Block 3957, lot 001
350 Rhode Island St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
113 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2010 | Completed final sign-off Nov 2010 | 350 Rhode Island St | R L H Fire Protection Inc | t/i upgrade on the extg fire sprinklers system. 2nd floor common area(corridor). 28 heads total. 26 relocate and 2 addDetails
t/i upgrade on the extg fire sprinklers system. 2nd floor common area(corridor). 28 heads total. 26 relocate and 2 add | $8,400 |
| Sep 22, 2010 | Completed final sign-off Mar 2011 | 350 Rhode Island St | Rossi Builders Inc. | public space: lobby, hallways, suite entries, ceilings, and finishes tenant improvement construction. reference #201006104267 extg t iDetails
public space: lobby, hallways, suite entries, ceilings, and finishes tenant improvement construction. reference #201006104267 extg t i | $200,000 |
| Sep 9, 2010 | Completed final sign-off Nov 2010 | 350 Rhode Island St | Jimmy Carl Duarte Electric | 2nd floor, ste 200 - add 7 horn/strobes, 5 strobes, 2 sounder control modules, 1 monitor module & 1 power supply to existing fire alarm system.Details
2nd floor, ste 200 - add 7 horn/strobes, 5 strobes, 2 sounder control modules, 1 monitor module & 1 power supply to existing fire alarm system. | $9,000 |
| Sep 8, 2010 | Completed final sign-off Nov 2010 | 350 Rhode Island St | R L H Fire Protection Inc | 2nd floor -ti upgrade to (e) sprinkler system on 2nd floor. relocate 62 pendent sprinklers. add 5 pendent sprinklers.Details
2nd floor -ti upgrade to (e) sprinkler system on 2nd floor. relocate 62 pendent sprinklers. add 5 pendent sprinklers. | $20,000 |
| Aug 24, 2010 | Completed final sign-off Nov 2010 | 350 Rhode Island St | Rossi Builders Inc. | install mechanical, electrical, plumbing reference# app 2010-06-10-4267Details
install mechanical, electrical, plumbing reference# app 2010-06-10-4267 | $300,000 |
| Jun 10, 2010 | Completed final sign-off Nov 2010 | 350 Rhode Island St | Rossi Builders Inc. | ti- 5406 sq ft, spmf, 2nd fl, suite 200 - install offices on empty 2nd fl for sutter pacific medical foundation. fire sprinkler & fire alarm deferred submittals.Details
ti- 5406 sq ft, spmf, 2nd fl, suite 200 - install offices on empty 2nd fl for sutter pacific medical foundation. fire sprinkler & fire alarm deferred submittals. | $450,000 |
| Jun 2, 2010 | Completed final sign-off Aug 2010 | 350 Rhode Island St | Reeve-Knight Construction Inc. | to obtain final inspection for work approved under pa 200808260051. all work is complete.Details
to obtain final inspection for work approved under pa 200808260051. all work is complete. | |
| Mar 12, 2010 | Completed final sign-off May 2010 | 350 Rhode Island St | Jimmy Carl Duarte Electric | 2nd floor - add 3 horn/strobe to existing fire alarm.Details
2nd floor - add 3 horn/strobe to existing fire alarm. | $3,200 |
| Mar 9, 2010 | Expired or cancelled cancelled Dec 2010 | 350 Rhode Island St | Richlen Construction | 4th floor m.e.p. work reference #201002236970.Details
4th floor m.e.p. work reference #201002236970. | $199,000 |
| Mar 9, 2010 | Expired or cancelled cancelled Dec 2010 | 350 Rhode Island St | Richlen Construction | 3rd floor m.e.p. work , refernece arch pa# 2010/02/23/6970.Details
3rd floor m.e.p. work , refernece arch pa# 2010/02/23/6970. | $596,000 |
| Mar 5, 2010 | Completed final sign-off Jun 2010 | 350 Rhode Island St | Richlen Construction | mech: modification of (e) hvac & remodel & replacement of 1-vav box. ref. appl.#2010/0125/5225. elec.: relocate (e) & new power outlets. relocate lighting & new heat pump.Details
mech: modification of (e) hvac & remodel & replacement of 1-vav box. ref. appl.#2010/0125/5225. elec.: relocate (e) & new power outlets. relocate lighting & new heat pump. | $25,000 |
| Mar 3, 2010 | Completed final sign-off May 2010 | 350 Rhode Island St | Pioneer Fire Inc. | 1st floor -relocate 11-fire sprinkler & add 1-@ office area.Details
1st floor -relocate 11-fire sprinkler & add 1-@ office area. | $3,200 |
| Feb 23, 2010 | Expired or cancelled cancelled Dec 2010 | 350 Rhode Island St | Richlen Construction | ti 3rd floor: build out new 12,250 sf space. paint, carpet, walls, reconfig ex 8358 sf: remove walls, carpet,vct, doors, sidelites, reinstall.Details
ti 3rd floor: build out new 12,250 sf space. paint, carpet, walls, reconfig ex 8358 sf: remove walls, carpet,vct, doors, sidelites, reinstall. | $862,000 |
| Jan 25, 2010 | Completed final sign-off May 2010 | 350 Rhode Island St | Richlen Construction | ground floor-tenant improvement: new conference room, patch & repair walls, remove computer rakcs, equipment. new ceiling (where noted), carpet, paint. new outlets where notedDetails
ground floor-tenant improvement: new conference room, patch & repair walls, remove computer rakcs, equipment. new ceiling (where noted), carpet, paint. new outlets where noted | $60,000 |
| Mar 6, 2009 | Never finaled issued Mar 2009, no final | 350 Rhode Island St | Skyline Construction | 3rd floor-addition of 1 door/frame/hardware, fail safe security card reader. electrical permit under seperate permitDetails
3rd floor-addition of 1 door/frame/hardware, fail safe security card reader. electrical permit under seperate permit | $5,000 |
| Feb 6, 2009 | Never finaled issued Feb 2009, no final | 350 Rhode Island St | Golden Gate Sign Company Inc. | change copy on 2 existing electric wall signsDetails
change copy on 2 existing electric wall signs | $10,000 |
| Jan 30, 2009 | Never finaled issued Jan 2009, no final | 350 Rhode Island St | Jimmy Carl Duarte Electric | 3rd floor add 3 duct detectors, 1 module/relay to existing fire alarm.Details
3rd floor add 3 duct detectors, 1 module/relay to existing fire alarm. | $3,300 |
| Dec 19, 2008 | Completed final sign-off Feb 2009 | 350 Rhode Island St | Richlen Construction | 2nd fl connecting power to new or relocated light fixtures,power outlets & tenant equipment,installation of (7) new vav boxes (6 reheat,1 no reheat) & all associated ducting, distributio & controls to match (e) bldg system. reference appl #200811035691. life safety, fire sprink under separate permitDetails
2nd fl connecting power to new or relocated light fixtures,power outlets & tenant equipment,installation of (7) new vav boxes (6 reheat,1 no reheat) & all associated ducting, distributio & controls to match (e) bldg system. reference appl #200811035691. life safety, fire sprink under separate permit | $150,000 |
| Dec 4, 2008 | Completed final sign-off Feb 2009 | 350 Rhode Island St | Jimmy Carl Duarte Electric | add seven horn/strobes to extg fire alarm system on 2nd floorDetails
add seven horn/strobes to extg fire alarm system on 2nd floor | $5,500 |
| Nov 24, 2008 | Completed final sign-off Feb 2009 | 350 Rhode Island St | Pioneer Fire Protection | relocated 19 fire sprinklers, 14 add 14 fire sprinklersDetails
relocated 19 fire sprinklers, 14 add 14 fire sprinklers | $4,500 |
| Nov 3, 2008 | Completed final sign-off Mar 2009 | 350 Rhode Island St | Richlen Construction | 2nd floor - demolition of existing non-structural partitions, construction of new non-structural petitions, associated elec power & lighting distribution, associed life safety system changes, & associated disabled access upgrades. elec, mech, fire sprinkler & life safety under separate permit.Details
2nd floor - demolition of existing non-structural partitions, construction of new non-structural petitions, associated elec power & lighting distribution, associed life safety system changes, & associated disabled access upgrades. elec, mech, fire sprinkler & life safety under separate permit. | $300,000 |
| Oct 16, 2008 | Never finaled issued Oct 2008, no final | 350 Rhode Island St | Jimmy Carl Duarte Electric | add annunciator to extg fire alarmDetails
add annunciator to extg fire alarm | $6,400 |
| Sep 10, 2008 | Completed final sign-off Jul 2009 | 350 Rhode Island St | Ad Art Inc. | renew pa#200712271354 for final inspection.Details
renew pa#200712271354 for final inspection. | |
| Aug 26, 2008 | Never finaled issued Aug 2008, no final | 350 Rhode Island St | Reeve-Knight Construction Inc. | 1st floor -installation of new brewer & new coutnertop for brewer, removal of old coutner at new brower location - minor plumbing & electrical for brewer.Details
1st floor -installation of new brewer & new coutnertop for brewer, removal of old coutner at new brower location - minor plumbing & electrical for brewer. | $6,900 |
| Jul 11, 2008 | Completed final sign-off Dec 2008 | 350 Rhode Island St | Jimmy Carl Duarte Electric | add 1 duct detector and 1 module to fire alarm on 4th floorDetails
add 1 duct detector and 1 module to fire alarm on 4th floor | $3,950 |
| Jul 11, 2008 | Completed final sign-off Oct 2008 | 350 Rhode Island St | Skyline Construction | revision to application 200802064199 to add doors at the elevator lobby with card reader, new partitions & door to creat storage room in basementDetails
revision to application 200802064199 to add doors at the elevator lobby with card reader, new partitions & door to creat storage room in basement | $15,000 |
| Jul 11, 2008 | Never finaled issued Jul 2008, no final | 350 Rhode Island St | Jimmy Carl Duarte Electric | add 2 door release modules to unlock door upon fire alarm activation 4th floorDetails
add 2 door release modules to unlock door upon fire alarm activation 4th floor | $2,200 |
| Jun 25, 2008 | Never finaled issued Jun 2008, no final | 350 Rhode Island St | Jimmy Carl Duarte Electric | as built to 200803217692 modified sequence of operation in f/a softwareDetails
as built to 200803217692 modified sequence of operation in f/a software | |
| Jun 18, 2008 | Expired or cancelled cancelled Jan 2009 | 350 Rhode Island St | Richlen Construction | 3rd floor-build out of 7500 sf of new office space, reconfigureation of 8389 sf of (e) office & classroom space for an (e) cooking school. work confined to 3rd floor. fire sprinkler & alarm under seperate permit.Details
3rd floor-build out of 7500 sf of new office space, reconfigureation of 8389 sf of (e) office & classroom space for an (e) cooking school. work confined to 3rd floor. fire sprinkler & alarm under seperate permit. | $750,000 |
| May 27, 2008 | Completed final sign-off Feb 2010 | 350 Rhode Island St | Vulcan Fire Protection | modify existing ansul kitchen fire systems in class rooms, 406, 407, 409 for new cooking appliances.Details
modify existing ansul kitchen fire systems in class rooms, 406, 407, 409 for new cooking appliances. | $3,500 |
| May 20, 2008 | Completed final sign-off Dec 2008 | 350 Rhode Island St | Richlen Construction | 4th floor: in the pastry/chocolate kitchen #407 - adding new denhumidification unit in the ceiling plenum to produce humidity levels of 35% rh. adding new supplemental water source ac unit in the ceiling plenum.Details
4th floor: in the pastry/chocolate kitchen #407 - adding new denhumidification unit in the ceiling plenum to produce humidity levels of 35% rh. adding new supplemental water source ac unit in the ceiling plenum. | $10,000 |
| Apr 24, 2008 | Expired or cancelled cancelled Jan 2026 | 350 Rhode Island St | install preaction detection and bell on the 3rd floor in server room 0316, 11 devicesDetails
install preaction detection and bell on the 3rd floor in server room 0316, 11 devices | $3,600 | |
| Apr 24, 2008 | Completed final sign-off Oct 2008 | 350 Rhode Island St | Intelligent Technologies & Services Inc | install pre-action detection & bell on the 3rd floor in server room 0316 11 devices.Details
install pre-action detection & bell on the 3rd floor in server room 0316 11 devices. | $3,600 |
| Apr 22, 2008 | Completed final sign-off Oct 2008 | 350 Rhode Island St | Pioneer Fire Protection | ti for fire sprinkler for the 3rd floor. new pre-action system to be connected to ex. 3" main on the 3rd floor.Details
ti for fire sprinkler for the 3rd floor. new pre-action system to be connected to ex. 3" main on the 3rd floor. | $1,000 |
| Apr 18, 2008 | Completed final sign-off Oct 2008 | 350 Rhode Island St | Pioneer Fire Protection | relocate 102 sprinklers, add 57 sprinklers, 159 totalDetails
relocate 102 sprinklers, add 57 sprinklers, 159 total | $31,800 |
| Apr 18, 2008 | Never finaled issued Apr 2008, no final | 350 Rhode Island St | Pioneer Fire Protection | relocate 121 sprinklers, add 73 sprinklersDetails
relocate 121 sprinklers, add 73 sprinklers | $38,800 |
| Mar 21, 2008 | Expired or cancelled expired Aug 2009 | 350 Rhode Island St | Jimmy Carl Duarte Electric | ti for fire alarm on the 2nd and 3rd floors. add 32 smoke detectors, 2 power supplies, 6 modules, 2 relays, 2 monitor modules, 21 strobes, 32 horn strobes and 9 holders.Details
ti for fire alarm on the 2nd and 3rd floors. add 32 smoke detectors, 2 power supplies, 6 modules, 2 relays, 2 monitor modules, 21 strobes, 32 horn strobes and 9 holders. | $21,255 |
| Feb 6, 2008 | Completed final sign-off Dec 2008 | 350 Rhode Island St | Skyline Construction | tenant improvement to provide new office space and open work area in an existing shell space. new acoustical ceiling tile and grid. mechanical, electrical, structural work included.Details
tenant improvement to provide new office space and open work area in an existing shell space. new acoustical ceiling tile and grid. mechanical, electrical, structural work included. | $3,000,000 |
| Jan 28, 2008 | Completed final sign-off Mar 2008 | 350 Rhode Island St | Jimmy Carl Duarte Electric | 1st floor: tenant improvement - fire alarm, add 1 smoke detector & 3 horn strobesDetails
1st floor: tenant improvement - fire alarm, add 1 smoke detector & 3 horn strobes | $3,500 |
| Jan 16, 2008 | Completed final sign-off Mar 2008 | 350 Rhode Island St | Pioneer Fire Protection | 1st floor: relocate 3 fire sprinklers - add two fire sprinklers & 1 plugged pendent.Details
1st floor: relocate 3 fire sprinklers - add two fire sprinklers & 1 plugged pendent. | $1,950 |
| Jan 3, 2008 | Completed final sign-off Mar 2008 | 350 Rhode Island St | Richlen Construction | first oti. new partitions, glazing doors, new power/data outlets, new millwork. one office, one conference rm and a break room. new window for office. pa# 200.03.23.5127 for ada compliance. mep under separate permit.Details
first oti. new partitions, glazing doors, new power/data outlets, new millwork. one office, one conference rm and a break room. new window for office. pa# 200.03.23.5127 for ada compliance. mep under separate permit. | $100,000 |
| Dec 27, 2007 | Never finaled issued Dec 2007, no final | 350 Rhode Island St | Ad Art Inc. | to erect a 2 single faced electrical wall signDetails
to erect a 2 single faced electrical wall sign | |
| Dec 12, 2007 | Never finaled issued Dec 2007, no final | 350 Rhode Island St | Imagepoint Inc | install one interior illuminated sign cabinet "citi smith barney" 12" x 40" x 4".Details
install one interior illuminated sign cabinet "citi smith barney" 12" x 40" x 4". | |
| Nov 29, 2007 | Completed final sign-off Jan 2008 | 350 Rhode Island St | Richlen Construction | remove partial height wall on second floorDetails
remove partial height wall on second floor | $1,500 |
| Aug 24, 2007 | Completed final sign-off Nov 2007 | 350 Rhode Island St | Pioneer Fire Protection | revision to an approved plan 200708160029 add 1 sprinkler armover in corridorDetails
revision to an approved plan 200708160029 add 1 sprinkler armover in corridor | $1,995 |
| Aug 17, 2007 | Completed final sign-off Nov 2007 | 350 Rhode Island St | Richlen Construction | south building, ground floor - electrical and mechanical engineered drawings (build out from shell conditions).Details
south building, ground floor - electrical and mechanical engineered drawings (build out from shell conditions). | $100,000 |
| Aug 16, 2007 | Completed final sign-off Nov 2007 | 350 Rhode Island St | Pioneer Fire Protection | fire sprinkler relocates, 11 relocate, 2 add 1st flrDetails
fire sprinkler relocates, 11 relocate, 2 add 1st flr | $2,400 |
| Aug 7, 2007 | Completed final sign-off Nov 2007 | 350 Rhode Island St | Jimmy Carl Duarte Electric | addition of 1 smoke detector, 1 pull station, 3 strobes & 4 horn strobes to the (e) fire alarm system. work on 1st floor.Details
addition of 1 smoke detector, 1 pull station, 3 strobes & 4 horn strobes to the (e) fire alarm system. work on 1st floor. | $4,900 |
| Jul 10, 2007 | Completed final sign-off Nov 2007 | 350 Rhode Island St | Richlen Construction | office tenant improvement: (1) conference room, (1) classroom w/ kitchen, general office area, lounge reception / waiting, & storage. groundfloor (aka second floor)Details
office tenant improvement: (1) conference room, (1) classroom w/ kitchen, general office area, lounge reception / waiting, & storage. groundfloor (aka second floor) | $200,000 |
| May 11, 2007 | Completed final sign-off May 2007 | 350 Rhode Island St | Richlen Construction | renew 200604038129Details
renew 200604038129 | |
| Apr 12, 2007 | Completed final sign-off May 2007 | 350 Rhode Island St | Richlen Construction | oti-3 2nd floor spDetails
oti-3 2nd floor sp | $10,000 |
| Mar 15, 2007 | Completed final sign-off May 2007 | 350 Rhode Island St | Richlen Construction | oti-2 2nd floor el, meDetails
oti-2 2nd floor el, me | $160,000 |
| Mar 13, 2007 | Completed final sign-off May 2007 | 350 Rhode Island St | Jimmy Carl Duarte Electric | sddition of 1 smoke detectir, 1 stobe & 3 horn storbes to a second floor office spaceDetails
sddition of 1 smoke detectir, 1 stobe & 3 horn storbes to a second floor office space | $4,200 |
| Jan 31, 2007 | Completed final sign-off May 2007 | 350 Rhode Island St | lexington properties: oti-1 2nd floor el,sp, me,lsDetails
lexington properties: oti-1 2nd floor el,sp, me,ls | $186,000 | |
| Dec 5, 2006 | Completed final sign-off Jan 2007 | 350 Rhode Island St | provide maximum room capicity signage @ meeting rooms 161, 164, 167. and install more exit signs (2). reference pa# 2006/07/05/5713.Details
provide maximum room capicity signage @ meeting rooms 161, 164, 167. and install more exit signs (2). reference pa# 2006/07/05/5713. | $2,500 | |
| Oct 18, 2006 | Never finaled issued Oct 2006, no final | 350 Rhode Island St | Rcm Fire Protection Inc. | replace existing 46 upright hds from exist outlet to pendent in ceiling & add 1 from mt.Details
replace existing 46 upright hds from exist outlet to pendent in ceiling & add 1 from mt. | $8,300 |
| Oct 18, 2006 | Expired or cancelled expired Apr 2011 | 350 Rhode Island St | Coast Sign Incorporated | erect electric wall new signDetails
erect electric wall new sign | |
| Oct 3, 2006 | Completed final sign-off Dec 2006 | 350 Rhode Island St | Jimmy Carl Duarte Electric | 1st floor-tenant addition to (e) fire alarm system. addition of smoke detectors, horns, strobes & pull station.Details
1st floor-tenant addition to (e) fire alarm system. addition of smoke detectors, horns, strobes & pull station. | $6,170 |
| Sep 19, 2006 | Completed final sign-off Dec 2006 | 350 Rhode Island St | W. L. Butler Construction Inc | ot1-2 rev. 1st floor, el, me.Details
ot1-2 rev. 1st floor, el, me. | $5,000 |
| Sep 14, 2006 | Never finaled issued Sep 2006, no final | 350 Rhode Island St | streetspaceDetails
streetspace | ||
| Sep 12, 2006 | Never finaled issued Sep 2006, no final | 350 Rhode Island St | W. L. Butler Construction Inc | ot1-2 g fl el,meDetails
ot1-2 g fl el,me | $91,630 |
| Aug 23, 2006 | Completed final sign-off Dec 2006 | 350 Rhode Island St | W. L. Butler Construction Inc | new exterior walk up automated teller machine.Details
new exterior walk up automated teller machine. | $2,000 |
| Aug 15, 2006 | Completed final sign-off Dec 2006 | 350 Rhode Island St | provide new accessible entry to unoccuppied suite 140 noff of kansas streetDetails
provide new accessible entry to unoccuppied suite 140 noff of kansas street | $25,000 | |
| Aug 15, 2006 | Completed final sign-off Dec 2006 | 350 Rhode Island St | W. L. Butler Construction Inc | oti-1, ground floor, el, me, ls, sp.Details
oti-1, ground floor, el, me, ls, sp. | $400,000 |
| Aug 3, 2006 | Never finaled issued Aug 2006, no final | 350 Rhode Island St | Richlen Construction | oti-2 1st/fl, el-me,sp.Details
oti-2 1st/fl, el-me,sp. | $750,000 |
| Aug 1, 2006 | Completed final sign-off Jan 2007 | 350 Rhode Island St | Jimmy Carl Duarte Electric | fire alarm ti addition 1st floor. addition of fire alarm detection and annunciation devices to existing fire alarm systemDetails
fire alarm ti addition 1st floor. addition of fire alarm detection and annunciation devices to existing fire alarm system | $12,000 |
| Jul 10, 2006 | Completed final sign-off Jan 2007 | 350 Rhode Island St | (n) exterior door on kansas st. by encroachment permit #60639 & 60630. ref. to oti appl#200607055713Details
(n) exterior door on kansas st. by encroachment permit #60639 & 60630. ref. to oti appl#200607055713 | $15,000 | |
| Jul 5, 2006 | Completed final sign-off Jan 2007 | 350 Rhode Island St | oti-1, 1st floor, el, ls, sp, me.Details
oti-1, 1st floor, el, ls, sp, me. | $550,000 | |
| Apr 3, 2006 | Expired or cancelled expired Mar 2007 | 350 Rhode Island St | Classic Sign Solutions | erect sign, non-electric, single faced,non illminated new sign.Details
erect sign, non-electric, single faced,non illminated new sign. | |
| Mar 13, 2006 | Expired or cancelled expired Mar 2007 | 350 Rhode Island St | Pacific Neon Company | renew pa# 2004/10/14/6771 for final inspection.Details
renew pa# 2004/10/14/6771 for final inspection. | |
| Mar 8, 2006 | Expired or cancelled expired Mar 2007 | 350 Rhode Island St | replace countertop & under counter cabinets. new refrigerator & microwave.Details
replace countertop & under counter cabinets. new refrigerator & microwave. | $7,500 | |
| Sep 12, 2005 | Expired or cancelled expired Feb 2006 | 350 Rhode Island St | Pacific Neon Company | renew permit app for final inspection 200408242355-200408242357Details
renew permit app for final inspection 200408242355-200408242357 | |
| Aug 18, 2005 | Completed final sign-off Aug 2005 | 350 Rhode Island St | renew 200306237673, 200306237666 for final insp onlyDetails
renew 200306237673, 200306237666 for final insp only | ||
| Jun 8, 2005 | Completed final sign-off Jun 2005 | 350 Rhode Island St | River City Fire Equipment Co | install ansul fire systemDetails
install ansul fire system | $3,000 |
| May 2, 2005 | Completed final sign-off Jun 2005 | 350 Rhode Island St | River City Fire Equipment Co | ansul fire suppression systemDetails
ansul fire suppression system | $6,000 |
| Apr 11, 2005 | Never finaled issued Apr 2005, no final | 350 Rhode Island St | street spaceDetails
street space | ||
| Feb 25, 2005 | Never finaled issued Feb 2005, no final | 350 Rhode Island St | street space permitDetails
street space permit | ||
| Feb 25, 2005 | Completed final sign-off Jun 2005 | 350 Rhode Island St | R L H Fire Protection Inc | install new fire sprinklers (269 total) at new tenant space on levels 1,2,& 3 from (e) shell systemsDetails
install new fire sprinklers (269 total) at new tenant space on levels 1,2,& 3 from (e) shell systems | $40,500 |
| Feb 18, 2005 | Completed final sign-off Jun 2005 | 350 Rhode Island St | Aeco Systems, Inc | modifications to existing fire alarm to accomodate new tenant improvements: 42 horn strobes, 3 moniDetails
modifications to existing fire alarm to accomodate new tenant improvements: 42 horn strobes, 3 moni | $16,000 |
| Feb 17, 2005 | Never finaled issued Feb 2005, no final | 350 Rhode Island St | street spaceDetails
street space | ||
| Oct 29, 2004 | Completed final sign-off Nov 2004 | 350 Rhode Island St | Swinerton Builders | to renew for final 200105088683, 200104025821, 200108095625Details
to renew for final 200105088683, 200104025821, 200108095625 | |
| Oct 22, 2004 | Completed final sign-off Jun 2005 | 350 Rhode Island St | phase 2 of pa# 2004/04/09/0900. partitions for resturant on 1st floor. class room on 2nd floor & 3rdDetails
phase 2 of pa# 2004/04/09/0900. partitions for resturant on 1st floor. class room on 2nd floor & 3rd | $1,700,000 | |
| Oct 20, 2004 | Never finaled issued Oct 2004, no final | 350 Rhode Island St | streetspaceDetails
streetspace | ||
| Oct 14, 2004 | Expired or cancelled expired Feb 2006 | 350 Rhode Island St | Pacific Neon Company | rev. to pa#2004/08/24/2357 & 2004/08/24/2355 on difference signs locations & attachmentDetails
rev. to pa#2004/08/24/2357 & 2004/08/24/2355 on difference signs locations & attachment | |
| Oct 1, 2004 | Completed final sign-off Feb 2005 | 350 Rhode Island St | Ayoob & Peery Plumbing Co Inc | relocated & add fire sprinkler heads per tenant improvements.Details
relocated & add fire sprinkler heads per tenant improvements. | $80,500 |
| Sep 27, 2004 | Completed final sign-off Feb 2005 | 350 Rhode Island St | Simplex Grinnell | hook up of (13) ansul r-102 fire systems on 4th floorDetails
hook up of (13) ansul r-102 fire systems on 4th floor | $7,000 |
| Sep 10, 2004 | Never finaled issued Sep 2004, no final | 350 Rhode Island St | street space permitDetails
street space permit | ||
| Aug 27, 2004 | Completed final sign-off Oct 2004 | 350 Rhode Island St | Swinerton Builders | renew app #200003295702Details
renew app #200003295702 | |
| Aug 27, 2004 | Completed final sign-off Oct 2004 | 350 Rhode Island St | Swinerton Builders | renew app 200006021671/200006304139/200008057074Details
renew app 200006021671/200006304139/200008057074 | |
| Aug 24, 2004 | Expired or cancelled expired Feb 2006 | 350 Rhode Island St | Pacific Neon Company | single faced electrical wall signDetails
single faced electrical wall sign | |
| Aug 24, 2004 | Never finaled issued Aug 2004, no final | 350 Rhode Island St | Pacific Neon Company | single faced electrical wall signDetails
single faced electrical wall sign | |
| Aug 17, 2004 | Completed final sign-off Feb 2005 | 350 Rhode Island St | Metropolitan Electrical Construction | modification to fire alarm system due to tenant improvementDetails
modification to fire alarm system due to tenant improvement | $47,500 |
| Apr 9, 2004 | Completed final sign-off Feb 2005 | 350 Rhode Island St | Swinerton Builders | install new t.i. for california culinary academ & install teaching kitchens,class room etc.new exterDetails
install new t.i. for california culinary academ & install teaching kitchens,class room etc.new exter | $5,000,000 |
| Mar 12, 2004 | Completed final sign-off Feb 2005 | 350 Rhode Island St | Swinerton Builders | interior structural alterations for future t.i.Details
interior structural alterations for future t.i. | $250,000 |
| Sep 24, 2003 | Expired or cancelled expired Feb 2006 | 350 Rhode Island St | Cosco Fire Protection Inc. | for as built record drawing sumittal/permit (per plmbg) inspector mr. kenneth young request. pipingDetails
for as built record drawing sumittal/permit (per plmbg) inspector mr. kenneth young request. piping | |
| Aug 28, 2003 | Completed final sign-off Sep 2003 | 350 Rhode Island St | Cosco Fire Protection Inc. | 11 pendant fire spkr heads relocateDetails
11 pendant fire spkr heads relocate | $2,000 |
| Aug 28, 2003 | Completed final sign-off Sep 2003 | 350 Rhode Island St | Intellisec | addition to (e) fire detections system for new retail space. addition includes 1-manual pollstation.Details
addition to (e) fire detections system for new retail space. addition includes 1-manual pollstation. | $10,670 |
| Jul 16, 2003 | Completed final sign-off Sep 2003 | 350 Rhode Island St | Superior Electrical Advertising Inc | to erect electrical signDetails
to erect electrical sign | |
| Jun 23, 2003 | Never finaled issued Aug 2003, no final | 350 Rhode Island St | vacant space to be remodeled to coffee shop. new restroom and seatingDetails
vacant space to be remodeled to coffee shop. new restroom and seating | $98,000 | |
| Jun 23, 2003 | Expired or cancelled expired Feb 2006 | 350 Rhode Island St | demis (e) vacant space for new tenant add new hvac units for demised space, enclosed (n) hvacunitsDetails
demis (e) vacant space for new tenant add new hvac units for demised space, enclosed (n) hvacunits | $50,000 | |
| Mar 11, 2002 | Completed final sign-off Oct 2004 | 350 Rhode Island St | as built plans for stairs.Details
as built plans for stairs. | ||
| Mar 11, 2002 | Completed final sign-off Oct 2004 | 350 Rhode Island St | as built drawing for exterior wall & canopyDetails
as built drawing for exterior wall & canopy | ||
| Dec 3, 2001 | Never finaled issued Dec 2001, no final | 350 Rhode Island St | tenant improvement on the fourth floorDetails
tenant improvement on the fourth floor | $180,000 | |
| Nov 15, 2001 | Expired or cancelled expired Mar 2002 | 350 Rhode Island St | Bay Alarm Company | install dact to extg system at 1st floorDetails
install dact to extg system at 1st floor | $1,265 |
| Aug 9, 2001 | Expired or cancelled expired Nov 2004 | 350 Rhode Island St | Metropolitan Electrical Construction | new complete fire alarm systemDetails
new complete fire alarm system | $35,000 |
| May 8, 2001 | Expired or cancelled expired Nov 2004 | 350 Rhode Island St | revision to app 200003235127 fuel tank resubmittedDetails
revision to app 200003235127 fuel tank resubmitted | ||
| Apr 2, 2001 | Expired or cancelled expired Nov 2004 | 350 Rhode Island St | Cosco Fire Protection Inc. | install of neal fire sprinkler system at parking space & office spaceDetails
install of neal fire sprinkler system at parking space & office space | $520,000 |
| Aug 5, 2000 | Expired or cancelled expired Dec 2000 | 350 Rhode Island St | foundation permit for super structure under review dcp pending revis #200003235127 200006021671Details
foundation permit for super structure under review dcp pending revis #200003235127 200006021671 | ||
| Jun 30, 2000 | Expired or cancelled expired Oct 2000 | 350 Rhode Island St | rev. to pa#2000/06/02/1671Details
rev. to pa#2000/06/02/1671 | ||
| Jun 2, 2000 | Expired or cancelled expired Oct 2000 | 350 Rhode Island St | pile design for appli-2000/03/23/5127Details
pile design for appli-2000/03/23/5127 | ||
| Mar 29, 2000 | Never finaled issued May 2000, no final | 350 Rhode Island St | shoring/excavationDetails
shoring/excavation | $187,000 | |
| Mar 23, 2000 | Completed final sign-off Nov 2004 | 350 Rhode Island St | erect a four story office/parking/retail bldgDetails
erect a four story office/parking/retail bldg | $38,000,000 | |
| Feb 7, 2000 | Completed final sign-off Oct 2001 | 350 Rhode Island St | Swinerton Builders | demolishing 2 story/o dwelling unitDetails
demolishing 2 story/o dwelling unit |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.