James Zak
- Listed as
- architect, designer
- Firm
- Wz Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to May 2026
94 permits since 2000 (architect on 90 permits, designer on 4 permits): 64 completed, 7 in progress, 16 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2026 | In progress issued May 2026 | 240 Post St | C C I Commercial Construction & Improv | revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demoDetails
revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demo | |
| Mar 25, 2026 | Completed final sign-off Sep 2026 | 240 Stockton St | C C I Commercial Construction & Improv | 10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and glazing partitions per plan for 3 new private office rooms, (1) new conference room. addition of new drywall dropDetails
10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and glazing partitions per plan for 3 new private office rooms, (1) new conference room. addition of new drywall drop | $160,000 |
| Mar 25, 2026 | Completed final sign-off Sep 2026 | 240 Stockton St | C C I Commercial Construction & Improv | 3/f: partial office tenant improvement. arch - addition of new non-structural, non-rated drywall partitions per plan for existing office reception area with new floor finish and new drywall drop ceiling. electrical under separate permit.Details
3/f: partial office tenant improvement. arch - addition of new non-structural, non-rated drywall partitions per plan for existing office reception area with new floor finish and new drywall drop ceiling. electrical under separate permit. | $150,000 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 180 Geary St | C C I Commercial Construction & Improv | t.i. of existing floor at 1st floor lobby, non structural partitionDetails
t.i. of existing floor at 1st floor lobby, non structural partition | $180,000 |
| Feb 10, 2026 | Completed final sign-off May 2026 | 240 Post St | C C I Commercial Construction & Improv | demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors.Details
demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors. | $250,000 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 146 Geary St | C C I Commercial Construction & Improv | revision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of houseDetails
revision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of house | |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 801 Market St | C C I Commercial Construction & Improv | 2 and 3 /fl- partial ti of (e) floor retail addition of (n) non structural, non rated drywall partition enclose ground (e) escalator from floor 2 -3 with drywall soffit extension under escalator for separtition of floor 3 retail from floor 1 to 2 retailDetails
2 and 3 /fl- partial ti of (e) floor retail addition of (n) non structural, non rated drywall partition enclose ground (e) escalator from floor 2 -3 with drywall soffit extension under escalator for separtition of floor 3 retail from floor 1 to 2 retail | $24,221 |
| Oct 8, 2025 | Completed final sign-off Jan 2026 | 149 Maiden Ln | C C I Commercial Construction & Improv | 3rd fl - partial ti of (e) 3rd office. addition of (n) non-structural, non-rated drywall and glazing partitions per plan or 2 (n) meeting rooms and 1 (n) conference room; addition (n) drywall drop ceiling over the (n) conference room deferred fire & mepDetails
3rd fl - partial ti of (e) 3rd office. addition of (n) non-structural, non-rated drywall and glazing partitions per plan or 2 (n) meeting rooms and 1 (n) conference room; addition (n) drywall drop ceiling over the (n) conference room deferred fire & mep | $30,000 |
| Jul 9, 2025 | Completed final sign-off Oct 2025 | 2197 Chestnut St | C C I Commercial Construction & Improv | partial ti of (e) 1st floor retail for addition of new cafe and boh (back house) cafe service roomDetails
partial ti of (e) 1st floor retail for addition of new cafe and boh (back house) cafe service room | $8,000 |
| May 30, 2025 | Completed final sign-off Feb 2026 | 146 Geary St | C C I Commercial Construction & Improv | basement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remainDetails
basement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remain | $200,000 |
| Apr 14, 2025 | Completed final sign-off Sep 2025 | 22 04th St | Skyline Construction | add a vent enclosure to existing elevatorDetails
add a vent enclosure to existing elevator | $10,000 |
| Mar 6, 2025 | Completed final sign-off Oct 2025 | 2197 Chestnut St | C C I Commercial Construction & Improv | (n) storefront @ chestnut and pierce st. limited to change of facade materials on 1st and 2nd fl. no change of (e) structure, mass and window openings r+r metal roofing material, remove tile replace w/ metal.exterior lighting replaced.Details
(n) storefront @ chestnut and pierce st. limited to change of facade materials on 1st and 2nd fl. no change of (e) structure, mass and window openings r+r metal roofing material, remove tile replace w/ metal.exterior lighting replaced. | $100,000 |
| Feb 25, 2025 | Completed final sign-off Feb 2026 | 120 Maiden Ln | replace (e) front sign with a single sided non electrical sign b for "camera west" facing street.Details
replace (e) front sign with a single sided non electrical sign b for "camera west" facing street. | $1,500 | |
| Feb 25, 2025 | Completed final sign-off Feb 2026 | 120 Maiden Ln | replace (e) front sign with a double sided electrical blade sign for "camera west" for sign a facing street.Details
replace (e) front sign with a double sided electrical blade sign for "camera west" for sign a facing street. | $3,000 | |
| Feb 25, 2025 | Completed final sign-off Feb 2026 | 120 Maiden Ln | Singular Builders | (n) soffit above main entrance service door and side window replacement of (e) first floor glazing with (n) security glazing. (n) secuirty shutter at all first floor glazing. construction of 1 (n) face sign above entrance and one (n) blade sign above service doorDetails
(n) soffit above main entrance service door and side window replacement of (e) first floor glazing with (n) security glazing. (n) secuirty shutter at all first floor glazing. construction of 1 (n) face sign above entrance and one (n) blade sign above service door | $120,000 |
| Dec 24, 2024 | Completed final sign-off Oct 2025 | 2197 Chestnut St | C C I Commercial Construction & Improv | 1&2/fl- ti of retail for (n) retail tenants (n) retail and back of house non strucrtural partitions, celign finishes and casework. (n) restrooms and staff rooms with ada complaint drinking fountain, platform lift (approved under separte permit) demo portion of (e) retail stair from 1st to 2nd floorDetails
1&2/fl- ti of retail for (n) retail tenants (n) retail and back of house non strucrtural partitions, celign finishes and casework. (n) restrooms and staff rooms with ada complaint drinking fountain, platform lift (approved under separte permit) demo portion of (e) retail stair from 1st to 2nd floor | $400,000 |
| Aug 19, 2024 | Completed final sign-off Jun 2025 | 2197 Chestnut St | Bsm Construction Inc | installation of (n) vertical platform lift.barrier removalDetails
installation of (n) vertical platform lift.barrier removal | $30,000 |
| Jul 8, 2024 | Completed final sign-off Aug 2024 | 2197 Chestnut St | Bsm Construction Inc | demo interior demising walls, non structural only. demo and remove all casework and cabinetry. remove modular bank vault. demo electrical and telecom cables. remove drop ceiling and lighting. infill atm wall within property. electrical panels to remain. ab-017Details
demo interior demising walls, non structural only. demo and remove all casework and cabinetry. remove modular bank vault. demo electrical and telecom cables. remove drop ceiling and lighting. infill atm wall within property. electrical panels to remain. ab-017 | $50,000 |
| Jul 3, 2024 | Completed final sign-off Mar 2025 | 22 04th St | installation of new security gate in existing garage at vehicle ramp at level b2.Details
installation of new security gate in existing garage at vehicle ramp at level b2. | $10,000 | |
| Jun 4, 2024 | Completed final sign-off Nov 2024 | 255 Post St | Singular Builders | revision to pa#2023-0614-0038. minor changes to floor plan layout at first floor, minor change to retail stair, and minor changes to retail lighting and finishes.Details
revision to pa#2023-0614-0038. minor changes to floor plan layout at first floor, minor change to retail stair, and minor changes to retail lighting and finishes. | |
| Nov 14, 2023 | Completed final sign-off Oct 2024 | 99 Harding Rd | Singular Builders | revision to pa 202203029071 s. update use/occupancy of the site permit to b occupancy (not a occupancy). no assembly use in this building.Details
revision to pa 202203029071 s. update use/occupancy of the site permit to b occupancy (not a occupancy). no assembly use in this building. | |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 80 Maiden Ln | storefront entrance ada compliance checklist. barrier removal - addition of power door operators at storefront entrance. encroachment of power door swing into row. ref 23mse-00450Details
storefront entrance ada compliance checklist. barrier removal - addition of power door operators at storefront entrance. encroachment of power door swing into row. ref 23mse-00450 | $3,000 | |
| Oct 19, 2023 | In progress filed Oct 2023, not yet issued | 1295 Folsom St | entrance abe compliance check barrier removal. request for technical infeasiblity - entrance level landings can not be provided. abe: 201811022349Details
entrance abe compliance check barrier removal. request for technical infeasiblity - entrance level landings can not be provided. abe: 201811022349 | ||
| Oct 19, 2023 | In progress filed Oct 2023, not yet issued | 2125 Fillmore St | to comply with abe# 201811292664, storefront entrance abe compliance check, barrier removal- addition of power door operators at storefront entrance.Details
to comply with abe# 201811292664, storefront entrance abe compliance check, barrier removal- addition of power door operators at storefront entrance. | $3,000 | |
| Oct 19, 2023 | In progress filed Oct 2023, not yet issued | 2123 Fillmore St | to comply with abe# 201811292657, storefront entrance abe compliance check, barrier removal- modify (e) storefront entrance to provide required door clearances.Details
to comply with abe# 201811292657, storefront entrance abe compliance check, barrier removal- modify (e) storefront entrance to provide required door clearances. | $3,000 | |
| Oct 19, 2023 | In progress filed Oct 2023, not yet issued | 2121 Fillmore St | to comply abe# 201811292669, storefront abe compliance checklist, provide new ada compliant door hardware.Details
to comply abe# 201811292669, storefront abe compliance checklist, provide new ada compliant door hardware. | $750 | |
| Oct 19, 2023 | In progress filed Oct 2023, not yet issued | 2306 Fillmore St | to comply w/abe#: 201811272570; storefront entrance abe compliance. barrier removal-addition of power of door operator at storefront entrance.Details
to comply w/abe#: 201811272570; storefront entrance abe compliance. barrier removal-addition of power of door operator at storefront entrance. | $3,000 | |
| Jun 14, 2023 | Completed final sign-off Nov 2024 | 255 Post St | Singular Builders, C C I Commercial Construction & Improv | 1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mepDetails
1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep | $1,500,000 |
| Jun 14, 2023 | Completed final sign-off Nov 2024 | 255 Post St | Singular Builders | demo and replacement of e 1st fl post street retail storefront. removal of structural and non structural partitons and finishes. opening in masonry stucco building facade, new retail storefront, non structural partitons, structural n hss structural for storefront systemsDetails
demo and replacement of e 1st fl post street retail storefront. removal of structural and non structural partitons and finishes. opening in masonry stucco building facade, new retail storefront, non structural partitons, structural n hss structural for storefront systems | $150,000 |
| Mar 6, 2023 | Completed final sign-off Sep 2023 | 360 Post St | C C I Commercial Construction & Improv | demolition & replacement of post st. office lobby entrance door. no basement work under this permit, no elevator cabin/hoistway work under this permit, no interior ti work under this permit, office lobby removation perviously approved under separate permit.Details
demolition & replacement of post st. office lobby entrance door. no basement work under this permit, no elevator cabin/hoistway work under this permit, no interior ti work under this permit, office lobby removation perviously approved under separate permit. | $30,000 |
| Nov 7, 2022 | Completed final sign-off Feb 2023 | 255 Post St | C C I Commercial Construction & Improv | ab-017. demo (e) flooring, parition walls, stair finish, wall cladding, casework/cabinetry, ceiling light fixtures/soffits, hvac ducts/diffusers, electrical conduits. all finishes to be removed, all tenant mep services to be demo to base risers/shafts/panels. no structural demo.Details
ab-017. demo (e) flooring, parition walls, stair finish, wall cladding, casework/cabinetry, ceiling light fixtures/soffits, hvac ducts/diffusers, electrical conduits. all finishes to be removed, all tenant mep services to be demo to base risers/shafts/panels. no structural demo. | $30,000 |
| Oct 31, 2022 | Expired or cancelled cancelled Jan 2026 | 220 Post St | 4th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 4 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes.Details
4th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 4 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes. | $175,000 | |
| Oct 31, 2022 | Expired or cancelled cancelled Jan 2026 | 220 Post St | 5th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 5 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes.Details
5th fl: change of use from 6175 sf of retail to 6175 sf of office pursuant to planning commission motion no.20590 + planning dept case# 2017-014849 cua. floor 5 office space tenant improvements comprising addition of 2 unisex restrooms, 1 kitchen, 1 wellness room & interior finishes. | $175,000 | |
| Sep 30, 2022 | Completed final sign-off Mar 2023 | 360 Post St | Rudolph Commercial Interiors Inc, Rci | 8/f: partial ti work addition of 4 new office cabins and new carpet area of work. reworking of (e) hvac and light in area of work under separate permitDetails
8/f: partial ti work addition of 4 new office cabins and new carpet area of work. reworking of (e) hvac and light in area of work under separate permit | $60,000 |
| Aug 31, 2022 | Completed final sign-off Feb 2023 | 22 04th St | C C I Commercial Construction & Improv | demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office.Details
demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office. | $100,000 |
| May 2, 2022 | Completed final sign-off Aug 2022 | 833 Market St | 1st fl office lobby 200 sf ft renovation. installation of ada compliant turnstile security system in office lobby.Details
1st fl office lobby 200 sf ft renovation. installation of ada compliant turnstile security system in office lobby. | $50,000 | |
| May 2, 2022 | Completed final sign-off May 2023 | 360 Post St | C C I Commercial Construction & Improv | demo and replace 1st fl lobby (cosmetic). no basement work, no storefront work, no elevator cabin/hoistway, no tenant improvment under this permit. mep under separate permit.Details
demo and replace 1st fl lobby (cosmetic). no basement work, no storefront work, no elevator cabin/hoistway, no tenant improvment under this permit. mep under separate permit. | $160,000 |
| Mar 2, 2022 | Completed final sign-off Oct 2024 | 99 Harding Rd | Singular Builders, Fisher Development Inc | priority process - new building construction recreation centerDetails
priority process - new building construction recreation center | $700,000 |
| Jan 7, 2022 | Never finaled issued Jan 2022, no final | 220 Post St | C C I Commercial Construction & Improv | extend previously approved 2hour rated partition from first floor to second floor ceiling per dbi inspector comments. ba 202103126505 and 202009033352Details
extend previously approved 2hour rated partition from first floor to second floor ceiling per dbi inspector comments. ba 202103126505 and 202009033352 | $5,000 |
| Jan 7, 2022 | Never finaled issued Jan 2022, no final | 220 Post St | C C I Commercial Construction & Improv | revision of notes (previously approved under below mentioned references permits #201806212632 and 201903074683. for final (bldg) instpection and permit sign off.Details
revision of notes (previously approved under below mentioned references permits #201806212632 and 201903074683. for final (bldg) instpection and permit sign off. | |
| Nov 17, 2021 | Completed final sign-off Oct 2022 | 135 Post St | change of use: land use designation from retail to office on 3/f, 4/f, 5/f, 6/f pursuant to pc motions 20927 & 20928. no occupancy under this permit. no work propsed, all life safety, egress and ada review under future t.i. no cfc for this permit until future ti is issued. subject to seimic upgradeDetails
change of use: land use designation from retail to office on 3/f, 4/f, 5/f, 6/f pursuant to pc motions 20927 & 20928. no occupancy under this permit. no work propsed, all life safety, egress and ada review under future t.i. no cfc for this permit until future ti is issued. subject to seimic upgrade | ||
| Mar 12, 2021 | Never finaled issued May 2021, no final | 220 Post St | C C I Commercial Construction & Improv | revision to app#202009033352: upgrade previously approved partitions and soffit to 2 hours rating per dbi inspectors comments.Details
revision to app#202009033352: upgrade previously approved partitions and soffit to 2 hours rating per dbi inspectors comments. | $4,000 |
| Mar 4, 2021 | Completed final sign-off Dec 2021 | 825 Market St | entrance ada compliance check per approved historic code use barrier removal - addition of power door operators at 825-833 market st.Details
entrance ada compliance check per approved historic code use barrier removal - addition of power door operators at 825-833 market st. | $20,000 | |
| Nov 9, 2020 | Completed final sign-off May 2021 | 220 Post St | C C I Commercial Construction & Improv | revision to bpa# 2019-0307-4683, detail 1/a5.64. a 4-hour rated parapet wall against east party line on rooftop. not visible from street.Details
revision to bpa# 2019-0307-4683, detail 1/a5.64. a 4-hour rated parapet wall against east party line on rooftop. not visible from street. | $2,000 |
| Sep 3, 2020 | Never finaled issued Sep 2020, no final | 220 Post St | C C I Commercial Construction & Improv | interior partitions and finishes for white box. store fron to remain same. new drinking fountain.Details
interior partitions and finishes for white box. store fron to remain same. new drinking fountain. | $80,000 |
| Mar 12, 2020 | Never finaled issued Oct 2020, no final | 712 Montgomery St | replacement of staircaseDetails
replacement of staircase | $2,000 | |
| Feb 12, 2020 | Completed final sign-off Mar 2021 | 1822 Divisadero St | Pacific General Construction | interior remodel work on 3rd fl only. replacing existing windows with new glazing. no ext work under this permit. no change of use; laundromat to remain.Details
interior remodel work on 3rd fl only. replacing existing windows with new glazing. no ext work under this permit. no change of use; laundromat to remain. | $10,000 |
| Jan 31, 2020 | Completed final sign-off May 2021 | 34 Maiden Ln | C C I Commercial Construction & Improv | 1st floor: demolition and replace of lobby at maiden lane. no exterior storefront work. n/a for maherDetails
1st floor: demolition and replace of lobby at maiden lane. no exterior storefront work. n/a for maher | $80,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 34 Maiden Ln | demolition & replace of maiden lane ground floor storefront with proposed. ** maher: n/a **Details
demolition & replace of maiden lane ground floor storefront with proposed. ** maher: n/a ** | $100,000 | |
| Jan 7, 2020 | Completed final sign-off Jun 2021 | 146 Geary St | C C I Commercial Construction & Improv | 3rd fl - ti interior partitions and finishes for office use mep under separate permit. 3rd & 4th floorsDetails
3rd fl - ti interior partitions and finishes for office use mep under separate permit. 3rd & 4th floors | $110,000 |
| Jan 7, 2020 | Never finaled issued Mar 2020, no final | 34 Maiden Ln | C C I Commercial Construction & Improv | demo and replacement of restrooms on 3rd & 4th floors. plumbing fixtures & accessories to be removed and replace in-kindDetails
demo and replacement of restrooms on 3rd & 4th floors. plumbing fixtures & accessories to be removed and replace in-kind | $60,000 |
| Dec 18, 2019 | Completed final sign-off Jun 2021 | 253 Post St | Michilli Inc | no work on bldg facade. ground fl: scope of work consists of new elevator shaft connecting ground fl to basement. basement: scope consist of new elevator shaft, pit & elevator machine room with new mechanical connections.Details
no work on bldg facade. ground fl: scope of work consists of new elevator shaft connecting ground fl to basement. basement: scope consist of new elevator shaft, pit & elevator machine room with new mechanical connections. | $60,000 |
| Dec 2, 2019 | Completed final sign-off Jun 2021 | 253 Post St | Michilli Inc | ground floor - (n) cafe, (n) 2 x fitting room, (n) ada fitting room, (n) staircase connecting ground floor to basement, (n) elevator shaft; basement - adding partitions for back of house offices and staff lounge, adding 945 sf sales area, and (n) ada fitting roomDetails
ground floor - (n) cafe, (n) 2 x fitting room, (n) ada fitting room, (n) staircase connecting ground floor to basement, (n) elevator shaft; basement - adding partitions for back of house offices and staff lounge, adding 945 sf sales area, and (n) ada fitting room | $300,000 |
| Aug 7, 2019 | Completed final sign-off Oct 2020 | 1820 Divisadero St | Pacific General Construction | interior remodel work replace (e) windows at 2nd fl. at front facade, no change of use, use to remain (commercial)Details
interior remodel work replace (e) windows at 2nd fl. at front facade, no change of use, use to remain (commercial) | $150,000 |
| Mar 7, 2019 | Never finaled issued Dec 2019, no final | 220 Post St | C C I Commercial Construction & Improv | replace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck.Details
replace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck. | $10,000 |
| Feb 20, 2019 | Completed final sign-off Jul 2021 | 34 Maiden Ln | C C I Commercial Construction & Improv | 3rd flr. prepare space for tenant improvement work. remove interior partition walls, ceiling heights, soffits and wall cladding. remove (e) mechanical equipment, hvac shaft, plumbing to riser shaft and cap all unused lines. install lighting per plan. patch polish and seal concrete floor per planDetails
3rd flr. prepare space for tenant improvement work. remove interior partition walls, ceiling heights, soffits and wall cladding. remove (e) mechanical equipment, hvac shaft, plumbing to riser shaft and cap all unused lines. install lighting per plan. patch polish and seal concrete floor per plan | $60,000 |
| Jun 21, 2018 | Expired or cancelled cancelled Nov 2022 | 220 Post St | demolition and replacement of ground floor storefronts with proposed. addition of 2 light fixtures at compton places store front. refurbish upper floor building facades. install new elevator and lobby at compton placeDetails
demolition and replacement of ground floor storefronts with proposed. addition of 2 light fixtures at compton places store front. refurbish upper floor building facades. install new elevator and lobby at compton place | $50,000 | |
| Apr 16, 2018 | Completed final sign-off Sep 2021 | 146 Geary St | C C I Commercial Construction & Improv | install new enclosed exit staircase - core and shell. new elevator. mep under separate permit. no exterior work under this permit. no change of use. retail use to remain.Details
install new enclosed exit staircase - core and shell. new elevator. mep under separate permit. no exterior work under this permit. no change of use. retail use to remain. | $350,000 |
| Mar 22, 2018 | Never finaled issued Jul 2018, no final | 210 Post St | P 3 Construction & Remodeling Inc | revision to 201609228486, change from 2 ada baths on each floor to 1 on each floorDetails
revision to 201609228486, change from 2 ada baths on each floor to 1 on each floor | |
| Dec 7, 2017 | Completed final sign-off Feb 2026 | 146 Geary St | C C I Commercial Construction & Improv | demolition and replace ground floor storefront with proposed addition of two blade signs at ground floor, storefront. refurbish upper floor building facade. existing blade sign to remain and reused. install new skylights at roof.Details
demolition and replace ground floor storefront with proposed addition of two blade signs at ground floor, storefront. refurbish upper floor building facade. existing blade sign to remain and reused. install new skylights at roof. | $35,000 |
| Dec 7, 2017 | Never finaled issued Dec 2019, no final | 146 Geary St | C C I Commercial Construction & Improv | install ground floor non-electric projecting single-faced sign "st vincent"Details
install ground floor non-electric projecting single-faced sign "st vincent" | $3,000 |
| Dec 7, 2017 | Never finaled issued Dec 2019, no final | 146 Geary St | C C I Commercial Construction & Improv | install ground floor non-electric projecting single-faced sign "st vincent"Details
install ground floor non-electric projecting single-faced sign "st vincent" | $3,000 |
| Dec 5, 2017 | Completed final sign-off Feb 2019 | 399 Geary St | H & M Fire Protection, Inc. | install fire sprinkler system in 3 story building with basement. **maher n/a**Details
install fire sprinkler system in 3 story building with basement. **maher n/a** | $118,650 |
| Nov 29, 2017 | Completed final sign-off Mar 2018 | 146 Geary St | Fisher Development Inc | demo existing finishes, casework, non-structural partitions. ab-017Details
demo existing finishes, casework, non-structural partitions. ab-017 | $100,000 |
| Sep 25, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13Details
revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13 | |
| Jul 13, 2017 | Completed final sign-off Mar 2018 | 3636 Clay St | Culvert Pps | rear deck addition.Details
rear deck addition. | $1,000 |
| Mar 8, 2017 | Completed final sign-off May 2019 | 336 Mason St | Fisher Development Inc | grnd flr: soft demo - ab-017 ref pa 201611233479 maher naDetails
grnd flr: soft demo - ab-017 ref pa 201611233479 maher na | $5,000 |
| Jan 27, 2017 | Completed final sign-off Apr 2017 | 220 Post St | Fisher Development Inc | soft demo ab-017. demoltion or removal of extg flooring, extg casework extg interior partition walls, extg ceiling lights and soffits, and extg cladding to structural. exit enclosure must remain.Details
soft demo ab-017. demoltion or removal of extg flooring, extg casework extg interior partition walls, extg ceiling lights and soffits, and extg cladding to structural. exit enclosure must remain. | $30,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep.Details
change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep. | $2,000,000 |
| Sep 23, 2016 | Completed final sign-off Mar 2017 | 210 Post St | Fisher Development Inc | demo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539Details
demo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539 | $5,000 |
| Aug 24, 2016 | Completed final sign-off Mar 2018 | 3636 Clay St | Culvert Pps | revision to pa 201510058838: addition of dormer, chimney, skylight at roof levelDetails
revision to pa 201510058838: addition of dormer, chimney, skylight at roof level | $1,000 |
| Mar 2, 2016 | Completed final sign-off Apr 2017 | 166 Geary St | P 3 Construction & Remodeling Inc | renovation of lobby including interior & exterior wall and floor finishes and new entry canopyDetails
renovation of lobby including interior & exterior wall and floor finishes and new entry canopy | $50,000 |
| Oct 5, 2015 | Expired or cancelled expired Apr 2023 | 3636 Clay St | Culvert Pps | minor alteration to bldg exterior and revision to the garage design. ref app#201409055513 no change to garageDetails
minor alteration to bldg exterior and revision to the garage design. ref app#201409055513 no change to garage | $100,000 |
| Sep 11, 2015 | Expired or cancelled disapproved Sep 2018 | 340 Mason St | planning entitlementDetails
planning entitlement | $1,000 | |
| Sep 10, 2015 | Expired or cancelled expired May 2019 | 3636 Clay St | Culvert Pps | remove walls at kitchen and dining room on gr fl. remove walls in bedrooms on 2nd fl remove e brick fireplaces. approx 2,000 sq ft of floor area. no change to wallsor layout. no structural work.Details
remove walls at kitchen and dining room on gr fl. remove walls in bedrooms on 2nd fl remove e brick fireplaces. approx 2,000 sq ft of floor area. no change to wallsor layout. no structural work. | $5,000 |
| Sep 10, 2015 | Completed final sign-off Mar 2018 | 3636 Clay St | Culvert Pps | new partitions and associated structural workDetails
new partitions and associated structural work | $290,000 |
| Aug 11, 2015 | Completed final sign-off Sep 2018 | 340 Mason St | Peacock Construction | tenant 2: soft demo ab-017. tenant #2. n/a for maher.Details
tenant 2: soft demo ab-017. tenant #2. n/a for maher. | $5,000 |
| Aug 10, 2015 | Completed final sign-off Sep 2018 | 340 Mason St | Peacock Construction | demo of (e) interior partitions, installations of a (n) partition wall on 1st floor. tenant #5. maher na.Details
demo of (e) interior partitions, installations of a (n) partition wall on 1st floor. tenant #5. maher na. | $20,000 |
| Jun 9, 2015 | Never finaled filed Jun 2015, never issued | 210 Post St | basement, mezz, 1st,2nd,3rd flr - demolition of select (e) ceilings, partitions, & remove (e) flooring, select plumbing fixtures, select bldg systems no longer in use. relocate (e) bldg systems where they interfere with proposed shell & core work.Details
basement, mezz, 1st,2nd,3rd flr - demolition of select (e) ceilings, partitions, & remove (e) flooring, select plumbing fixtures, select bldg systems no longer in use. relocate (e) bldg systems where they interfere with proposed shell & core work. | $20,000 | |
| Feb 19, 2015 | Completed final sign-off Oct 2015 | 3711 19th Av | Northern Sun Associates | demolition of elements of (e) entry, demo some landscaping elements, construction of new entry, installation of entry overhang system.Details
demolition of elements of (e) entry, demo some landscaping elements, construction of new entry, installation of entry overhang system. | $20,000 |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 3711 19th Av | Northern Sun Associates | tenant improvement install glass and drywall partitions. replacement of flooring. install new lights. reconstruction of double height spaceDetails
tenant improvement install glass and drywall partitions. replacement of flooring. install new lights. reconstruction of double height space | $50,000 |
| Jun 30, 2014 | Completed final sign-off Jul 2015 | 16 Maiden Ln | Premier Structures Inc | 3rd floor t.i. installation of new partitions, relocating lighting and new break room. maher n/a. compliance with maher ordinance no. 155-13 not required.Details
3rd floor t.i. installation of new partitions, relocating lighting and new break room. maher n/a. compliance with maher ordinance no. 155-13 not required. | $80,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 463 Bush St | Premier Structures Inc | amendment to bldg permit #201312184447. documentation from architect the lifesafty and fire sprinklers are not required. this is to be removed from permit as part of scope. type 3a allows for a 4-story bldg w/o sprinklers. n/a for the maher ordidnance #155-13Details
amendment to bldg permit #201312184447. documentation from architect the lifesafty and fire sprinklers are not required. this is to be removed from permit as part of scope. type 3a allows for a 4-story bldg w/o sprinklers. n/a for the maher ordidnance #155-13 | |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 463 Bush St | Premier Structures Inc | re-installation of existing fan coil. installation of new lighting throughout. refer to pa# 2013/1218/4447. compliance with ordinance no. 155-13 not required.Details
re-installation of existing fan coil. installation of new lighting throughout. refer to pa# 2013/1218/4447. compliance with ordinance no. 155-13 not required. | $80,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2013 | 140 Geary St | Swinerton Builders | 5th fl. demo e carpeting and acoustic ceiling. new carpet and acoustic ceiling. new conference room partitions and doors, replace break room counter and cabinets.Details
5th fl. demo e carpeting and acoustic ceiling. new carpet and acoustic ceiling. new conference room partitions and doors, replace break room counter and cabinets. | $60,000 |
| Nov 4, 2013 | Expired or cancelled cancelled Nov 2018 | 461 Bush St | Premier Structures Inc | replace retail store front @ ground floor.Details
replace retail store front @ ground floor. | $55,000 |
| Mar 18, 2013 | Completed final sign-off Jan 2014 | 55 Grant Av | Cci Com'l Constr & Improv**See 985808*** | replace (e) storefront for ground floor, replace lobby flooring & paint walls & ceiling. install 3 wall sconces. install recessed ceiling lightsDetails
replace (e) storefront for ground floor, replace lobby flooring & paint walls & ceiling. install 3 wall sconces. install recessed ceiling lights | $70,000 |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 1438 Green St | Paul Ryan Associates | #5e- int. remodel of studio a on 2nd floor. work includes new paneling, cabinets, flooring, wet bar. no exterior work.Details
#5e- int. remodel of studio a on 2nd floor. work includes new paneling, cabinets, flooring, wet bar. no exterior work. | $15,000 |
| Jan 11, 2012 | Completed final sign-off Oct 2013 | 240 Post St | Fisher Development Inc | install (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit.Details
install (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit. | $850,000 |
| Sep 23, 2011 | Completed final sign-off Feb 2012 | 99 Rhode Island St | Fisher Development Inc | 1st & 3rd floors-interior tenant improvement for an (e) shell to include new partitions, flooring & paint. m.e.p work under seperate permit, design/build permit. scope of new work at street level & 3rd floor. (e) shell & structure to remain as isDetails
1st & 3rd floors-interior tenant improvement for an (e) shell to include new partitions, flooring & paint. m.e.p work under seperate permit, design/build permit. scope of new work at street level & 3rd floor. (e) shell & structure to remain as is | $300,000 |
| Aug 31, 2011 | Completed final sign-off Jan 2012 | 99 Rhode Island St | Fisher Development Inc | ground floor & 3rd floor - demolitoin of portions of interior walls, ceiling & flooring. t.i. under separate permit. per ab-017.Details
ground floor & 3rd floor - demolitoin of portions of interior walls, ceiling & flooring. t.i. under separate permit. per ab-017. | $25,000 |
| Dec 14, 2010 | Never finaled issued Dec 2010, no final | 165 Post St | Premier Structures Inc | new fitting room, partitions, 1st fl, basement storage. patch and repair ceiling, repair and replace lights, new signage under separate permit, mep sep permitDetails
new fitting room, partitions, 1st fl, basement storage. patch and repair ceiling, repair and replace lights, new signage under separate permit, mep sep permit | $80,000 |
| Aug 31, 2005 | Completed final sign-off Mar 2008 | 185 Post St | Plant Construction Company Lp | remove three facade panels @ (e) fireescape to determine repair needed from water intrusion.Details
remove three facade panels @ (e) fireescape to determine repair needed from water intrusion. | $1,500 |
| Apr 6, 2005 | Completed final sign-off Apr 2005 | 245 Vallejo St | Bridger Construction Company Inc. | re-locate restroom under (e) permit. revision to approved pa# 2003/12/08/1797.Details
re-locate restroom under (e) permit. revision to approved pa# 2003/12/08/1797. |