Block 0309, lot 001
201 Post St
- City’s use
- Commercial Retail
- Built
- 1909
- Stories
- 12
- Rooms
- 35 bathrooms
- Building
- 99,223 sq ft
- Lot
- 7,779 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
158 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Sep 2026 | 201 Post St | Northern Sun Associates | 7/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting.Details
7/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting. | $150,000 |
| Aug 26, 2026 | In progress issued Sep 2026 | 201 Post St | Northern Sun Associates | 6/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting.Details
6/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting. | $150,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 201 Post St | Northern Sun Associates | 5th floor: construction of new non-structural partition, doors and sidelite, new finishes, new millwork, accessibility upgrade and new ceiling work and lightingDetails
5th floor: construction of new non-structural partition, doors and sidelite, new finishes, new millwork, accessibility upgrade and new ceiling work and lighting | $150,000 |
| Jul 28, 2026 | In progress issued Aug 2026 | 201 Post St | Northern Sun Associates | floors 5-7: install (2) new stairwells for floor to floor circulation.Details
floors 5-7: install (2) new stairwells for floor to floor circulation. | $190,000 |
| Jul 22, 2025 | Completed final sign-off Oct 2025 | 209 Post St | Pavion Corp | fire alarm. to provide the replacement of the pots lines with a new csfm listed clss communicator.Details
fire alarm. to provide the replacement of the pots lines with a new csfm listed clss communicator. | $6,482 |
| May 9, 2024 | Completed final sign-off Jun 2024 | 199 Grant Av | Northern Sun Associates | replace +/- 2'0" x 30' lower section of sheetrock due to water damaged caused by flooding due to city drain linesDetails
replace +/- 2'0" x 30' lower section of sheetrock due to water damaged caused by flooding due to city drain lines | $1,000 |
| Nov 23, 2021 | Completed final sign-off Apr 2022 | 209 Post St | Rfi Enterprises Inc. | fire alarm modification due to ti 202107124144. provide new nac devices on 11/f: 1 power, 6 mod/relay, 5 duct detectors, 2 strobes, 16 speaker/strobes. (e) slc & nac devices on 12/f to remain. demo (e) duct detectors & provide new duct detectors. maher n/a.Details
fire alarm modification due to ti 202107124144. provide new nac devices on 11/f: 1 power, 6 mod/relay, 5 duct detectors, 2 strobes, 16 speaker/strobes. (e) slc & nac devices on 12/f to remain. demo (e) duct detectors & provide new duct detectors. maher n/a. | $18,860 |
| Oct 4, 2021 | Never finaled issued Oct 2021, no final | 209 Post St | Aquamatic Fire Protection | 11/f & 12/f: modify (33) fire sprinlers for office t.i. remodel. reroute fire sprinkler piping for new stairs. ref t.i. pa202107124144. maher n/a.Details
11/f & 12/f: modify (33) fire sprinlers for office t.i. remodel. reroute fire sprinkler piping for new stairs. ref t.i. pa202107124144. maher n/a. | $33,400 |
| Jul 12, 2021 | Completed final sign-off Aug 2022 | 209 Post St | Northern Sun Associates | interior tenant improvement, interior demo (n) interior wall partitins (n) interior stair and opening between 11th & 12 fl. mep upgradeDetails
interior tenant improvement, interior demo (n) interior wall partitins (n) interior stair and opening between 11th & 12 fl. mep upgrade | $605,044 |
| Apr 22, 2021 | Completed final sign-off Dec 2021 | 209 Post St | Xclusive Wireless Resources Llc. | removal of (e) sprint wireless equipments on rooftop including antennas, antenna mounts, rru's cables, cable trays, quipment cabinets and steel platform.Details
removal of (e) sprint wireless equipments on rooftop including antennas, antenna mounts, rru's cables, cable trays, quipment cabinets and steel platform. | $15,000 |
| Sep 19, 2020 | Completed final sign-off Oct 2020 | 209 Post St | Bayside Mechanical Inc | 8/f: provide & install new ductwork & connect to existing. refer to pa# 202002063682.Details
8/f: provide & install new ductwork & connect to existing. refer to pa# 202002063682. | $3,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 209 Post St | Rrs Fire Alarm Inc Dba California Fire D | 8/f:install 7 new speaker strobes in added common areas. ref-202002063682Details
8/f:install 7 new speaker strobes in added common areas. ref-202002063682 | $6,000 |
| Feb 19, 2020 | Completed final sign-off Aug 2020 | 209 Post St | Westates Mechanical Corporation Inc | fire sprinklers on 8th fl: add, rleocate, & plug fire sprinkler as required ti in the area of work. refer pa #202002063682.Details
fire sprinklers on 8th fl: add, rleocate, & plug fire sprinkler as required ti in the area of work. refer pa #202002063682. | $5,000 |
| Feb 6, 2020 | Completed final sign-off Jun 2020 | 209 Post St | Accurate Contracting Inc.Dba Unispace Co | 8th fl - interior renovation to (e) tenant floor 8 in buildling. no change in occupancy use or egress, no renovation to exterior envelopDetails
8th fl - interior renovation to (e) tenant floor 8 in buildling. no change in occupancy use or egress, no renovation to exterior envelop | $210,000 |
| Jan 15, 2020 | Never finaled issued Jan 2020, no final | 209 Post St | street spaceDetails
street space | ||
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 209 Post St | Accurate Contracting Inc.Dba Unispace Co | 8th floor: demo of non-structural walls, doors, glazing, lights and finishes. no change in occupancy. ab-017 applies (prior to tenant improvement that will be under another permit//this does not include any demo work of the ceilingDetails
8th floor: demo of non-structural walls, doors, glazing, lights and finishes. no change in occupancy. ab-017 applies (prior to tenant improvement that will be under another permit//this does not include any demo work of the ceiling | $30,000 |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 209 Post St | street spaceDetails
street space | ||
| Jul 26, 2019 | Completed final sign-off Oct 2019 | 209 Post St | Rfi Enterprises Inc. | rev to pa#201906052559; updating of fire alarm system inside paradigm per new renovationDetails
rev to pa#201906052559; updating of fire alarm system inside paradigm per new renovation | $24,920 |
| Jul 19, 2019 | Completed final sign-off Oct 2019 | 209 Post St | Potter Fire Protection | relocate 28 pendent sprinklers add 1 pendent, replace 19 pendent sprinklers wuth upright. ref 201906052559Details
relocate 28 pendent sprinklers add 1 pendent, replace 19 pendent sprinklers wuth upright. ref 201906052559 | $22,000 |
| Jun 6, 2019 | Completed final sign-off Oct 2019 | 209 Post St | Potter Fire Protection | remove pendent sprinklers; install temproary upright, demo ref permit # 201905231586Details
remove pendent sprinklers; install temproary upright, demo ref permit # 201905231586 | $2,500 |
| Jun 5, 2019 | Completed final sign-off Oct 2019 | 209 Post St | Northern Sun Associates | 12th floor: interior ti, interior wall partitionsDetails
12th floor: interior ti, interior wall partitions | $166,157 |
| May 31, 2019 | Expired or cancelled cancelled Aug 2023 | 209 Post St | Potter Fire Protection | remove pendant sprinklers; install temporary uprights. demolition ref permit #201905231586.Details
remove pendant sprinklers; install temporary uprights. demolition ref permit #201905231586. | $2,500 |
| May 23, 2019 | Completed final sign-off Aug 2019 | 209 Post St | Northern Sun Associates | 12th flr. demo of interior partitions and drop ceilings.Details
12th flr. demo of interior partitions and drop ceilings. | $36,220 |
| May 13, 2019 | Completed final sign-off Jun 2019 | 209 Post St | Northern Sun Associates | suite 1000: remove existing walls and doors. construct new walls and doors. add new power, lighting, and data outlets. minor modification of mechanical.Details
suite 1000: remove existing walls and doors. construct new walls and doors. add new power, lighting, and data outlets. minor modification of mechanical. | $100,000 |
| Dec 5, 2017 | Never finaled issued Mar 2018, no final | 201 Post St | Dickinson Cameron Construction Company I | to erect electric, wall, projecting, double faced sign. install 2 cartier signsDetails
to erect electric, wall, projecting, double faced sign. install 2 cartier signs | $6,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 201 Post St | Rcm Fire Protection Inc. | f/s: install modify existing automatic sprinkler system and extend system to protect ground floor. ref #201708225522.Details
f/s: install modify existing automatic sprinkler system and extend system to protect ground floor. ref #201708225522. | $30,000 |
| Sep 27, 2017 | Completed final sign-off Mar 2018 | 201 Post St | Rfi Enterprises Inc. | ti for cartier moving in 201 post st. adding (20 remote power supplies, (13) ducts, (48) notification appliances, (5) smokes, (1) heat, elev control, (2) fsd's. ref ti #201705116376.Details
ti for cartier moving in 201 post st. adding (20 remote power supplies, (13) ducts, (48) notification appliances, (5) smokes, (1) heat, elev control, (2) fsd's. ref ti #201705116376. | $7,000 |
| Sep 1, 2017 | Never finaled issued Oct 2017, no final | 201 Post St | Golden Gate Sign Company Inc. | to erect two electric, wall, single faced signs.Details
to erect two electric, wall, single faced signs. | $10,000 |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | street spaceDetails
street space | ||
| Aug 22, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | Dickinson Cameron Construction Company I | revision to 201705025489, minor structural changes for selected elevator, new curb shape, chandelier attachment and misc.Details
revision to 201705025489, minor structural changes for selected elevator, new curb shape, chandelier attachment and misc. | $10,000 |
| Aug 4, 2017 | Completed final sign-off May 2018 | 201 Post St | Rfi Enterprises Inc. | revised drawings, turning in fire alarm corrected as-builts. ref pa#201703131261.Details
revised drawings, turning in fire alarm corrected as-builts. ref pa#201703131261. | $200 |
| Jun 29, 2017 | Completed final sign-off Feb 2018 | 201 Post St | Alain Hirsch Construction Corp | administrative permit to correct scope of work under revision pa#201705116309 which incorrectly identified pa#201703282582. this permit shall reference approved pa#201611031915.Details
administrative permit to correct scope of work under revision pa#201705116309 which incorrectly identified pa#201703282582. this permit shall reference approved pa#201611031915. | |
| Jun 20, 2017 | Completed final sign-off Feb 2018 | 201 Post St | Alain Hirsch Construction Corp | revision to pa 2017-0511-6309 - minor egress revisionDetails
revision to pa 2017-0511-6309 - minor egress revision | |
| Jun 19, 2017 | Completed final sign-off Mar 2018 | 201 Post St | Alain Hirsch Construction Corp | installation of mobile shelving in basement stockroom. no other workDetails
installation of mobile shelving in basement stockroom. no other work | $15,000 |
| Jun 15, 2017 | Completed final sign-off Apr 2018 | 201 Post St | Alain Hirsch Construction Corp | electrical revision only to 2017-05-11-6309Details
electrical revision only to 2017-05-11-6309 | |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 201 Post St | street space w/mtaDetails
street space w/mta | ||
| May 25, 2017 | Never finaled issued May 2017, no final | 201 Post St | permit for meters onlyDetails
permit for meters only | ||
| May 11, 2017 | Never finaled issued Nov 2017, no final | 201 Post St | Dickinson Cameron Construction Company I | renovation of (e) retail tenant on basement and grnd flr levels. (n) equipment & finshes, mep included. signage, fire alarm, sprinklers & barricade on seperate permit. demo/structural under #2017-0502-5489. exterior storefront under #2017-0328-2582.Details
renovation of (e) retail tenant on basement and grnd flr levels. (n) equipment & finshes, mep included. signage, fire alarm, sprinklers & barricade on seperate permit. demo/structural under #2017-0502-5489. exterior storefront under #2017-0328-2582. | $3,000,000 |
| May 11, 2017 | Completed final sign-off Apr 2018 | 201 Post St | Alain Hirsch Construction Corp | revision to 201611152698 misc arch & structural & mep changes. exterior/facade under pa#201703282582Details
revision to 201611152698 misc arch & structural & mep changes. exterior/facade under pa#201703282582 | |
| May 3, 2017 | Completed final sign-off Jul 2017 | 201 Post St | Battalion One Fire Protection | b-g/f: add sprinkler protection throughout the basement tenant space utilizing (e) 1 outlets. provide sprinkler protection at the ceiling level of the ground floor. ref t.i. pa201611152698.Details
b-g/f: add sprinkler protection throughout the basement tenant space utilizing (e) 1 outlets. provide sprinkler protection at the ceiling level of the ground floor. ref t.i. pa201611152698. | $9,500 |
| May 2, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | Dickinson Cameron Construction Company I | demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floorDetails
demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floor | $176,000 |
| Apr 20, 2017 | Completed final sign-off Mar 2018 | 201 Post St | erect non-electric double faced projecting sign.Details
erect non-electric double faced projecting sign. | $20,000 | |
| Apr 20, 2017 | Completed final sign-off Mar 2018 | 201 Post St | erect an electric single faced wall sign.Details
erect an electric single faced wall sign. | $20,000 | |
| Apr 13, 2017 | Completed final sign-off Dec 2017 | 201 Post St | Alain Hirsch Construction Corp | two temporary exterior construction barricades.Details
two temporary exterior construction barricades. | $2,000 |
| Mar 28, 2017 | Never finaled issued Dec 2017, no final | 199 Grant Av | Dickinson Cameron Construction Company I | exterior store front with (n) door & windows. signage under seperate permit.Details
exterior store front with (n) door & windows. signage under seperate permit. | $20,000 |
| Mar 13, 2017 | Completed final sign-off Apr 2018 | 201 Post St | Rfi Enterprises Inc. | fire alarm for new tenant (fendi) 1st fl/bsmt. add fire power supply (remote), add 10 notification appliances, 8 smokes, 3 heats, 7 ducts, 2 fsds ref 201611152698Details
fire alarm for new tenant (fendi) 1st fl/bsmt. add fire power supply (remote), add 10 notification appliances, 8 smokes, 3 heats, 7 ducts, 2 fsds ref 201611152698 | $15,000 |
| Nov 15, 2016 | Completed final sign-off Feb 2018 | 201 Post St | Alain Hirsch Construction Corp | interior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permitDetails
interior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permit | $1,700,000 |
| Nov 3, 2016 | Completed final sign-off Feb 2018 | 201 Post St | Alain Hirsch Construction Corp | exterior improvement of ground floor retail store. scope to include relocation of (e) exterior doors & (n) spandral cladding @ exterior.Details
exterior improvement of ground floor retail store. scope to include relocation of (e) exterior doors & (n) spandral cladding @ exterior. | $20,000 |
| Aug 29, 2016 | Completed final sign-off Dec 2016 | 201 Post St | Northern Sun Associates | interior demo of all existing finishes & non-structural partition walls. removal of stairwell & infill with metal decking & concrete.Details
interior demo of all existing finishes & non-structural partition walls. removal of stairwell & infill with metal decking & concrete. | $40,000 |
| Jul 28, 2016 | Never finaled issued Jul 2016, no final | 193 Grant Av | add address to block 0309, lot 001 as; 193 grant ave.Details
add address to block 0309, lot 001 as; 193 grant ave. | ||
| Apr 16, 2015 | Expired or cancelled cancelled Jun 2015 | 201 Post St | Principal Builders Inc. | interior demolition and construction of ofice and work spaces on 2nd, 3rd and 4th floor in existing tenant space. mep and sprinkler and life safety under separate permit. no exterior work no change of use. life safety under separate permit.Details
interior demolition and construction of ofice and work spaces on 2nd, 3rd and 4th floor in existing tenant space. mep and sprinkler and life safety under separate permit. no exterior work no change of use. life safety under separate permit. | $206,794 |
| Mar 20, 2015 | Never finaled issued Mar 2015, no final | 201 Post St | Rfi Enterprises Inc. | fire alarm as builts per app#201502118003- changing matrix to elimante stairwell locks on plan, non in buildingDetails
fire alarm as builts per app#201502118003- changing matrix to elimante stairwell locks on plan, non in building | |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 201 Post St | Rfi Enterprises Inc. | t.i. on the 7th floor. adding remote power supply and notification appliances. no mech changes. ref app#201412294593Details
t.i. on the 7th floor. adding remote power supply and notification appliances. no mech changes. ref app#201412294593 | $6,200 |
| Jan 23, 2015 | Completed final sign-off Mar 2015 | 201 Post St | Ayoob & Peery Plumbing Co Inc | add and relocate fire sprinkler per ti 3 added, 1 relocate, 7th fl ref 201412294593Details
add and relocate fire sprinkler per ti 3 added, 1 relocate, 7th fl ref 201412294593 | $3,084 |
| Dec 29, 2014 | Completed final sign-off Apr 2015 | 201 Post St | Sc Builders, Inc | 7th floor - demolitoin of non-structural partitions. new non-structural partitions doors. hardware ceiling, mechanical & electrical.Details
7th floor - demolitoin of non-structural partitions. new non-structural partitions doors. hardware ceiling, mechanical & electrical. | $375,000 |
| Jun 11, 2014 | Completed final sign-off Jun 2015 | 201 Post St | Electric Tech Construction Inc | sprint replace (3 2.5 panel antennas.1 ea at sectors a,b&c.add 3 2.5 rrh,1 ea at 3 sectors.add new coax jumper lines fr rrhs to new antennas,install(p)hybrid cables.add(n) cable shrouds at ea of 3 antennas.add new 2.5 equip&batteries inside(p)2.5mmbs cabinet.remove 3 (e) nv antennas, 1 ea at sectorsDetails
sprint replace (3 2.5 panel antennas.1 ea at sectors a,b&c.add 3 2.5 rrh,1 ea at 3 sectors.add new coax jumper lines fr rrhs to new antennas,install(p)hybrid cables.add(n) cable shrouds at ea of 3 antennas.add new 2.5 equip&batteries inside(p)2.5mmbs cabinet.remove 3 (e) nv antennas, 1 ea at sectors | $20,000 |
| Jan 28, 2014 | Completed final sign-off Aug 2015 | 209 Post St | Overland Contracting Inc | to obtain final inspection for work approved under pa# 201111038203. all work is complete.Details
to obtain final inspection for work approved under pa# 201111038203. all work is complete. | |
| Nov 22, 2013 | Completed final sign-off Dec 2013 | 201 Post St | Sc Builders, Inc | 11/f- mechanical and electrical for pa# 201310018179Details
11/f- mechanical and electrical for pa# 201310018179 | $50,000 |
| Nov 14, 2013 | Completed final sign-off Dec 2013 | 201 Post St | Rfi Enterprises Inc. | fire alarm: ti on the 11th fl. provide notification appliance througout floor. no initiation devices added.Details
fire alarm: ti on the 11th fl. provide notification appliance througout floor. no initiation devices added. | $4,000 |
| Oct 22, 2013 | Completed final sign-off Nov 2013 | 201 Post St | R L H Fire Protection Inc | 11th floor-fire sprinkler permit-relocate 6 & add 3 pendentsDetails
11th floor-fire sprinkler permit-relocate 6 & add 3 pendents | $4,626 |
| Oct 1, 2013 | Completed final sign-off Sep 2014 | 201 Post St | Sc Builders, Inc | 11th floor-adding unisex restroom, demo non structural partitions, building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted seperately. bldg fully sprinkleredDetails
11th floor-adding unisex restroom, demo non structural partitions, building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted seperately. bldg fully sprinklered | $206,000 |
| Sep 26, 2013 | Completed final sign-off Dec 2013 | 201 Post St | Sc Builders, Inc | the demo of non-structural partitions under ab0.17. mep and life safety under seperate permit. 11th floorDetails
the demo of non-structural partitions under ab0.17. mep and life safety under seperate permit. 11th floor | $30,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 201 Post St | street spaceDetails
street space | ||
| May 22, 2013 | Completed final sign-off May 2013 | 201 Post St | Michilli Inc | revision to pa# 2013-0222-0826-scope os to remove language on original permit per district inspector's request, that says "fire protection under seperate permit. no fire protection permit is required. no construction work under this permitDetails
revision to pa# 2013-0222-0826-scope os to remove language on original permit per district inspector's request, that says "fire protection under seperate permit. no fire protection permit is required. no construction work under this permit | |
| Feb 22, 2013 | Completed final sign-off May 2013 | 201 Post St | Michilli Inc | interior ti on ground floor of prada retail store. includes millwork, finishes, furniture, no exterior work mep and fire protection under separate permitDetails
interior ti on ground floor of prada retail store. includes millwork, finishes, furniture, no exterior work mep and fire protection under separate permit | $500,000 |
| Feb 21, 2013 | Expired or cancelled cancelled Aug 2022 | 201 Post St | facade work to be performed including (n) stone facing around (e) windows and doors.Details
facade work to be performed including (n) stone facing around (e) windows and doors. | $50,000 | |
| Nov 8, 2011 | Completed final sign-off Dec 2011 | 201 Post St | Rfi Enterprises Inc. | 11th floor fire alarm - add modules for (2) fsd's being added & relocate notification appliances.Details
11th floor fire alarm - add modules for (2) fsd's being added & relocate notification appliances. | $4,000 |
| Nov 3, 2011 | Never finaled issued Feb 2012, no final | 209 Post St | Overland Contracting Inc | wireless facility modificatin: replace 6 (e) panel antennas with 6 with panel antennas on (e)roof penthouse; replace 3 (e) equipment cabinets with 2 new equipment cabinets on roof equipment platform, and run coaxial lines from equipment to antennas.Details
wireless facility modificatin: replace 6 (e) panel antennas with 6 with panel antennas on (e)roof penthouse; replace 3 (e) equipment cabinets with 2 new equipment cabinets on roof equipment platform, and run coaxial lines from equipment to antennas. | $45,000 |
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 201 Post St | Ward Alan Emery Construction Inc. | tenant improvement 11th fl. expand existing breakroom. new finishes throughout. mep and fire life safety under separate permit.Details
tenant improvement 11th fl. expand existing breakroom. new finishes throughout. mep and fire life safety under separate permit. | $125,000 |
| Apr 18, 2011 | Completed final sign-off Jun 2011 | 201 Post St | Rfi Enterprises Inc. | 4th floor tenant improvement, add on to extg fire life safty system.Details
4th floor tenant improvement, add on to extg fire life safty system. | $6,000 |
| Apr 7, 2011 | Never finaled issued Apr 2011, no final | 201 Post St | R L H Fire Protection Inc | fire sprinkler permit. relocate 14 heads, add 1, relocate 51 upright 6 hd upright. remove 5 hd total 17 for 4th flDetails
fire sprinkler permit. relocate 14 heads, add 1, relocate 51 upright 6 hd upright. remove 5 hd total 17 for 4th fl | $35,500 |
| Feb 9, 2011 | Completed final sign-off Jun 2011 | 201 Post St | Principal Builders Inc. | 4th floor interior remodel of non-structural prtitions & demolitoin of existing non-structural partitions.Details
4th floor interior remodel of non-structural prtitions & demolitoin of existing non-structural partitions. | $250,000 |
| Dec 28, 2009 | Completed final sign-off Mar 2010 | 201 Post St | Rfi Enterprises Inc. | 10th floor-tenant improvement to office space turning into art gallery under pa# 2009-1020-9337-this is a fire alarm permit for tenant improvement-relocating 5 notification appliances, 1 smoke, 1 door holder & 1 fsd for new floor plan. connect to (e) curcuits. (e) fire alarm system will not changeDetails
10th floor-tenant improvement to office space turning into art gallery under pa# 2009-1020-9337-this is a fire alarm permit for tenant improvement-relocating 5 notification appliances, 1 smoke, 1 door holder & 1 fsd for new floor plan. connect to (e) curcuits. (e) fire alarm system will not change | $13,000 |
| Dec 15, 2009 | Completed final sign-off Mar 2010 | 201 Post St | Potter Fire Protection | 10th floor. relocate 5 and plug 2 fire sprinklers.Details
10th floor. relocate 5 and plug 2 fire sprinklers. | $1,200 |
| Oct 20, 2009 | Completed final sign-off Mar 2010 | 201 Post St | keep some partitions & add others for proposed use as an art gallery. (hackett/mill gallery). new small offices for sales people.Details
keep some partitions & add others for proposed use as an art gallery. (hackett/mill gallery). new small offices for sales people. | $189,825 | |
| Aug 4, 2009 | Never finaled issued Aug 2009, no final | 201 Post St | street spaceDetails
street space | ||
| Jun 19, 2009 | Never finaled issued Jun 2009, no final | 201 Post St | street space and mtaDetails
street space and mta | ||
| Apr 8, 2009 | Completed final sign-off Apr 2014 | 201 Post St | to obtain final inspection for work approved under pa#200711027237.Details
to obtain final inspection for work approved under pa#200711027237. | ||
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 209 Post St | Plant Construction Company Lp | to obtain final inspection for work approved under pa#200708149793. all work has been completed.Details
to obtain final inspection for work approved under pa#200708149793. all work has been completed. | |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 209 Post St | Plant Construction Company Lp | to obtain final inspection for work approved under pa#2007801182805.Details
to obtain final inspection for work approved under pa#2007801182805. | |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 201 Post St | Plant Construction Company Lp | to obtain final inspection for work approved under pa#200807035966. all work has been completed.Details
to obtain final inspection for work approved under pa#200807035966. all work has been completed. | |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 201 Post St | Plant Construction Company Lp | to obtain final inspection for work approved under pa#200706073344. all work has been completed.Details
to obtain final inspection for work approved under pa#200706073344. all work has been completed. | |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 201 Post St | Plant Construction Company Lp | to obtain final inspection for work approved under pa#200704259710.Details
to obtain final inspection for work approved under pa#200704259710. | |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 201 Post St | Plant Construction Company Lp | to obtain final inspection for work approved under pa#200711067437. all work has been completed.Details
to obtain final inspection for work approved under pa#200711067437. all work has been completed. | |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 201 Post St | Plant Construction Company Lp | to obtain final inspection for work approved under pa#200711057279. all work has been completed.Details
to obtain final inspection for work approved under pa#200711057279. all work has been completed. | |
| Apr 3, 2009 | Never finaled issued Apr 2009, no final | 201 Post St | street space permit only.Details
street space permit only. | ||
| Sep 10, 2008 | Never finaled issued Sep 2008, no final | 209 Post St | street space permit only.Details
street space permit only. | ||
| Jul 29, 2008 | Never finaled issued Jul 2008, no final | 209 Post St | street space onlyDetails
street space only | ||
| Jul 3, 2008 | Completed final sign-off Jun 2009 | 201 Post St | revision to appl #200710094917 - add request for equivalency & alter accessibility for path of travel. no change to ocsntruction, for recording purposes only. replace maden lane ada entrance/egress with 1 on grant ave.Details
revision to appl #200710094917 - add request for equivalency & alter accessibility for path of travel. no change to ocsntruction, for recording purposes only. replace maden lane ada entrance/egress with 1 on grant ave. | ||
| Apr 10, 2008 | Never finaled issued Apr 2008, no final | 201 Post St | street space permit only.Details
street space permit only. | ||
| Jan 18, 2008 | Completed final sign-off Jun 2009 | 209 Post St | Rfi Enterprises Inc. | fire alarm system on basement and lobby floor. install (n) wps power supply for nac circuits. pull new 18 ts pair to all speakers. notification in common areas. mp at all exits. heat detection in elev. mech room.Details
fire alarm system on basement and lobby floor. install (n) wps power supply for nac circuits. pull new 18 ts pair to all speakers. notification in common areas. mp at all exits. heat detection in elev. mech room. | $19,614 |
| Jan 11, 2008 | Never finaled issued Jan 2008, no final | 201 Post St | street spaceDetails
street space | ||
| Dec 24, 2007 | Completed final sign-off Jan 2008 | 201 Post St | Craft Master Construction | remove 20' of non-bearing partition wall and install a new 11'x 8' non-bearing partition wall. re-configure 4-4plex outlets. remove and replace 1 toilet fixture in exist restroom.Details
remove 20' of non-bearing partition wall and install a new 11'x 8' non-bearing partition wall. re-configure 4-4plex outlets. remove and replace 1 toilet fixture in exist restroom. | $5,000 |
| Dec 5, 2007 | Never finaled issued Dec 2007, no final | 209 Post St | street space permitDetails
street space permit | ||
| Nov 6, 2007 | Expired or cancelled expired Jun 2009 | 201 Post St | revision to appl. #2007.0814.9793. scope of this permit is to incorporate and document the storefront support at the base, at the spandrall and at the tip of the storefornt. no change to exterior or to facade. work is the support of the storefront behind the facade.Details
revision to appl. #2007.0814.9793. scope of this permit is to incorporate and document the storefront support at the base, at the spandrall and at the tip of the storefornt. no change to exterior or to facade. work is the support of the storefront behind the facade. | $18,700 | |
| Nov 5, 2007 | Expired or cancelled expired Jun 2009 | 201 Post St | Dpw Inc. | modify (e)sprinkler system at basement and ground levels including relocation and installation of new sprinkler heads. 25 heads in basement and 101 heads in ground floor.Details
modify (e)sprinkler system at basement and ground levels including relocation and installation of new sprinkler heads. 25 heads in basement and 101 heads in ground floor. | $35,000 |
| Nov 2, 2007 | Expired or cancelled expired Jun 2009 | 201 Post St | mechanical and electrical (title 24) in conjunction with application # 2002/0405/3197.Details
mechanical and electrical (title 24) in conjunction with application # 2002/0405/3197. | $70,000 | |
| Oct 9, 2007 | Completed final sign-off Jun 2009 | 209 Post St | interior tenant improvement at ground floor and at basement work includes (n)wlls, (n0flooring, (n) ceiling, (n) finishes,(n)casework. mechanical, fire alarm and fire protection under separate permits. structural work approved under pa# 2007.08.14.9793Details
interior tenant improvement at ground floor and at basement work includes (n)wlls, (n0flooring, (n) ceiling, (n) finishes,(n)casework. mechanical, fire alarm and fire protection under separate permits. structural work approved under pa# 2007.08.14.9793 | $1,888,000 | |
| Aug 14, 2007 | Expired or cancelled expired Jun 2009 | 209 Post St | revision to application 2002/0405/3197. this revision is for the structural portion only. no architectural changes under this permit.Details
revision to application 2002/0405/3197. this revision is for the structural portion only. no architectural changes under this permit. | $200,000 | |
| Jun 28, 2007 | Completed final sign-off Sep 2007 | 201 Post St | Principal Builders Inc. | 5th floor-mechanical and electrical build out for tenant improvement on 5th floor. includes fire alarm.Details
5th floor-mechanical and electrical build out for tenant improvement on 5th floor. includes fire alarm. | $200,000 |
| Jun 26, 2007 | Completed final sign-off Sep 2007 | 201 Post St | Principal Builders Inc. | office build out on an extg vacant floor. oti- at vacant fifth floorDetails
office build out on an extg vacant floor. oti- at vacant fifth floor | $250,000 |
| Jun 18, 2007 | Completed final sign-off Jun 2009 | 209 Post St | to renew pa# 2002/04/03/3046, pa# 2002/04/05/3197 & pa# 2002/10/02/7978.Details
to renew pa# 2002/04/03/3046, pa# 2002/04/05/3197 & pa# 2002/10/02/7978. | $750,000 | |
| Jun 7, 2007 | Expired or cancelled expired Jun 2009 | 201 Post St | (n) temporary barricade surrounding bldng. on post st. & grant av. & maiden lane to serve as barrier during int. construction. no other work.Details
(n) temporary barricade surrounding bldng. on post st. & grant av. & maiden lane to serve as barrier during int. construction. no other work. | $12,000 | |
| May 31, 2007 | Completed final sign-off Sep 2007 | 201 Post St | Anderson, Rowe & Buckley, Inc. | t.i. existing fire sprinkler system, 45 new pendents, new bracing.Details
t.i. existing fire sprinkler system, 45 new pendents, new bracing. | $12,000 |
| Apr 25, 2007 | Expired or cancelled expired Jun 2009 | 201 Post St | remove (e) mezzanine at g/f. mezzanine supports only itself. work includes removing (e) floor beams for mezz. and spandall beams at building perimeter. interior demo only.Details
remove (e) mezzanine at g/f. mezzanine supports only itself. work includes removing (e) floor beams for mezz. and spandall beams at building perimeter. interior demo only. | $25,000 | |
| Jan 26, 2006 | Completed final sign-off Apr 2006 | 201 Post St | Anderson, Rowe & Buckley, Inc. | existing fire spkrs system, ti, 2 new/2 relocates. no increase in sizeDetails
existing fire spkrs system, ti, 2 new/2 relocates. no increase in size | $500 |
| Jan 20, 2006 | Completed final sign-off Apr 2006 | 201 Post St | minor interior alteration to create 4 new work stations and minor related work 200301175480Details
minor interior alteration to create 4 new work stations and minor related work 200301175480 | $22,750 | |
| Feb 25, 2005 | Completed final sign-off Jun 2005 | 201 Post St | Bcci Construction Company | oti-4 11th floor ls onlyDetails
oti-4 11th floor ls only | $12,000 |
| Jan 28, 2005 | Completed final sign-off Jun 2005 | 201 Post St | Bcci Construction Company | fire sprinkler work on the 11th/fl including 11 new heads, 3 removed heads & 8 relocated heads.Details
fire sprinkler work on the 11th/fl including 11 new heads, 3 removed heads & 8 relocated heads. | $3,800 |
| Jan 19, 2005 | Completed final sign-off Jun 2009 | 201 Post St | revise to app #2002/04/03/3046 facade alteration on grant and maiden lane for fcade only. no interior.Details
revise to app #2002/04/03/3046 facade alteration on grant and maiden lane for fcade only. no interior. | $100,000 | |
| Jan 19, 2005 | Expired or cancelled cancelled Mar 2007 | 201 Post St | revise to app #200204053197 t/i of retail space interior work only reduce occupant load from 90 toDetails
revise to app #200204053197 t/i of retail space interior work only reduce occupant load from 90 to | $50,000 | |
| Dec 14, 2004 | Completed final sign-off Jun 2005 | 201 Post St | Bcci Construction Company | oti-,2 11th floor, me, el, ls.Details
oti-,2 11th floor, me, el, ls. | $90,000 |
| Dec 1, 2004 | Completed final sign-off Jun 2005 | 201 Post St | Bcci Construction Company | oti-1, 11th floor, el, me, ls, spDetails
oti-1, 11th floor, el, me, ls, sp | $200,000 |
| Nov 24, 2004 | Never finaled issued Nov 2004, no final | 209 Post St | renew pa# 2002/04/03/3046, pa# 2002/04/05/3197, pa# 2002/10/02/7978 to complete work.Details
renew pa# 2002/04/03/3046, pa# 2002/04/05/3197, pa# 2002/10/02/7978 to complete work. | $1,500,000 | |
| Sep 1, 2004 | Never finaled issued Sep 2004, no final | 201 Post St | streetspaceDetails
streetspace | ||
| Jul 28, 2004 | Completed final sign-off Sep 2004 | 201 Post St | Kent M Lim & Company Inc | install (6) new water source heat pumps and necessary ductworks - 12th floorDetails
install (6) new water source heat pumps and necessary ductworks - 12th floor | $87,500 |
| Jul 27, 2004 | Completed final sign-off Dec 2004 | 201 Post St | Principal Builders Inc. | oti-2: 3rd floor, el, me, l/sDetails
oti-2: 3rd floor, el, me, l/s | $200,000 |
| Jul 8, 2004 | Completed final sign-off Dec 2004 | 201 Post St | Principal Builders Inc. | oti-3, 2nd floor, me.Details
oti-3, 2nd floor, me. | $50,000 |
| Jul 2, 2004 | Completed final sign-off Dec 2004 | 201 Post St | Principal Builders Inc. | install interior stair & pantry area, between 2nd & 3rd fl.Details
install interior stair & pantry area, between 2nd & 3rd fl. | $75,000 |
| Jul 2, 2004 | Completed final sign-off Sep 2004 | 201 Post St | Alpha Fire Suppression | add 33 sprinkler heads 12/fDetails
add 33 sprinkler heads 12/f | $6,850 |
| Jun 30, 2004 | Completed final sign-off Dec 2004 | 201 Post St | Principal Builders Inc. | oti-1 3rd/f-el, me,ls, sp.Details
oti-1 3rd/f-el, me,ls, sp. | $200,000 |
| Jun 23, 2004 | Completed final sign-off Dec 2004 | 201 Post St | Principal Builders Inc. | oti-1,2nd/fl-el,me, ls,sp.Details
oti-1,2nd/fl-el,me, ls,sp. | $200,000 |
| Jun 23, 2004 | Completed final sign-off Dec 2004 | 201 Post St | Principal Builders Inc. | oti-2,2nd/fl-el, ls.Details
oti-2,2nd/fl-el, ls. | $80,000 |
| Jun 16, 2004 | Never finaled issued Jun 2004, no final | 201 Post St | street spaceDetails
street space | ||
| Jun 14, 2004 | Expired or cancelled cancelled Sep 2007 | 201 Post St | Novo Construction Inc | metal studs structure framing for wall/soffit per app #200405264901Details
metal studs structure framing for wall/soffit per app #200405264901 | $25,000 |
| Jun 7, 2004 | Completed final sign-off Sep 2004 | 201 Post St | Novo Construction Inc | oti-2 12th/ fl-el, me, lsDetails
oti-2 12th/ fl-el, me, ls | $100,000 |
| May 26, 2004 | Completed final sign-off Sep 2004 | 201 Post St | Novo Construction Inc | oti-1 12/f el me ls spDetails
oti-1 12/f el me ls sp | $370,000 |
| May 10, 2004 | Never finaled issued May 2004, no final | 201 Post St | street spaceDetails
street space | ||
| Apr 1, 2004 | Completed final sign-off Jun 2004 | 201 Post St | Dpw Inc. | 6/f- relocate (e) sprinkler heads for new walls/ceilings, add 4Details
6/f- relocate (e) sprinkler heads for new walls/ceilings, add 4 | $7,000 |
| Mar 4, 2004 | Completed final sign-off Jun 2004 | 201 Post St | oti-2, 6/f -me,ls,elDetails
oti-2, 6/f -me,ls,el | $175,000 | |
| Mar 2, 2004 | Completed final sign-off Jun 2004 | 201 Post St | oti-1 6th fl-el, me, ls, spDetails
oti-1 6th fl-el, me, ls, sp | $175,000 | |
| Feb 3, 2004 | Never finaled issued Feb 2004, no final | 201 Post St | street space permitDetails
street space permit | ||
| Nov 24, 2003 | Completed final sign-off Jan 2004 | 201 Post St | Alpha Fire Suppression | relocate sprinkler heads 7 at 10th floor only add 33Details
relocate sprinkler heads 7 at 10th floor only add 33 | $6,600 |
| Nov 4, 2003 | Completed final sign-off Nov 2004 | 201 Post St | replace (e)construction barricade with (n)barricade @ street level for entire structural on 3 sides.Details
replace (e)construction barricade with (n)barricade @ street level for entire structural on 3 sides. | $30,000 | |
| Oct 29, 2003 | Completed final sign-off Jul 2004 | 201 Post St | oti-1 10th floor elme ls spDetails
oti-1 10th floor elme ls sp | $100,000 | |
| Oct 29, 2003 | Completed final sign-off Jul 2004 | 201 Post St | oti-2 10th floor el me lsDetails
oti-2 10th floor el me ls | $75,000 | |
| Apr 8, 2003 | Completed final sign-off Jun 2003 | 201 Post St | Muratore Inc | mechanical and fire protection as per plansDetails
mechanical and fire protection as per plans | $108,000 |
| Mar 28, 2003 | Completed final sign-off Jun 2003 | 201 Post St | Alpha Fire Suppression | relocate (62) sprinkler heads from upward coverage to downward add (0) sprinkler headsDetails
relocate (62) sprinkler heads from upward coverage to downward add (0) sprinkler heads | $8,500 |
| Feb 12, 2003 | Never finaled issued Feb 2003, no final | 201 Post St | street spaceDetails
street space | ||
| Feb 12, 2003 | Completed final sign-off Aug 2003 | 201 Post St | oti-2 7th floor, el, me, lsDetails
oti-2 7th floor, el, me, ls | $70,000 | |
| Feb 11, 2003 | Completed final sign-off Aug 2003 | 201 Post St | Alpha Fire Suppression | add 9 sprinkler heads, relocate 14 sprinkler headsDetails
add 9 sprinkler heads, relocate 14 sprinkler heads | $2,500 |
| Jan 30, 2003 | Never finaled issued Jan 2003, no final | 201 Post St | Alpha Fire Suppression | relocate 2 sprinkler heads and add 11 sprinklers headsDetails
relocate 2 sprinkler heads and add 11 sprinklers heads | $1,500 |
| Jan 17, 2003 | Completed final sign-off Jun 2003 | 201 Post St | t.i for 9th floor office space, including (n) partitions fixtures, finishes remodel of (e) bathrms,Details
t.i for 9th floor office space, including (n) partitions fixtures, finishes remodel of (e) bathrms, | $125,000 | |
| Jan 8, 2003 | Completed final sign-off Aug 2003 | 201 Post St | oti-2 8th flr,el,me,lsDetails
oti-2 8th flr,el,me,ls | $255,000 | |
| Dec 20, 2002 | Completed final sign-off Aug 2003 | 201 Post St | oti-7th floor el,me ls spDetails
oti-7th floor el,me ls sp | $90,000 | |
| Dec 13, 2002 | Expired or cancelled expired Apr 2006 | 201 Post St | oti-1 8th floor, el, me, ls, spDetails
oti-1 8th floor, el, me, ls, sp | $255,000 | |
| Oct 2, 2002 | Never finaled issued Oct 2002, no final | 209 Post St | mechanical electrical and plumbing basement ground and 2/fDetails
mechanical electrical and plumbing basement ground and 2/f | $50,000 | |
| Jun 4, 2002 | Completed final sign-off Oct 2002 | 201 Post St | oti-2 4th floor, el, me, lsDetails
oti-2 4th floor, el, me, ls | $75,000 | |
| May 30, 2002 | Completed final sign-off Oct 2002 | 201 Post St | Alpha Fire Suppression | relocate (51) pendant heads-4th floorDetails
relocate (51) pendant heads-4th floor | $7,500 |
| May 2, 2002 | Completed final sign-off Oct 2002 | 201 Post St | oti-1 4th floor, ltg, mech, ls,sprDetails
oti-1 4th floor, ltg, mech, ls,spr | $175,000 | |
| Apr 5, 2002 | Never finaled issued Aug 2002, no final | 209 Post St | t/i of of (e) basement g/f & 1/f the ground & 1/f will be used as a retail basement for service toDetails
t/i of of (e) basement g/f & 1/f the ground & 1/f will be used as a retail basement for service to | $1,200,000 | |
| Apr 3, 2002 | Never finaled issued Dec 2002, no final | 209 Post St | provide exterior work on storefront per plans, signage under separate permit install motorizedDetails
provide exterior work on storefront per plans, signage under separate permit install motorized | $200,000 | |
| May 14, 2001 | Completed final sign-off Jun 2002 | 201 Post St | Intellisec | install fire alarm, emt + wire by others (arc electric) - all floorsDetails
install fire alarm, emt + wire by others (arc electric) - all floors | $100,000 |
| Mar 22, 2001 | Completed final sign-off Jun 2002 | 201 Post St | rev. appl#9924865 structural revision, all changes are cloudedDetails
rev. appl#9924865 structural revision, all changes are clouded | $30,000 | |
| Nov 15, 2000 | Expired or cancelled cancelled Dec 2002 | 201 Post St | install fire alarm system for building, comply w/complaint 200005915Details
install fire alarm system for building, comply w/complaint 200005915 | $150,000 | |
| Aug 31, 2000 | Expired or cancelled expired Jun 2002 | 201 Post St | revision to pa#9924865-structural work onlyDetails
revision to pa#9924865-structural work only | $50,000 | |
| Aug 24, 2000 | Completed final sign-off Jun 2002 | 201 Post St | Alpha Fire Suppression | relocate and add 985 uprights and 104 window headsDetails
relocate and add 985 uprights and 104 window heads | $159,000 |
| Jul 21, 2000 | Completed final sign-off Jun 2002 | 201 Post St | revision to 9919693Details
revision to 9919693 |
Find contractors for work like this