Rcm Fire Protection Inc.
- Based in
- Tracy
- On San Francisco permits
- Oct 2002 to Sep 2026
- Last 24 months
- 26 permits filed
399 permits since 2000: 304 completed, 17 in progress, 70 never finaled, 8 expired or cancelled.
Of the 70 never-finaled permits, 5 are 3 to 5 years old, 20 are 5 to 10 years old, 45 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 399.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 1750 Van Ness Av | renew fire sprinkler pa# 2025-0207-9888 (rev to 2021-1123-2980 s4) for final inspection. all work is complete.Details
renew fire sprinkler pa# 2025-0207-9888 (rev to 2021-1123-2980 s4) for final inspection. all work is complete. | |
| Jul 1, 2026 | In progress issued Jul 2026 | 105 Wisteria Ln | revison to bpa 202511109264 - new flow sheet, point of connection on wisteria and ab-005 noteDetails
revison to bpa 202511109264 - new flow sheet, point of connection on wisteria and ab-005 note | $8,000 |
| Feb 9, 2026 | In progress issued Feb 2026 | 1303 Larkin St | to modify existing sprinkler piping due to new walls on 3rd, 4th, 5th & 6th floors. ref pa #2025-0310-1910Details
to modify existing sprinkler piping due to new walls on 3rd, 4th, 5th & 6th floors. ref pa #2025-0310-1910 | $60,000 |
| Dec 9, 2025 | In progress issued Mar 2026 | 555 Taylor St | upgrade existing fire aalrm system one for one, add new low frequency notification devices inse all sleeping rooms & living rooms to meet the sf 75 db @ the pilow ordinace,existing elevator has only primary reclal functions.Details
upgrade existing fire aalrm system one for one, add new low frequency notification devices inse all sleeping rooms & living rooms to meet the sf 75 db @ the pilow ordinace,existing elevator has only primary reclal functions. | $60,000 |
| Dec 4, 2025 | In progress issued Apr 2026 | 1155 Ellis St | 1-4/f: modify an existing automatic sprinkler system to accommodate the floor plan layout. new control valves to be installed on levels 1-4.Details
1-4/f: modify an existing automatic sprinkler system to accommodate the floor plan layout. new control valves to be installed on levels 1-4. | $600,000 |
| Nov 17, 2025 | In progress issued Jun 2026 | 1245 Alabama St | install a new nfpa 13 wet automatic sprinkler system to accommodate the floor plan layout.Details
install a new nfpa 13 wet automatic sprinkler system to accommodate the floor plan layout. | $148,750 |
| Nov 10, 2025 | In progress issued Nov 2025 | 11 Frida Kahlo Wy | install new 8" ductle iron underground fire line approx 16 feet from the tie-in @ the curb to a new 8 inch back flow preventer. install new ames c200 bfp. fire pump on site ref 202503313370Details
install new 8" ductle iron underground fire line approx 16 feet from the tie-in @ the curb to a new 8 inch back flow preventer. install new ames c200 bfp. fire pump on site ref 202503313370 | $8,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 1245 Alabama St | install a new 4" ductile iron underground fire line approx 12'-0" from the tie in at the curb to a new exterior 4" riser. ref pa # 202502069837Details
install a new 4" ductile iron underground fire line approx 12'-0" from the tie in at the curb to a new exterior 4" riser. ref pa # 202502069837 | $7,880 |
| Oct 10, 2025 | Completed final sign-off Oct 2025 | 2226 Fillmore St | modify existing sprinkler system to accommodate new tenant ceiling layout. ref 202506178857Details
modify existing sprinkler system to accommodate new tenant ceiling layout. ref 202506178857 | $10,000 |
| Oct 7, 2025 | Completed final sign-off Oct 2025 | 2169 Chestnut St | modify existing sprinklker system to accommodate new tenant ceiling layout. ref 202506068115.Details
modify existing sprinklker system to accommodate new tenant ceiling layout. ref 202506068115. | $4,000 |
| Oct 7, 2025 | Completed final sign-off Oct 2025 | 2159 Chestnut St | modify existing sprinkler system to accommodate new tenant ceiling layout. ref 202506068116.Details
modify existing sprinkler system to accommodate new tenant ceiling layout. ref 202506068116. | $4,000 |
| Sep 16, 2025 | Completed final sign-off Sep 2026 | 421 Leavenworth St | proposed fire sprinkler work is to install a complete operational speaker system for full coverage of the rehabilitated 47 public housing apartment and community room. ref #202305057244Details
proposed fire sprinkler work is to install a complete operational speaker system for full coverage of the rehabilitated 47 public housing apartment and community room. ref #202305057244 | $475,000 |
| Jul 25, 2025 | Completed final sign-off Sep 2025 | 1055 Ellis St | to modify existing fire sprinklers to accomodate new ceiling and walls.Details
to modify existing fire sprinklers to accomodate new ceiling and walls. | $7,000 |
| Jul 17, 2025 | In progress issued Sep 2025 | 1001 Brannan St | remove and replace (e) fire alarm panel and devices on (e) f/a system. 60 devices total.Details
remove and replace (e) fire alarm panel and devices on (e) f/a system. 60 devices total. | $24,972 |
| Jul 3, 2025 | Completed final sign-off Sep 2026 | 421 Leavenworth St | to install a new 6" di underground fire line to area below grade. (ref pa# 202305057244)Details
to install a new 6" di underground fire line to area below grade. (ref pa# 202305057244) | $5,000 |
| Jul 3, 2025 | In progress issued Jul 2025 | 1501 Sunnydale Av | revision to pa# 202503313362. new 8 inch underground service to supply multi family bldg. ref to 202211297323Details
revision to pa# 202503313362. new 8 inch underground service to supply multi family bldg. ref to 202211297323 | |
| Apr 30, 2025 | Completed final sign-off Jul 2025 | 58 Geary St | modify an existing sprinkler system to accomodate new tenant ceiling plan ref 202501158364Details
modify an existing sprinkler system to accomodate new tenant ceiling plan ref 202501158364 | $14,300 |
| Mar 31, 2025 | In progress issued Mar 2025 | 1652 Sunnydale Av | new 8- inch underground service to supply multifamily building ref pa 2022-1114-6447Details
new 8- inch underground service to supply multifamily building ref pa 2022-1114-6447 | $10,000 |
| Mar 31, 2025 | In progress issued Mar 2025 | 1501 Sunnydale Av | revision to pa # 2025-0124-9025 added cathodic protection detail ref pa 2022-1129-7323Details
revision to pa # 2025-0124-9025 added cathodic protection detail ref pa 2022-1129-7323 | $5,000 |
| Mar 27, 2025 | In progress issued Nov 2025 | 1245 Alabama St | change occupancy type e to i-4. add fence and gate in exterior play yard.Details
change occupancy type e to i-4. add fence and gate in exterior play yard. | $2,500 |
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 100 California St | basement: to relocate and modify existing mains and heads to accommodate new electrical room. ref permit 202310058107Details
basement: to relocate and modify existing mains and heads to accommodate new electrical room. ref permit 202310058107 | $22,000 |
| Feb 7, 2025 | In progress issued Feb 2025 | 1750 Van Ness Av | revision to pa 2021-1123-2980- s4 revised sheets fp0.3, fp2.0 & fp3.0. clg change, delete fhvDetails
revision to pa 2021-1123-2980- s4 revised sheets fp0.3, fp2.0 & fp3.0. clg change, delete fhv | |
| Jan 24, 2025 | In progress issued Jan 2025 | 1501 Sunnydale Av | install new 8" underground service to supply multi-family bldg. bldg has 1 lvl of parking with some ev charging, 4 lvls of units & amenities. ref pa 202211297323.Details
install new 8" underground service to supply multi-family bldg. bldg has 1 lvl of parking with some ev charging, 4 lvls of units & amenities. ref pa 202211297323. | $5,000 |
| Jan 23, 2025 | Completed final sign-off Feb 2026 | 1333 Gough St | upgrade fire alarm system to voice evacuation, add new speaker in all bedrooms and living rooms. replace facp and all slc devices w/ newDetails
upgrade fire alarm system to voice evacuation, add new speaker in all bedrooms and living rooms. replace facp and all slc devices w/ new | $765,000 |
| Dec 3, 2024 | Completed final sign-off Oct 2025 | 730 Stanyan St | revision to previously 20210331737 fire only revision: per sffd request: remove sprinkler in elevator control room levelDetails
revision to previously 20210331737 fire only revision: per sffd request: remove sprinkler in elevator control room level | $500 |
| Oct 25, 2024 | In progress filed Oct 2024, not yet issued | 5252 Geary Bl | emergecney 1 for 1 replacement of (e) panel and devices not capable of being monitored. provide new potter 1 pa 60 facp. provide monitoring to waterflow and tamper switches at riser. provide new addressable smoke detector. add ressable pull station at facp. provide (n) notification devices toDetails
emergecney 1 for 1 replacement of (e) panel and devices not capable of being monitored. provide new potter 1 pa 60 facp. provide monitoring to waterflow and tamper switches at riser. provide new addressable smoke detector. add ressable pull station at facp. provide (n) notification devices to | $16,557 |
| Jul 18, 2024 | Completed final sign-off Jan 2025 | 1750 Van Ness Av | administrative to pa#202212168518 to update new hydrolic calcs.Details
administrative to pa#202212168518 to update new hydrolic calcs. | |
| Jul 8, 2024 | Completed final sign-off Aug 2024 | 3251 20th Av | space 166: modify existing sprinkler system to accommodate new tenant layout. 4 new and 10 relocates ref permit 202405071572.Details
space 166: modify existing sprinkler system to accommodate new tenant layout. 4 new and 10 relocates ref permit 202405071572. | $3,700 |
| Jan 19, 2024 | Completed final sign-off Feb 2024 | 333 Dolores St | revision to pa# 202312082230, add more pipe to underground connection.Details
revision to pa# 202312082230, add more pipe to underground connection. | $20,000 |
| Dec 8, 2023 | Completed final sign-off Jun 2024 | 333 Dolores St | install new 4" fire sprinkler in building riser.Details
install new 4" fire sprinkler in building riser. | $4,000 |
| Oct 13, 2023 | In progress filed Oct 2023, not yet issued | 333 Dolores St | install new 4" fire sprinkler in bldg riser.Details
install new 4" fire sprinkler in bldg riser. | $20,000 |
| Oct 6, 2023 | Completed final sign-off Aug 2024 | 1004 16th St | change address from 900 16th st to 1004 16th st, ref pa# 202307121948.Details
change address from 900 16th st to 1004 16th st, ref pa# 202307121948. | |
| Sep 26, 2023 | Never finaled issued Sep 2023, no final | 2300 16th St | t.i. sprinker work. reference#: 202304196042Details
t.i. sprinker work. reference#: 202304196042 | $4,500 |
| Aug 8, 2023 | Completed final sign-off Sep 2024 | 1360 43rd Av | revision to pa# 201912099009/s-5: includes updated fire sprinkler required flow, removal of sprinkler heads from elevator shafts and elevator machine rooms & updated hanger information.Details
revision to pa# 201912099009/s-5: includes updated fire sprinkler required flow, removal of sprinkler heads from elevator shafts and elevator machine rooms & updated hanger information. | |
| Aug 2, 2023 | Completed final sign-off Feb 2024 | 480 Eddy St | revision to bpa#201912190012, add attic protection above level 6, fire walls to be added by gcDetails
revision to bpa#201912190012, add attic protection above level 6, fire walls to be added by gc | |
| Jul 12, 2023 | Completed final sign-off Jul 2025 | 900 16th St | modifty (e) fire sprinkler system to accomodate new tenant layout. ref t.i. pa 202305057245.Details
modifty (e) fire sprinkler system to accomodate new tenant layout. ref t.i. pa 202305057245. | $1,500 |
| Jul 6, 2023 | Completed final sign-off Nov 2023 | 480 Warren Dr | fire alarm 75 decibel at the pillow test report and verification.Details
fire alarm 75 decibel at the pillow test report and verification. | |
| Jan 27, 2023 | Never finaled filed Jan 2023, never issued | 1360 43rd Av | install new 8" fire sprinkler underground lineDetails
install new 8" fire sprinkler underground line | $6,000 |
| Dec 16, 2022 | Completed final sign-off Jan 2025 | 1750 Van Ness Av | install a new 6" underground supply.Details
install a new 6" underground supply. | $4,600 |
| Dec 8, 2022 | Completed final sign-off Jan 2024 | 1000 Market St | t.i. change all sprinklerheads, replace (e) outside dry standpipe/install control valve for each floor. ref bpa#201912270786Details
t.i. change all sprinklerheads, replace (e) outside dry standpipe/install control valve for each floor. ref bpa#201912270786 | $250,000 |
| Dec 1, 2022 | Completed final sign-off Mar 2024 | 480 Eddy St | install new 6" ductile iron fire line approx 6' from tie-in @ curb to 6" in-building riser. 6" ames colt c300 backflow preventer w/tamper switch install in commercial space off stub-in.Details
install new 6" ductile iron fire line approx 6' from tie-in @ curb to 6" in-building riser. 6" ames colt c300 backflow preventer w/tamper switch install in commercial space off stub-in. | $10,000 |
| Nov 10, 2022 | Completed final sign-off Nov 2022 | 180 Post St | to reroute (e) standpipe for beam installation & reinstall to same location to (e) fdc. ref 202112295174.Details
to reroute (e) standpipe for beam installation & reinstall to same location to (e) fdc. ref 202112295174. | $6,000 |
| Nov 10, 2022 | Completed final sign-off Oct 2023 | 2335 Golden Gate Av | install a new fire sprinkler system. ref pa 202105210845.Details
install a new fire sprinkler system. ref pa 202105210845. | |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 3908 24th St | sprinkler ti: relocate 9 heads & add 2 heads due to new t.i. ceiling & walls. ref 202209082066.Details
sprinkler ti: relocate 9 heads & add 2 heads due to new t.i. ceiling & walls. ref 202209082066. | $5,000 |
| Nov 10, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | revision to 202201186129. as built fire sprinklers. no residential guest room will be removed.Details
revision to 202201186129. as built fire sprinklers. no residential guest room will be removed. | |
| Nov 1, 2022 | Expired or cancelled withdrawn Nov 2022 | 480 Eddy St | underground fire service tie-in w/in-building riser.Details
underground fire service tie-in w/in-building riser. | $10,000 |
| Oct 19, 2022 | Never finaled issued Dec 2022, no final | 22 Johnson St | treasure island: to install a new 8 inch c900 underground fire alarm approx 20' from city main to stub through wall into fire pump room on basement level 8'-3 above finish floor back flow to be install in fire pump room on basement level.Details
treasure island: to install a new 8 inch c900 underground fire alarm approx 20' from city main to stub through wall into fire pump room on basement level 8'-3 above finish floor back flow to be install in fire pump room on basement level. | $6,000 |
| Aug 29, 2022 | Completed final sign-off Oct 2022 | 845 Market St | unit 14: relocate/add sprinklers to accommodate proposed ceiling changes. ref bpa#202205204694Details
unit 14: relocate/add sprinklers to accommodate proposed ceiling changes. ref bpa#202205204694 | $2,800 |
| Aug 15, 2022 | Completed final sign-off Oct 2022 | 500 Turk St | fire underground service revision, pa# 201712156628 s3.Details
fire underground service revision, pa# 201712156628 s3. | |
| Jul 25, 2022 | Completed final sign-off Jul 2023 | 50 Thomas More Wy | add 3 sprinkler heads due to new ceiling and wallDetails
add 3 sprinkler heads due to new ceiling and wall | $3,000 |
| May 11, 2022 | Never finaled issued May 2022, no final | 865 Market St | suite# c-10. relocate, add new sprinklers to accomodate new tenant layout and local ahjDetails
suite# c-10. relocate, add new sprinklers to accomodate new tenant layout and local ahj | $2,700 |
| Feb 24, 2022 | Never finaled issued Jun 2022, no final | 865 Market St | unit c29: remodel of existing currency exchange. relocate (4) sprinklers to accomadate new ceiling and full height walls. ref 202003126839Details
unit c29: remodel of existing currency exchange. relocate (4) sprinklers to accomadate new ceiling and full height walls. ref 202003126839 | $2,800 |
| Jan 18, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | relocate and add sprinkler heads to new ceilings in basement on 4th floorDetails
relocate and add sprinkler heads to new ceilings in basement on 4th floor | $100,000 |
| Jan 5, 2022 | Completed final sign-off Jan 2022 | 420 Taylor St | add, relocate, and revise head locations and types due to new hard lid ceilings being added. revise pipe layout due to new walls, standpipes, and open ceilings. ref permit 202001141845.Details
add, relocate, and revise head locations and types due to new hard lid ceilings being added. revise pipe layout due to new walls, standpipes, and open ceilings. ref permit 202001141845. | $1,500 |
| Dec 15, 2021 | Completed final sign-off Jan 2022 | 607 Front St | add 4 new spriklers to accommodate new proposed ceiling for proposed ti. ref permit 202108035629.Details
add 4 new spriklers to accommodate new proposed ceiling for proposed ti. ref permit 202108035629. | $2,200 |
| Dec 1, 2021 | Completed final sign-off Dec 2021 | 845 Market St | fe-5 foodcourt: re-cut 2 (e) fire sprinklers for store front soffit , minor t.i. pa 202110120260.Details
fe-5 foodcourt: re-cut 2 (e) fire sprinklers for store front soffit , minor t.i. pa 202110120260. | $3,380 |
| Oct 22, 2021 | Completed final sign-off Nov 2021 | 2601 Mariposa St | as builts for new wet fire sprinkler system with class 1 standpipes to reflect changes on level 1a and 2. ref pa 2020-0719-0464Details
as builts for new wet fire sprinkler system with class 1 standpipes to reflect changes on level 1a and 2. ref pa 2020-0719-0464 | |
| Sep 9, 2021 | Completed final sign-off Mar 2022 | 88 Arkansas St | as built for car stackers per inspection. ref bpa#201511021443Details
as built for car stackers per inspection. ref bpa#201511021443 | |
| Sep 9, 2021 | Completed final sign-off Oct 2021 | 345 08th St | revision to as built pa 201707121715. adding 4 new pendents @ balconies. one on each balcony, 2 balconies per floor.Details
revision to as built pa 201707121715. adding 4 new pendents @ balconies. one on each balcony, 2 balconies per floor. | |
| Aug 23, 2021 | Completed final sign-off Nov 2021 | 1340 04th St | space 'e'. t.i space remodel for dining area. (light hazard). relocate uprights as needed and tie into existing system, add 2 new semi-recessed pendents.Details
space 'e'. t.i space remodel for dining area. (light hazard). relocate uprights as needed and tie into existing system, add 2 new semi-recessed pendents. | $14,000 |
| Aug 13, 2021 | Completed final sign-off May 2025 | 75 Arkansas St | to add sprinlker heads to remodled area from(e) new sprinkler system. 8 total heads. ref pa202107305475. ref t.i. pa202104239259.Details
to add sprinlker heads to remodled area from(e) new sprinkler system. 8 total heads. ref pa202107305475. ref t.i. pa202104239259. | $5,000 |
| Jul 30, 2021 | Never finaled issued Jul 2021, no final | 1068 Mission St | commencement of work not started under previously aproved permit application 2020020733838.Details
commencement of work not started under previously aproved permit application 2020020733838. | |
| Jul 30, 2021 | Never finaled issued Jul 2021, no final | 343 08th St | commencement of work not started under previously aproved permit application pa#201903155346.Details
commencement of work not started under previously aproved permit application pa#201903155346. | |
| Jul 30, 2021 | Completed final sign-off Oct 2021 | 75 Arkansas St | to install 2 sprinkler heads. ti ref. pa 202104239259Details
to install 2 sprinkler heads. ti ref. pa 202104239259 | $2,000 |
| Jun 21, 2021 | Completed final sign-off Aug 2021 | 865 Market St | #204: relocate existing sprinklers (30) to accomodate proposed ceiling changes for new tenant improvement - ref #2021-0520-0730Details
#204: relocate existing sprinklers (30) to accomodate proposed ceiling changes for new tenant improvement - ref #2021-0520-0730 | $4,900 |
| Jun 21, 2021 | Completed final sign-off Jul 2022 | 2201 Bay Shore Bl | this is a fre only sprinkler system installed in an existing 4-story building, with a design criteria of light hazard, and ordinary hazard in electrical rooms, storage, etc.include 6" c900 underground. ref # 2020-1023-7295Details
this is a fre only sprinkler system installed in an existing 4-story building, with a design criteria of light hazard, and ordinary hazard in electrical rooms, storage, etc.include 6" c900 underground. ref # 2020-1023-7295 | $58,280 |
| Apr 13, 2021 | Completed final sign-off Aug 2022 | 2601 Mariposa St | to install 12'0" of 6" underground (ref permit # 2020-0719-0464)Details
to install 12'0" of 6" underground (ref permit # 2020-0719-0464) | $4,000 |
| Feb 11, 2021 | Completed final sign-off May 2021 | 845 Market St | modify existing sprinklers to accomodate proposed t.i.; ref # 2019 1227 0799Details
modify existing sprinklers to accomodate proposed t.i.; ref # 2019 1227 0799 | $4,300 |
| Nov 9, 2020 | Completed final sign-off Sep 2021 | 825 Kearny St | modify existing sprinkler system per nfpa 13-2013 for new ceiling feature and layout. 17 total heads added. ref: 2019-1205-8781.Details
modify existing sprinkler system per nfpa 13-2013 for new ceiling feature and layout. 17 total heads added. ref: 2019-1205-8781. | $1,500 |
| Aug 11, 2020 | Never finaled filed Aug 2020, never issued | 425 Mission St | suite 145. add 6- semi recessed, 13- concealed, 3-new uprights. (verizon)Details
suite 145. add 6- semi recessed, 13- concealed, 3-new uprights. (verizon) | $1,500 |
| Jul 21, 2020 | Completed final sign-off Oct 2020 | 845 Market St | relocate (e) sprinkler to accommodate new rcp ceiling t.i ref pa# 201912028450Details
relocate (e) sprinkler to accommodate new rcp ceiling t.i ref pa# 201912028450 | $16,000 |
| Jul 19, 2020 | Completed final sign-off Nov 2021 | 2601 Mariposa St | added sidewall heads to top of freight elevator shaft, added clarification notes for hazardous storage conditions and codes that design is complying to in the other clarifications section on the right of each sheetDetails
added sidewall heads to top of freight elevator shaft, added clarification notes for hazardous storage conditions and codes that design is complying to in the other clarifications section on the right of each sheet | |
| Feb 28, 2020 | Never finaled issued Feb 2020, no final | 845 Market St | ste 129 - modify extg sprinkler to accomodate new t.i. ref app#202001101683Details
ste 129 - modify extg sprinkler to accomodate new t.i. ref app#202001101683 | $6,800 |
| Feb 27, 2020 | Completed final sign-off Jan 2021 | 969 Treat Av | install new 6" pvc fire sprinkler u/g line. ref. pa201810233943 a1Details
install new 6" pvc fire sprinkler u/g line. ref. pa201810233943 a1 | $10,000 |
| Feb 7, 2020 | Completed final sign-off Dec 2022 | 1068 Mission St | install new 6" fire sprinkler undergorund line. ref pa #201810233860.Details
install new 6" fire sprinkler undergorund line. ref pa #201810233860. | $4,000 |
| Jan 23, 2020 | Completed final sign-off Feb 2020 | 865 Market St | fire sprinkler: relocate sprinkler to accomodate (e) starbucks remodeling. ref pa #201908280025Details
fire sprinkler: relocate sprinkler to accomodate (e) starbucks remodeling. ref pa #201908280025 | $6,300 |
| Jan 17, 2020 | Completed final sign-off Mar 2022 | 88 Arkansas St | fire: install 8" ductile iron pipe form street curb to inside building.Details
fire: install 8" ductile iron pipe form street curb to inside building. | $390,000 |
| Jan 17, 2020 | Completed final sign-off May 2025 | 923 Folsom St | fire: relocate 1 sprinkler head. ref pa #201907155854.Details
fire: relocate 1 sprinkler head. ref pa #201907155854. | $1,500 |
| Jan 14, 2020 | Completed final sign-off Jan 2022 | 420 Taylor St | to modify (e) fire sprinkler system for new walls. general cont.# 2019-0116-0492. **maher n/a**Details
to modify (e) fire sprinkler system for new walls. general cont.# 2019-0116-0492. **maher n/a** | $112,000 |
| Jan 14, 2020 | Completed final sign-off Feb 2020 | 135 04th St | relocate/add sprinkler to accomodate new ti. 2 sprinklers ref pa 2018-1219-8707Details
relocate/add sprinkler to accomodate new ti. 2 sprinklers ref pa 2018-1219-8707 | $1,880 |
| Dec 20, 2019 | Expired or cancelled cancelled Aug 2023 | 845 Market St | adjust 3 existing sprinklers for new soffit elevation ref 201910154506 fe-7Details
adjust 3 existing sprinklers for new soffit elevation ref 201910154506 fe-7 | $2,600 |
| Dec 20, 2019 | Completed final sign-off Apr 2020 | 865 Market St | relocate 36 e sprinklers to accomodate new ti ref 201909242698Details
relocate 36 e sprinklers to accomodate new ti ref 201909242698 | $17,305 |
| Oct 18, 2019 | Never finaled issued Oct 2019, no final | 845 Market St | #181: ref pa# 201906284685; modify (e) sprinklers to accomodate new tenant improvementDetails
#181: ref pa# 201906284685; modify (e) sprinklers to accomodate new tenant improvement | $9,360 |
| Oct 18, 2019 | Completed final sign-off Apr 2020 | 222 Taylor St | ref pa# 201808288565; add & relocate speakers from (e) outletsDetails
ref pa# 201808288565; add & relocate speakers from (e) outlets | $3,000 |
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 865 Market St | space 144: relocate 17 sprinkler heads to accodate t.i. ref pa201907256991. maher n/a.Details
space 144: relocate 17 sprinkler heads to accodate t.i. ref pa201907256991. maher n/a. | $5,600 |
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 845 Market St | space 183: relocate 41 sprinkler heads to accodate t.i. ref pa 201907267045. maher n/a.Details
space 183: relocate 41 sprinkler heads to accodate t.i. ref pa 201907267045. maher n/a. | $8,880 |
| Sep 27, 2019 | Completed final sign-off Apr 2022 | 201 Macalla Rd | yerba buena island: install 8in ductile iron pipe for fire water service from street curb to inside building. ref t.i. pa201808137195Details
yerba buena island: install 8in ductile iron pipe for fire water service from street curb to inside building. ref t.i. pa201808137195 | $6,000 |
| Aug 30, 2019 | Completed final sign-off Oct 2019 | 845 Market St | #fe9, noobowl: modify (e) sprinklers to accomodate new t.i. ref #201904198509.Details
#fe9, noobowl: modify (e) sprinklers to accomodate new t.i. ref #201904198509. | $3,600 |
| Aug 30, 2019 | Completed final sign-off Sep 2019 | 845 Market St | space 7: modify (e) sprinklers to accomodate new t.i. ref #201811216596.Details
space 7: modify (e) sprinklers to accomodate new t.i. ref #201811216596. | $16,800 |
| Aug 30, 2019 | Completed final sign-off Oct 2019 | 1038 Mission St | modify (e) sprinklers to accomodate new t.i. ref #201808026223.Details
modify (e) sprinklers to accomodate new t.i. ref #201808026223. | $3,100 |
| Aug 30, 2019 | Never finaled issued Aug 2019, no final | 845 Market St | #1 the void - modification of existing sprinkler to accomodate new ti. ref #201906072845.Details
#1 the void - modification of existing sprinkler to accomodate new ti. ref #201906072845. | $26,500 |
| Jul 31, 2019 | Completed final sign-off Oct 2021 | 827 Kearny St | install approx 12-0 of 6" ductile iron pipe connecting upstream of n back flow preventer located in basement. point of conn is face of curb to 6" inside bldg. 201612275906-sDetails
install approx 12-0 of 6" ductile iron pipe connecting upstream of n back flow preventer located in basement. point of conn is face of curb to 6" inside bldg. 201612275906-s | $120,000 |
| Jul 30, 2019 | Never finaled issued Oct 2019, no final | 350 Ellis St | to demolish & remove 13 (e) class 2 fire house valves & cabinets. plug off existing standpipe connected to domestic water. ref pa #201511182921-s4-r1.spirnkler permit complete- ef # 201511182921 s4r1Details
to demolish & remove 13 (e) class 2 fire house valves & cabinets. plug off existing standpipe connected to domestic water. ref pa #201511182921-s4-r1.spirnkler permit complete- ef # 201511182921 s4r1 | $1,000 |
| Jul 12, 2019 | Completed final sign-off Aug 2019 | 845 Market St | suite 124. modify (e) sprinkler system to accomodate new t.i. ref pa 201905312197. 31 relocate pendant, 09 sidewall relocate.Details
suite 124. modify (e) sprinkler system to accomodate new t.i. ref pa 201905312197. 31 relocate pendant, 09 sidewall relocate. | $17,800 |
| Jul 12, 2019 | Completed final sign-off Oct 2019 | 845 Market St | suite 100. modify (e) sprinkler system to accomodate new t.i. ref 201903226048. relocate 19 pendants, 3 uprights.Details
suite 100. modify (e) sprinkler system to accomodate new t.i. ref 201903226048. relocate 19 pendants, 3 uprights. | $9,600 |
| Apr 17, 2019 | Completed final sign-off Sep 2019 | 865 Market St | #168 - fire protection - automatic fire sprinklersDetails
#168 - fire protection - automatic fire sprinklers | $2,400 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 865 Market St | fire protection/automatic fire sprinklers relocate and add. ref app#2011901099890Details
fire protection/automatic fire sprinklers relocate and add. ref app#2011901099890 | $11,700 |
| Mar 15, 2019 | Completed final sign-off Apr 2019 | 865 Market St | space #124: relocate and add sprinkler to accomodate new t.i. ref app#201901241183Details
space #124: relocate and add sprinkler to accomodate new t.i. ref app#201901241183 | $8,900 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 349 08th St | installation of 8'-0" of 6" ductile iron pipe to connect fire service to the new bldg. ref app#201707121715Details
installation of 8'-0" of 6" ductile iron pipe to connect fire service to the new bldg. ref app#201707121715 | $6,300 |
| Feb 8, 2019 | Completed final sign-off Feb 2019 | 845 Market St | relocate sprinkler to accomodate ti ref 201901180787Details
relocate sprinkler to accomodate ti ref 201901180787 | $4,000 |