W. L. Butler Construction Inc

Contractor license
355353
State license record
Based in
Redwood City
On San Francisco permits
Nov 2001 to Jul 2026
Last 24 months
1 permit filed

38 permits since 2000: 29 completed, 3 in progress, 4 never finaled, 2 expired or cancelled.

Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 2
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 2, 2026In progress
issued Jul 2026
33 Banbury Drtemporary shoring to facilitate the foundation excavation and installation for the project permitted under pa#: 202303093340. this shoring will remain in place but is not neccesary for, nor will it become part of permanent structure.
Details
Permit
202607024496
Status
issued
Filed
Jul 2, 2026
Permit issued
Jul 7, 2026
Declared cost
$65,000
Address
33 Banbury Dr

temporary shoring to facilitate the foundation excavation and installation for the project permitted under pa#: 202303093340. this shoring will remain in place but is not neccesary for, nor will it become part of permanent structure.

Open the permit page

$65,000
Mar 9, 2023In progress
issued Sep 2025
33 Banbury Drfront,side and rear building additions, new exterior cladding windows, roofing and solar, new footing, new electrical, mechanincal and plumbing, new elevator, new landscaping, and fencing
Details
Permit
202303093340
Status
issued
Filed
Mar 9, 2023
Permit issued
Sep 18, 2025
Declared cost
$2,500,000
Address
33 Banbury Dr

front,side and rear building additions, new exterior cladding windows, roofing and solar, new footing, new electrical, mechanincal and plumbing, new elevator, new landscaping, and fencing

Open the permit page

$2,500,000
Jan 27, 2023In progress
issued Apr 2024
450 10th Streplacement of two sets of concrete stairways.
Details
Permit
202301270895
Status
issued
Filed
Jan 27, 2023
Permit issued
Apr 16, 2024
Declared cost
$464,433
Address
450 10th St

replacement of two sets of concrete stairways.

Open the permit page

$464,433
Dec 20, 2022Completed
final sign-off Nov 2023
1690 Folsom Stinstallation of interior overhead security grilles on (e) storefront windows along perimeter of store, minor facade modification to accommodate new hollow metal emergency egress/employee entry door to (e) parking lot.
Details
Permit
202212208759
Status
complete
Filed
Dec 20, 2022
Permit issued
Feb 28, 2023
Final sign-off
Nov 21, 2023
Declared cost
$275,000
Address
1690 Folsom St

installation of interior overhead security grilles on (e) storefront windows along perimeter of store, minor facade modification to accommodate new hollow metal emergency egress/employee entry door to (e) parking lot.

Open the permit page

$275,000
Aug 19, 2022Completed
final sign-off Apr 2024
789 Mission Stremodel of (e) retail store to the g/f interior improvements only. this permit is for mep fixtures and seismic shelving fixtures. t.i. pa202206307535.
Details
Permit
202208190915
Status
complete
Filed
Aug 19, 2022
Permit issued
Oct 13, 2022
Final sign-off
Apr 4, 2024
Declared cost
$350,000
Address
789 Mission St

remodel of (e) retail store to the g/f interior improvements only. this permit is for mep fixtures and seismic shelving fixtures. t.i. pa202206307535.

Open the permit page

$350,000
Jun 30, 2022Completed
final sign-off Apr 2024
789 Mission Stremodel to the ground floor with exterior and interior improvements including the (e) starbucks exterior pick-up window & remodel. tenant to convert retail sales to storage for mobile order pick-up. sprinklers/fire alarm under separate permits.
Details
Permit
202206307535
Status
complete
Filed
Jun 30, 2022
Permit issued
Oct 12, 2022
Final sign-off
Apr 4, 2024
Declared cost
$575,000
Address
789 Mission St

remodel to the ground floor with exterior and interior improvements including the (e) starbucks exterior pick-up window & remodel. tenant to convert retail sales to storage for mobile order pick-up. sprinklers/fire alarm under separate permits.

Open the permit page

$575,000
May 21, 2021Never finaled
issued Jun 2021, no final
233 Winston Drrevision to previously approved permits 202005217676 and 202005217677. amendments to structural special inspections, seperating them between the two address/spaces whereas before there was 1 special inspection for both.
Details
Permit
202105210837
Status
issued
Filed
May 21, 2021
Permit issued
Jun 10, 2021
Address
233 Winston Dr

revision to previously approved permits 202005217676 and 202005217677. amendments to structural special inspections, seperating them between the two address/spaces whereas before there was 1 special inspection for both.

Open the permit page

Nov 20, 2020Completed
final sign-off Nov 2021
2675 Geary Blinterior t.i.: partitions, celing , flooring, walls, finiehs, structural. includes remodel of (e) starbucks inside of target. maher n/a.
Details
Permit
202011209426
Status
complete
Filed
Nov 20, 2020
Permit issued
Feb 19, 2021
Final sign-off
Nov 15, 2021
Declared cost
$975,000
Address
2675 Geary Bl

interior t.i.: partitions, celing , flooring, walls, finiehs, structural. includes remodel of (e) starbucks inside of target. maher n/a.

Open the permit page

$975,000
Nov 20, 2020Completed
final sign-off Dec 2021
2675 Geary Blt.i. for (e) target store. work consists of seismic anchorage for sales floor shelving and storage shelving. refrigeration, walk-in, and reach in cooler/freezer, mechanical, electrical, plumbing trade work for target and starbucks kiosk inside target store
Details
Permit
202011209414
Status
complete
Filed
Nov 20, 2020
Permit issued
Mar 31, 2021
Final sign-off
Dec 21, 2021
Declared cost
$850,000
Address
2675 Geary Bl

t.i. for (e) target store. work consists of seismic anchorage for sales floor shelving and storage shelving. refrigeration, walk-in, and reach in cooler/freezer, mechanical, electrical, plumbing trade work for target and starbucks kiosk inside target store

Open the permit page

$850,000
Oct 22, 2020Completed
final sign-off Apr 2021
285 Winston Drdeferred submittal to 2020-0521-7676 & 2020-0521-7677 civil upgrade. accessible ramp to serve loading doc at southeast corner of anchor building
Details
Permit
202010227169
Status
complete
Filed
Oct 22, 2020
Permit issued
Jan 21, 2021
Final sign-off
Apr 12, 2021
Declared cost
$275,000
Address
285 Winston Dr

deferred submittal to 2020-0521-7676 & 2020-0521-7677 civil upgrade. accessible ramp to serve loading doc at southeast corner of anchor building

Open the permit page

$275,000
May 21, 2020Completed
final sign-off Dec 2022
285 Winston Drremodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking.
Details
Permit
202005217677
Status
complete
Filed
May 21, 2020
Permit issued
Dec 10, 2020
Final sign-off
Dec 1, 2022
Declared cost
$3,500,000
Address
285 Winston Dr

remodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking.

Open the permit page

$3,500,000
May 21, 2020Completed
final sign-off Dec 2022
233 Winston Drremodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking.
Details
Permit
202005217676
Status
complete
Filed
May 21, 2020
Permit issued
Dec 10, 2020
Final sign-off
Dec 2, 2022
Declared cost
$4,000,000
Address
233 Winston Dr

remodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking.

Open the permit page

$4,000,000
May 2, 2019Completed
final sign-off Mar 2020
1690 Folsom Strevision to 201811206421 voluntary arch, struct, mep revision work. no exterior changes. maher n/a
Details
Permit
201905029603
Status
complete
Filed
May 2, 2019
Permit issued
May 21, 2019
Final sign-off
Mar 2, 2020
Address
1690 Folsom St

revision to 201811206421 voluntary arch, struct, mep revision work. no exterior changes. maher n/a

Open the permit page

May 1, 2019Completed
final sign-off May 2020
789 Mission St2/f: (e) water closet replacement and installation of vacuum waste piping system. repair/replace finishes as necessary. maher n/a.
Details
Permit
201905019404
Status
complete
Filed
May 1, 2019
Permit issued
Jun 25, 2019
Final sign-off
May 22, 2020
Declared cost
$300,000
Address
789 Mission St

2/f: (e) water closet replacement and installation of vacuum waste piping system. repair/replace finishes as necessary. maher n/a.

Open the permit page

$300,000
Mar 12, 2019Never finaled
issued Apr 2019, no final
1690 Folsom Stnon structural inteior only demo. of partitions under ab-017
Details
Permit
201903125053
Status
issued
Filed
Mar 12, 2019
Permit issued
Apr 19, 2019
Declared cost
$18,500
Address
1690 Folsom St

non structural inteior only demo. of partitions under ab-017

Open the permit page

$18,500
Nov 20, 2018Completed
final sign-off Mar 2020
1690 Folsom Stinterior and exterior tenant improvement. ;o,oted tp tje omsta;;atopm pf freezer/cooler fixtures on sales fl @ the market area as well as the installation of freezer/cooler storage units in the rear stockroom. addition of rooftop consdesing units. **maher n/a**
Details
Permit
201811206421
Status
complete
Filed
Nov 20, 2018
Permit issued
Apr 24, 2019
Final sign-off
Mar 2, 2020
Declared cost
$7,900,000
Address
1690 Folsom St

interior and exterior tenant improvement. ;o,oted tp tje omsta;;atopm pf freezer/cooler fixtures on sales fl @ the market area as well as the installation of freezer/cooler storage units in the rear stockroom. addition of rooftop consdesing units. **maher n/a**

Open the permit page

$7,900,000
Feb 2, 2017Expired or cancelled
cancelled Jan 2026
450 10th Stinstall grease trap replace pld grease trap with new 20000g grease trap maher na
Details
Permit
201702028450
Status
cancelled
Filed
Feb 2, 2017
Declared cost
$20,000
Address
450 10th St

install grease trap replace pld grease trap with new 20000g grease trap maher na

Open the permit page

$20,000
Jul 30, 2015Completed
final sign-off Sep 2015
1830 Ocean Avsoft demo, interior only maher not required. arch, mep, sprinkler and fire alarm revisions under separate application
Details
Permit
201507302931
Status
complete
Filed
Jul 30, 2015
Permit issued
Jul 31, 2015
Final sign-off
Sep 21, 2015
Declared cost
$30,000
Address
1830 Ocean Av

soft demo, interior only maher not required. arch, mep, sprinkler and fire alarm revisions under separate application

Open the permit page

$30,000
Nov 25, 2014Completed
final sign-off Oct 2015
1830 Ocean Avinterior demolition. install reach-in refrigerator. plumbing & electrical. fully accessible restrooms. new mechanical systems include rtus. repair & replace finishes. deffered submittals: sales area fixtures over 5'-9", storage shelving over 5'-9", fire alarm, fire sprinkler. exterior signage.
Details
Permit
201411252527
Status
complete
Filed
Nov 25, 2014
Permit issued
Aug 13, 2015
Final sign-off
Oct 22, 2015
Declared cost
$1,444,000
Address
1830 Ocean Av

interior demolition. install reach-in refrigerator. plumbing & electrical. fully accessible restrooms. new mechanical systems include rtus. repair & replace finishes. deffered submittals: sales area fixtures over 5'-9", storage shelving over 5'-9", fire alarm, fire sprinkler. exterior signage.

Open the permit page

$1,444,000
Jun 26, 2014Completed
final sign-off Sep 2014
450 10th Stequipment removal wall door and sidelite demo, new act and grid, new casework, new equipment, new door and walls, elec and mech. n/a ordinance #155-13.
Details
Permit
201406269597
Status
complete
Filed
Jun 26, 2014
Permit issued
Jun 30, 2014
Final sign-off
Sep 12, 2014
Declared cost
$193,000
Address
450 10th St

equipment removal wall door and sidelite demo, new act and grid, new casework, new equipment, new door and walls, elec and mech. n/a ordinance #155-13.

Open the permit page

$193,000
Jul 29, 2013Never finaled
issued Jul 2013, no final
450 10th Stequipment removal, new power soak sink, new hood, ovens, ansol system, new a.c.t. new t-bar grid lights, new flooring, sink relaction, wall demo of awning and lights. replace cooler with larger fixing walls and materioal where water damage new service counter and window at food service.
Details
Permit
201307292930
Status
issued
Filed
Jul 29, 2013
Permit issued
Jul 31, 2013
Declared cost
$297,208
Address
450 10th St

equipment removal, new power soak sink, new hood, ovens, ansol system, new a.c.t. new t-bar grid lights, new flooring, sink relaction, wall demo of awning and lights. replace cooler with larger fixing walls and materioal where water damage new service counter and window at food service.

Open the permit page

$297,208
Apr 30, 2013Completed
final sign-off May 2013
135 Powell Strevision to extg app#201301178181. add more lights, reused t-24 documents, change from electrical water heater to gas.
Details
Permit
201304305802
Status
complete
Filed
Apr 30, 2013
Permit issued
May 1, 2013
Final sign-off
May 8, 2013
Declared cost
$5,000
Address
135 Powell St

revision to extg app#201301178181. add more lights, reused t-24 documents, change from electrical water heater to gas.

Open the permit page

$5,000
Mar 19, 2013Completed
final sign-off May 2013
135 Powell Strevision to app#201108263364 r-1.1) revised single line diagram for extg a.i.c. 2)fixture calcs deffered sumittal item(sale fixtures was deffered submittal.3) steel stair shop drawings deffered sumittal item
Details
Permit
201303192490
Status
complete
Filed
Mar 19, 2013
Permit issued
Mar 19, 2013
Final sign-off
May 8, 2013
Address
135 Powell St

revision to app#201108263364 r-1.1) revised single line diagram for extg a.i.c. 2)fixture calcs deffered sumittal item(sale fixtures was deffered submittal.3) steel stair shop drawings deffered sumittal item

Open the permit page

Jan 17, 2013Completed
final sign-off May 2013
135 Powell Strevisions to pa#2011-08-26-3364r-1 includes new ceiling & lighting, revised t-24, updated fixture plan. updated finishes & revised plumbing & electrical.
Details
Permit
201301178181
Status
complete
Filed
Jan 17, 2013
Permit issued
Jan 24, 2013
Final sign-off
May 8, 2013
Address
135 Powell St

revisions to pa#2011-08-26-3364r-1 includes new ceiling & lighting, revised t-24, updated fixture plan. updated finishes & revised plumbing & electrical.

Open the permit page

Aug 26, 2011Completed
final sign-off May 2013
135 Powell Stdemo interior of basement & both floors. new walgreens interior tenant improvement. (e) 2nd floor restaurant becomes part of new walgreens space. add new elevator & escalators & seismic streng thening.
Details
Permit
201108263364
Status
complete
Filed
Aug 26, 2011
Permit issued
Aug 17, 2012
Final sign-off
May 6, 2013
Declared cost
$1,000,000
Address
135 Powell St

demo interior of basement & both floors. new walgreens interior tenant improvement. (e) 2nd floor restaurant becomes part of new walgreens space. add new elevator & escalators & seismic streng thening.

Open the permit page

$1,000,000
Jun 2, 2011Completed
final sign-off May 2013
135 Powell Stdemo (e) store front system & entry doors for new store front, automatic entry doors, entry canopy structure.
Details
Permit
201106027299
Status
complete
Filed
Jun 2, 2011
Permit issued
Jan 15, 2013
Final sign-off
May 8, 2013
Declared cost
$150,000
Address
135 Powell St

demo (e) store front system & entry doors for new store front, automatic entry doors, entry canopy structure.

Open the permit page

$150,000
Sep 24, 2009Completed
final sign-off Nov 2009
450 10th Stada work at new hearing center to provide ramp into the booth by placing 1- 1/8 topping slab.
Details
Permit
200909247585
Status
complete
Filed
Sep 24, 2009
Permit issued
Sep 30, 2009
Final sign-off
Nov 3, 2009
Declared cost
$5,000
Address
450 10th St

ada work at new hearing center to provide ramp into the booth by placing 1- 1/8 topping slab.

Open the permit page

$5,000
Feb 23, 2009Completed
final sign-off Mar 2009
450 10th Strevision to 200901200470: relocate water fountain to new location.
Details
Permit
200902232555
Status
complete
Filed
Feb 23, 2009
Permit issued
Feb 24, 2009
Final sign-off
Mar 11, 2009
Declared cost
$100
Address
450 10th St

revision to 200901200470: relocate water fountain to new location.

Open the permit page

$100
Jan 20, 2009Completed
final sign-off Nov 2009
450 10th Stremoval of 3 storage racks. installation of hearing aid center. one fire sprinkler added, sink, water, & electrical.
Details
Permit
200901200470
Status
complete
Filed
Jan 20, 2009
Permit issued
Jan 23, 2009
Final sign-off
Nov 3, 2009
Declared cost
$54,000
Address
450 10th St

removal of 3 storage racks. installation of hearing aid center. one fire sprinkler added, sink, water, & electrical.

Open the permit page

$54,000
Sep 19, 2006Completed
final sign-off Dec 2006
350 Rhode Island Stot1-2 rev. 1st floor, el, me.
Details
Permit
200609192703
Status
complete
Filed
Sep 19, 2006
Permit issued
Sep 19, 2006
Final sign-off
Dec 1, 2006
Declared cost
$5,000
Address
350 Rhode Island St

ot1-2 rev. 1st floor, el, me.

Open the permit page

$5,000
Sep 12, 2006Never finaled
issued Sep 2006, no final
350 Rhode Island Stot1-2 g fl el,me
Details
Permit
200609121989
Status
issued
Filed
Sep 12, 2006
Permit issued
Sep 12, 2006
Declared cost
$91,630
Address
350 Rhode Island St

ot1-2 g fl el,me

Open the permit page

$91,630
Aug 23, 2006Completed
final sign-off Dec 2006
350 Rhode Island Stnew exterior walk up automated teller machine.
Details
Permit
200608230328
Status
complete
Filed
Aug 23, 2006
Permit issued
Oct 6, 2006
Final sign-off
Dec 1, 2006
Declared cost
$2,000
Address
350 Rhode Island St

new exterior walk up automated teller machine.

Open the permit page

$2,000
Aug 15, 2006Completed
final sign-off Dec 2006
350 Rhode Island Stoti-1, ground floor, el, me, ls, sp.
Details
Permit
200608159513
Status
complete
Filed
Aug 15, 2006
Permit issued
Sep 6, 2006
Final sign-off
Dec 1, 2006
Declared cost
$400,000
Address
350 Rhode Island St

oti-1, ground floor, el, me, ls, sp.

Open the permit page

$400,000
May 1, 2006Expired or cancelled
expired May 2007
450 10th Strenewal pa 9804301 for final inspection.
Details
Permit
200605010331
Status
expired
Filed
May 1, 2006
Permit issued
May 1, 2006
Address
450 10th St

renewal pa 9804301 for final inspection.

Open the permit page

Feb 15, 2006Completed
final sign-off Aug 2016
450 10th Stremodel existing costco pharmacy in phases with (e) restrooms to remain.work includes but not limited to demolition,interior t.i.& finishes.items furnished by owner,installed by contractor & items furnished by owner with final corrections by contractor.also includes fire protection,sprinkler system,
Details
Permit
200602154680
Status
complete
Filed
Feb 15, 2006
Permit issued
Jun 22, 2006
Final sign-off
Aug 25, 2016
Declared cost
$200,000
Address
450 10th St

remodel existing costco pharmacy in phases with (e) restrooms to remain.work includes but not limited to demolition,interior t.i.& finishes.items furnished by owner,installed by contractor & items furnished by owner with final corrections by contractor.also includes fire protection,sprinkler system,

Open the permit page

$200,000
Jul 9, 2004Completed
final sign-off Jun 2007
1617 Harrison Stdemolishing auto repair and plumbing
Details
Permit
200407098442
Status
complete
Filed
Jul 9, 2004
Permit issued
Apr 24, 2007
Final sign-off
Jun 14, 2007
Address
1617 Harrison St

demolishing auto repair and plumbing

Open the permit page

Nov 5, 2002Completed
final sign-off Dec 2002
450 10th Strenew: 9903210 and 9801900 complete work
Details
Permit
200211050830
Status
complete
Filed
Nov 5, 2002
Permit issued
Nov 5, 2002
Final sign-off
Dec 19, 2002
Declared cost
$30,000
Address
450 10th St

renew: 9903210 and 9801900 complete work

Open the permit page

$30,000
Nov 8, 2001Completed
final sign-off Jan 2003
450 10th Stinterior remodel (e) warehouse, demo (e) food service & new food service @ same location
Details
Permit
200111082686
Status
complete
Filed
Nov 8, 2001
Permit issued
Jul 17, 2002
Final sign-off
Jan 6, 2003
Declared cost
$100,000
Address
450 10th St

interior remodel (e) warehouse, demo (e) food service & new food service @ same location

Open the permit page

$100,000