Block 0295, lot 006
350 Post St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2025 | In progress issued Jul 2026 | 350 Post St | Johnson Controls Fire | basement - fls modification to add 1 elevator relay for elevator machine om smoke detector relay | $500 |
| Jun 18, 2024 | Completed final sign-off Aug 2024 | 360 Post St | Gci, Inc | revision to pa# 202103106256: for reduction in scope to remove unnecessary special inspections and attachment details not used. | |
| Sep 11, 2023 | Completed final sign-off Sep 2023 | 360 Post St | Sajo, Inc. | revision to 202306281101: demo of all tenant partitions, doors, as well as removal of furniture, millwork & quipments. no work to sprinkler or fire alarm system. work do not included removal of ceilings, lighting fixtures & mech deffusers | |
| Jun 28, 2023 | Never finaled issued Aug 2023, no final | 360 Post St | Sajo, Inc. | 7/f ste 701: work includes demolition of all tenant patitions, door and ceilings as well as furniture, millwork and equipment. work also includes removal of supply & return grills thru and associated ducting and wiring. hvac system to remain | $10,000 |
| Mar 6, 2023 | Completed final sign-off Sep 2023 | 360 Post St | C C I Commercial Construction & Improv | demolition & replacement of post st. office lobby entrance door. no basement work under this permit, no elevator cabin/hoistway work under this permit, no interior ti work under this permit, office lobby removation perviously approved under separate permit. | $30,000 |
| Feb 27, 2023 | Completed final sign-off May 2023 | 360 Post St | C C I Commercial Construction & Improv | ref pa# 202205023360, new power & signal devices throughout space, new 2019 t24 compliant lighting & controls. | $1,000 |
| Jan 6, 2023 | Never finaled issued Jan 2023, no final | 360 Post St | Johnson Controls Fire | modify (e) fire alarm system: rpovide and install 3 aim's monitor and 1 smoke detector. the (e) fire alarm system shall not be disconneted or taken out of service. w/o written permission from owner. | $2,000 |
| Dec 14, 2022 | Completed final sign-off Mar 2023 | 360 Post St | E. J. Weber Elect.Co Inc | title 24 energy compliant electrical drawing to be added to permit #202209303569. | $16,000 |
| Dec 7, 2022 | Completed final sign-off Dec 2022 | 360 Post St | Anatra Fire Protection Inc | relocate 5 sprinkler heads and add 1 sprinkler per new floor plan | $6,000 |
| Oct 14, 2022 | Completed final sign-off Mar 2023 | 360 Post St | Eco Fire Sprinklers Inc | revision to permit 202208190885. relocate 12 sprinklers for ti and demo of existing. | |
| Sep 30, 2022 | Completed final sign-off Mar 2023 | 360 Post St | Rudolph Commercial Interiors Inc, Rci | 8/f: partial ti work addition of 4 new office cabins and new carpet area of work. reworking of (e) hvac and light in area of work under separate permit | $60,000 |
| Aug 19, 2022 | Completed final sign-off Oct 2022 | 360 Post St | Eco Fire Sprinklers Inc | 1/f: demo of (e) fire sprinlkers & relocate 12 pendent fire sprinklers in area of work for ti. pa 202205023360. maher n/a | $15,611 |
| May 2, 2022 | Completed final sign-off May 2023 | 360 Post St | C C I Commercial Construction & Improv | demo and replace 1st fl lobby (cosmetic). no basement work, no storefront work, no elevator cabin/hoistway, no tenant improvment under this permit. mep under separate permit. | $160,000 |
| Apr 18, 2022 | Expired or cancelled cancelled Jan 2026 | 360 Post St | 4th & 5th fl: office tenant improvement. remodel portion of (e) office space. work includes: demo & construction of partitions, electrica, mechanical, plumbing, ceiling & finishes. | $172,418 | |
| Apr 7, 2021 | Completed final sign-off Oct 2021 | 360 Post St | R L H Fire Protection Inc | fire sprinkler permit. remove 4 sidewall sprinklers from the elevator pits and remove 4 sprinklers from the top of the elevator shafts. | $2,000 |
| Mar 10, 2021 | Completed final sign-off Aug 2024 | 360 Post St | Gci, Inc | replace current generator (90kw diesel) for emergency lights and one elevator with manufacturers recommended in-kind unit. will serve: 40hp fire pump, 1hp jockey pump, 40hp elevator (only 1 for emergency), 5hp sewage ejector pump 1 and 2. | $250,000 |
| Oct 1, 2020 | Completed final sign-off Jan 2021 | 350 Post St | Johnson Controls Fire | revision to 201910094005 revision to approved plans per field inspector fire alarm | |
| Jun 12, 2020 | Completed final sign-off Mar 2021 | 360 Post St | Johnson Controls Fire | suite 1111: fire alarm: add elevator monitoring and recall to new elevators installed during elevator moderniation project. maher n/a. | $2,000 |
| Jan 15, 2020 | Completed final sign-off Aug 2022 | 350 Post St | Johnson Controls Fire | add 3 duct detectors to the (e) fire alarm system; ref permit # 2019-1008-4005 | $4,800 |
| Jan 15, 2020 | Completed final sign-off Apr 2020 | 360 Post St | Johnson Controls Fire | ref pa# 201806222670; provide as-built which includes (1) new access control rex and (1) new access control edr emergency door release button in suite 901 in fire alarm drawings | |
| Oct 9, 2019 | Completed final sign-off Sep 2022 | 350 Post St | Marchetti Group | 1st floor: t.i to "tiffany & co" work includes new non-structual partition, furnitures, fixturs, finishes, lighting and mep. | $275,000 |
| Aug 27, 2019 | Never finaled issued Aug 2019, no final | 360 Post St | street space | ||
| Jul 16, 2019 | Completed final sign-off Nov 2019 | 360 Post St | Weidner Architectural Signage | 9th floor: install 3 new evacuation maps. | $1,220 |
| Mar 14, 2019 | Never finaled issued Apr 2019, no final | 350 Post St | Source Planning And Construction Inc | revision to pa 201802201711. suite 901. electrical revision | |
| Jan 30, 2019 | Completed final sign-off Nov 2020 | 360 Post St | Gci, Inc | mechanical - demo (e) sand filter service adjust (e) water treatment chemical system install new cooling water filtration separator remove & replace all piping from chiller to main basement | $400,000 |
| Dec 5, 2018 | Never finaled issued Jan 2019, no final | 360 Post St | Acco Engineered Systems Inc. Dba Acco En | suite 701: mech for 7th floor for construction plan- 201804166410- add (2) heat pumps to break room area for supplemental cooling. | $7,000 |
| Sep 17, 2018 | Completed final sign-off Feb 2020 | 360 Post St | Source Planning And Construction Inc | 9th fl - revision to pa 2015-0220-1711 install safety glassing film to selected interior windows (6); remove interior handrail to these 6 windows | $5,000 |
| Aug 30, 2018 | Completed final sign-off Jun 2019 | 360 Post St | Gci, Inc | accessibility of upgrade for floors 4,6,9,10,11. work includes upgrading existing bathrooms and elevator lobby and adding drinking fountains off path of travel corridors | $353,995 |
| Aug 28, 2018 | Completed final sign-off Sep 2018 | 360 Post St | Johnson Controls Fire | 7th fl: rev pa# 201808106992 fire alarm t.i. to suite 701: install (4) new strobe appliances and (4) new horn/strobe appliances | $4,200 |
| Aug 21, 2018 | Completed final sign-off May 2019 | 360 Post St | R L H Fire Protection Inc | ref pa# 201802201711; fire sprinkler t.i. relocate 19, add 1 pendent add 1 upright-pendent heads on existing flex head connections | $6,514 |
| Aug 10, 2018 | Completed final sign-off Jun 2019 | 360 Post St | Gci, Inc | 7th flr - accessibility upgrade - remove door, wall, sink & vanity. remove urinal wall partition. replace wall sconces w/new wall sconces. new sink and vanity, new walls. life safety under separate permit. | $30,000 |
| Jul 13, 2018 | Completed final sign-off Feb 2020 | 350 Post St | Source Planning And Construction Inc | revision to pa# 201802201711. suite 901. interior work: new suspended ceiling finishes, new decorative wall finishes. new lighting. | $75,000 |
| Jul 11, 2018 | Completed final sign-off Sep 2018 | 360 Post St | R L H Fire Protection Inc | 7th frl. fire sprinkler tenant improvement. relocate 17, add7 and delete 2. | $8,048 |
| Jun 22, 2018 | Completed final sign-off Feb 2020 | 360 Post St | Johnson Controls Fire | fire alarm tenant improvement 9th fl suite 901. 1 new relay 8 new notification appliances | $4,850 |
| Jun 12, 2018 | Completed final sign-off Sep 2018 | 360 Post St | Seabay Building Group Llc | demolition in relation to future ti under ab-017 | $45,000 |
| May 14, 2018 | Completed final sign-off May 2018 | 350 Post St | Dickinson Cameron Construction Company I | to obtain final inspection for work approved under pa#201511122446. all work is complete. | |
| Apr 27, 2018 | Expired or cancelled cancelled Nov 2018 | 360 Post St | Gci, Inc | suite #405: commercial tenant improvement on a 4th fl: work includes new partitions, doors & frames, ceiling, lighting, finishes, casework, electrical and mechanical; 4000 sq. ft; fire under separate permits | $130,100 |
| Apr 16, 2018 | Completed final sign-off Oct 2018 | 360 Post St | Seabay Building Group Llc | 7th - ti of (e) office space | $460,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2018 | 360 Post St | Johnson Controls Fire | as builts for 5th fl ti consist of adding (1) smoke detector in the east elevator lobby door. relocate (11) ceiling mount horn/strobes to wall mount. original permit #201801319975. | |
| Mar 2, 2018 | Completed final sign-off Mar 2018 | 360 Post St | R L H Fire Protection Inc | 5th fl. fire sprinkler ti: 43 relocated pendent, 12 added pendent, 55 heads. total ref app# 201712136331 | $14,192 |
| Feb 20, 2018 | Completed final sign-off Sep 2018 | 360 Post St | Marchetti Group | revision to 201712136331 open one door to conf rm. relocate one door to conf rm | |
| Feb 20, 2018 | Completed final sign-off Feb 2020 | 360 Post St | Source Planning And Construction Inc | 9th fl: renovate office suite with new partitions, ceilings, and doors, new and revised lighting and mech systems, new electrical & data communicaiton cabling. new finishes throughout . life safety work to be design build under sep. permit. no ohspd. | $275,000 |
| Feb 9, 2018 | Never finaled issued Feb 2018, no final | 360 Post St | Team Commercial Construction Inc. | 10th floor: partial scope office tenant retrofit: lighting, power and signal, wiring, lighting and controls. ref app#201707141966 | $21,325 |
| Feb 1, 2018 | Expired or cancelled cancelled Jan 2026 | 360 Post St | Marchetti Group | change to extg t.i. app#201712136331. close 2 door openings and create one door opening in conference room. | |
| Jan 31, 2018 | Completed final sign-off Apr 2018 | 360 Post St | Johnson Controls Fire | 5th floor: t.i. consist of adding 3 strobes and 8 horn/strobes as shown. relocate extg 6 horn/strobes to new locations. ref app#201712136331 | $7,000 |
| Dec 13, 2017 | Completed final sign-off Aug 2018 | 360 Post St | Marchetti Group | 5th flr: ti - build out entire 5th flr, including demo min work in elevator lobby, corridor & toilet rooms. | $777,000 |
| Oct 12, 2017 | Completed final sign-off Dec 2017 | 360 Post St | Johnson Controls Fire | 9/f: suite 900: t.i. f/a - adding new (5) horn / strobes & (2) strobes as shown on plans. | $4,200 |
| Oct 3, 2017 | Completed final sign-off Oct 2017 | 360 Post St | R L H Fire Protection Inc | 9/f: fire sprinklers: relocate 18 pendent, add 6 pendent and deleted 1 pendent. ref t.i. pa#201708164968. | $6,880 |
| Oct 3, 2017 | Completed final sign-off Oct 2017 | 360 Post St | R L H Fire Protection Inc | 7/f: fire sprinklers: relocate 14 pendent and deleted 3 pendents. ref t.i. pa#201708033800. | $3,960 |
| Sep 27, 2017 | Completed final sign-off Nov 2017 | 360 Post St | Johnson Controls Fire | 7/f- fire alarm consist of adding new (1) ceiling mount strobe & (3) ceiling mount horn/strobes. t.i. pa#201708033800 | $2,400 |
| Aug 16, 2017 | Completed final sign-off Feb 2018 | 360 Post St | Marchetti Group | suite 900: t.i. on a single floor to include work for new partitions, doors and frames, celings, finishes, lighting, casemwork, electrical and mechanical. | $380,000 |
| Aug 4, 2017 | Completed final sign-off Aug 2017 | 350 Post St | Johnson Controls Fire | as built scope of work includes (2) relay modules for alarm & trouble condition to bosch system (fbo). addition of 1 relay module for music shutdown. relocate (1) relay module to new location as shorwn. replace (1) smoke detector to new heat detector. ref pa 2015-1013-9440 | |
| Aug 3, 2017 | Completed final sign-off Nov 2017 | 360 Post St | Marchetti Group | 7/f- commercial t.i. on 7/f to include new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical & mechanical. | $140,000 |
| Jul 14, 2017 | Never finaled issued Sep 2017, no final | 360 Post St | Team Commercial Construction Inc. | 10th floor tenant improvement work includes demolition of exisitng partitions, millwork & plumbing work also includes new finishes, casework & electrical. (not medical office) | $110,650 |
| Jun 26, 2017 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | location of emergency evacuation signage per tenant improvement no change use | $5,000 |
| May 25, 2017 | Never finaled issued May 2017, no final | 350 Post St | street space | ||
| Feb 6, 2017 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | revision to 201505126122 lighting only no exterior work | |
| Jan 31, 2017 | Completed final sign-off Apr 2018 | 350 Post St | Dickinson Cameron Construction Company I | to erect electric single faced sign | $2,000 |
| Jan 31, 2017 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | to erect non electric single faced signs | $10,000 |
| Jan 31, 2017 | Completed final sign-off Apr 2018 | 350 Post St | Dickinson Cameron Construction Company I | new atlas statue with clock to be installed above main entrance approved on minor permit to alter case #2015-01-2882 pta | $30,000 |
| Jan 31, 2017 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | to erect non electric single faced sign | $3,500 |
| Jan 31, 2017 | Completed final sign-off Apr 2018 | 350 Post St | Dickinson Cameron Construction Company I | to erect electric single faced signs | $15,000 |
| Jan 20, 2017 | Never finaled issued Jan 2017, no final | 350 Post St | street space w/mta | ||
| Nov 28, 2016 | Completed final sign-off May 2018 | 350 Post St | Dickinson Cameron Construction Company I | revision to 201505216889. addition of smoke curtains at top and bottom of stair #4 | $10,000 |
| Nov 21, 2016 | Never finaled issued Nov 2016, no final | 360 Post St | Accurate Contracting Inc.Dba Unispace Co | 3/f- new furniture, new paint, make 2 (e) office smaller, new finishes in lobby. | $70,000 |
| Nov 14, 2016 | Expired or cancelled withdrawn Jan 2017 | 350 Post St | installation of 2 (n) knox boxes | $1,000 | |
| Nov 10, 2016 | Completed final sign-off Mar 2017 | 350 Post St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti, 31 relocated sprinklers, 10 added sprinklers, 23 removed sprinklers. ref pa 2015-0521-6889 | $11,200 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 350 Post St | street space permit | ||
| Sep 13, 2016 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | structural revisions in field- to approved. pa 201502198787 | $10,000 |
| Sep 12, 2016 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | mep revisions only to 201605126122 fire protection on sep permit. maher not req | $10,000 |
| Aug 5, 2016 | Completed final sign-off Aug 2016 | 360 Post St | Johnson Controls Fire | bsmnt, 1st fl & penthouse: update as built drawings to show 5 relays for fau shut down. ref 2012-0316-6226, 2013-0412-4401, 2016-0615-0029. | |
| Jun 15, 2016 | Completed final sign-off Aug 2016 | 360 Post St | Johnson Controls Fire | update as built to show (7) duct detectors basement @ 1st floor plane/shaft as shown on drawings. fa permit 2012-0316-6226 & 2013-0412-4401 | |
| Jun 13, 2016 | Never finaled issued Jun 2016, no final | 350 Post St | street space permit | ||
| May 6, 2016 | Never finaled issued May 2016, no final | 360 Post St | Johnson Controls Fire | 10th floor, ste 1001 consist of relocated (1) strobe & add (10) new horn/strobes ti 2016-0318-2486 | $7,000 |
| May 2, 2016 | Completed final sign-off Oct 2016 | 360 Post St | R L H Fire Protection Inc | fire sprinkler permit - relocate 17 pendents, add 1 pendent, delete 3 pendents on the 10th floor, suite 1001. ref pa 2016-0318-2486 | $8,868 |
| Apr 29, 2016 | Never finaled issued Apr 2016, no final | 360 Post St | R L H Fire Protection Inc | 6th floor, suite 604: fire sprinkler - add 1 pendent in new closet ref permit 201604054001 | $500 |
| Apr 20, 2016 | Completed final sign-off Mar 2017 | 350 Post St | Anderson, Rowe & Buckley, Inc. | existing system ti - relocated 44 sprinklers, added 47 sprinklers, removed 56 sprinklers. ref pa 2015-0521-6889 | $33,000 |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 360 Post St | Marchetti Group | 6th flr, ste #604: commercial tenant improvement on a single floor, work includes new partitions,doors & frames, finishes casework,minor electrical & mechanical,sprinkler & fire alarm under separate permit. | $62,000 |
| Mar 18, 2016 | Completed final sign-off Jun 2016 | 360 Post St | Marchetti Group | 10th floor: ti buildout - interoir only | $474,000 |
| Mar 8, 2016 | Completed final sign-off Jul 2016 | 360 Post St | Mcclure Electric Inc | ste. # 1100 - 11th flr: revision to ref pa 2016 0129 8336 - title 24 power only no lighting | |
| Mar 4, 2016 | Completed final sign-off Mar 2016 | 360 Post St | Johnson Controls Fire | 11th flr: t.i. consist of adding (2) horn/strobes, t.i. 201601298336. | $1,500 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 360 Post St | Marchetti Group | revision to ref pa 2016 0129 8336: minor demo added - remove 2 offices | $1,000 |
| Feb 2, 2016 | Expired or cancelled cancelled Jan 2026 | 360 Post St | t.i. for #703- 1685 sq.ft. work includes (n) partitions glass walls, breakroom, mep. fire protection under seperate permit. | $80,000 | |
| Jan 29, 2016 | Completed final sign-off Apr 2016 | 360 Post St | Marchetti Group | #1100- commercial t.i. on 11/f to include minor demolition, new partitions, doors and frame, finishes, casework and minor electrical work such as new power and date outlets, relocation of (2) lights, no new lighting, all existing duct work and diffusers to remain. | $165,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 360 Post St | Mcclure Electric Inc | title 24 ref 201509187434 | |
| Nov 19, 2015 | Completed final sign-off Jan 2016 | 360 Post St | R L H Fire Protection Inc | fire sprinkler permit: relocate 6 pendent sprinklers, add 2 pendent sprinklers. ref app#201509187434 | $2,500 |
| Nov 12, 2015 | Expired or cancelled expired May 2018 | 350 Post St | Dickinson Cameron Construction Company I | basement: fixed & mobile shelving units in basement stockroom, addition to approved t.i. pa 201504294925. | $15,000 |
| Nov 6, 2015 | Never finaled issued Nov 2015, no final | 360 Post St | Johnson Controls Fire | 6th floor ti consist of adding (2) horn/strobes & demo (1) existing horn/strobes ti. 2015-0918-7434 | $1,500 |
| Oct 22, 2015 | Completed final sign-off May 2018 | 350 Post St | Dickinson Cameron Construction Company I | electrical revisions only to 201505126122. no other work | |
| Oct 21, 2015 | Completed final sign-off Nov 2017 | 350 Post St | Anderson, Rowe & Buckley, Inc. | sprinklers ti- eleimanting connection to existing domestic- reconnect to sprinkler system. hydr required- calculated as ordinary hazard- delete 11 add 5 and relocate 68 | $37,850 |
| Oct 13, 2015 | Completed final sign-off Aug 2017 | 350 Post St | Johnson Controls Fire | basement,1st/2nd: fire alarm tenant improvement,87 smokes, 2 pulls, 1 heat, 5 monitor modules, 19 relays, 2 duct smokes, 42 horn/strobes, 7 strobes, ref. t.i. 201505216889. | $65,000 |
| Sep 24, 2015 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | basement area minor revision to pa 2015 0429 4925. changes are bubbled on plans | |
| Sep 18, 2015 | Never finaled issued Oct 2015, no final | 360 Post St | Marchetti Group | ti suite 602 on 6th fl. work includes new partitions, doors, frames, finishes, casework, mep, fire protection under sep permit | $62,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2016 | 360 Post St | Source Planning And Construction Inc | 3rd floor: electrical for 201503110516 | $75,000 |
| Aug 28, 2015 | Completed final sign-off Apr 2016 | 360 Post St | Johnson Controls Fire | 10th and 11th floor: fire alarm t.i. to provide and install new one nac panel, 16 duct detectors, 9 smoke detectors, 24 ceiling mount horn/strobes, 12 ceiling mount strobes, 20 relays, and 4 control relays. t.i. app#201203166226. | $22,000 |
| Aug 12, 2015 | Expired or cancelled cancelled Sep 2015 | 350 Post St | Dickinson Cameron Construction Company I | basement area minor revision to pa 201504294925. changes are bubbled on plans | |
| Jul 21, 2015 | Completed final sign-off Apr 2016 | 360 Post St | Balfour Beatty Construction Llc | revision to 201412163862 to simplify scope of work with existing offices to remain | |
| Jul 17, 2015 | Completed final sign-off Jul 2015 | 360 Post St | R L H Fire Protection Inc | 3rd floor fire sprinkler permit - relcoate 2 & add 1 sprinkler. ref #201503110516. | $1,542 |
| Jun 15, 2015 | Completed final sign-off Mar 2016 | 360 Post St | Source Planning And Construction Inc | mechanical for pa#201503110516 | |
| May 29, 2015 | Completed final sign-off Apr 2016 | 360 Post St | Johnson Controls Fire | 8th and 9th floor: fire alarm t.i. to provide 2 new power supply nac, 17 duct detectors, 7 smoke detectors, 26 ceiling mount horn/strobe, 21 relays, 4 control zam and 2 signal zams. ref app#201412163862 | $22,000 |
| May 22, 2015 | Completed final sign-off Oct 2015 | 360 Post St | Johnson Controls Fire | 3rd floor: tenant improvement 3rd fl fire alarm relocate 1 existing speaker strobe to new location and add 1 strobe/ ref t.i. # 201503110516 | $1,500 |
| May 21, 2015 | Completed final sign-off Jul 2016 | 350 Post St | Dickinson Cameron Construction Company I | t.i. construction of non structural partition, elevator, restrooms. new staircase- basement, first & second floor. mep under seperate permit, fire deferred. | $550,000 |
| May 12, 2015 | Completed final sign-off Apr 2016 | 360 Post St | Westates Mechanical Corporation Inc | add 2 and relocate one pendent at 8th floor. tenant imrovement. ref app#201412163862. | $1,545 |
| May 12, 2015 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | mep work for ti. of retail store, no exterior work, fire protection under separate permit. | $750,000 |
| Apr 29, 2015 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | ground flr & basement: phase 1b - ti for (e) retail store. work includes (n) partitions, casework, fixtures (n) ada restrooms; re-cladding of (e) elevator lab. no exterior. mep & fire protection under sep. permit | $50,000 |
| Apr 22, 2015 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | construction of temp. office space and break room on 2nd floor. no exterior work. fire protection under seperate permit. | $50,000 |
| Apr 20, 2015 | Completed final sign-off Mar 2018 | 350 Post St | Dickinson Cameron Construction Company I | phase 1 - terior soft demo per ab 017 on basement, 1st floor and 2nd floors of retail store. no construction under this permit. fire protection to be unaffected. | $30,000 |
| Mar 11, 2015 | Completed final sign-off Mar 2016 | 360 Post St | Source Planning And Construction Inc | ti- minor demo of non load bearing interior partitions. expand interior opening office space. relocate break rm and storage space. mech/ele/plum - under seperate permit | $195,000 |
| Feb 19, 2015 | Completed final sign-off May 2018 | 350 Post St | Dickinson Cameron Construction Company I | facade renovation including expansion of glazing area, replacement of exterior finishes on ground and 2nd level and removal of awning and scones. | $80,000 |
| Dec 16, 2014 | Expired or cancelled cancelled Mar 2017 | 360 Post St | supplemental air conditioning unit on the roof for 8th floor use | $20,000 | |
| Dec 16, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Balfour Beatty Construction Llc | 8/f: office ti on the 8th fl including new partitions, fixtures, finishes, mechanical and electrical. no exterior work. fire protection under sep permit | $386,000 |
| Nov 20, 2014 | Never finaled issued Nov 2014, no final | 350 Post St | Johnson Controls Fire | basement - provide & installnew (1) relay to release roll down door. | $1,000 |
| Aug 13, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Balfour Beatty Construction Llc | rev. to pa#201203166226 adding fsd's to electrical & communications closets based on building inspectors request. work includes shaft infill with light weight concrete on basement & 1/f. | $12,000 |
| Aug 1, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Johnson Controls Fire | 6th & 7th floors: install new 1 nac pane, 25 ceiling mount horn/strobes, 8 ceiling mount strobes, 5 smoke detectors, 16 duct detectors, 29 relays, 4 control zams, 2 signal zams. ref app#201203166226. | $20,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Balfour Beatty Construction Llc | revision to 201203166226. add fire smoke dampers to electrical closets on floor 3-11, except for 5 based on bldg inspectors request | $150,000 |
| Jun 5, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Johnson Controls Fire | revision to permit application 2013-1004-8507 & 2014-0218-8648. provide new (8) smoke detectors & (3) duct detectors for 5th floor t.i. | $6,400 |
| May 9, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Balfour Beatty Construction Llc | revision to 201203166226. 5th fl change single tenant layout to 2 tenant layout | $95,000 |
| Feb 27, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Westates Mechanical Corporation Inc | relocate 26 pendent heads and add end of line restraints within the new tenant improvement at the 4th fl. reference ti 201001124583 | $13,390 |
| Feb 18, 2014 | Completed final sign-off Apr 2016 | 360 Post St | Johnson Controls Fire | 4revision to pa# 201310048507 to include 4/f tenant space, provide & install new (3) ceiling mount horn/strobes & (9) strobe. remove & replace (2) horn/strobes to strobe only. | $6,000 |
| Oct 4, 2013 | Completed final sign-off Apr 2016 | 360 Post St | Johnson Controls Fire | 4th and 5th floors:provide and install 17 duct detectors, 2 smoke detectors, 34 ceiling mount horn/strobes and 19 relays. ref app#201306078903 for 4th floor and 201203166226 for 5th floor | $18,000 |
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 200509304379. all work complete | ||
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 350 Post St | to obtain final inspection for work approved under p.a. # 9109085. all work is completed. | ||
| Jul 25, 2013 | Completed final sign-off Apr 2016 | 360 Post St | renew for final 200010203579. all work is complete | ||
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 360 Post St | to obtain final inspection for work approved under p.a. #200606133823. all work is completed. (renewed under pa #20070327-7407 & 2009-0226-2939 both expried) | ||
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 360 Post St | to obtain final inspection for work approved under p.a. #200806093938. all work is completed. | ||
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 200105239802. all work is complete | ||
| Jul 25, 2013 | Completed final sign-off Apr 2016 | 360 Post St | renew for final 200605151646. previously under 200703277407, 200902262942 | ||
| Jul 25, 2013 | Completed final sign-off Apr 2016 | 360 Post St | renew for final 200307220067. all work is complete | ||
| Jul 25, 2013 | Completed final sign-off Apr 2016 | 360 Post St | to obtain final inspection for work approved under p.a. # 200002151955. all work is completed. | ||
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 200508251190. all work complete | ||
| Jul 25, 2013 | Completed final sign-off Apr 2016 | 360 Post St | to obtain final inspection for work approved under p.a. #200805152178. all work is completed. | ||
| Jul 23, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final all work complete 9905663 | ||
| Jul 23, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final all work complete 9616918 | ||
| Jul 23, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final all work complete 9517321 | ||
| Jul 23, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final all work complete 9713069 | ||
| Jul 23, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final all work complete 9701386 | ||
| Jul 23, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final all work complete 9706948 | ||
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 9319435 all work complete | ||
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 9107712. all work complete | ||
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 9201009 all work complete | ||
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final all work complete 9317459 | ||
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 9104282. all work complete | ||
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 360 Post St | renew for final 9201784 all work complete | ||
| Jul 2, 2013 | Completed final sign-off Apr 2016 | 360 Post St | Howard S. Wright Constructors Lp | 3rd-11th floors-replace of (e) fireproofing products & systems at floors 3 to 11 at (e) steel structure required by hvac replacement project under pa# 2012-0316-6226. | $500,000 |
| Jun 20, 2013 | Never finaled issued Jun 2013, no final | 350 Post St | Simplexgrinnell Lp. | provide new (23) duct smoke detectors, 1 relay iam | $25,000 |
| Jun 13, 2013 | Completed final sign-off Apr 2016 | 360 Post St | Simplexgrinnell Lp. | addition of new (10) duct detectors, (3) smoke detectors, (14) ceiling mounted horn/strobes & (2) ceiling mount strobes. demo (14)existing horn/strobes as shown. | $10,000 |
| Jun 7, 2013 | Completed final sign-off Apr 2016 | 360 Post St | Howard S. Wright Constructors Lp | ste 400: tenant build out of approx 2800 sq.ft. work includes drywall, concrete floors, acoustical ceilings, electrical, mechanical, plumbing and fire sprinklers and finishes such as paint, wall paper, use will be for doctor's office (dermatologist) | $150,000 |
| Apr 17, 2013 | Completed final sign-off Apr 2016 | 360 Post St | Westates Mechanical Corporation Inc | basement,1, 3 thru 11 floors-replace 480 pendents, replace/relocate 175 pendents, add 2 pendents. also, add sway beacing and end-of-branch line restraints, t.i. pa #2010.01.12.4583. | $229,000 |
| Apr 12, 2013 | Completed final sign-off Apr 2016 | 360 Post St | Simplexgrinnell Lp. | basement & 1st fl. install (n) control relays, (2) for security door & (1) addressable module for fire dpet key switch. revision to pa#2013-03-01-1311 | |
| Apr 10, 2013 | Completed final sign-off Oct 2013 | 350 Post St | Shawmut Woodworking & Supply Inc | revision to pa# 2012-0416-8394-minor changes to piping layout, structural, mechanical & electrical | $5,600 |
| Mar 1, 2013 | Never finaled issued Mar 2013, no final | 360 Post St | street space | ||
| Mar 1, 2013 | Completed final sign-off Apr 2016 | 360 Post St | Simplexgrinnell Lp. | basement:addition of new 6 duct detectors with relay to shutdown fsd. addition of 3 ceiling mount horn/strobes | $5,000 |
| Jan 31, 2013 | Completed final sign-off Mar 2013 | 360 Post St | to obtain a final inspection for work approved under pa# 200509304378, all work is complete. | ||
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 360 Post St | street space | ||
| Apr 16, 2012 | Completed final sign-off Oct 2013 | 350 Post St | Shawmut Woodworking & Supply Inc | separation of tenant utilities from landlord system work to include chilled water, heating hot water, domestic hot water, emergency lighting back up cutting and patching of ceilings for mechanical work above ceiling. add 30 fsds, remove 15 fds. new bas panel (must be listed as compatible). | $600,000 |
| Mar 16, 2012 | Completed final sign-off Apr 2016 | 360 Post St | Howard S. Wright Constructors Lp | interior renovation of 12 story bldg on all floors, including architectural, mechanical, electrical & plumbing, lighting, ceiling system replacement, bathrooms, elevator lobbies & corridors. no ext'r work under this permit. fire protectn under separate permit. primary work is hvac replacement. | $11,000,000 |
| Feb 13, 2012 | Expired or cancelled cancelled Dec 2012 | 350 Post St | facade remodel of an (e) store. remove & replace 2-story facade materials. signage for reference only & will be submitted under separate permit. add cornice to top front & sides of building. | $250,000 | |
| Mar 31, 2011 | Completed final sign-off Apr 2011 | 350 Post St | Simplex Grinnell | 2nd floor t.i. consist of: adding (1) new horn/strobe, remov e& replace existing (4) smoke detectors w/new.remove & cover (2) existing smoke detectors & (3) horn/strobes. | $4,000 |
| Mar 17, 2011 | Completed final sign-off May 2011 | 350 Post St | Anderson, Rowe & Buckley, Inc. | 2nd floor-t.i. (e) fire sprinkler system-15 relocated sprinklers, 1 add sprinkler | $8,000 |
| Dec 27, 2010 | Completed final sign-off Nov 2011 | 350 Post St | Shawmut Woodworking & Supply Inc | minor remodel of a section of ti on 2nd floor in office area. partition,door jewerly case grab bars, ceiling, duct work & minor electrical | $110,000 |
| Jan 12, 2010 | Completed final sign-off May 2010 | 360 Post St | Simplex Grinnell | 4th floor-addition of 5 ceiling mount horns/strobes | $3,500 |
| Jan 12, 2010 | Completed final sign-off May 2010 | 360 Post St | Simplex Grinnell | 3rd floor-addition of 1 remote power supply, 3 ceiling mount horns/strobes & 1 wall mount horn/strobe | $4,000 |
| Jan 12, 2010 | Completed final sign-off May 2010 | 360 Post St | Simplex Grinnell | 1st floor-addition of 1 ceiling mount horn/strobe & 1 wall mount horn/strobe | $2,000 |
| Jan 8, 2010 | Completed final sign-off Jun 2010 | 360 Post St | Westates Mechanical Corporation Inc | relocate pendent sprinklers (64 total) on 1st,3rd,4th, and 7th floor due to new ceiling configuration | $6,400 |
| Jan 6, 2010 | Completed final sign-off Jun 2010 | 350 Post St | Simplex Grinnell | 7th floor fire life safety system - addition of remote power supply, 9 ceiling mount horn/strobes, replace 2 existing wall mount services. | $6,000 |
| Jan 6, 2010 | Completed final sign-off May 2010 | 360 Post St | Simplex Grinnell | 5th floor fire life safety system - addition of remote power supply, 13 ceiling mount horn/strobes, replace 1 existing wall mount device. | $7,500 |
| Jan 4, 2010 | Completed final sign-off Jun 2010 | 360 Post St | Westates Mechanical Corporation Inc | 5th floor relocate and add pendent sprinklers (58 total) due to new ceiling configuration. | $6,000 |
| Dec 7, 2009 | Completed final sign-off Jun 2010 | 360 Post St | Howard S. Wright Constructors Lp | 5th fl - replacement of existing ceiling & light fixtures and 20% ada bathroom upgrades. (n) t-bar clg. | $83,000 |
| Dec 4, 2009 | Completed final sign-off Jun 2010 | 360 Post St | Howard S. Wright Constructors Lp | 4th floor-replace of (e) ceiling & lights, 20% ada bathroom upgrades | $28,000 |
| Dec 4, 2009 | Completed final sign-off Jun 2010 | 360 Post St | Howard S. Wright Constructors Lp | 7th floor-replace of (e) ceiling & lights, 20% ada bathroom upgrades | $47,000 |
| Nov 16, 2009 | Completed final sign-off Jun 2010 | 360 Post St | Howard S. Wright Constructors Lp | 3rd floor. replacement of existing ceiling grid and existing lights fixtures. field verify life safety (fa/sprinkler) is required under separate permits. | $8,500 |
| Nov 16, 2009 | Completed final sign-off May 2010 | 360 Post St | Howard S. Wright Constructors Lp | 1st floor. replacement of existing ceiling grid and existing lights fixtures. | $7,500 |
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#200404121070. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#200404121069. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#200404221966. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#9811115. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#9815235. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#200408131487. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#200504129862. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#200404121027. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#200507208080. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 350 Post St | to obtain final inspection for work approved under pa#9814517. all work has been completed. | ||
| Apr 20, 2009 | Completed final sign-off Oct 2009 | 350 Post St | to obtain final inspection for work approved under pa#200409154224. all work has been completed. | ||
| Feb 26, 2009 | Never finaled issued Feb 2009, no final | 360 Post St | Pacific Coast Trane Service Co. | to obtain final insp. for work approved under 2006/06/13/3823. all work has been completed. | |
| Feb 26, 2009 | Never finaled issued Feb 2009, no final | 360 Post St | Pacific Coast Trane Service Co. | to obtain final insp. for work approved under 2005/09/30/4378. all work has been completed. | |
| Feb 26, 2009 | Never finaled issued Feb 2009, no final | 360 Post St | Pacific Coast Trane Service Co. | to obtain final insp. for work approved under 2006/05/15/1646. all work has been completed. | |
| Oct 3, 2008 | Expired or cancelled cancelled Jan 2026 | 360 Post St | 9th fl: construct 3 new offices, 1 feature wall. all ceiling height, non bearing, drywall partition | $11,300 | |
| Sep 24, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to obtain final inspection of work performed under appl #200803207530. | |
| Sep 24, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to obtain final inspection of work performed under appl #200705161465. | |
| Sep 24, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to obtain final inspection of work performed under appl #200805091712. | |
| Sep 24, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to obtain final inspection of work performed under appl #200803257978. | |
| Sep 24, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to obtain final inspection of work performed under appl #200705161474. | |
| Sep 17, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to finalize work started under pa#200710014146. | |
| Sep 17, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to finalize work started under pa#200608159539. | |
| Sep 17, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to finalize work started under pa#200705292368. | |
| Sep 17, 2008 | Never finaled issued Sep 2008, no final | 360 Post St | Pacific Coast Trane Service Co. | to finalize work started under pa#200707277969. | |
| Sep 17, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to finalize work started under pa#200708170182. | |
| Sep 17, 2008 | Completed final sign-off Oct 2008 | 360 Post St | Pacific Coast Trane Service Co. | to finalize work started under pa#200607146623. | |
| Jul 30, 2008 | Completed final sign-off Aug 2008 | 360 Post St | umbrella permit/compliance with ordinance 377-93. no work | ||
| Jul 16, 2008 | Completed final sign-off Jul 2008 | 360 Post St | R L H Fire Protection Inc | revision to application 200806245170. change original permitted plan. sprinkler head in closet on ground floor ommitted. 11th floor, add to set, add sprinkler head (sidewalk) in stairwell. | $1,000 |