Accurate Contracting Inc.Dba Unispace Co
- Based in
- Hayward
- On San Francisco permits
- May 2013 to Feb 2020
- Last 24 months
- 0 permits filed
29 permits since 2000: 15 completed, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 4 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2020 | Completed final sign-off Jun 2020 | 209 Post St | 8th fl - interior renovation to (e) tenant floor 8 in buildling. no change in occupancy use or egress, no renovation to exterior envelopDetails
8th fl - interior renovation to (e) tenant floor 8 in buildling. no change in occupancy use or egress, no renovation to exterior envelop | $210,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 209 Post St | 8th floor: demo of non-structural walls, doors, glazing, lights and finishes. no change in occupancy. ab-017 applies (prior to tenant improvement that will be under another permit//this does not include any demo work of the ceilingDetails
8th floor: demo of non-structural walls, doors, glazing, lights and finishes. no change in occupancy. ab-017 applies (prior to tenant improvement that will be under another permit//this does not include any demo work of the ceiling | $30,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 1300 Bryant St | title 24 only, ref# 2019-0603-2303: interior improvement to (e) industrial building, no change to exterior n/a maherDetails
title 24 only, ref# 2019-0603-2303: interior improvement to (e) industrial building, no change to exterior n/a maher | $200,000 |
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 1300 Bryant St | 1/f: replace (e) split syst by it room, modify ductwork; install (1)5-ton & (2)4-ton cooling split system; install (3) exhaust fans & (2) gravity intake w/factory curbs; install (1)3-ton unit split system & ductwork for lobby/restrooms. 2/f: install ductwork/connect to (e) units;Details
1/f: replace (e) split syst by it room, modify ductwork; install (1)5-ton & (2)4-ton cooling split system; install (3) exhaust fans & (2) gravity intake w/factory curbs; install (1)3-ton unit split system & ductwork for lobby/restrooms. 2/f: install ductwork/connect to (e) units; | $75,000 |
| Jun 3, 2019 | Completed final sign-off Feb 2020 | 1300 Bryant St | interior renovation to (e) industrial bld, no changes to exterior or (e) bld structure. mep deferredDetails
interior renovation to (e) industrial bld, no changes to exterior or (e) bld structure. mep deferred | $750,000 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 1300 Bryant St | demo of bathrooms 1st fl; demo of finishes on 2nd fl. no structural demolition. ab-017.Details
demo of bathrooms 1st fl; demo of finishes on 2nd fl. no structural demolition. ab-017. | $45,000 |
| Oct 12, 2018 | Expired or cancelled withdrawn Jun 2019 | 1300 Bryant St | interior tenant improvement renovation to existing moperate industrial facility(f-1). no changes to exterior envelope or existing building structure. no change made to exiting or common path of travel. restroom on ground floor to be brought up to compliance with cbc 11b+ ada. ** maher: n/a **Details
interior tenant improvement renovation to existing moperate industrial facility(f-1). no changes to exterior envelope or existing building structure. no change made to exiting or common path of travel. restroom on ground floor to be brought up to compliance with cbc 11b+ ada. ** maher: n/a ** | $750,000 |
| Sep 11, 2018 | Expired or cancelled cancelled Jan 2026 | 1255 Battery St | 5th floor: demo glass partitions. n/a for maherDetails
5th floor: demo glass partitions. n/a for maher | $35,000 |
| Jul 20, 2018 | Completed final sign-off Jan 2019 | 300 Clay St | limited renovation to existing tenant floors 17 & 18, no change in egress or occupancy, no renovation to exterior envelope, no change to exisitng building structureDetails
limited renovation to existing tenant floors 17 & 18, no change in egress or occupancy, no renovation to exterior envelope, no change to exisitng building structure | $850,000 |
| Jul 2, 2018 | Completed final sign-off Oct 2018 | 275 Battery St | suite 700 on 7th fl: ti to include demo non-structural partitions, doors, glazing, & finishes. construction of non-structural/rated partitions, doors, glazing & finishes. new energy efficient lighting, new power, data and tele. maher naDetails
suite 700 on 7th fl: ti to include demo non-structural partitions, doors, glazing, & finishes. construction of non-structural/rated partitions, doors, glazing & finishes. new energy efficient lighting, new power, data and tele. maher na | $120,000 |
| Aug 10, 2017 | Completed final sign-off Oct 2017 | 475 Brannan St | 4/f #420- office tenant improvement interior renovation, no changes in occupancy, use or egress, no renovation to exterior envelope. n/a ordinance #155-13Details
4/f #420- office tenant improvement interior renovation, no changes in occupancy, use or egress, no renovation to exterior envelope. n/a ordinance #155-13 | $300,000 |
| Nov 21, 2016 | Never finaled issued Nov 2016, no final | 360 Post St | 3/f- new furniture, new paint, make 2 (e) office smaller, new finishes in lobby.Details
3/f- new furniture, new paint, make 2 (e) office smaller, new finishes in lobby. | $70,000 |
| May 25, 2016 | Never finaled issued May 2016, no final | 343 Sansome St | 6th & 10th floors: mep work associated w/full floor ti on 6th and partial floor ti on 10th. bathroom and breakroom. maher naDetails
6th & 10th floors: mep work associated w/full floor ti on 6th and partial floor ti on 10th. bathroom and breakroom. maher na | $50,000 |
| May 16, 2016 | Completed final sign-off Jun 2016 | 343 Sansome St | tenant improvment to existing levels 6 & 10th floors. spaces including new non load bearing partitions, suspended ceiling, floor finshes, restroom expansion, break room and storage.Details
tenant improvment to existing levels 6 & 10th floors. spaces including new non load bearing partitions, suspended ceiling, floor finshes, restroom expansion, break room and storage. | $1,500,000 |
| Apr 28, 2016 | Expired or cancelled cancelled Jan 2026 | 1 California St | 7th floor: mech. elec. & plumbing work related to approved bldg permit #201604134657. (partial foor t.i. include office space and restrooms). fire/life safety/sprinklers shall be design build under seperate permits.Details
7th floor: mech. elec. & plumbing work related to approved bldg permit #201604134657. (partial foor t.i. include office space and restrooms). fire/life safety/sprinklers shall be design build under seperate permits. | |
| Apr 28, 2016 | Never finaled issued Apr 2016, no final | 1 California St | 8th floor: work related to approved bldg permit #201604134657. (partial foor t.i. include office space, breakroom, and restrooms). fire/life safety/sprinklers shall be design build under seperate permits. two way communication on fire alarm.Details
8th floor: work related to approved bldg permit #201604134657. (partial foor t.i. include office space, breakroom, and restrooms). fire/life safety/sprinklers shall be design build under seperate permits. two way communication on fire alarm. | |
| Apr 20, 2016 | Never finaled issued Apr 2016, no final | 1 California St | 5th floor - mech, elec & plumbing work related to ref pa 2016-0413-4657 (partial floor ti, including office space, break room & restrooms). fire/life-safety/sprinklers shall be design building under separate permit. maher naDetails
5th floor - mech, elec & plumbing work related to ref pa 2016-0413-4657 (partial floor ti, including office space, break room & restrooms). fire/life-safety/sprinklers shall be design building under separate permit. maher na | |
| Apr 20, 2016 | Expired or cancelled cancelled Jan 2026 | 1 California St | 5th floor - mech, elec & plumbing work related to ref pa 2016-0405-3943 (full floor ti, including office space, break room, eating area & restrooms). fire/life-safety/sprinklers shall be design building under separate permit. maher naDetails
5th floor - mech, elec & plumbing work related to ref pa 2016-0405-3943 (full floor ti, including office space, break room, eating area & restrooms). fire/life-safety/sprinklers shall be design building under separate permit. maher na | |
| Apr 13, 2016 | Completed final sign-off Aug 2016 | 1 California St | 6th, 7th & 8th floors partial tenant improvement includ. demo/construction of partitoins, restroom upgrades, no structural work. mep, fire/life safety under separate permit.Details
6th, 7th & 8th floors partial tenant improvement includ. demo/construction of partitoins, restroom upgrades, no structural work. mep, fire/life safety under separate permit. | $1,254,770 |
| Apr 5, 2016 | Completed final sign-off Aug 2016 | 1 California St | 5th flr: ti - full flr icludes restroom upgrades, new furniture, partitions demo & construction, no structural. mep/fire/alarms under sep permit. compliance with maher ordinance no 155-13 not required.Details
5th flr: ti - full flr icludes restroom upgrades, new furniture, partitions demo & construction, no structural. mep/fire/alarms under sep permit. compliance with maher ordinance no 155-13 not required. | $1,700,000 |
| Apr 28, 2015 | Expired or cancelled cancelled Mar 2018 | 832 Folsom St | 8th floor - vacant suite preperation including demolition of existing offices, suspended ceiling, floor finishes w/minor wall finishes & demolition of non-bearing walls per sfab-017. n/a maher ordinanceDetails
8th floor - vacant suite preperation including demolition of existing offices, suspended ceiling, floor finishes w/minor wall finishes & demolition of non-bearing walls per sfab-017. n/a maher ordinance | $100,000 |
| Mar 3, 2015 | Completed final sign-off Apr 2016 | 832 Folsom St | mep for approved ti pa 2015 0109 5357 scope also includes minor structural renovation, no exterior work. fire protection under seperate permit. maher - not req'dDetails
mep for approved ti pa 2015 0109 5357 scope also includes minor structural renovation, no exterior work. fire protection under seperate permit. maher - not req'd | $40,000 |
| Jan 9, 2015 | Completed final sign-off Oct 2015 | 832 Folsom St | 5th & 6th floor: t.i. work include new partitions, fixtures, millwork. mep and fire protection under separate permit. mahner n/a.Details
5th & 6th floor: t.i. work include new partitions, fixtures, millwork. mep and fire protection under separate permit. mahner n/a. | $1,200,000 |
| Jan 8, 2015 | Completed final sign-off Apr 2016 | 832 Folsom St | interior soft demo on 5th and 6th floors, in advance of ti per ab017. no other workDetails
interior soft demo on 5th and 6th floors, in advance of ti per ab017. no other work | $20,000 |
| Oct 17, 2014 | Never finaled issued Oct 2014, no final | 720 Market St | revision appl #2013.1213.3123. work include structural, change counter design and mep included.Details
revision appl #2013.1213.3123. work include structural, change counter design and mep included. | $77,000 |
| Dec 13, 2013 | Completed final sign-off Mar 2015 | 720 Market St | suite#1000-10th fl. demolition of interior non load bearing walls & some ceiling grid, construction of new non load bearing partitions, new ceiling, new electrical (under seperate permit) and new finishes. fire sprinklers, fire alarm and mechanical changes under separate applications.Details
suite#1000-10th fl. demolition of interior non load bearing walls & some ceiling grid, construction of new non load bearing partitions, new ceiling, new electrical (under seperate permit) and new finishes. fire sprinklers, fire alarm and mechanical changes under separate applications. | $92,679 |
| Nov 27, 2013 | Completed final sign-off Mar 2014 | 1160 Battery St | 2nd floor - removal & additoin of walls, (n) shower & break areaDetails
2nd floor - removal & additoin of walls, (n) shower & break area | $150,000 |
| Aug 5, 2013 | Completed final sign-off Sep 2013 | 88 Kearny St | demolition of non load bearing partitions. construction of non rated ceiling height partitions. elec, mep, fire , ls, under separate permitDetails
demolition of non load bearing partitions. construction of non rated ceiling height partitions. elec, mep, fire , ls, under separate permit | $45,000 |
| May 7, 2013 | Never finaled issued Jun 2013, no final | 260 California St | ti, remove walls, ceiling add new lights, new flooring, expose existing brick, extend existing walls from ceiling level to slab above.Details
ti, remove walls, ceiling add new lights, new flooring, expose existing brick, extend existing walls from ceiling level to slab above. | $105,000 |