000
Apr 14, 2025Completed
final sign-off Sep 2025
22 04th StSkyline Constructionadd a vent enclosure to existing elevator
Details
Permit
202504144349
Permit issued
Apr 29, 2025
Final sign-off
Sep 24, 2025

add a vent enclosure to existing elevator

Open the permit page

$10,000
Mar 6, 2025Completed
final sign-off Oct 2025
2197 Chestnut StC C I Commercial Construction & Improv(n) storefront @ chestnut and pierce st. limited to change of facade materials on 1st and 2nd fl. no change of (e) structure, mass and window openings r+r metal roofing material, remove tile replace w/ metal.exterior lighting replaced.
Details
Permit
202503061714
Permit issued
Mar 31, 2025
Final sign-off
Oct 9, 2025

(n) storefront @ chestnut and pierce st. limited to change of facade materials on 1st and 2nd fl. no change of (e) structure, mass and window openings r+r metal roofing material, remove tile replace w/ metal.exterior lighting replaced.

Open the permit page

$100,000
Feb 25, 2025Completed
final sign-off Feb 2026
120 Maiden Lnreplace (e) front sign with a single sided non electrical sign b for "camera west" facing street.
Details
Permit
202502251043
Permit issued
Jul 18, 2025
Final sign-off
Feb 5, 2026

replace (e) front sign with a single sided non electrical sign b for "camera west" facing street.

Open the permit page

$1,500
Feb 25, 2025Completed
final sign-off Feb 2026
120 Maiden Lnreplace (e) front sign with a double sided electrical blade sign for "camera west" for sign a facing street.
Details
Permit
202502251040
Permit issued
Jul 18, 2025
Final sign-off
Feb 5, 2026

replace (e) front sign with a double sided electrical blade sign for "camera west" for sign a facing street.

Open the permit page

$3,000
Feb 25, 2025Completed
final sign-off Feb 2026
120 Maiden LnSingular Builders(n) soffit above main entrance service door and side window replacement of (e) first floor glazing with (n) security glazing. (n) secuirty shutter at all first floor glazing. construction of 1 (n) face sign above entrance and one (n) blade sign above service door
Details
Permit
202502251037
Permit issued
Jul 18, 2025
Final sign-off
Feb 5, 2026

(n) soffit above main entrance service door and side window replacement of (e) first floor glazing with (n) security glazing. (n) secuirty shutter at all first floor glazing. construction of 1 (n) face sign above entrance and one (n) blade sign above service door

Open the permit page

$120,000
Dec 24, 2024Completed
final sign-off Oct 2025
2197 Chestnut StC C I Commercial Construction & Improv1&2/fl- ti of retail for (n) retail tenants (n) retail and back of house non strucrtural partitions, celign finishes and casework. (n) restrooms and staff rooms with ada complaint drinking fountain, platform lift (approved under separte permit) demo portion of (e) retail stair from 1st to 2nd floor
Details
Permit
202412247367
Permit issued
Mar 13, 2025
Final sign-off
Oct 9, 2025

1&2/fl- ti of retail for (n) retail tenants (n) retail and back of house non strucrtural partitions, celign finishes and casework. (n) restrooms and staff rooms with ada complaint drinking fountain, platform lift (approved under separte permit) demo portion of (e) retail stair from 1st to 2nd floor

Open the permit page

$400,000
Aug 19, 2024Completed
final sign-off Jun 2025
2197 Chestnut StBsm Construction Incinstallation of (n) vertical platform lift.barrier removal
Details
Permit
202408198968
Permit issued
Oct 15, 2024
Final sign-off
Jun 25, 2025

installation of (n) vertical platform lift.barrier removal

Open the permit page

$30,000
Jul 8, 2024Completed
final sign-off Aug 2024
2197 Chestnut StBsm Construction Incdemo interior demising walls, non structural only. demo and remove all casework and cabinetry. remove modular bank vault. demo electrical and telecom cables. remove drop ceiling and lighting. infill atm wall within property. electrical panels to remain. ab-017
Details
Permit
202407085971
Permit issued
Jul 11, 2024
Final sign-off
Aug 12, 2024

demo interior demising walls, non structural only. demo and remove all casework and cabinetry. remove modular bank vault. demo electrical and telecom cables. remove drop ceiling and lighting. infill atm wall within property. electrical panels to remain. ab-017

Open the permit page

$50,000
Jul 3, 2024Completed
final sign-off Mar 2025
22 04th Stinstallation of new security gate in existing garage at vehicle ramp at level b2.
Details
Permit
202407035766
Permit issued
Nov 14, 2024
Final sign-off
Mar 6, 2025

installation of new security gate in existing garage at vehicle ramp at level b2.

Open the permit page

$10,000
Jun 4, 2024Completed
final sign-off Nov 2024
255 Post StSingular Buildersrevision to pa#2023-0614-0038. minor changes to floor plan layout at first floor, minor change to retail stair, and minor changes to retail lighting and finishes.
Details
Permit
202406043636
Permit issued
Sep 18, 2024
Final sign-off
Nov 20, 2024

revision to pa#2023-0614-0038. minor changes to floor plan layout at first floor, minor change to retail stair, and minor changes to retail lighting and finishes.

Open the permit page

Nov 14, 2023Completed
final sign-off Oct 2024
99 Harding RdSingular Buildersrevision to pa 202203029071 s. update use/occupancy of the site permit to b occupancy (not a occupancy). no assembly use in this building.
Details
Permit
202311140753
Permit issued
Dec 4, 2023
Final sign-off
Oct 15, 2024

revision to pa 202203029071 s. update use/occupancy of the site permit to b occupancy (not a occupancy). no assembly use in this building.

Open the permit page

Oct 25, 2023Never finaled
filed Oct 2023, never issued
80 Maiden Lnstorefront entrance ada compliance checklist. barrier removal - addition of power door operators at storefront entrance. encroachment of power door swing into row. ref 23mse-00450
Details
Permit
202310259486

storefront entrance ada compliance checklist. barrier removal - addition of power door operators at storefront entrance. encroachment of power door swing into row. ref 23mse-00450

Open the permit page

$3,000
Oct 19, 2023Never finaled
filed Oct 2023, never issued
2121 Fillmore Stto comply abe# 201811292669, storefront abe compliance checklist, provide new ada compliant door hardware.
Details
Permit
202310199065

to comply abe# 201811292669, storefront abe compliance checklist, provide new ada compliant door hardware.

Open the permit page

$750
Oct 19, 2023Never finaled
filed Oct 2023, never issued
2306 Fillmore Stto comply w/abe#: 201811272570; storefront entrance abe compliance. barrier removal-addition of power of door operator at storefront entrance.
Details
Permit
202310198999

to comply w/abe#: 201811272570; storefront entrance abe compliance. barrier removal-addition of power of door operator at storefront entrance.

Open the permit page

$3,000
Oct 19, 2023Never finaled
filed Oct 2023, never issued
1295 Folsom Stentrance abe compliance check barrier removal. request for technical infeasiblity - entrance level landings can not be provided. abe: 201811022349
Details
Permit
202310199078

entrance abe compliance check barrier removal. request for technical infeasiblity - entrance level landings can not be provided. abe: 201811022349

Open the permit page

Oct 19, 2023Never finaled
filed Oct 2023, never issued
2125 Fillmore Stto comply with abe# 201811292664, storefront entrance abe compliance check, barrier removal- addition of power door operators at storefront entrance.
Details
Permit
202310198992

to comply with abe# 201811292664, storefront entrance abe compliance check, barrier removal- addition of power door operators at storefront entrance.

Open the permit page

$3,000
Oct 19, 2023Never finaled
filed Oct 2023, never issued
2123 Fillmore Stto comply with abe# 201811292657, storefront entrance abe compliance check, barrier removal- modify (e) storefront entrance to provide required door clearances.
Details
Permit
202310198989

to comply with abe# 201811292657, storefront entrance abe compliance check, barrier removal- modify (e) storefront entrance to provide required door clearances.

Open the permit page

$3,000
Jun 14, 2023Completed
final sign-off Nov 2024
255 Post StSingular Buildersdemo and replacement of e 1st fl post street retail storefront. removal of structural and non structural partitons and finishes. opening in masonry stucco building facade, new retail storefront, non structural partitons, structural n hss structural for storefront systems
Details
Permit
202306140036
Permit issued
Nov 10, 2023
Final sign-off
Nov 20, 2024

demo and replacement of e 1st fl post street retail storefront. removal of structural and non structural partitons and finishes. opening in masonry stucco building facade, new retail storefront, non structural partitons, structural n hss structural for storefront systems

Open the permit page

$150,000
Jun 14, 2023Completed
final sign-off Nov 2024
255 Post StSingular Builders, C C I Commercial Construction & Improv1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep
Details
Permit
202306140038
Permit issued
Aug 14, 2023
Final sign-off
Nov 20, 2024

1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep

Open the permit page

$1,500,000
Mar 6, 2023Completed
final sign-off Sep 2023
360 Post StC C I Commercial Construction & Improvdemolition & replacement of post st. office lobby entrance door. no basement work under this permit, no elevator cabin/hoistway work under this permit, no interior ti work under this permit, office lobby removation perviously approved under separate permit.
Details
Permit
202303063063
Permit issued
Apr 25, 2023
Final sign-off
Sep 11, 2023

demolition & replacement of post st. office lobby entrance door. no basement work under this permit, no elevator cabin/hoistway work under this permit, no interior ti work under this permit, office lobby removation perviously approved under separate permit.

Open the permit page

$30,000
Nov 7, 2022Completed
final sign-off Feb 2023
255 Post StC C I Commercial Construction & Improvab-017. demo (e) flooring, parition walls, stair finish, wall cladding, casework/cabinetry, ceiling light fixtures/soffits, hvac ducts/diffusers, electrical conduits. all finishes to be removed, all tenant mep services to be demo to base risers/shafts/panels. no structural demo.
Details
Permit
202211075979
Permit issued
Nov 14, 2022
Final sign-off
Feb 3, 2023

ab-017. demo (e) flooring, parition walls, stair finish, wall cladding, casework/cabinetry, ceiling light fixtures/soffits, hvac ducts/diffusers, electrical conduits. all finishes to be removed, all tenant mep services to be demo to base risers/shafts/panels. no structural demo.

Open the permit page

$30,000
Oct 31, 2022Expired or cancelled
cancelled Jan 2026
220 Post St5th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 5 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes.
Details
Permit
202210315549

5th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 5 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes.

Open the permit page

$175,000
Oct 31, 2022Expired or cancelled
cancelled Jan 2026
220 Post St4th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 4 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes.
Details
Permit
202210315547

4th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 4 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes.

Open the permit page

$175,000
Sep 30, 2022Completed
final sign-off Mar 2023
360 Post StRudolph Commercial Interiors Inc, Rci8/f: partial ti work addition of 4 new office cabins and new carpet area of work. reworking of (e) hvac and light in area of work under separate permit
Details
Permit
202209303569
Permit issued
Nov 28, 2022
Final sign-off
Mar 28, 2023

8/f: partial ti work addition of 4 new office cabins and new carpet area of work. reworking of (e) hvac and light in area of work under separate permit

Open the permit page

$60,000
Aug 31, 2022Completed
final sign-off Feb 2023
22 04th StC C I Commercial Construction & Improvdemolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office.
Details
Permit
202208311622
Permit issued
Nov 18, 2022
Final sign-off
Feb 21, 2023

demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office.

Open the permit page

$100,000
May 2, 2022Completed
final sign-off May 2023
360 Post StC C I Commercial Construction & Improvdemo and replace 1st fl lobby (cosmetic). no basement work, no storefront work, no elevator cabin/hoistway, no tenant improvment under this permit. mep under separate permit.
Details
Permit
202205023360
Permit issued
Jun 16, 2022
Final sign-off
May 5, 2023

demo and replace 1st fl lobby (cosmetic). no basement work, no storefront work, no elevator cabin/hoistway, no tenant improvment under this permit. mep under separate permit.

Open the permit page

$160,000
May 2, 2022Completed
final sign-off Aug 2022
833 Market St1st fl office lobby 200 sf ft renovation. installation of ada compliant turnstile security system in office lobby.
Details
Permit
202205023356
Permit issued
Jul 6, 2022
Final sign-off
Aug 1, 2022

1st fl office lobby 200 sf ft renovation. installation of ada compliant turnstile security system in office lobby.

Open the permit page

$50,000
Mar 2, 2022Completed
final sign-off Oct 2024
99 Harding RdSingular Builders, Fisher Development Incpriority process - new building construction recreation center
Details
Permit
202203029071
Permit issued
May 19, 2023
Final sign-off
Oct 15, 2024

priority process - new building construction recreation center

Open the permit page

$700,000
Jan 7, 2022Never finaled
issued Jan 2022, no final
220 Post StC C I Commercial Construction & Improvextend previously approved 2hour rated partition from first floor to second floor ceiling per dbi inspector comments. ba 202103126505 and 202009033352
Details
Permit
202201075529
Permit issued
Jan 10, 2022

extend previously approved 2hour rated partition from first floor to second floor ceiling per dbi inspector comments. ba 202103126505 and 202009033352

Open the permit page

$5,000
Jan 7, 2022Never finaled
issued Jan 2022, no final
220 Post StC C I Commercial Construction & Improvrevision of notes (previously approved under below mentioned references permits #201806212632 and 201903074683. for final (bldg) instpection and permit sign off.
Details
Permit
202201075527
Permit issued
Jan 10, 2022

revision of notes (previously approved under below mentioned references permits #201806212632 and 201903074683. for final (bldg) instpection and permit sign off.

Open the permit page

Nov 17, 2021Completed
final sign-off Oct 2022
135 Post Stchange of use: land use designation from retail to office on 3/f, 4/f, 5/f, 6/f pursuant to pc motions 20927 & 20928. no occupancy under this permit. no work propsed, all life safety, egress and ada review under future t.i. no cfc for this permit until future ti is issued. subject to seimic upgrade
Details
Permit
202111172647
Permit issued
Dec 10, 2021
Final sign-off
Oct 6, 2022

change of use: land use designation from retail to office on 3/f, 4/f, 5/f, 6/f pursuant to pc motions 20927 & 20928. no occupancy under this permit. no work propsed, all life safety, egress and ada review under future t.i. no cfc for this permit until future ti is issued. subject to seimic upgrade

Open the permit page

Mar 12, 2021Never finaled
issued May 2021, no final
220 Post StC C I Commercial Construction & Improvrevision to app#202009033352: upgrade previously approved partitions and soffit to 2 hours rating per dbi inspectors comments.
Details
Permit
202103126505
Permit issued
May 11, 2021

revision to app#202009033352: upgrade previously approved partitions and soffit to 2 hours rating per dbi inspectors comments.

Open the permit page

$4,000
Mar 4, 2021Completed
final sign-off Dec 2021
825 Market Stentrance ada compliance check per approved historic code use barrier removal - addition of power door operators at 825-833 market st.
Details
Permit
202103045899
Permit issued
May 7, 2021
Final sign-off
Dec 8, 2021

entrance ada compliance check per approved historic code use barrier removal - addition of power door operators at 825-833 market st.

Open the permit page

$20,000
Nov 9, 2020Completed
final sign-off May 2021
220 Post StC C I Commercial Construction & Improvrevision to bpa# 2019-0307-4683, detail 1/a5.64. a 4-hour rated parapet wall against east party line on rooftop. not visible from street.
Details
Permit
202011098480
Permit issued
Dec 18, 2020
Final sign-off
May 11, 2021

revision to bpa# 2019-0307-4683, detail 1/a5.64. a 4-hour rated parapet wall against east party line on rooftop. not visible from street.

Open the permit page

$2,000
Sep 3, 2020Never finaled
issued Sep 2020, no final
220 Post StC C I Commercial Construction & Improvinterior partitions and finishes for white box. store fron to remain same. new drinking fountain.
Details
Permit
202009033352
Permit issued
Sep 29, 2020

interior partitions and finishes for white box. store fron to remain same. new drinking fountain.

Open the permit page

$80,000
Mar 12, 2020Never finaled
issued Oct 2020, no final
712 Montgomery Streplacement of staircase
Details
Permit
202003126936
Permit issued
Oct 6, 2020

replacement of staircase

Open the permit page

$2,000
Feb 12, 2020Completed
final sign-off Mar 2021
1822 Divisadero StPacific General Constructioninterior remodel work on 3rd fl only. replacing existing windows with new glazing. no ext work under this permit. no change of use; laundromat to remain.
Details
Permit
202002124229
Permit issued
Mar 16, 2020
Final sign-off
Mar 18, 2021

interior remodel work on 3rd fl only. replacing existing windows with new glazing. no ext work under this permit. no change of use; laundromat to remain.

Open the permit page

$10,000
Jan 31, 2020Never finaled
filed Jan 2020, never issued
34 Maiden Lndemolition & replace of maiden lane ground floor storefront with proposed. ** maher: n/a **
Details
Permit
202001313268

demolition & replace of maiden lane ground floor storefront with proposed. ** maher: n/a **

Open the permit page

$100,000
Jan 31, 2020Completed
final sign-off May 2021
34 Maiden LnC C I Commercial Construction & Improv1st floor: demolition and replace of lobby at maiden lane. no exterior storefront work. n/a for maher
Details
Permit
202001313265
Permit issued
May 18, 2020
Final sign-off
May 19, 2021

1st floor: demolition and replace of lobby at maiden lane. no exterior storefront work. n/a for maher

Open the permit page

$80,000
Jan 7, 2020Completed
final sign-off Jun 2021
146 Geary StC C I Commercial Construction & Improv3rd fl - ti interior partitions and finishes for office use mep under separate permit. 3rd & 4th floors
Details
Permit
202001071340
Permit issued
Oct 13, 2020
Final sign-off
Jun 3, 2021

3rd fl - ti interior partitions and finishes for office use mep under separate permit. 3rd & 4th floors

Open the permit page

$110,000
Jan 7, 2020Never finaled
issued Mar 2020, no final
34 Maiden LnC C I Commercial Construction & Improvdemo and replacement of restrooms on 3rd & 4th floors. plumbing fixtures & accessories to be removed and replace in-kind
Details
Permit
202001071334
Permit issued
Mar 4, 2020

demo and replacement of restrooms on 3rd & 4th floors. plumbing fixtures & accessories to be removed and replace in-kind

Open the permit page

$60,000
Dec 18, 2019Completed
final sign-off Jun 2021
253 Post StMichilli Incno work on bldg facade. ground fl: scope of work consists of new elevator shaft connecting ground fl to basement. basement: scope consist of new elevator shaft, pit & elevator machine room with new mechanical connections.
Details
Permit
201912189950
Permit issued
Feb 12, 2020
Final sign-off
Jun 15, 2021

no work on bldg facade. ground fl: scope of work consists of new elevator shaft connecting ground fl to basement. basement: scope consist of new elevator shaft, pit & elevator machine room with new mechanical connections.

Open the permit page

$60,000
Dec 2, 2019Completed
final sign-off Jun 2021
253 Post StMichilli Incground floor - (n) cafe, (n) 2 x fitting room, (n) ada fitting room, (n) staircase connecting ground floor to basement, (n) elevator shaft; basement - adding partitions for back of house offices and staff lounge, adding 945 sf sales area, and (n) ada fitting room
Details
Permit
201912028471
Permit issued
Jan 17, 2020
Final sign-off
Jun 14, 2021

ground floor - (n) cafe, (n) 2 x fitting room, (n) ada fitting room, (n) staircase connecting ground floor to basement, (n) elevator shaft; basement - adding partitions for back of house offices and staff lounge, adding 945 sf sales area, and (n) ada fitting room

Open the permit page

$300,000
Aug 7, 2019Completed
final sign-off Oct 2020
1820 Divisadero StPacific General Constructioninterior remodel work replace (e) windows at 2nd fl. at front facade, no change of use, use to remain (commercial)
Details
Permit
201908078214
Permit issued
Sep 10, 2019
Final sign-off
Oct 29, 2020

interior remodel work replace (e) windows at 2nd fl. at front facade, no change of use, use to remain (commercial)

Open the permit page

$150,000
Mar 7, 2019Never finaled
issued Dec 2019, no final
220 Post StC C I Commercial Construction & Improvreplace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck.
Details
Permit
201903074683
Permit issued
Dec 6, 2019

replace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck.

Open the permit page

$10,000
Feb 20, 2019Completed
final sign-off Jul 2021
34 Maiden LnC C I Commercial Construction & Improv3rd flr. prepare space for tenant improvement work. remove interior partition walls, ceiling heights, soffits and wall cladding. remove (e) mechanical equipment, hvac shaft, plumbing to riser shaft and cap all unused lines. install lighting per plan. patch polish and seal concrete floor per plan
Details
Permit
201902203416
Permit issued
Feb 22, 2019
Final sign-off
Jul 23, 2021

3rd flr. prepare space for tenant improvement work. remove interior partition walls, ceiling heights, soffits and wall cladding. remove (e) mechanical equipment, hvac shaft, plumbing to riser shaft and cap all unused lines. install lighting per plan. patch polish and seal concrete floor per plan

Open the permit page

$60,000
Jun 21, 2018Expired or cancelled
cancelled Nov 2022
220 Post Stdemolition and replacement of ground floor storefronts with proposed. addition of 2 light fixtures at compton places store front. refurbish upper floor building facades. install new elevator and lobby at compton place
Details
Permit
201806212631

demolition and replacement of ground floor storefronts with proposed. addition of 2 light fixtures at compton places store front. refurbish upper floor building facades. install new elevator and lobby at compton place

Open the permit page

$50,000
Apr 16, 2018Completed
final sign-off Sep 2021
146 Geary StC C I Commercial Construction & Improvinstall new enclosed exit staircase - core and shell. new elevator. mep under separate permit. no exterior work under this permit. no change of use. retail use to remain.
Details
Permit
201804166407
Permit issued
Mar 21, 2019
Final sign-off
Sep 21, 2021

install new enclosed exit staircase - core and shell. new elevator. mep under separate permit. no exterior work under this permit. no change of use. retail use to remain.

Open the permit page

$350,000
Mar 22, 2018Never finaled
issued Jul 2018, no final
210 Post StP 3 Construction & Remodeling Increvision to 201609228486, change from 2 ada baths on each floor to 1 on each floor
Details
Permit
201803224364
Permit issued
Jul 6, 2018

revision to 201609228486, change from 2 ada baths on each floor to 1 on each floor

Open the permit page

Dec 7, 2017Never finaled
issued Dec 2019, no final
146 Geary StC C I Commercial Construction & Improvinstall ground floor non-electric projecting single-faced sign "st vincent"
Details
Permit
201712075850
Permit issued
Dec 4, 2019

install ground floor non-electric projecting single-faced sign "st vincent"

Open the permit page

$3,000
Dec 7, 2017Completed
final sign-off Feb 2026
146 Geary StC C I Commercial Construction & Improvdemolition and replace ground floor storefront with proposed addition of two blade signs at ground floor, storefront. refurbish upper floor building facade. existing blade sign to remain and reused. install new skylights at roof.
Details
Permit
201712075852
Permit issued
Dec 4, 2019
Final sign-off
Feb 2, 2026

demolition and replace ground floor storefront with proposed addition of two blade signs at ground floor, storefront. refurbish upper floor building facade. existing blade sign to remain and reused. install new skylights at roof.

Open the permit page

$35,000
Dec 7, 2017Never finaled
issued Dec 2019, no final
146 Geary StC C I Commercial Construction & Improvinstall ground floor non-electric projecting single-faced sign "st vincent"
Details
Permit
201712075851
Permit issued
Dec 4, 2019

install ground floor non-electric projecting single-faced sign "st vincent"

Open the permit page

$3,000
Dec 5, 2017Completed
final sign-off Feb 2019
399 Geary StH & M Fire Protection, Inc.install fire sprinkler system in 3 story building with basement. **maher n/a**
Details
Permit
201712055574
Permit issued
Feb 15, 2018
Final sign-off
Feb 6, 2019

install fire sprinkler system in 3 story building with basement. **maher n/a**

Open the permit page

$118,650
Nov 29, 2017Completed
final sign-off Mar 2018
146 Geary StFisher Development Incdemo existing finishes, casework, non-structural partitions. ab-017
Details
Permit
201711295004
Permit issued
Jan 25, 2018
Final sign-off
Mar 14, 2018

demo existing finishes, casework, non-structural partitions. ab-017

Open the permit page

$100,000
Sep 25, 2017Completed
final sign-off Apr 2019
399 Geary StFisher Development Increvision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13
Details
Permit
201709259436
Permit issued
Nov 20, 2017
Final sign-off
Apr 22, 2019

revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13

Open the permit page

Jul 13, 2017Completed
final sign-off Mar 2018
3636 Clay StCulvert Ppsrear deck addition.
Details
Permit
201707131799
Permit issued
Jul 19, 2017
Final sign-off
Mar 5, 2018

rear deck addition.

Open the permit page

$1,000
Mar 8, 2017Completed
final sign-off May 2019
336 Mason StFisher Development Incgrnd flr: soft demo - ab-017 ref pa 201611233479 maher na
Details
Permit
201703081021
Permit issued
Mar 9, 2017
Final sign-off
May 10, 2019

grnd flr: soft demo - ab-017 ref pa 201611233479 maher na

Open the permit page

$5,000
Jan 27, 2017Completed
final sign-off Apr 2017
220 Post StFisher Development Incsoft demo ab-017. demoltion or removal of extg flooring, extg casework extg interior partition walls, extg ceiling lights and soffits, and extg cladding to structural. exit enclosure must remain.
Details
Permit
201701278121
Permit issued
Feb 1, 2017
Final sign-off
Apr 6, 2017

soft demo ab-017. demoltion or removal of extg flooring, extg casework extg interior partition walls, extg ceiling lights and soffits, and extg cladding to structural. exit enclosure must remain.

Open the permit page

$30,000
Nov 23, 2016Completed
final sign-off Apr 2019
399 Geary StFisher Development Incchange of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep.
Details
Permit
201611233479
Permit issued
Aug 31, 2017
Final sign-off
Apr 22, 2019

change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep.

Open the permit page

$2,000,000
Sep 23, 2016Completed
final sign-off Mar 2017
210 Post StFisher Development Incdemo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539
Details
Permit
201609238725
Permit issued
Dec 20, 2016
Final sign-off
Mar 29, 2017

demo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539

Open the permit page

$5,000
Aug 24, 2016Completed
final sign-off Mar 2018
3636 Clay StCulvert Ppsrevision to pa 201510058838: addition of dormer, chimney, skylight at roof level
Details
Permit
201608245849
Permit issued
Feb 17, 2017
Final sign-off
Mar 5, 2018

revision to pa 201510058838: addition of dormer, chimney, skylight at roof level

Open the permit page

$1,000
Mar 2, 2016Completed
final sign-off Apr 2017
166 Geary StP 3 Construction & Remodeling Increnovation of lobby including interior & exterior wall and floor finishes and new entry canopy
Details
Permit
201603020965
Permit issued
Jan 23, 2017
Final sign-off
Apr 19, 2017

renovation of lobby including interior & exterior wall and floor finishes and new entry canopy

Open the permit page

$50,000
Oct 5, 2015Expired or cancelled
expired Apr 2023
3636 Clay StCulvert Ppsminor alteration to bldg exterior and revision to the garage design. ref app#201409055513 no change to garage
Details
Permit
201510058838
Permit issued
Jun 14, 2016

minor alteration to bldg exterior and revision to the garage design. ref app#201409055513 no change to garage

Open the permit page

$100,000
Sep 11, 2015Expired or cancelled
disapproved Sep 2018
340 Mason Stplanning entitlement
Details
Permit
201509116763

planning entitlement

Open the permit page

$1,000
Sep 10, 2015Completed
final sign-off Mar 2018
3636 Clay StCulvert Ppsnew partitions and associated structural work
Details
Permit
201509106618
Permit issued
Oct 7, 2015
Final sign-off
Mar 5, 2018

new partitions and associated structural work

Open the permit page

$290,000
Sep 10, 2015Expired or cancelled
expired May 2019
3636 Clay StCulvert Ppsremove walls at kitchen and dining room on gr fl. remove walls in bedrooms on 2nd fl remove e brick fireplaces. approx 2,000 sq ft of floor area. no change to wallsor layout. no structural work.
Details
Permit
201509106613
Permit issued
Oct 5, 2015

remove walls at kitchen and dining room on gr fl. remove walls in bedrooms on 2nd fl remove e brick fireplaces. approx 2,000 sq ft of floor area. no change to wallsor layout. no structural work.

Open the permit page

$5,000
Aug 11, 2015Completed
final sign-off Sep 2018
340 Mason StPeacock Constructiontenant 2: soft demo ab-017. tenant #2. n/a for maher.
Details
Permit
201508113988
Permit issued
Sep 23, 2015
Final sign-off
Sep 17, 2018

tenant 2: soft demo ab-017. tenant #2. n/a for maher.

Open the permit page

$5,000
Aug 10, 2015Completed
final sign-off Sep 2018
340 Mason StPeacock Constructiondemo of (e) interior partitions, installations of a (n) partition wall on 1st floor. tenant #5. maher na.
Details
Permit
201508103793
Permit issued
Sep 23, 2015
Final sign-off
Sep 17, 2018

demo of (e) interior partitions, installations of a (n) partition wall on 1st floor. tenant #5. maher na.

Open the permit page

$20,000
Jun 9, 2015Never finaled
filed Jun 2015, never issued
210 Post Stbasement, mezz, 1st,2nd,3rd flr - demolition of select (e) ceilings, partitions, & remove (e) flooring, select plumbing fixtures, select bldg systems no longer in use. relocate (e) bldg systems where they interfere with proposed shell & core work.
Details
Permit
201506098504

basement, mezz, 1st,2nd,3rd flr - demolition of select (e) ceilings, partitions, & remove (e) flooring, select plumbing fixtures, select bldg systems no longer in use. relocate (e) bldg systems where they interfere with proposed shell & core work.

Open the permit page

$20,000
Feb 19, 2015Completed
final sign-off Oct 2015
3711 19th AvNorthern Sun Associatesdemolition of elements of (e) entry, demo some landscaping elements, construction of new entry, installation of entry overhang system.
Details
Permit
201502198801
Permit issued
Mar 23, 2015
Final sign-off
Oct 19, 2015

demolition of elements of (e) entry, demo some landscaping elements, construction of new entry, installation of entry overhang system.

Open the permit page

$20,000
Jan 14, 2015Never finaled
issued Jan 2015, no final
3711 19th AvNorthern Sun Associatestenant improvement install glass and drywall partitions. replacement of flooring. install new lights. reconstruction of double height space
Details
Permit
201501145750
Permit issued
Jan 20, 2015

tenant improvement install glass and drywall partitions. replacement of flooring. install new lights. reconstruction of double height space

Open the permit page

$50,000
Jun 30, 2014Completed
final sign-off Jul 2015
16 Maiden LnPremier Structures Inc3rd floor t.i. installation of new partitions, relocating lighting and new break room. maher n/a. compliance with maher ordinance no. 155-13 not required.
Details
Permit
201406300113
Permit issued
Jul 28, 2014
Final sign-off
Jul 1, 2015

3rd floor t.i. installation of new partitions, relocating lighting and new break room. maher n/a. compliance with maher ordinance no. 155-13 not required.

Open the permit page

$80,000
Apr 29, 2014Never finaled
issued Apr 2014, no final
463 Bush StPremier Structures Incamendment to bldg permit #201312184447. documentation from architect the lifesafty and fire sprinklers are not required. this is to be removed from permit as part of scope. type 3a allows for a 4-story bldg w/o sprinklers. n/a for the maher ordidnance #155-13
Details
Permit
201404294386
Permit issued
Apr 30, 2014

amendment to bldg permit #201312184447. documentation from architect the lifesafty and fire sprinklers are not required. this is to be removed from permit as part of scope. type 3a allows for a 4-story bldg w/o sprinklers. n/a for the maher ordidnance #155-13

Open the permit page

Mar 21, 2014Never finaled
issued Mar 2014, no final
463 Bush StPremier Structures Incre-installation of existing fan coil. installation of new lighting throughout. refer to pa# 2013/1218/4447. compliance with ordinance no. 155-13 not required.
Details
Permit
201403211406
Permit issued
Mar 21, 2014

re-installation of existing fan coil. installation of new lighting throughout. refer to pa# 2013/1218/4447. compliance with ordinance no. 155-13 not required.

Open the permit page

$80,000
Nov 15, 2013Completed
final sign-off Dec 2013
140 Geary StSwinerton Builders5th fl. demo e carpeting and acoustic ceiling. new carpet and acoustic ceiling. new conference room partitions and doors, replace break room counter and cabinets.
Details
Permit
201311152049
Permit issued
Nov 21, 2013
Final sign-off
Dec 18, 2013

5th fl. demo e carpeting and acoustic ceiling. new carpet and acoustic ceiling. new conference room partitions and doors, replace break room counter and cabinets.

Open the permit page

$60,000
Nov 4, 2013Expired or cancelled
cancelled Nov 2018
461 Bush StPremier Structures Increplace retail store front @ ground floor.
Details
Permit
201311041077
Permit issued
Jun 25, 2014

replace retail store front @ ground floor.

Open the permit page

$55,000
Mar 18, 2013Completed
final sign-off Jan 2014
55 Grant AvCci Com'l Constr & Improv**See 985808***replace (e) storefront for ground floor, replace lobby flooring & paint walls & ceiling. install 3 wall sconces. install recessed ceiling lights
Details
Permit
201303182461
Permit issued
Oct 15, 2013
Final sign-off
Jan 24, 2014

replace (e) storefront for ground floor, replace lobby flooring & paint walls & ceiling. install 3 wall sconces. install recessed ceiling lights

Open the permit page

$70,000
Jun 25, 2012Completed
final sign-off Aug 2012
1438 Green StPaul Ryan Associates#5e- int. remodel of studio a on 2nd floor. work includes new paneling, cabinets, flooring, wet bar. no exterior work.
Details
Permit
201206253353
Permit issued
Jun 27, 2012
Final sign-off
Aug 27, 2012

#5e- int. remodel of studio a on 2nd floor. work includes new paneling, cabinets, flooring, wet bar. no exterior work.

Open the permit page

$15,000
Jan 11, 2012Completed
final sign-off Oct 2013
240 Post StFisher Development Incinstall (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit.
Details
Permit
201201112085
Permit issued
Mar 27, 2012
Final sign-off
Oct 24, 2013

install (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit.

Open the permit page

$850,000
Sep 23, 2011Completed
final sign-off Feb 2012
99 Rhode Island StFisher Development Inc1st & 3rd floors-interior tenant improvement for an (e) shell to include new partitions, flooring & paint. m.e.p work under seperate permit, design/build permit. scope of new work at street level & 3rd floor. (e) shell & structure to remain as is
Details
Permit
201109235367
Permit issued
Oct 25, 2011
Final sign-off
Feb 2, 2012

1st & 3rd floors-interior tenant improvement for an (e) shell to include new partitions, flooring & paint. m.e.p work under seperate permit, design/build permit. scope of new work at street level & 3rd floor. (e) shell & structure to remain as is

Open the permit page

$300,000
Aug 31, 2011Completed
final sign-off Jan 2012
99 Rhode Island StFisher Development Incground floor & 3rd floor - demolitoin of portions of interior walls, ceiling & flooring. t.i. under separate permit. per ab-017.
Details
Permit
201108313636
Permit issued
Aug 31, 2011
Final sign-off
Jan 27, 2012

ground floor & 3rd floor - demolitoin of portions of interior walls, ceiling & flooring. t.i. under separate permit. per ab-017.

Open the permit page

$25,000
Dec 14, 2010Never finaled
issued Dec 2010, no final
165 Post StPremier Structures Incnew fitting room, partitions, 1st fl, basement storage. patch and repair ceiling, repair and replace lights, new signage under separate permit, mep sep permit
Details
Permit
201012146671
Permit issued
Dec 14, 2010

new fitting room, partitions, 1st fl, basement storage. patch and repair ceiling, repair and replace lights, new signage under separate permit, mep sep permit

Open the permit page

$80,000
Aug 31, 2005Completed
final sign-off Mar 2008
185 Post StPlant Construction Company Lpremove three facade panels @ (e) fireescape to determine repair needed from water intrusion.
Details
Permit
200508311773
Permit issued
Aug 31, 2005
Final sign-off
Mar 10, 2008

remove three facade panels @ (e) fireescape to determine repair needed from water intrusion.

Open the permit page

$1,500
Apr 6, 2005Completed
final sign-off Apr 2005
245 Vallejo StBridger Construction Company Inc.re-locate restroom under (e) permit. revision to approved pa# 2003/12/08/1797.
Details
Permit
200504069339
Permit issued
Apr 6, 2005
Final sign-off
Apr 20, 2005

re-locate restroom under (e) permit. revision to approved pa# 2003/12/08/1797.

Open the permit page