Block 3723, lot 001
781 Mission St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 781 Mission St | ste 1000 ground fl interior demolition of (e) restaurant tenant space: plumbing, electrical, and lighting fixtures, interior walls, doors, and finishes. patching of finishes and preparation for future tenant build-out. space to remain vacant and disables access compliance is deferred per ab-017...Details
ste 1000 ground fl interior demolition of (e) restaurant tenant space: plumbing, electrical, and lighting fixtures, interior walls, doors, and finishes. patching of finishes and preparation for future tenant build-out. space to remain vacant and disables access compliance is deferred per ab-017... | $16,425 | |
| Nov 13, 2026 | In progress filed Nov 2026, not yet issued | 785 Mission St | ground flr interior demolition of (e) day spa tenant space: plumbing, electrical, and lighting fixtures, interior walls, doors,and finisehs.patching of finishes and preparation for future t.i. build out.space to remain vacant and disables access compliance is defered per ab-017.no exterior workDetails
ground flr interior demolition of (e) day spa tenant space: plumbing, electrical, and lighting fixtures, interior walls, doors,and finisehs.patching of finishes and preparation for future t.i. build out.space to remain vacant and disables access compliance is defered per ab-017.no exterior work | $25,353 | |
| Aug 15, 2025 | Completed final sign-off Sep 2025 | 157 04th St | Safe Assurance Fire Protection | add 2 new fire sprinkler head and relocate2 others for new. ti. t.i pa# 202502220693Details
add 2 new fire sprinkler head and relocate2 others for new. ti. t.i pa# 202502220693 | $2,800 |
| Feb 21, 2025 | Completed final sign-off Sep 2025 | 135 04th St | Pio Mcgarr Inc | suite fc8-interior ti install tap room bar. replacing an (e) cafe no change of occupancy, no exterior alteration. new work includes minor interior demo of (e) finishes and construction of new interior finishes, new interior storefront new furnishings and equipment. mep deferred.Details
suite fc8-interior ti install tap room bar. replacing an (e) cafe no change of occupancy, no exterior alteration. new work includes minor interior demo of (e) finishes and construction of new interior finishes, new interior storefront new furnishings and equipment. mep deferred. | $200,000 |
| Feb 20, 2025 | Completed final sign-off Mar 2026 | 157 04th St | Kang Construction Inc | suite 1055 tenant improvment - remodel (e) restaurant. new interior pony wall. plumbing, mechanical, electrical and equipment.Details
suite 1055 tenant improvment - remodel (e) restaurant. new interior pony wall. plumbing, mechanical, electrical and equipment. | $120,000 |
| Feb 3, 2025 | Completed final sign-off Mar 2025 | 789 Mission St | Lankford Construction Company | interior ti (e) target retail store to replace portion of checkout lanes at front of store fixtures under 5'9"Details
interior ti (e) target retail store to replace portion of checkout lanes at front of store fixtures under 5'9" | $90,700 |
| Jan 7, 2025 | In progress issued Jan 2025 | 135 04th St | Centimark Corporation | reroofing (no hot works) | $244,445 |
| Dec 3, 2024 | Completed final sign-off May 2025 | 165 04th St | Modelo Design Build Co. | construction revision to pa # 2024-0910-0415 new lighting & t-24Details
construction revision to pa # 2024-0910-0415 new lighting & t-24 | |
| Nov 12, 2024 | Completed final sign-off Jan 2025 | 165 04th St | Safe Assurance Fire Protection | modification of an existing fire sprinkler system for t.i. ref bldg pa# 202409100415Details
modification of an existing fire sprinkler system for t.i. ref bldg pa# 202409100415 | $5,000 |
| Sep 10, 2024 | Completed final sign-off May 2025 | 165 04th St | Modelo Design Build Co. | change of use from (e) bookstore retail to (n) limited restaurant. relocate (e) interior ramp. new ada restroom. electrical power included; lighting deferred.Details
change of use from (e) bookstore retail to (n) limited restaurant. relocate (e) interior ramp. new ada restroom. electrical power included; lighting deferred. | $86,000 |
| Jul 23, 2024 | In progress issued Jul 2024 | 135 04th St | Pio Mcgarr Inc | remove non load bearing walls by ice machine; remove free standing countertops; remove bench seating; remove reception desks and counter; remove non-load bearing 4 ft high pony walls; all electrical, plumbing, fire systems to remain. demo only.Details
remove non load bearing walls by ice machine; remove free standing countertops; remove bench seating; remove reception desks and counter; remove non-load bearing 4 ft high pony walls; all electrical, plumbing, fire systems to remain. demo only. | $20,000 |
| Jun 14, 2024 | In progress issued Jun 2024 | 145 04th St | S J P Signs, Inc | install exterior projecting sign above entrance "nick the greek"Details
install exterior projecting sign above entrance "nick the greek" | $3,000 |
| Jun 21, 2023 | Completed final sign-off Jul 2023 | 789 Mission St | Johnson Controls Fire | as built for fire alarm under 202210204818Details
as built for fire alarm under 202210204818 | $6,900 |
| Mar 7, 2023 | Completed final sign-off Apr 2023 | 135 04th St | Pacific Wide Builders Inc. | fc#5: minor interior renovation at extg space . replace extg countertop and interior finishes only. no change to kitchen or kitchen equipment.Details
fc#5: minor interior renovation at extg space . replace extg countertop and interior finishes only. no change to kitchen or kitchen equipment. | $50,000 |
| Nov 14, 2022 | Completed final sign-off Jun 2023 | 789 Mission St | Allied Fire Protection | revamp (e) system over (n) order pick-up storage area to meet (n) design densities, 0.45 gpm/2000 s.f. & 0.60 gpm/900 s.f.-relocate, add or delete (e) sprinklers in (n) order pick-up & (e) starbucks to accommodate (n) ceilings & walls. five stop (by allied) through arc rioted assemblies.Details
revamp (e) system over (n) order pick-up storage area to meet (n) design densities, 0.45 gpm/2000 s.f. & 0.60 gpm/900 s.f.-relocate, add or delete (e) sprinklers in (n) order pick-up & (e) starbucks to accommodate (n) ceilings & walls. five stop (by allied) through arc rioted assemblies. | $12,500 |
| Oct 20, 2022 | Completed final sign-off Jul 2023 | 789 Mission St | Johnson Controls Fire | modify (e) fire alarm system. install 8 speaker strobes, 4 strobes, and 1 relay. ref pa# 202206307535.Details
modify (e) fire alarm system. install 8 speaker strobes, 4 strobes, and 1 relay. ref pa# 202206307535. | $6,900 |
| Aug 19, 2022 | Completed final sign-off Apr 2024 | 789 Mission St | W. L. Butler Construction Inc | remodel of (e) retail store to the g/f interior improvements only. this permit is for mep fixtures and seismic shelving fixtures. t.i. pa202206307535.Details
remodel of (e) retail store to the g/f interior improvements only. this permit is for mep fixtures and seismic shelving fixtures. t.i. pa202206307535. | $350,000 |
| Aug 1, 2022 | Never finaled issued Aug 2022, no final | 135 04th St | Ad Art Inc. | unit fc5: single faced illuminated indoor sigh "buckhorn grill"Details
unit fc5: single faced illuminated indoor sigh "buckhorn grill" | $5,000 |
| Jun 30, 2022 | Completed final sign-off Apr 2024 | 789 Mission St | W. L. Butler Construction Inc | remodel to the ground floor with exterior and interior improvements including the (e) starbucks exterior pick-up window & remodel. tenant to convert retail sales to storage for mobile order pick-up. sprinklers/fire alarm under separate permits.Details
remodel to the ground floor with exterior and interior improvements including the (e) starbucks exterior pick-up window & remodel. tenant to convert retail sales to storage for mobile order pick-up. sprinklers/fire alarm under separate permits. | $575,000 |
| Jan 28, 2022 | Completed final sign-off Jun 2023 | 135 04th St | Quality Telecom Consultants | cell site: verizon mod: install 3 (n) atennas on (n) mounts, install 3 (n) radio 8863 uniots at antennaes. install 3(n) filters at antennas.Details
cell site: verizon mod: install 3 (n) atennas on (n) mounts, install 3 (n) radio 8863 uniots at antennaes. install 3(n) filters at antennas. | $40,000 |
| Nov 2, 2021 | Completed final sign-off Dec 2021 | 789 Mission St | The Whiting-Turner Contracting Company | 2nd flr - install 3 2-door coolers, 1 3-door freezer, and 1 single door freezer to be used for grocery pickup. install 5 cooler/freezer electrical receptacles. install entry and restroom signage and restroom upgrades for ada compliance.Details
2nd flr - install 3 2-door coolers, 1 3-door freezer, and 1 single door freezer to be used for grocery pickup. install 5 cooler/freezer electrical receptacles. install entry and restroom signage and restroom upgrades for ada compliance. | $33,682 |
| Mar 10, 2021 | Completed final sign-off Apr 2021 | 135 04th St | Johnson Controls Fire | modify existing fire alarm system, relocate and demo devices as shown on drawings. ref to ti # 2020-0313-7101Details
modify existing fire alarm system, relocate and demo devices as shown on drawings. ref to ti # 2020-0313-7101 | $1,500 |
| Jan 25, 2021 | Never finaled issued Jan 2021, no final | 135 04th St | Certified Fire And Safety | modify existing ul300 ansul fire system to protect kitche hoods and cooking equipment changes for new occupant. ref 202003137101Details
modify existing ul300 ansul fire system to protect kitche hoods and cooking equipment changes for new occupant. ref 202003137101 | $10,000 |
| Jan 21, 2021 | Never finaled issued Mar 2021, no final | 135 04th St | Ags Signs | ste #fc-10 - install sign sg-3 "san francisco" led illuminated channel letters. 5.3 sfDetails
ste #fc-10 - install sign sg-3 "san francisco" led illuminated channel letters. 5.3 sf | $1,200 |
| Jan 21, 2021 | Never finaled issued Mar 2021, no final | 135 04th St | Ags Signs | ste #fc-10 - install led logo box sign sg-2 "bonchon" 18.6 sfDetails
ste #fc-10 - install led logo box sign sg-2 "bonchon" 18.6 sf | $900 |
| Jan 21, 2021 | Never finaled issued Mar 2021, no final | 135 04th St | Ags Signs | ste #fc-10 - install sign sg-1 "bonchon" led illuminated channel letters & "korean fired chicken" black sintra (pvc) letters, non-illuminatedDetails
ste #fc-10 - install sign sg-1 "bonchon" led illuminated channel letters & "korean fired chicken" black sintra (pvc) letters, non-illuminated | $3,200 |
| Jan 21, 2021 | Never finaled issued Mar 2021, no final | 135 04th St | Ags Signs | ste #fc-10 - install sign sg-4 "eat happiness" led illuminated channel letters 5.3 sfDetails
ste #fc-10 - install sign sg-4 "eat happiness" led illuminated channel letters 5.3 sf | $1,300 |
| Jan 21, 2021 | Never finaled issued Mar 2021, no final | 135 04th St | Ags Signs | ste #fc-10 - install sign eg-1. new vinyl wall graphic. 45 sf.Details
ste #fc-10 - install sign eg-1. new vinyl wall graphic. 45 sf. | $500 |
| Jan 21, 2021 | Never finaled issued Mar 2021, no final | 135 04th St | Ags Signs | ste #fc-10 - install sign sg-5 "bonchon" led illuminated, hunging sign, double faced, 3.3 sfDetails
ste #fc-10 - install sign sg-5 "bonchon" led illuminated, hunging sign, double faced, 3.3 sf | $900 |
| Jan 13, 2021 | Completed final sign-off Apr 2022 | 135 04th St | Famand Inc Dba Indoor Environmental Serv | replace rooftop air cooled chiller.Details
replace rooftop air cooled chiller. | $65,935 |
| Dec 15, 2020 | Completed final sign-off Mar 2021 | 135 04th St | Battalion One Fire Protection | add, relocate and demolish sprinklers as required to accomodate wall and ceiling changes as part of tenant improvement. ref. 2020-0313-7101Details
add, relocate and demolish sprinklers as required to accomodate wall and ceiling changes as part of tenant improvement. ref. 2020-0313-7101 | $2,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2021 | 135 04th St | Bilt Rite Inc | $120,000 | |
| Feb 28, 2020 | Completed final sign-off Apr 2021 | 135 04th St | Johnson Controls Fire | fire alarm 1st & 3rd fl: add 2 monitor modules for existing co2 detection on 1st fl and 3rd fl. monitoring modules are part of fire alarm systemDetails
fire alarm 1st & 3rd fl: add 2 monitor modules for existing co2 detection on 1st fl and 3rd fl. monitoring modules are part of fire alarm system | $1,056 |
| Jan 14, 2020 | Completed final sign-off Feb 2020 | 135 04th St | Rcm Fire Protection Inc. | relocate/add sprinkler to accomodate new ti. 2 sprinklers ref pa 2018-1219-8707Details
relocate/add sprinkler to accomodate new ti. 2 sprinklers ref pa 2018-1219-8707 | $1,880 |
| Jun 18, 2019 | Completed final sign-off Apr 2021 | 135 04th St | V & T Carbonic Inc | #300: provide upgrade to the extg food service c0 2 distribution system. to include confirming extg distribution system is in compliance with life safty codes. rectifying & items that are not in compliance, adding nw co 2 monitoring system & tying in co2 alarm system into the bldg. n/a for maher.Details
#300: provide upgrade to the extg food service c0 2 distribution system. to include confirming extg distribution system is in compliance with life safty codes. rectifying & items that are not in compliance, adding nw co 2 monitoring system & tying in co2 alarm system into the bldg. n/a for maher. | $20,000 |
| May 6, 2019 | Completed final sign-off Sep 2019 | 155 04th St | Bel Construction Company | tenant improvement (interior remodel) no structure alteration: install kitchen equipment replace (replace/sink, add 1 hand sink) install new finishes (wall/floor/ceiling alter lightingDetails
tenant improvement (interior remodel) no structure alteration: install kitchen equipment replace (replace/sink, add 1 hand sink) install new finishes (wall/floor/ceiling alter lighting | $90,000 |
| May 1, 2019 | Completed final sign-off May 2020 | 789 Mission St | W. L. Butler Construction Inc | 2/f: (e) water closet replacement and installation of vacuum waste piping system. repair/replace finishes as necessary. maher n/a.Details
2/f: (e) water closet replacement and installation of vacuum waste piping system. repair/replace finishes as necessary. maher n/a. | $300,000 |
| May 1, 2019 | Completed final sign-off Sep 2019 | 155 04th St | Sgdm Llc | demo for "tsuta" restaurant. selective demolition of floor, wall, ceiling finishes. no structural work. per ab-017Details
demo for "tsuta" restaurant. selective demolition of floor, wall, ceiling finishes. no structural work. per ab-017 | $4,000 |
| Mar 13, 2019 | Never finaled issued Mar 2019, no final | 135 04th St | Bolter Construction | install a temporary structure in center of pocket park, acting as an art installation for launch of new product for tech brand.Details
install a temporary structure in center of pocket park, acting as an art installation for launch of new product for tech brand. | $150,000 |
| Jan 30, 2019 | Completed final sign-off Apr 2019 | 135 04th St | Mikeco Construction Company | unit #4536: replace extg equipment on a fast food shop. (e) hvac system to remain, @ (e) retail space @ metreonDetails
unit #4536: replace extg equipment on a fast food shop. (e) hvac system to remain, @ (e) retail space @ metreon | $8,000 |
| Dec 19, 2018 | Completed final sign-off Feb 2020 | 135 04th St | Paradigm General Contractors | 1/f: sharetea: (e) tenant interior remodel, relocating (e) equipment, install glaze above (e) wall, lighting replacement, plumbing. maher n/a. across from amc ticket counter.Details
1/f: sharetea: (e) tenant interior remodel, relocating (e) equipment, install glaze above (e) wall, lighting replacement, plumbing. maher n/a. across from amc ticket counter. | $143,000 |
| Oct 3, 2018 | Expired or cancelled cancelled Jan 2026 | 781 Mission St | Terra Nova Industries | replace existing metal panel wall w/stud wall and durock. replace existing pavers w/new pavers. replace existing transition plate w/new plate. maher naDetails
replace existing metal panel wall w/stud wall and durock. replace existing pavers w/new pavers. replace existing transition plate w/new plate. maher na | $17,000 |
| Jul 19, 2018 | Expired or cancelled cancelled Jan 2026 | 789 Mission St | installation of delayed egress hardware to all emergency ecist access door as noted on the planDetails
installation of delayed egress hardware to all emergency ecist access door as noted on the plan | $15,000 | |
| Feb 16, 2018 | Completed final sign-off Mar 2018 | 175 04th St | Johnson Controls Fire | ground fl. t.i. consist of adding new (1) nac panel, (1) manual pull station, (11) speaker /strobes & (2) strobes. remove & replace (3) speakers/strobes & (1) strobe w/ new deco (e) fire alarm devices t.i. #201712227235Details
ground fl. t.i. consist of adding new (1) nac panel, (1) manual pull station, (11) speaker /strobes & (2) strobes. remove & replace (3) speakers/strobes & (1) strobe w/ new deco (e) fire alarm devices t.i. #201712227235 | $11,000 |
| Jan 25, 2018 | Completed final sign-off Mar 2018 | 175 04th St | Rcm Fire Protection Inc. | minor upgrades and modifications for fire sprinkler system to accomodate for ceiling changes and under floor storage ref ti pa app# 201712227235.Details
minor upgrades and modifications for fire sprinkler system to accomodate for ceiling changes and under floor storage ref ti pa app# 201712227235. | $6,250 |
| Dec 22, 2017 | Completed final sign-off Apr 2018 | 175 04th St | R S Mac Farlane Company Inc. | ti of approx 1635 sf of (e) restaurant space within the metron mall scope of work include but not limited to storefront modification, mep, adding w/partition for banquet room & (n) finishes for the dining area. fire sprinkler & fire alarm shall be designed/built & under sep permit. n/a meher orDetails
ti of approx 1635 sf of (e) restaurant space within the metron mall scope of work include but not limited to storefront modification, mep, adding w/partition for banquet room & (n) finishes for the dining area. fire sprinkler & fire alarm shall be designed/built & under sep permit. n/a meher or | $165,000 |
| Sep 11, 2017 | Completed final sign-off Nov 2017 | 135 04th St | Johnson Controls Fire | fire alarm revision to 201708033831. ti to 4th fl 10 new wp strobes, 10 n ew wp speakersDetails
fire alarm revision to 201708033831. ti to 4th fl 10 new wp strobes, 10 n ew wp speakers | $13,000 |
| Sep 5, 2017 | Completed final sign-off Oct 2017 | 135 04th St | Build Group Inc. | plan note revision for bldg dept approval. revision to app#201702219805 to clarify code section.Details
plan note revision for bldg dept approval. revision to app#201702219805 to clarify code section. | |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 135 04th St | Build Group Inc. | installation of 40'x60' temporary tent on 4th floor terrace for one(1) night for grand openign event (occupant load factor 15 sf/occ) using existing tent anchors permanently built onto terrace under pa #201708175075.Details
installation of 40'x60' temporary tent on 4th floor terrace for one(1) night for grand openign event (occupant load factor 15 sf/occ) using existing tent anchors permanently built onto terrace under pa #201708175075. | $5,000 |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 135 04th St | Build Group Inc. | 4th floor - revision to pa #201702219805: installation of tent anchors on exterior terrace. including occupant load verificationDetails
4th floor - revision to pa #201702219805: installation of tent anchors on exterior terrace. including occupant load verification | $40,000 |
| Aug 8, 2017 | Completed final sign-off Aug 2017 | 135 04th St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install 1 ul 300 ansul piranha fire system in the main kitchen area on the gr flDetails
furnish and install 1 ul 300 ansul piranha fire system in the main kitchen area on the gr fl | $5,000 |
| Aug 3, 2017 | Completed final sign-off Nov 2017 | 135 04th St | Johnson Controls Fire | 4/f: mod (e) f/a system: remove and relocate (e) notification appliances as shown on plan. provide and install monitor mods for kitchen hood systems, reference approved pa#201702219805; 2 individual addressable mods, 2 strobes, 1 speaker.Details
4/f: mod (e) f/a system: remove and relocate (e) notification appliances as shown on plan. provide and install monitor mods for kitchen hood systems, reference approved pa#201702219805; 2 individual addressable mods, 2 strobes, 1 speaker. | $6,000 |
| Jul 25, 2017 | Completed final sign-off Sep 2017 | 135 04th St | Johnson Controls Fire | revision to appln #201703060730. tenant improvement for 3rd fl. add monitor module for ul300. as built-relocation of strobe. relocate/install to close won doors.Details
revision to appln #201703060730. tenant improvement for 3rd fl. add monitor module for ul300. as built-relocation of strobe. relocate/install to close won doors. | $1,500 |
| Jun 16, 2017 | Completed final sign-off Jul 2017 | 135 04th St | 4/f- fire sprinkler permit. relocate 46, delette 14, install 19 pendent sprinklers. relocate 10 and install 3 new upright sprinklers 4th flDetails
4/f- fire sprinkler permit. relocate 46, delette 14, install 19 pendent sprinklers. relocate 10 and install 3 new upright sprinklers 4th fl | $25,000 | |
| Jun 14, 2017 | Completed final sign-off Oct 2017 | 135 04th St | Colorado Structures Inc Dba Csi Construc | revision to bring restroom stall to ada compliance. revision to app#201603182469,201609289064, & 201702169600Details
revision to bring restroom stall to ada compliance. revision to app#201603182469,201609289064, & 201702169600 | |
| Mar 24, 2017 | Completed final sign-off Apr 2017 | 135 04th St | Johnson Controls Fire | revision to pa 2017-0306-0730, addition of 2 monitor modules for kitchen auto fryerDetails
revision to pa 2017-0306-0730, addition of 2 monitor modules for kitchen auto fryer | $1,500 |
| Mar 6, 2017 | Completed final sign-off Sep 2017 | 135 04th St | Johnson Controls Fire | fire alarm ti to 3rd floor - relocate (e) terminal box & relay, relocate (e) strobe, install 2 new relays for won door & 1 new speaker/strobe. ref pa 2016-0318-2469; ref pa # 201702169600Details
fire alarm ti to 3rd floor - relocate (e) terminal box & relay, relocate (e) strobe, install 2 new relays for won door & 1 new speaker/strobe. ref pa 2016-0318-2469; ref pa # 201702169600 | $8,500 |
| Feb 21, 2017 | Completed final sign-off Oct 2017 | 135 04th St | Build Group Inc. | working in common area. 4th flr: subdivide event space. redesign prefunction lobby, access to event space, restrooms, meeting rm, coat rm, office, hallway & relocate (e) warming kitchen, new mep workDetails
working in common area. 4th flr: subdivide event space. redesign prefunction lobby, access to event space, restrooms, meeting rm, coat rm, office, hallway & relocate (e) warming kitchen, new mep work | $2,000,000 |
| Feb 21, 2017 | Completed final sign-off Mar 2017 | 135 04th St | Westates Mechanical Corporation Inc | amc 3rd floor ti, adding 5 new pendent fire sprinler heads & relocating 12 pendent fire sprinkler heads. ref pa 2016-0928-9064Details
amc 3rd floor ti, adding 5 new pendent fire sprinler heads & relocating 12 pendent fire sprinkler heads. ref pa 2016-0928-9064 | $6,000 |
| Feb 16, 2017 | Completed final sign-off Oct 2017 | 135 04th St | Colorado Structures Inc Dba Csi Construc | revision to pa 2016-0928-6064 and pa 2016-0318-2469 - reduce the width of the won doors and adjust the corresponding bulkhead and electrical. this change also required to adjest the freestyle (soda) area by shifting it all to the eastDetails
revision to pa 2016-0928-6064 and pa 2016-0318-2469 - reduce the width of the won doors and adjust the corresponding bulkhead and electrical. this change also required to adjest the freestyle (soda) area by shifting it all to the east | |
| Jan 23, 2017 | Never finaled issued Jan 2017, no final | 135 04th St | Black Bird Fire Protection | ste 3000: installation of 2 autofryers with built in ansul fire suppression system from manufactures.Details
ste 3000: installation of 2 autofryers with built in ansul fire suppression system from manufactures. | $4,000 |
| Dec 20, 2016 | Completed final sign-off Feb 2017 | 789 Mission St | Swinerton Builders | ground floor - existing interior space to be modified per new interior furniture, finishes, equipmentsDetails
ground floor - existing interior space to be modified per new interior furniture, finishes, equipments | $120,000 |
| Nov 3, 2016 | Completed final sign-off Dec 2016 | 135 04th St | Allied Fire Protection | suite 130: firesprinkler t/i - "metreon 13 - #130 (lev. 1), (3) added sprinklers, (1) relocated sprinklersDetails
suite 130: firesprinkler t/i - "metreon 13 - #130 (lev. 1), (3) added sprinklers, (1) relocated sprinklers | $2,060 |
| Oct 20, 2016 | Completed final sign-off Nov 2016 | 789 Mission St | Johnson Controls Fire | 2/f- fire alarm t.i., remove 1 existing speaker/strobe & relocate 1 existing speaker/strobe t.i. pa#201607293735Details
2/f- fire alarm t.i., remove 1 existing speaker/strobe & relocate 1 existing speaker/strobe t.i. pa#201607293735 | $2,000 |
| Oct 12, 2016 | Completed final sign-off Dec 2016 | 789 Mission St | Western States Fire Protection Co. | add & relocate fire sprinklers to accommodate new wall and ceiling layout for the order pick up area. t.i. pa#201607293735Details
add & relocate fire sprinklers to accommodate new wall and ceiling layout for the order pick up area. t.i. pa#201607293735 | $8,000 |
| Sep 28, 2016 | Completed final sign-off Oct 2017 | 135 04th St | Colorado Structures Inc Dba Csi Construc | 3rd floor. revision to permit 2016-0318-2469 revised lighting, lobby, restrooms, miscDetails
3rd floor. revision to permit 2016-0318-2469 revised lighting, lobby, restrooms, misc | |
| Sep 21, 2016 | Completed final sign-off Oct 2016 | 135 04th St | Allied Fire Protection | suite #300: fire sprinkler t.i. "metreon 16 corridor" 9 relocated sprinklers. ref app#201604185019Details
suite #300: fire sprinkler t.i. "metreon 16 corridor" 9 relocated sprinklers. ref app#201604185019 | $4,650 |
| Sep 8, 2016 | Never finaled issued Sep 2016, no final | 135 04th St | Ltci Ltd | revision to 201604185019, ste#300 revised walls, new vomitory wall, move/revise mechanical equipment, revised lighting, speaker pocketing, relocation of equipment. fire under separate permit.Details
revision to 201604185019, ste#300 revised walls, new vomitory wall, move/revise mechanical equipment, revised lighting, speaker pocketing, relocation of equipment. fire under separate permit. | |
| Sep 1, 2016 | Never finaled issued Sep 2016, no final | 135 04th St | Johnson Controls Fire | fire alarm ti to 3rd fl auditorium: 13 relocate existing manual fire alarm box and strobe. remove demo existing smoke sensor, install new speaker strobe. ref app 201604185019Details
fire alarm ti to 3rd fl auditorium: 13 relocate existing manual fire alarm box and strobe. remove demo existing smoke sensor, install new speaker strobe. ref app 201604185019 | $4,500 |
| Jul 29, 2016 | Completed final sign-off Dec 2016 | 789 Mission St | Taylor Bros Construction Co. Inc. | minor ti: affected area: 539 sf reconfig of (e) guest services area to include order pick up storage (no high pile proposed) within (e) footprint. includes fixtures & finishes update to wall ceiling & floorDetails
minor ti: affected area: 539 sf reconfig of (e) guest services area to include order pick up storage (no high pile proposed) within (e) footprint. includes fixtures & finishes update to wall ceiling & floor | $141,700 |
| May 25, 2016 | Completed final sign-off Feb 2018 | 135 04th St | L.D. Strobel Co Ltd | verizon wireless proposing to add one ball antenna, permit the (e) temp ball antenna & add a panel antenna. both sectors will be behind a frp screens painted to match the (e) bldg. new equipent will be inside bldg in (e0 equipment room, including two battery cabinets.Details
verizon wireless proposing to add one ball antenna, permit the (e) temp ball antenna & add a panel antenna. both sectors will be behind a frp screens painted to match the (e) bldg. new equipent will be inside bldg in (e0 equipment room, including two battery cabinets. | $250,000 |
| Apr 18, 2016 | Never finaled issued Jul 2016, no final | 135 04th St | Ltci Ltd | suite 300 - cinema tenant interior remodel for auditorium #13 within an existing mall bldg.Details
suite 300 - cinema tenant interior remodel for auditorium #13 within an existing mall bldg. | $250,000 |
| Mar 22, 2016 | Completed final sign-off Apr 2016 | 781 Mission St | Aaa Restaurant Fire Control/Dba Aaa Fire | install 1 ansul 3 gal fire system @ ground floorDetails
install 1 ansul 3 gal fire system @ ground floor | $3,000 |
| Mar 18, 2016 | Completed final sign-off Oct 2017 | 135 04th St | Colorado Structures Inc Dba Csi Construc | #3000- interior t.i. of existing theatre including new lighting, tiles, carpet, new seating.Details
#3000- interior t.i. of existing theatre including new lighting, tiles, carpet, new seating. | $5,180,000 |
| Mar 14, 2016 | Completed final sign-off Jan 2018 | 135 04th St | this permit is being obtained to extend the temp site approval under pa#201510058811 this approval of temp site will extend the site a further 6 months beginning 3/7/2016 through 9/7/2016. no work on this permit.Details
this permit is being obtained to extend the temp site approval under pa#201510058811 this approval of temp site will extend the site a further 6 months beginning 3/7/2016 through 9/7/2016. no work on this permit. | ||
| Mar 8, 2016 | Completed final sign-off Apr 2016 | 135 04th St | Ltci Ltd | revision to 201508053348 speaker attachment for theater sound only.Details
revision to 201508053348 speaker attachment for theater sound only. | |
| Mar 4, 2016 | Never finaled issued Mar 2016, no final | 789 Mission St | Emcor Services/Mesa Energy Systems Inc | demo existing fan coil unit, install new fan coil unit.Details
demo existing fan coil unit, install new fan coil unit. | $62,763 |
| Feb 18, 2016 | Never finaled issued Mar 2016, no final | 781 Mission St | American Sign Installation Co, S J P Signs, Inc | erect 2 blade signs, non electric, double faced projecting signs.Details
erect 2 blade signs, non electric, double faced projecting signs. | $2,600 |
| Feb 18, 2016 | Never finaled issued Mar 2016, no final | 781 Mission St | S J P Signs, Inc | erect electric single faced canopy sign.Details
erect electric single faced canopy sign. | $2,500 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 781 Mission St | Johnson Controls Fire | fire alarm t.i. for 1st flr lemonade consist of adding 6 speaker/strobes & 1 manual pull stn, remove & repl 1 speaker/strobe,1 pull stn & 1 am demo(3)(e) speaker/strobes,t.i.201511122382.Details
fire alarm t.i. for 1st flr lemonade consist of adding 6 speaker/strobes & 1 manual pull stn, remove & repl 1 speaker/strobe,1 pull stn & 1 am demo(3)(e) speaker/strobes,t.i.201511122382. | $7,000 |
| Feb 9, 2016 | Completed final sign-off Jan 2017 | 781 Mission St | Terra Nova Industries | revision to pa 2015-1112-2382, windguard and cladding painting. signage under separate permitDetails
revision to pa 2015-1112-2382, windguard and cladding painting. signage under separate permit | $10,000 |
| Feb 2, 2016 | Completed final sign-off Apr 2016 | 781 Mission St | Eco Fire Sprinklers Inc | sprinklers relocate- ground flr: relocate 2 flex head sprinklers in area of work of ti for new ceiling configuration - ref pa 2015 1112 2382Details
sprinklers relocate- ground flr: relocate 2 flex head sprinklers in area of work of ti for new ceiling configuration - ref pa 2015 1112 2382 | $3,000 |
| Jan 7, 2016 | Completed final sign-off Dec 2016 | 781 Mission St | Terra Nova Industries | interior demo only. bldg permit under seperate permit being reviewed.Details
interior demo only. bldg permit under seperate permit being reviewed. | $9,000 |
| Nov 12, 2015 | Completed final sign-off Dec 2016 | 781 Mission St | Terra Nova Industries | interior remodel of a new restaurant, remodeling front kitchen line and dining with existing restrooms to remain, exterior consists of new seating on existing patio. new ocupant load of 77 persons.Details
interior remodel of a new restaurant, remodeling front kitchen line and dining with existing restrooms to remain, exterior consists of new seating on existing patio. new ocupant load of 77 persons. | $132,000 |
| Oct 5, 2015 | Completed final sign-off Jan 2018 | 135 04th St | L.D. Strobel Co Ltd | install new unmanned verizon wireless telecommunication facility. add 1 ball antenna. add 18 rrhs and 3 surge suppressors, place 1 6pas antenna and add 1 microwave on roof mounted tripod. temporary site 4 months (from permit issuance).Details
install new unmanned verizon wireless telecommunication facility. add 1 ball antenna. add 18 rrhs and 3 surge suppressors, place 1 6pas antenna and add 1 microwave on roof mounted tripod. temporary site 4 months (from permit issuance). | $150,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 789 Mission St | Arrow Sign Company | install 2 sets of letters on existing blade signDetails
install 2 sets of letters on existing blade sign | $7,000 |
| Sep 17, 2015 | Expired or cancelled cancelled Jan 2026 | 789 Mission St | Arrow Sign Company | non electric wall sign | $7,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 789 Mission St | Arrow Sign Company | remove existing letters and logo and replace with new logo only.Details
remove existing letters and logo and replace with new logo only. | $7,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 789 Mission St | Arrow Sign Company | install 2 sets of letters on existing blade signDetails
install 2 sets of letters on existing blade sign | $7,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 789 Mission St | Arrow Sign Company | remove existing letters and logo and replace with new logo only.Details
remove existing letters and logo and replace with new logo only. | $7,000 |
| Aug 26, 2015 | Completed final sign-off Dec 2015 | 161 04th St | Arrow Sign Company | erect illum signDetails
erect illum sign | $3,000 |
| Aug 5, 2015 | Never finaled issued Aug 2015, no final | 135 04th St | Ltci Ltd | 3rd & 4th floors: new projectors. new audio rack. new screen. shaker rack. new electrical panel.Details
3rd & 4th floors: new projectors. new audio rack. new screen. shaker rack. new electrical panel. | $30,000 |
| Aug 5, 2015 | Completed final sign-off Apr 2016 | 135 04th St | Ltci Ltd | new speaker, seating, railings installed. floor and wall finishes replaced.Details
new speaker, seating, railings installed. floor and wall finishes replaced. | $400,000 |
| Jul 6, 2015 | Never finaled issued Jul 2015, no final | 135 04th St | Johnson Controls Fire | as built record drawing for pa 2015 0423 4392Details
as built record drawing for pa 2015 0423 4392 | |
| May 13, 2015 | Completed final sign-off May 2015 | 789 Mission St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinklers per t.i. (5) add, (7) relocate on 1/f. t.i. pa# 201504093245. n/a ordinance #155-13Details
add & relocate fire sprinklers per t.i. (5) add, (7) relocate on 1/f. t.i. pa# 201504093245. n/a ordinance #155-13 | $6,168 |
| May 8, 2015 | Completed final sign-off Aug 2015 | 115 04th St | Arrow Sign Company | erect illum signDetails
erect illum sign | $3,000 |
| May 8, 2015 | Completed final sign-off Aug 2015 | 115 04th St | Arrow Sign Company | erect illum signDetails
erect illum sign | $3,000 |
| Apr 23, 2015 | Never finaled issued Apr 2015, no final | 135 04th St | Johnson Controls Fire | fire alarm tenant improvement to ground floor target space. relocate 1 existing smoke detector remove/demo 2 existing smokes, relocate 5 existing speaker/strobes, remove/demo 2 existing speakers. pa 201504093245Details
fire alarm tenant improvement to ground floor target space. relocate 1 existing smoke detector remove/demo 2 existing smokes, relocate 5 existing speaker/strobes, remove/demo 2 existing speakers. pa 201504093245 | $5,500 |
| Apr 9, 2015 | Completed final sign-off Aug 2015 | 789 Mission St | Swinerton Builders | remodel (e) retail space into (n) reatil function. light gage stud framing/gyp/finishes ans sales fixtures ref pa# ew20150407401Details
remodel (e) retail space into (n) reatil function. light gage stud framing/gyp/finishes ans sales fixtures ref pa# ew20150407401 | $1,200,000 |
| Mar 12, 2015 | Completed final sign-off Jun 2015 | 135 04th St | Swinerton Builders | demo 3 non bearing partition walls and doors, per plan. ab-017.Details
demo 3 non bearing partition walls and doors, per plan. ab-017. | $20,000 |
| Mar 4, 2015 | Completed final sign-off Jun 2015 | 789 Mission St | The Whiting-Turner Contracting Company | store fixture updates, floor finish updates & upgrade electronics area departments, all interior, minor 700 sq ft approx.Details
store fixture updates, floor finish updates & upgrade electronics area departments, all interior, minor 700 sq ft approx. | $120,000 |
| May 16, 2014 | Completed final sign-off Aug 2014 | 155 04th St | Johnson Controls Fire | on ground floor - fire alarm ti to space 1050. 2 duct smoke detectos, 1 monitor module, 2 relays, 4 strobes, 4 speaker strobes. ti ref pa# 201304194994Details
on ground floor - fire alarm ti to space 1050. 2 duct smoke detectos, 1 monitor module, 2 relays, 4 strobes, 4 speaker strobes. ti ref pa# 201304194994 | $7,200 |
| Sep 25, 2013 | Never finaled issued Sep 2013, no final | 781 Mission St | to administrrtively amend occupancy classification from a-3 (per pa# 201111148793) to a-2. establish occupancy load for place of assembly permit associated with completed permit #201111148793. no work under this permit.Details
to administrrtively amend occupancy classification from a-3 (per pa# 201111148793) to a-2. establish occupancy load for place of assembly permit associated with completed permit #201111148793. no work under this permit. | ||
| Sep 20, 2013 | Never finaled issued Oct 2013, no final | 781 Mission St | clarification to equipment plan for pa# 2011/11/14/8793 to reflect placement of a portable couter-top double burner induction cooktop as requested by sf dept of public health.Details
clarification to equipment plan for pa# 2011/11/14/8793 to reflect placement of a portable couter-top double burner induction cooktop as requested by sf dept of public health. | ||
| Nov 26, 2012 | Completed final sign-off Feb 2013 | 789 Mission St | Arrow Sign Company | install illuminated letter set on marqueeDetails
install illuminated letter set on marquee | $3,000 |
| Nov 26, 2012 | Completed final sign-off Feb 2013 | 789 Mission St | Arrow Sign Company | erect electric wall signDetails
erect electric wall sign | $3,000 |
| Jul 9, 2012 | Never finaled issued Jul 2012, no final | 145 04th St | Certified Fire & Safety Co | space #1040-install ansul fire system into 2 kitchen hoods. t.i pa# 2012-0313-6000Details
space #1040-install ansul fire system into 2 kitchen hoods. t.i pa# 2012-0313-6000 | $4,000 |
| Jun 29, 2012 | Never finaled issued Jun 2012, no final | 135 04th St | International Fire Equip | installation of (3) ul 300 kitchen fire systems within three existing hoods.Details
installation of (3) ul 300 kitchen fire systems within three existing hoods. | $5,000 |
| Jun 11, 2012 | Completed final sign-off Jun 2012 | 135 04th St | Rcm Fire Protection Inc. | suite # 9120: add 5 sprinklers to tenant improvement.Details
suite # 9120: add 5 sprinklers to tenant improvement. | $4,800 |
| Jun 1, 2012 | Never finaled issued Jun 2012, no final | 135 04th St | Johnson United Inc Dba United Sign Syste | to erect double faced ceiling mounted electric signDetails
to erect double faced ceiling mounted electric sign | $1,900 |
| Jun 1, 2012 | Never finaled issued Jun 2012, no final | 135 04th St | Johnson United Inc Dba United Sign Syste | to erect single faced electric signDetails
to erect single faced electric sign | $1,459 |
| Jun 1, 2012 | Completed final sign-off Jul 2013 | 175 04th St | Arrow Sign Company | erect an electric double faced projecting sign.Details
erect an electric double faced projecting sign. | $3,000 |
| Jun 1, 2012 | Completed final sign-off Feb 2013 | 145 04th St | Arrow Sign Company | erect an electric single faced letter sign on existing canopy.Details
erect an electric single faced letter sign on existing canopy. | $3,000 |
| Jun 1, 2012 | Completed final sign-off Aug 2012 | 135 04th St | Simplexgrinnell Lp. | fire alarm styem tenant improvement to space 9120. adding 1 relay, 1 speaker/strobeDetails
fire alarm styem tenant improvement to space 9120. adding 1 relay, 1 speaker/strobe | $3,500 |
| Jun 1, 2012 | Never finaled issued Jun 2012, no final | 135 04th St | Johnson United Inc Dba United Sign Syste | to erect single faced electric signDetails
to erect single faced electric sign | $1,964 |
| Jun 1, 2012 | Completed final sign-off Aug 2012 | 175 04th St | Arrow Sign Company | erect an electric single faced wall sign.Details
erect an electric single faced wall sign. | $3,000 |
| Jun 1, 2012 | Completed final sign-off Oct 2012 | 145 04th St | Arrow Sign Company | erect an electric double faced projecting sign.Details
erect an electric double faced projecting sign. | $3,000 |
| May 30, 2012 | Completed final sign-off Jul 2012 | 135 04th St | Pioneer Fire Inc. | relocate 14 fire sprinklers, remove 2 fire sprnklers.Details
relocate 14 fire sprinklers, remove 2 fire sprnklers. | $4,000 |
| May 30, 2012 | Never finaled issued Jun 2012, no final | 789 Mission St | Ayoob & Peery Plumbing Co Inc | add, relocate & remove fire sprinklers heads per tenant improvment. 24 add, 496 relocate, 344 remove.Details
add, relocate & remove fire sprinklers heads per tenant improvment. 24 add, 496 relocate, 344 remove. | $150,000 |
| May 25, 2012 | Expired or cancelled cancelled Jan 2026 | 145 04th St | revision to permit application #201203136000. revision to mechanical system, removal of ducted return & type @ hood. revised partition layout.Details
revision to permit application #201203136000. revision to mechanical system, removal of ducted return & type @ hood. revised partition layout. | ||
| May 9, 2012 | Completed final sign-off Nov 2012 | 115 04th St | Arrow Sign Company | erect an electric projecting double faced direct new signDetails
erect an electric projecting double faced direct new sign | $3,000 |
| May 9, 2012 | Completed final sign-off Nov 2012 | 115 04th St | Arrow Sign Company | erect an electric single faced direct new signDetails
erect an electric single faced direct new sign | $3,000 |
| May 8, 2012 | Completed final sign-off Jun 2012 | 157 04th St | Certified Fire & Safety Co | install fixted fire suppression system cure brand into kitchen hoodDetails
install fixted fire suppression system cure brand into kitchen hood | $3,000 |
| May 8, 2012 | Completed final sign-off Jul 2012 | 121 04th St | Certified Fire & Safety Co | ste# 1035: install ansul fire system in kitchen hoodDetails
ste# 1035: install ansul fire system in kitchen hood | $3,000 |
| May 4, 2012 | Never finaled issued May 2012, no final | 135 04th St | Lifeguard Fire Protection | add 10 pendent sprinklers. relocate 3 pendent sprinklers, add 2 dry pendent sprinklers.Details
add 10 pendent sprinklers. relocate 3 pendent sprinklers, add 2 dry pendent sprinklers. | $7,000 |
| Apr 30, 2012 | Completed final sign-off Aug 2012 | 135 04th St | Alsterlind Construction Inc. | #9120- tenant improvement for new creperie shop.Details
#9120- tenant improvement for new creperie shop. | $30,000 |
| Apr 27, 2012 | Completed final sign-off Aug 2012 | 135 04th St | Simplexgrinnell Lp. | 2nd floor fire alarm build out. add to exist system. 1 control panel, 4 power supplies,3 annunmators, 3 polls, 9 smokes, 2 heats, 15 duct smokes, 1 monitor module 10 relay modules, 139 speaker/strobes, 80 speakers.Details
2nd floor fire alarm build out. add to exist system. 1 control panel, 4 power supplies,3 annunmators, 3 polls, 9 smokes, 2 heats, 15 duct smokes, 1 monitor module 10 relay modules, 139 speaker/strobes, 80 speakers. | $100,000 |
| Apr 27, 2012 | Completed final sign-off Jul 2012 | 135 04th St | Simplexgrinnell Lp. | space #fc10 - fire alarm system tenant improvement, 2 relay modules, 3 monitor modules, 7 speaker/strobes.Details
space #fc10 - fire alarm system tenant improvement, 2 relay modules, 3 monitor modules, 7 speaker/strobes. | $8,000 |
| Apr 26, 2012 | Never finaled issued Apr 2012, no final | 135 04th St | Rcm Fire Protection Inc. | fire sprinkler t.i. in food court. 17 relocates & 9 add's.Details
fire sprinkler t.i. in food court. 17 relocates & 9 add's. | $3,900 |
| Apr 26, 2012 | Never finaled issued May 2012, no final | 135 04th St | Rcm Fire Protection Inc. | relocate 9 sprinklers on mezz and new 2.5 main for underside of new balcony plus new branch lines plus add 16 heads off new main and lines add 1 head off (e) on mezz level.Details
relocate 9 sprinklers on mezz and new 2.5 main for underside of new balcony plus new branch lines plus add 16 heads off new main and lines add 1 head off (e) on mezz level. | $6,000 |
| Apr 25, 2012 | Completed final sign-off Jul 2012 | 135 04th St | Simplexgrinnell Lp. | fire alarm system tenant improvement to space #1040 (ground floor). 2 duct smokes w/relay & test station, 1 monitor module, 2 relay modules, 7 speaker/strobes.Details
fire alarm system tenant improvement to space #1040 (ground floor). 2 duct smokes w/relay & test station, 1 monitor module, 2 relay modules, 7 speaker/strobes. | $8,000 |
| Apr 19, 2012 | Completed final sign-off Oct 2012 | 121 04th St | Arrow Sign Company | to erect double faced projecting electric signDetails
to erect double faced projecting electric sign | $2,500 |
| Apr 19, 2012 | Completed final sign-off Dec 2012 | 789 Mission St | Arrow Sign Company | new engineering for as built conditions to permit 201011225479. revision to approved p.a. not visible changes.Details
new engineering for as built conditions to permit 201011225479. revision to approved p.a. not visible changes. | |
| Apr 19, 2012 | Completed final sign-off Oct 2012 | 121 04th St | Arrow Sign Company | intall illuminated channel letter sign on entrance canopyDetails
intall illuminated channel letter sign on entrance canopy | $2,500 |
| Apr 11, 2012 | Completed final sign-off Aug 2012 | 135 04th St | Simplexgrinnell Lp. | # 1010: fire alarm system tenant improvement to space 1010: "super duper burger". addition of 3 duct smoke detectors w/ relay and test station. 1 monitor module, 2 relay modules, 9 speaker strobesDetails
# 1010: fire alarm system tenant improvement to space 1010: "super duper burger". addition of 3 duct smoke detectors w/ relay and test station. 1 monitor module, 2 relay modules, 9 speaker strobes | $7,500 |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 135 04th St | street space | ||
| Apr 10, 2012 | Completed final sign-off Dec 2012 | 135 04th St | revisions to approved pa 201110197158 for revised lighting and electricalDetails
revisions to approved pa 201110197158 for revised lighting and electrical | $10,000 | |
| Apr 4, 2012 | Completed final sign-off Jul 2012 | 135 04th St | Rcm Fire Protection Inc. | 1.add 7 / relocate 15 concelaed sprinkers for new tenant. 2. relocate 1 dry pendent sprinklers for walk-in freezer and refrigerator. 3. remove/plug (3) sprinkers.Details
1.add 7 / relocate 15 concelaed sprinkers for new tenant. 2. relocate 1 dry pendent sprinklers for walk-in freezer and refrigerator. 3. remove/plug (3) sprinkers. | $9,300 |
| Mar 30, 2012 | Completed final sign-off Jul 2012 | 135 04th St | Simplexgrinnell Lp. | #1035:fire alarm system t.i. to space #1035 (ground foor) 1 monitor module, 2 relay modules, 9 speaker/strobes & 1 strobe.Details
#1035:fire alarm system t.i. to space #1035 (ground foor) 1 monitor module, 2 relay modules, 9 speaker/strobes & 1 strobe. | $4,500 |
| Mar 29, 2012 | Completed final sign-off May 2012 | 157 04th St | Arrow Sign Company | sign b: 1 internally illuminated blade signDetails
sign b: 1 internally illuminated blade sign | $3,000 |
| Mar 29, 2012 | Completed final sign-off May 2012 | 157 04th St | Arrow Sign Company | 1 set of internally illuminated channel lettersDetails
1 set of internally illuminated channel letters | $3,000 |
| Mar 29, 2012 | Never finaled issued Mar 2012, no final | 121 04th St | Oakstone Construction Inc. | revision to pa #201107130113. modifications to mechanical, electrical & plumbing plans.Details
revision to pa #201107130113. modifications to mechanical, electrical & plumbing plans. | |
| Mar 20, 2012 | Expired or cancelled cancelled Jan 2026 | 135 04th St | interior non structural t.i. to "stone oven" in extg food court of mall.Details
interior non structural t.i. to "stone oven" in extg food court of mall. | $150,000 | |
| Mar 13, 2012 | Completed final sign-off Apr 2012 | 135 04th St | San Francisco Fire Protection | first floor.automatic fire suppression system installation over new kitchen hoodsDetails
first floor.automatic fire suppression system installation over new kitchen hoods | $6,000 |
| Mar 13, 2012 | Completed final sign-off Jul 2012 | 145 04th St | Oakstone Construction Inc. | space 1040:tenant improvement of an extg ground level shell retail space. new interior non-structural partitions, finishes, lighting, millwork, plmbg, kitchen equipment and electrical. mechanical included.Details
space 1040:tenant improvement of an extg ground level shell retail space. new interior non-structural partitions, finishes, lighting, millwork, plmbg, kitchen equipment and electrical. mechanical included. | $400,000 |
| Mar 9, 2012 | Completed final sign-off Apr 2012 | 135 04th St | Simplexgrinnell Lp. | fire alarm system tenant improvement to space #fc06, 1 duct smoke detector, 1 monitor module, 2 relay modules and 6 speaker/strobes.Details
fire alarm system tenant improvement to space #fc06, 1 duct smoke detector, 1 monitor module, 2 relay modules and 6 speaker/strobes. | $4,000 |
| Mar 8, 2012 | Completed final sign-off Jul 2012 | 135 04th St | space #fc-10 - remodel a space in metreon food court to become a filipino food kitchen. hood & duct fire suppression system separate permit.Details
space #fc-10 - remodel a space in metreon food court to become a filipino food kitchen. hood & duct fire suppression system separate permit. | $160,000 | |
| Mar 1, 2012 | Expired or cancelled cancelled Jan 2026 | 135 04th St | rev. to appl.#201110197158; provide power to ansul system, security system & big grease trap. remove power for air curtain & remote condeser, air curtain(omitted) & all refrig. units changed to self contain units. panel schedule revise to show panel (b as 400a). water supply added for hand sink @...Details
rev. to appl.#201110197158; provide power to ansul system, security system & big grease trap. remove power for air curtain & remote condeser, air curtain(omitted) & all refrig. units changed to self contain units. panel schedule revise to show panel (b as 400a). water supply added for hand sink @... | $5,000 | |
| Feb 29, 2012 | Completed final sign-off Apr 2012 | 135 04th St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of ansul r102 fire suppression system in the kitchen hoodDetails
installation of ansul r102 fire suppression system in the kitchen hood | $2,500 |
| Feb 24, 2012 | Completed final sign-off Mar 2012 | 135 04th St | Ok Fire System | fc7 (fc07)-install 1 fire suppression system in 2 hoods, t.i. pa# 2011-1012-6581Details
fc7 (fc07)-install 1 fire suppression system in 2 hoods, t.i. pa# 2011-1012-6581 | $6,210 |
| Feb 22, 2012 | Completed final sign-off Feb 2013 | 781 Mission St | Arrow Sign Company | to erect non illuminated blade signDetails
to erect non illuminated blade sign | $2,500 |
| Feb 17, 2012 | Completed final sign-off Mar 2013 | 135 04th St | One Source Security & Sound Inc | tenant improvement in adding a new walk up atm (exterior) & convert (e) utility room into atm roomDetails
tenant improvement in adding a new walk up atm (exterior) & convert (e) utility room into atm room | $1,500 |
| Feb 15, 2012 | Completed final sign-off Jun 2012 | 135 04th St | Simplexgrinnell Lp. | ground floor space #1055 fire alarm system improvement. 2 relay modules, 1 monitor modules, 6 speaker/strobes, 1 duct smoke.Details
ground floor space #1055 fire alarm system improvement. 2 relay modules, 1 monitor modules, 6 speaker/strobes, 1 duct smoke. | $4,000 |
| Feb 10, 2012 | Completed final sign-off Feb 2013 | 781 Mission St | Arrow Sign Company | install 1 illuminated marque sign at exterior entry sign # "a"Details
install 1 illuminated marque sign at exterior entry sign # "a" | $2,500 |
| Feb 10, 2012 | Completed final sign-off Feb 2013 | 781 Mission St | Arrow Sign Company | install 1 illuminated marque sign at exterior entry sign # "b"Details
install 1 illuminated marque sign at exterior entry sign # "b" | $2,500 |
| Feb 9, 2012 | Never finaled issued Feb 2012, no final | 135 04th St | Rcm Fire Protection Inc. | relocate 13 fire sprinklers, add 6 for ti in retail spaceDetails
relocate 13 fire sprinklers, add 6 for ti in retail space | $4,275 |
| Feb 9, 2012 | Never finaled issued Feb 2012, no final | 135 04th St | Rcm Fire Protection Inc. | relocate 15 plugs, 4 sprinklers for new ti in food courtDetails
relocate 15 plugs, 4 sprinklers for new ti in food court | $3,375 |
| Feb 3, 2012 | Completed final sign-off Apr 2012 | 135 04th St | Simplexgrinnell Lp. | fire alarm system tenant improvement to space #fc03. 1 duct smoke detector, 1 monitor module, 2 relay modules, 3 speaker strobes.Details
fire alarm system tenant improvement to space #fc03. 1 duct smoke detector, 1 monitor module, 2 relay modules, 3 speaker strobes. | $3,500 |
| Feb 3, 2012 | Completed final sign-off Feb 2013 | 789 Mission St | revision to approved pa# 201107089807 to revise cooler door sizeDetails
revision to approved pa# 201107089807 to revise cooler door size | $1,000 | |
| Feb 2, 2012 | Never finaled issued Feb 2012, no final | 135 04th St | Rcm Fire Protection Inc. | relocate 2 sprinklers for new soffit in common area.Details
relocate 2 sprinklers for new soffit in common area. | $1,000 |
| Feb 2, 2012 | Completed final sign-off Apr 2012 | 165 04th St | Arrow Sign Company | suite 1070 - erect an electric double faced sign @ existing marquee.Details
suite 1070 - erect an electric double faced sign @ existing marquee. | $2,000 |
| Feb 2, 2012 | Completed final sign-off Apr 2012 | 165 04th St | Arrow Sign Company | suite 1070 - erect an electric single faced sign @ existing marquee.Details
suite 1070 - erect an electric single faced sign @ existing marquee. | $2,000 |
| Feb 1, 2012 | Completed final sign-off Feb 2012 | 135 04th St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; add 1 pendent sprinkler head and relocate 4 upright heads.Details
fire sprinkler system upgrade; add 1 pendent sprinkler head and relocate 4 upright heads. | $2,575 |
| Jan 26, 2012 | Completed final sign-off Apr 2012 | 175 04th St | Young Electric Sign Co. | install (5) 40' x 40' banner frame systems on bldg exterior for " metreon", banners will be under separate permit.Details
install (5) 40' x 40' banner frame systems on bldg exterior for " metreon", banners will be under separate permit. | $10,000 |
| Jan 20, 2012 | Completed final sign-off Jan 2012 | 135 04th St | Rcm Fire Protection Inc. | #9109:relocate 2 sprinklers in retail space for t.i.Details
#9109:relocate 2 sprinklers in retail space for t.i. | $4,392 |
| Jan 20, 2012 | Completed final sign-off Jan 2012 | 135 04th St | Rcm Fire Protection Inc. | #fc09:relocate 2 sprinklers for t.i. in food court space.Details
#fc09:relocate 2 sprinklers for t.i. in food court space. | $4,912 |
| Jan 20, 2012 | Completed final sign-off Mar 2012 | 135 04th St | Simplexgrinnell Lp. | unit #9101 & 9130-fire alarm system t.i.-space 9101: adding 1 duct detector, 2 relays, 2 horn/strobes. space #9130: adding 2 relays & 2 horn/strobesDetails
unit #9101 & 9130-fire alarm system t.i.-space 9101: adding 1 duct detector, 2 relays, 2 horn/strobes. space #9130: adding 2 relays & 2 horn/strobes | $4,700 |
| Jan 18, 2012 | Never finaled issued Jan 2012, no final | 135 04th St | Pioneer Fire Inc. | 10 relocated fire sprinklers, 1 add fire sprinklersDetails
10 relocated fire sprinklers, 1 add fire sprinklers | $6,000 |
| Jan 9, 2012 | Never finaled issued Jan 2012, no final | 135 04th St | Value Fire Protection Inc | relocate extg sprinkler heads for tenant improvements. 11 heads. ref #201110176919Details
relocate extg sprinkler heads for tenant improvements. 11 heads. ref #201110176919 | $2,800 |
| Dec 30, 2011 | Never finaled issued Dec 2011, no final | 135 04th St | Simplex Grinnell | #fc02:fire alarm system tenant improvement-1 duct smoke detector with relay, 2 relay modules & 3 speaker/strobes.Details
#fc02:fire alarm system tenant improvement-1 duct smoke detector with relay, 2 relay modules & 3 speaker/strobes. | $4,000 |
| Dec 30, 2011 | Never finaled issued Dec 2011, no final | 135 04th St | Simplex Grinnell | suite #1000-fire alarm system tenant improvement-1 modular module, 2 relay modules & 6 speaker/strobes.Details
suite #1000-fire alarm system tenant improvement-1 modular module, 2 relay modules & 6 speaker/strobes. | $4,000 |
| Dec 30, 2011 | Never finaled issued Dec 2011, no final | 135 04th St | Simplex Grinnell | suite #1050-fire alarm system tenant improvement-1 duct smoke detectors with relay, 1 monitor module, 2 relay modules & 7 speaker/strobes.Details
suite #1050-fire alarm system tenant improvement-1 duct smoke detectors with relay, 1 monitor module, 2 relay modules & 7 speaker/strobes. | $5,500 |
| Dec 30, 2011 | Never finaled issued Dec 2011, no final | 165 04th St | Marina Mechanical Services | ste 1070: add new 4 pipe ahu, duct distribution, extend extg chw/hw piping, prog. themostat. reference #201111048298.Details
ste 1070: add new 4 pipe ahu, duct distribution, extend extg chw/hw piping, prog. themostat. reference #201111048298. | $20,000 |
| Dec 30, 2011 | Completed final sign-off Feb 2012 | 135 04th St | Simplex Grinnell | suite #1015-fire alarm system tenant improvement-2 relay modules & 11 speaker/strobes & 2 ceiling speakersDetails
suite #1015-fire alarm system tenant improvement-2 relay modules & 11 speaker/strobes & 2 ceiling speakers | $5,500 |
| Dec 23, 2011 | Completed final sign-off Apr 2012 | 161 04th St | Arrow Sign Company | erect an electric illuminated single faced sign @ top of existing canopy.Details
erect an electric illuminated single faced sign @ top of existing canopy. | $3,000 |
| Dec 23, 2011 | Completed final sign-off Jul 2012 | 785 Mission St | Arrow Sign Company | erect an electric illuminated single faced sign @ existing canopy (top).Details
erect an electric illuminated single faced sign @ existing canopy (top). | $3,000 |
| Dec 23, 2011 | Completed final sign-off Apr 2012 | 161 04th St | Arrow Sign Company | erect an electric illuminated double faced sign from bottom of existing canopy.Details
erect an electric illuminated double faced sign from bottom of existing canopy. | $2,000 |
| Dec 23, 2011 | Never finaled issued Dec 2011, no final | 135 04th St | Rcm Fire Protection Inc. | relocate 27 sprinkers, add 5 sprinklers for new ti.Details
relocate 27 sprinkers, add 5 sprinklers for new ti. | $8,000 |
| Dec 23, 2011 | Completed final sign-off Feb 2013 | 785 Mission St | Arrow Sign Company | erect an electric illuminated double faced sign @ bottom of existing canopy.Details
erect an electric illuminated double faced sign @ bottom of existing canopy. | $2,000 |
| Dec 21, 2011 | Completed final sign-off Mar 2012 | 135 04th St | Christy Construction Co | 1st floor-remodel frozen yogurt retail kiosk (400 sq ft) at westfield metreon, alteration to counter, electrical, plumbing & space renovation finishes. accessible path of travel is referenced to permit#2010098080463.Details
1st floor-remodel frozen yogurt retail kiosk (400 sq ft) at westfield metreon, alteration to counter, electrical, plumbing & space renovation finishes. accessible path of travel is referenced to permit#2010098080463. | $55,000 |
| Dec 20, 2011 | Never finaled issued Dec 2011, no final | 135 04th St | Pioneer Fire Inc. | space fc2-relocate 6 pendent sprinklers, add 4 pendent sprinklers, relocate 1 dry pendentDetails
space fc2-relocate 6 pendent sprinklers, add 4 pendent sprinklers, relocate 1 dry pendent | $4,000 |
| Dec 20, 2011 | Completed final sign-off Mar 2012 | 135 04th St | Rcm Fire Protection Inc. | relocate 18 sprinklers, add 3, plug 2 for tenant improvement in food courtDetails
relocate 18 sprinklers, add 3, plug 2 for tenant improvement in food court | $13,262 |
| Dec 19, 2011 | Completed final sign-off Feb 2012 | 135 04th St | Concept Builders And Construction Inc | space 9130: remodel existing retail space into a food service restaurantDetails
space 9130: remodel existing retail space into a food service restaurant | $50,000 |
| Dec 16, 2011 | Completed final sign-off Feb 2012 | 135 04th St | Concept Builders And Construction Inc | 1st time tenant improvement-remodel (e) retail space into a food service restaurant.Details
1st time tenant improvement-remodel (e) retail space into a food service restaurant. | $50,000 |
| Dec 15, 2011 | Completed final sign-off Mar 2012 | 135 04th St | Simplex Grinnell | space 1070: fire alarm system ti. 1-duct smoke detector with relay and indicator. 2 relays, 3 speaker/strobesDetails
space 1070: fire alarm system ti. 1-duct smoke detector with relay and indicator. 2 relays, 3 speaker/strobes | $3,500 |
| Dec 15, 2011 | Completed final sign-off Mar 2012 | 135 04th St | Simplex Grinnell | #5c07: fire alarm system ti. 1 monitor module, 2 relay modules, 5 speaker/strobesDetails
#5c07: fire alarm system ti. 1 monitor module, 2 relay modules, 5 speaker/strobes | $3,000 |
| Dec 14, 2011 | Never finaled issued Dec 2011, no final | 165 04th St | Potter Fire Protection | space 1070: relocate 16 fire sprinkles in a bookstore.Details
space 1070: relocate 16 fire sprinkles in a bookstore. | $7,000 |
| Dec 9, 2011 | Never finaled issued Dec 2011, no final | 135 04th St | Rcm Fire Protection Inc. | relocate 21 srinklers and add 5 for new t.i. ground floors areas a&bDetails
relocate 21 srinklers and add 5 for new t.i. ground floors areas a&b | $11,750 |
| Dec 9, 2011 | Completed final sign-off May 2012 | 157 04th St | David Singer General Contractor | tenant improvement of new restaurant at the metreon center. space 1055 of 4th street. (ground ground floor) to include electgrical, mechanical, floor build up and new kitchen. sign on separate permit.Details
tenant improvement of new restaurant at the metreon center. space 1055 of 4th street. (ground ground floor) to include electgrical, mechanical, floor build up and new kitchen. sign on separate permit. | $62,000 |
| Dec 6, 2011 | Never finaled issued Dec 2011, no final | 135 04th St | Simplex Grinnell | space 1060:fire alarm system t.i. 4 duct smoke detectors, 2 relay modules, 10 speaker/strobesDetails
space 1060:fire alarm system t.i. 4 duct smoke detectors, 2 relay modules, 10 speaker/strobes | $5,600 |
| Nov 30, 2011 | Expired or cancelled withdrawn Jan 2014 | 135 04th St | revision to p/a#201009080463 updating 1st fl. tenant lease line configurations and utility distribution revising mall and target entry door system and path of travel. make up air for the atrium smoke control system revised. no exterior work.Details
revision to p/a#201009080463 updating 1st fl. tenant lease line configurations and utility distribution revising mall and target entry door system and path of travel. make up air for the atrium smoke control system revised. no exterior work. | $100,000 | |
| Nov 29, 2011 | Never finaled issued Mar 2012, no final | 135 04th St | fire alarm system on all floors. modify (e) fire alarm system. provide new devices, relocate & demo (e) devices. provide firefighter's smoke control for atrium smoke management system.Details
fire alarm system on all floors. modify (e) fire alarm system. provide new devices, relocate & demo (e) devices. provide firefighter's smoke control for atrium smoke management system. | $175,000 | |
| Nov 18, 2011 | Never finaled issued Nov 2011, no final | 161 04th St | Rcm Fire Protection Inc. | unit #1060-relocate 23, add 8, plug 4 sprinkler for new light hazard office spaceDetails
unit #1060-relocate 23, add 8, plug 4 sprinkler for new light hazard office space | $8,500 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 781 Mission St | Terra Nova Industries | new restaurant tenant improvement to include new bathrooms, cabinetry, hvac, lighting, exterior trellis. signage under separate permit. fire alarm and sprinkler under seperate permit.Details
new restaurant tenant improvement to include new bathrooms, cabinetry, hvac, lighting, exterior trellis. signage under separate permit. fire alarm and sprinkler under seperate permit. | $140,000 |
| Nov 14, 2011 | Never finaled issued Dec 2011, no final | 781 Mission St | non-structural sign, blackened steel metal (letters cut out of trellis under separate permit).Details
non-structural sign, blackened steel metal (letters cut out of trellis under separate permit). | $1,000 | |
| Nov 4, 2011 | Never finaled issued Dec 2011, no final | 165 04th St | Northern Sun Associates | ground floor-tenant improvement to renovate (e) retail space into bookstore. bookstore includes retail area & storage area within (e) space. no exterior alterations or additions. mep separate permit.Details
ground floor-tenant improvement to renovate (e) retail space into bookstore. bookstore includes retail area & storage area within (e) space. no exterior alterations or additions. mep separate permit. | $324,500 |
| Nov 2, 2011 | Never finaled issued Nov 2011, no final | 135 04th St | ticket box t.i.-new wall partitions, wood casework, equipment, signage & finishes. core & sheel approved under pa# 2010-0908-0463Details
ticket box t.i.-new wall partitions, wood casework, equipment, signage & finishes. core & sheel approved under pa# 2010-0908-0463 | $278,000 | |
| Oct 25, 2011 | Expired or cancelled cancelled Nov 2014 | 155 04th St | Gotham Bay Construction | space 1050: change of use from merchantile to restaurant (t.i. to 2330 s.f.) space facing 4th street. work includes new kitchen, bar, dining room, wait station, to go food prep & pick up area & restrooms. kitchen type i hood, ul300 system, sprinkler/fire alarm system revision seperate permitDetails
space 1050: change of use from merchantile to restaurant (t.i. to 2330 s.f.) space facing 4th street. work includes new kitchen, bar, dining room, wait station, to go food prep & pick up area & restrooms. kitchen type i hood, ul300 system, sprinkler/fire alarm system revision seperate permit | $700,000 |
| Oct 19, 2011 | Completed final sign-off Apr 2012 | 135 04th St | Concept Builders And Construction Inc | space fc-6 - "fire wood cafe" - new drywall partitions, ceiling, lighting , flooring, finishes, new kitchen equipment. sprinklers and fire alarm under separate permitDetails
space fc-6 - "fire wood cafe" - new drywall partitions, ceiling, lighting , flooring, finishes, new kitchen equipment. sprinklers and fire alarm under separate permit | $125,000 |
| Oct 19, 2011 | Completed final sign-off May 2012 | 135 04th St | Peacock Construction Inc | tenamt improvement of restaurant interior (sanraku, fc#08). new interior demising/entry, new non-structural partitions, new lighting, new ceiling + new finishes where noted.Details
tenamt improvement of restaurant interior (sanraku, fc#08). new interior demising/entry, new non-structural partitions, new lighting, new ceiling + new finishes where noted. | $112,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Arrow Sign Company (30), Johnson Controls Fire (16), Rcm Fire Protection Inc. (15), Simplexgrinnell Lp. (10), Simplex Grinnell (7), Ags Signs (6), Ltci Ltd (5), Terra Nova Industries (5), Build Group Inc. (4), Colorado Structures Inc Dba Csi Construc (4), Aaa Restaurant Fire Control/Dba Aaa Fire (3), Allied Fire Protection (3), Certified Fire & Safety Co (3), Concept Builders And Construction Inc (3), Johnson United Inc Dba United Sign Syste (3), Pioneer Fire Inc. (3), S J P Signs, Inc (3), Swinerton Builders (3), W. L. Butler Construction Inc (3), Ayoob & Peery Plumbing Co Inc (2), L.D. Strobel Co Ltd (2), Modelo Design Build Co. (2), Oakstone Construction Inc. (2), Pio Mcgarr Inc (2), Safe Assurance Fire Protection (2), The Whiting-Turner Contracting Company (2), Ad Art Inc., Alsterlind Construction Inc., American Sign Installation Co, Battalion One Fire Protection, Bel Construction Company, Bilt Rite Inc, Black Bird Fire Protection, Bolter Construction, Centimark Corporation, Certified Fire And Safety, Christy Construction Co, David Singer General Contractor, Eco Fire Sprinklers Inc, Emcor Services/Mesa Energy Systems Inc, Famand Inc Dba Indoor Environmental Serv, Golden Gate Fire Protection Inc, Gotham Bay Construction, International Fire Equip, Kang Construction Inc, Lankford Construction Company, Lifeguard Fire Protection, Marina Mechanical Services, Mikeco Construction Company, Northern Sun Associates, Ok Fire System, One Source Security & Sound Inc, Pacific Wide Builders Inc., Paradigm General Contractors, Peacock Construction Inc, Potter Fire Protection, Quality Telecom Consultants, R S Mac Farlane Company Inc., San Francisco Fire Protection, Sgdm Llc, Taylor Bros Construction Co. Inc., V & T Carbonic Inc, Value Fire Protection Inc, Westates Mechanical Corporation Inc, Western States Fire Protection Co., Young Electric Sign Co.
- Architects
- Eric Hugger (3), Dennis Heath (2), Don Dacumos (2), Geoffrey B Lim (2), Joseph Tyndall (2), Lisa Harvey (2), Patricia K Beckman (2), Ahmad Mohazab, Brian Milford, Brian Milford, Daniel Perez, David Sun, Karl Edwin Shultz, Marc Dimalanta, Mark A Gastinger, Max A Crome, Michael Mccall, Millard Pratt, Robert J Sargenti, Samuel Kwong, Scott Klopfer, Timothy Rempel, Vincent Zawodny
- Engineers
- Albert Seto, Benjamin Jones, Bernard Chan, Brian Featherston, Casey J Steiner, Ingrid Stinchcomb, James Spore, James Spore, Jefferson Chen, Jeffrey Reder, Kyles Shaver, Mark Zoeteman, Robert King, Ryan Michael Huber, Tony Fong, Zhiqiang Zhang
- Authorized agents
- John Pena, Tony Fong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.