Young Wong
- Listed as
- architect, authorized agent-others, designer, engineer, lessee
- Firm
- Mcg Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jun 2003 to Mar 2021
100 permits since 2000 (architect on 93 permits, designer on 4 permits, authorized agent-others on 1 permit, engineer on 1 permit, lessee on 1 permit): 71 completed, 16 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 16, 2021 | Never finaled filed Mar 2021, never issued | 1155 Naples St | adu for ordinance 95-17 and to comply with nov. 2018-08112.Details
adu for ordinance 95-17 and to comply with nov. 2018-08112. | $70,000 | |
| Mar 13, 2020 | Expired or cancelled cancelled Jul 2024 | 728 Pacific Av | suite #118: wall to be infilled. new storefront system with new door. all previous finishes to be removed and replaced with new finishes. light fixtures to be removed and replaced with new light fixtures. new dedicated hvac unit in ceiling space for this space.Details
suite #118: wall to be infilled. new storefront system with new door. all previous finishes to be removed and replaced with new finishes. light fixtures to be removed and replaced with new light fixtures. new dedicated hvac unit in ceiling space for this space. | $20,000 | |
| Feb 21, 2020 | Completed final sign-off Jan 2021 | 2633 San Bruno Av | Da Chung Incorporated | new interior wall and doors to be added in. new suspended gypsum/act/wood panel ceilings. new plumbing at restrooms and sinks for space. new interior finishes throughout space for floors, walls ceiling. new electrical power outlets. new lighting throughout space. addition of new rtu and roof screen.Details
new interior wall and doors to be added in. new suspended gypsum/act/wood panel ceilings. new plumbing at restrooms and sinks for space. new interior finishes throughout space for floors, walls ceiling. new electrical power outlets. new lighting throughout space. addition of new rtu and roof screen. | $150,000 |
| Feb 13, 2020 | Completed final sign-off May 2020 | 728 Pacific Av | Amone Corp | suite 200: rev to pa201908067963. t.i. to (e) space. revised walls & doors for interior offices & rooms/ revised lighting & finishes.Details
suite 200: rev to pa201908067963. t.i. to (e) space. revised walls & doors for interior offices & rooms/ revised lighting & finishes. | $50,000 |
| Dec 6, 2019 | Expired or cancelled cancelled Jan 2026 | 201 Bay Shore Bl | modifications to extg exterior stair; removal of 4 extg parking spaces, modifications to extg path of travel striping.Details
modifications to extg exterior stair; removal of 4 extg parking spaces, modifications to extg path of travel striping. | $12,000 | |
| Oct 1, 2019 | Completed final sign-off Jan 2020 | 2300 16th St | Reeve-Knight Construction Inc. | revision to 201904097457. adding open officeDetails
revision to 201904097457. adding open office | $15,000 |
| Sep 9, 2019 | Completed final sign-off Mar 2023 | 1019 Clement St | Amone Corp | 2nd and 3rd floor: interior t.i. for extg medical services. **n/a for maher**Details
2nd and 3rd floor: interior t.i. for extg medical services. **n/a for maher** | $200,000 |
| Aug 23, 2019 | Completed final sign-off Jan 2020 | 728 Pacific Av | upgrade existing parking to ada compliance with stalls restiping. (head room for van accessible stall not met as technically infeasible and not in scope of work; and provide passenger loading zone. n/a for maherDetails
upgrade existing parking to ada compliance with stalls restiping. (head room for van accessible stall not met as technically infeasible and not in scope of work; and provide passenger loading zone. n/a for maher | $5,000 | |
| Aug 6, 2019 | Completed final sign-off Jul 2020 | 728 Pacific Av | suite #200: removal/demolition of (e) interior non-structural elements, new walls & doors for interior offices & rooms, new restrooms, new lighting, new interior finishes. maher naDetails
suite #200: removal/demolition of (e) interior non-structural elements, new walls & doors for interior offices & rooms, new restrooms, new lighting, new interior finishes. maher na | $400,000 | |
| Aug 5, 2019 | Never finaled issued Aug 2019, no final | 199 West Portal Av | Bobby Castle Construction | (2) new doors and workstations (3) and new reception dwgs.Details
(2) new doors and workstations (3) and new reception dwgs. | $50,000 |
| Jun 6, 2019 | Completed final sign-off Nov 2019 | 2300 16th St | Reeve-Knight Construction Inc. | ste 220 - selective interior demolition of non structural elements; non-structural partitions, doors, finishes, fixutres, furnishings. ti under separate permit. no ceiling demo.Details
ste 220 - selective interior demolition of non structural elements; non-structural partitions, doors, finishes, fixutres, furnishings. ti under separate permit. no ceiling demo. | $50,000 |
| May 31, 2019 | Completed final sign-off Dec 2019 | 2300 16th St | suite 220 - storefront glazing replacement new storefron glazing new canopy at entrance, new solar shadesDetails
suite 220 - storefront glazing replacement new storefron glazing new canopy at entrance, new solar shades | $200,000 | |
| May 30, 2019 | Never finaled issued Aug 2019, no final | 2395 Lombard St | Bobby Castle Construction | new walls, doors, and interior finishes, removal of existing non-structural walls.Details
new walls, doors, and interior finishes, removal of existing non-structural walls. | $75,000 |
| Oct 12, 2018 | Completed final sign-off Oct 2018 | 191 Sutter St | Amone Corp | revision to approved pa #201806081370, changes to mezzanine demo. revision to s1.1 keeping wall (not demoing it)Details
revision to approved pa #201806081370, changes to mezzanine demo. revision to s1.1 keeping wall (not demoing it) | |
| Aug 29, 2018 | Completed final sign-off Dec 2018 | 51 Jefferson St | Bobby Castle Construction | space o: ti- new interior walls for new kitchen, dining & restroom, new equipment & interior finishes & lighting. no exterior work. maher n/a.Details
space o: ti- new interior walls for new kitchen, dining & restroom, new equipment & interior finishes & lighting. no exterior work. maher n/a. | $147,335 |
| Aug 2, 2018 | Never finaled issued Oct 2018, no final | 865 Market St | Rylko Builders Inc. | 3rd fl. tenant improvement of (e) retail space: new store front, interior store finishes & fixture, new interior wall. # 338Details
3rd fl. tenant improvement of (e) retail space: new store front, interior store finishes & fixture, new interior wall. # 338 | $129,000 |
| Jul 26, 2018 | Completed final sign-off Apr 2019 | 1625 Powell St | Tritec Construction Co Inc--See Notes | remove existing overhead garage door, infill opening for 3'x7' door, add new 33 ' overhead garage door in place of removed door. replace overhead door motor for new doorDetails
remove existing overhead garage door, infill opening for 3'x7' door, add new 33 ' overhead garage door in place of removed door. replace overhead door motor for new door | $100,000 |
| Jun 8, 2018 | Completed final sign-off Oct 2018 | 191 Sutter St | Amone Corp | remove/demo (e) mezzanine. g/f to remain unchanged. maher n/a. 4,969 sq. ft. ground floor to remainDetails
remove/demo (e) mezzanine. g/f to remain unchanged. maher n/a. 4,969 sq. ft. ground floor to remain | $300,000 |
| Aug 7, 2017 | Completed final sign-off Oct 2018 | 1019 Clement St | Amone Corp | conditional use application #2016009071 cua. (n) interior connection, rolling door, interior wall, door, finishes, bike rack, ramp.Details
conditional use application #2016009071 cua. (n) interior connection, rolling door, interior wall, door, finishes, bike rack, ramp. | $20,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 728 Pacific Av | Amone Corp | add overhead roll up door/grill to recently completed ti under 201607081944. existing hvac system to remain.Details
add overhead roll up door/grill to recently completed ti under 201607081944. existing hvac system to remain. | $50,000 |
| May 2, 2017 | Completed final sign-off Jan 2018 | 1520 Stockton St | Amone Corp | interior improvmeent of e vacant space on the 2nd fl includes demo of non struc elements, new walls, doors. new ceilings, new ductwork, new interior finishes, lightingDetails
interior improvmeent of e vacant space on the 2nd fl includes demo of non struc elements, new walls, doors. new ceilings, new ductwork, new interior finishes, lighting | $60,000 |
| Mar 27, 2017 | Completed final sign-off Feb 2020 | 1520 Stockton St | Hillhouse Construction Company Inc | voluntary seismic upgrade in 6 story commercial building. work limited to front facing facadeDetails
voluntary seismic upgrade in 6 story commercial building. work limited to front facing facade | $1,300,000 |
| Nov 9, 2016 | Completed final sign-off Feb 2017 | 728 Pacific Av | Amone Corp | as builts and revision to pa 2016-0708-1944, add 10 fire smoke damper & rated tunnel n/a maher ord. 155-13Details
as builts and revision to pa 2016-0708-1944, add 10 fire smoke damper & rated tunnel n/a maher ord. 155-13 | |
| Sep 27, 2016 | Completed final sign-off Feb 2017 | 3259 Pierce St | revision to pa 201607263305, structural workDetails
revision to pa 201607263305, structural work | $6,000 | |
| Sep 15, 2016 | Never finaled issued Oct 2016, no final | 930 Cole St | Bobby Castle Construction | revision to pa 2016-0527-8632 - existing electrical differs from plan previous plan showed 200amp feeder, existing feeder is 400 amps. prior plan showed 2(n) 200 amp panels, new plan shows 1 (n) 400 amp panel & 1(n) 200amp panelDetails
revision to pa 2016-0527-8632 - existing electrical differs from plan previous plan showed 200amp feeder, existing feeder is 400 amps. prior plan showed 2(n) 200 amp panels, new plan shows 1 (n) 400 amp panel & 1(n) 200amp panel | |
| Sep 9, 2016 | Completed final sign-off Oct 2016 | 1801 Divisadero St | Bobby Castle Construction | structural work necessitated by ti under permit 2016-0726-3312. new posts, beam, shear wall reinforcementDetails
structural work necessitated by ti under permit 2016-0726-3312. new posts, beam, shear wall reinforcement | $6,000 |
| Sep 8, 2016 | Expired or cancelled withdrawn Oct 2016 | 4598 Mission St | structural work necessitated by ti - under pa 2016-0808-4486 discovered during construction new column, footer, new beams.Details
structural work necessitated by ti - under pa 2016-0808-4486 discovered during construction new column, footer, new beams. | $6,000 | |
| Aug 23, 2016 | Never finaled issued Sep 2016, no final | 150 Columbus Av | Bobby Castle Construction | ground floor t.i. space for 'gohealth' clinic #308 - new work includes partitions, doors, ceilings, mechanical, ducts & diffusers, plumbing, electricla & lighting.Details
ground floor t.i. space for 'gohealth' clinic #308 - new work includes partitions, doors, ceilings, mechanical, ducts & diffusers, plumbing, electricla & lighting. | $430,000 |
| Aug 8, 2016 | Completed final sign-off Mar 2017 | 4598 Mission St | Bobby Castle Construction | change of use from retail to urgent care clinic, ti space for gohealth. demo of non-structural elements, new walls & doors, ceiling, restrooms, duct work, interior finishes.Details
change of use from retail to urgent care clinic, ti space for gohealth. demo of non-structural elements, new walls & doors, ceiling, restrooms, duct work, interior finishes. | $430,000 |
| Jul 26, 2016 | Completed final sign-off Feb 2017 | 3259 Pierce St | Bobby Castle Construction | g/f -change of use to clinic; ti space for go health: demo of interior non structural eleements, new plumbing, interior walls and doors, restrooms, ceilings, ducts, lighting; separate sprinkler permit. rear patio for employees onlyDetails
g/f -change of use to clinic; ti space for go health: demo of interior non structural eleements, new plumbing, interior walls and doors, restrooms, ceilings, ducts, lighting; separate sprinkler permit. rear patio for employees only | $430,000 |
| Jul 26, 2016 | Completed final sign-off Jan 2017 | 1801 Divisadero St | Bobby Castle Construction | ti space for go health 1937 sf new interior walls restrooms, celings, duct hvac, lightingDetails
ti space for go health 1937 sf new interior walls restrooms, celings, duct hvac, lighting | $430,000 |
| Jul 8, 2016 | Completed final sign-off Feb 2017 | 728 Pacific Av | Amone Corp | #201: tenant fit-out of dental office. new work includes new partitions, doors, ceilings, hvac electrical and plumbing; maher n/aDetails
#201: tenant fit-out of dental office. new work includes new partitions, doors, ceilings, hvac electrical and plumbing; maher n/a | $409,000 |
| Jun 1, 2016 | Completed final sign-off Jan 2017 | 2895 Diamond St | Bobby Castle Construction | 1st floor - ti for go health: remove partition walls, add walls and doors for interior offices and spaces, new ceiling, new restrooms, new duct work to tie into (e) hvac, new interior finishes, new lighting throughoutDetails
1st floor - ti for go health: remove partition walls, add walls and doors for interior offices and spaces, new ceiling, new restrooms, new duct work to tie into (e) hvac, new interior finishes, new lighting throughout | $430,000 |
| May 27, 2016 | Completed final sign-off Mar 2017 | 930 Cole St | Bobby Castle Construction | ti space for "go health" - new walls & doors to interior office & rooms, gyp bd ceiling, restroom, sinks including m.e.p. work. maher naDetails
ti space for "go health" - new walls & doors to interior office & rooms, gyp bd ceiling, restroom, sinks including m.e.p. work. maher na | $430,000 |
| Apr 25, 2016 | Never finaled issued Nov 2017, no final | 3820 24th St | Bobby Castle Construction | unit# 101. ti space for go health 2020 sf.Details
unit# 101. ti space for go health 2020 sf. | $430,000 |
| Apr 25, 2016 | Completed final sign-off Nov 2016 | 2282 Market St | Bobby Castle Construction | #301 - t. i. build out for gohealth urgent care.Details
#301 - t. i. build out for gohealth urgent care. | $430,000 |
| Apr 12, 2016 | Completed final sign-off Jan 2017 | 1019 Clement St | Amone Corp | reception/lobby remodel. n/a for maher.Details
reception/lobby remodel. n/a for maher. | $95,000 |
| Dec 14, 2015 | Expired or cancelled cancelled Jan 2026 | 799 Market St | interior remodel of existing ross store, 1st fl remove select jewelry cases, add new showcase fixtures and register with new wiring and relocation of specified fixturesDetails
interior remodel of existing ross store, 1st fl remove select jewelry cases, add new showcase fixtures and register with new wiring and relocation of specified fixtures | $121,797 | |
| Aug 24, 2015 | Completed final sign-off Feb 2016 | 1019 Clement St | Amone Corp | revision to app#201504214151. added fire rating to extg structure. added structure at mezzanine. added mop sink and revised t-24. n/a for maher.Details
revision to app#201504214151. added fire rating to extg structure. added structure at mezzanine. added mop sink and revised t-24. n/a for maher. | |
| Apr 21, 2015 | Completed final sign-off Feb 2016 | 1019 Clement St | Amone Corp | interior iprovement of pharmacy, offices, restrooms and mezzanine office. n/a ordinance #155-13.Details
interior iprovement of pharmacy, offices, restrooms and mezzanine office. n/a ordinance #155-13. | $250,000 |
| Apr 20, 2015 | Completed final sign-off May 2018 | 1520 Stockton St | Cal - Pacific Constr. Inc. | elevator replacement. interior work only. no exterior work.Details
elevator replacement. interior work only. no exterior work. | $350,000 |
| Aug 29, 2014 | Completed final sign-off Mar 2015 | 799 Market St | Gh Group Inc. | g/f-interior remodel of existing retail including remove existing fitting rooms for additional sales floor, selective demo of interior non-bearing walls, new finishes at areas of work. n/a maher ordinanceDetails
g/f-interior remodel of existing retail including remove existing fitting rooms for additional sales floor, selective demo of interior non-bearing walls, new finishes at areas of work. n/a maher ordinance | $25,000 |
| Jun 17, 2014 | Completed final sign-off Jun 2015 | 2020 Market St | Eric F Anderson Incorporated | revision to 201309187143. remove e cmu walls and gatesDetails
revision to 201309187143. remove e cmu walls and gates | $40,000 |
| Jan 31, 2014 | Completed final sign-off Sep 2014 | 1301 Van Ness Av | Tilton Pacific Const Inc. | revisions to (e) bldg pa#2013-09-18-7135. expand (e) receiving office (modify). expand (e) break room (modify). new lock up storage. new platform at loading. relocate drinking fountain. reverse swing (e) restroom doors.Details
revisions to (e) bldg pa#2013-09-18-7135. expand (e) receiving office (modify). expand (e) break room (modify). new lock up storage. new platform at loading. relocate drinking fountain. reverse swing (e) restroom doors. | |
| Dec 18, 2013 | Completed final sign-off Jan 2014 | 15 Marina Bl | Eric F Anderson Incorporated | revision to appl #2013.09.17.7037 - revise accessible hi-low drinking fountain location from previously permitted drawings.Details
revision to appl #2013.09.17.7037 - revise accessible hi-low drinking fountain location from previously permitted drawings. | |
| Nov 20, 2013 | Completed final sign-off Mar 2014 | 2300 16th St | Construction Solutions Inc Dba Retail Ge | remodel (e) fitting rooms; selective demolition of interior non bearing walls; new finishes. compliance with ordinance no. 155-13 not required.Details
remodel (e) fitting rooms; selective demolition of interior non bearing walls; new finishes. compliance with ordinance no. 155-13 not required. | $100,000 |
| Sep 18, 2013 | Never finaled issued Sep 2013, no final | 1301 Van Ness Av | Terra Nova Industries | revision to appl #2013.07.13.1118 - relocate stairs, replace lift with fork lift, relocate drinking fountain, reduce (e) loading dock & add new main door.Details
revision to appl #2013.07.13.1118 - relocate stairs, replace lift with fork lift, relocate drinking fountain, reduce (e) loading dock & add new main door. | $20,000 |
| Sep 18, 2013 | Completed final sign-off Jun 2015 | 2020 Market St | Eric F Anderson Incorporated | space #1507-partial demolitoin of (e) recycling center, remvoe (e) equipments.Details
space #1507-partial demolitoin of (e) recycling center, remvoe (e) equipments. | $38,000 |
| Sep 17, 2013 | Completed final sign-off Jan 2014 | 15 Marina Bl | Eric F Anderson Incorporated | replace, relocate, remove display fixtures in sales area, del, meat, bakery, floral depts. non load bearing new interior walls. restripe parking over existing locations. upgrade accessible parking to full compliance. upgrade single occupancy restrooms to full compliance. new interior trench drain.Details
replace, relocate, remove display fixtures in sales area, del, meat, bakery, floral depts. non load bearing new interior walls. restripe parking over existing locations. upgrade accessible parking to full compliance. upgrade single occupancy restrooms to full compliance. new interior trench drain. | $477,450 |
| Sep 9, 2013 | Completed final sign-off Sep 2014 | 1301 Van Ness Av | Terra Nova Industries, Tilton Pacific Const Inc. | tenant improvement. sale area expansion, (n) hvac & condensing units. (n) ramp & stairs, (n) lighting in expansion space.Details
tenant improvement. sale area expansion, (n) hvac & condensing units. (n) ramp & stairs, (n) lighting in expansion space. | $400,000 |
| Aug 27, 2013 | Never finaled issued Feb 2014, no final | 2630 Bay Shore Bl | Tilton Pacific Const Inc. | tenant improvements to an exst'g 13,624 sq. ft. bldg (currently a. sylvestri). work includes new partitions, ceilings, lighting, finishes, fixtures, plumbing, electrical, refrigeration, hvac. exterior work icludes new loading dock w/steel canopy, new ext. freezer box.Details
tenant improvements to an exst'g 13,624 sq. ft. bldg (currently a. sylvestri). work includes new partitions, ceilings, lighting, finishes, fixtures, plumbing, electrical, refrigeration, hvac. exterior work icludes new loading dock w/steel canopy, new ext. freezer box. | $847,000 |
| Jul 31, 2013 | Completed final sign-off Feb 2014 | 6333 Geary Bl | Tilton Pacific Const Inc. | interior demo of existing improvements to an existing 12,544 sf bldg (formerly cala foods) ref app 201302059529 for t/i to remain vacant per ab-017. provide necessary supports for new floor openings due to demolition work.Details
interior demo of existing improvements to an existing 12,544 sf bldg (formerly cala foods) ref app 201302059529 for t/i to remain vacant per ab-017. provide necessary supports for new floor openings due to demolition work. | $40,000 |
| Jul 3, 2013 | Never finaled issued Aug 2013, no final | 1301 Van Ness Av | Terra Nova Industries | tenant improvement @ back of the building, remove (e) loading ramp & install new platform, stairs & scissor lift, remove (e) single occupied restrooms, office & breakroom & install (n) multi occupied restrooms, office, storage & breakroom.Details
tenant improvement @ back of the building, remove (e) loading ramp & install new platform, stairs & scissor lift, remove (e) single occupied restrooms, office & breakroom & install (n) multi occupied restrooms, office, storage & breakroom. | $150,000 |
| Apr 12, 2013 | Completed final sign-off Nov 2013 | 2020 Market St | Eric F Anderson Incorporated | suite 230 - interior maintenance refurbishment of an (e) retail food market, minor demo of fixtures & walls/ceiling & slab. relocate of fixtures & lighting. minor storefront work to bring light into relocated coffee sales areaDetails
suite 230 - interior maintenance refurbishment of an (e) retail food market, minor demo of fixtures & walls/ceiling & slab. relocate of fixtures & lighting. minor storefront work to bring light into relocated coffee sales area | $450,000 |
| Feb 14, 2013 | Completed final sign-off Mar 2013 | 888 Brannan St | Thomas Construction | new walls in existing tenant space in basementDetails
new walls in existing tenant space in basement | $3,000 |
| Feb 5, 2013 | Completed final sign-off Feb 2014 | 6333 Geary Bl | Tilton Pacific Const Inc. | tenant improvement to(e) 12,544 sf building(formerly cala foods/ delanos)new partitions, ceilings, lighting, finishes, fixtures, associated plumbing, elec, refrig, new hvac & distribution work, new steel canopy at entry area, replace auto sliding entry doors with new accessible parking lot striping.Details
tenant improvement to(e) 12,544 sf building(formerly cala foods/ delanos)new partitions, ceilings, lighting, finishes, fixtures, associated plumbing, elec, refrig, new hvac & distribution work, new steel canopy at entry area, replace auto sliding entry doors with new accessible parking lot striping. | $900,000 |
| Jan 28, 2013 | Completed final sign-off Jun 2013 | 2300 16th St | unit #340b: retail t.i. vitamin store on 2nd fl of (e) 2 story bldg. lower level is not part of this scope & currently occupied by retail tenants. build out to include new sales area, bathrooms, including (n) floor finish, walls, plumb fixts, ceiling including assoc. lighting/ductwork/etc,Details
unit #340b: retail t.i. vitamin store on 2nd fl of (e) 2 story bldg. lower level is not part of this scope & currently occupied by retail tenants. build out to include new sales area, bathrooms, including (n) floor finish, walls, plumb fixts, ceiling including assoc. lighting/ductwork/etc, | $130,000 | |
| Dec 19, 2012 | Never finaled issued Dec 2012, no final | 2000 Folsom St | revision to pa#2010-12-15-6802 expansion of previous lease area, modification to exiting.Details
revision to pa#2010-12-15-6802 expansion of previous lease area, modification to exiting. | $3,500 | |
| Oct 4, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space 2080:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit.Details
space 2080:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit. | $30,000 | |
| Oct 4, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space 161:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit.Details
space 161:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit. | $45,000 | |
| Oct 4, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space #2075: interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit.Details
space #2075: interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit. | $100,000 | |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | Richlen Construction | space #102-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permitDetails
space #102-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permit | $20,000 |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | Richlen Construction | space #109 & #113-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permitDetails
space #109 & #113-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permit | $20,000 |
| Aug 27, 2012 | Completed final sign-off Oct 2012 | 50 Post St | Rafferty Construction Inc | space 64 a: revision to extg bldg permit #201206202989. revise construction type from type 5b to type 1 construction. "as built"Details
space 64 a: revision to extg bldg permit #201206202989. revise construction type from type 5b to type 1 construction. "as built" | |
| Jun 20, 2012 | Completed final sign-off Oct 2012 | 50 Post St | crocker galleria - level 3, space #64a - 3rd floor-t.i. to an (e) 584 sq ft vacant retail space for a sandwich shop located on the 3rd fl of crocker galleria-new partitions, ceilings, equipment, finishes, lighting & associated electrical, plumbing & mechanical workDetails
crocker galleria - level 3, space #64a - 3rd floor-t.i. to an (e) 584 sq ft vacant retail space for a sandwich shop located on the 3rd fl of crocker galleria-new partitions, ceilings, equipment, finishes, lighting & associated electrical, plumbing & mechanical work | $76,000 | |
| Jan 27, 2012 | Expired or cancelled cancelled Apr 2014 | 300 Montgomery St | 3 new metal vent louvers installed into an (e) south elevation storefront for new mechanical design under separate permit.Details
3 new metal vent louvers installed into an (e) south elevation storefront for new mechanical design under separate permit. | $15,000 | |
| Nov 22, 2011 | Expired or cancelled cancelled Jan 2026 | 1300 Bush St | interior remodel,new wall covering, front and finishes, in sales area. new shelves, display fixtures i sales area. ada upgrades to store and parking lot. open air coolers, freezer, beverage bar in sales area. new 3 compartment sink, 1 handsink in stock area. new mech unit in 2nd fl garage, rstrm fixDetails
interior remodel,new wall covering, front and finishes, in sales area. new shelves, display fixtures i sales area. ada upgrades to store and parking lot. open air coolers, freezer, beverage bar in sales area. new 3 compartment sink, 1 handsink in stock area. new mech unit in 2nd fl garage, rstrm fix | $569,144 | |
| Nov 9, 2011 | Expired or cancelled cancelled Jan 2026 | 33 Drumm St | new interior decor insales area/remove (e) photo dept, new display shelving & fixture in sales, checkout & pharmacy, new floor fininsh at pharmacy, repainting of ceiling grid & replace suspended ceiling tile, new mechanical unit on roof, new refrig cases in sales areaDetails
new interior decor insales area/remove (e) photo dept, new display shelving & fixture in sales, checkout & pharmacy, new floor fininsh at pharmacy, repainting of ceiling grid & replace suspended ceiling tile, new mechanical unit on roof, new refrig cases in sales area | ||
| Nov 9, 2011 | Expired or cancelled cancelled Jan 2026 | 2801 Jones St | new wall covering/finishes in sales area, new ceiling in photo area, new display fixtures/shelves in sales area, paint (e) ceiling grid, new ceiling tiles, remove wet lab photo dept & repl w/new refrig. cases. new beverage bar in sales area, new 3 compartment sinks/hand sinks in stock rm, new mech uDetails
new wall covering/finishes in sales area, new ceiling in photo area, new display fixtures/shelves in sales area, paint (e) ceiling grid, new ceiling tiles, remove wet lab photo dept & repl w/new refrig. cases. new beverage bar in sales area, new 3 compartment sinks/hand sinks in stock rm, new mech u | ||
| Nov 2, 2011 | Never finaled issued Apr 2012, no final | 298 King St | Eric F Anderson Incorporated | install 1 hot dog cart & 1 sandwich cartDetails
install 1 hot dog cart & 1 sandwich cart | $5,300 |
| Aug 24, 2011 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | 1st floor suite 191 - removal of non-laod bearing partitions per ab-017. vacant space . t.i. under separate permit.Details
1st floor suite 191 - removal of non-laod bearing partitions per ab-017. vacant space . t.i. under separate permit. | $74,000 |
| Aug 5, 2011 | Completed final sign-off Jul 2012 | 121 04th St | Oakstone Construction Inc. | work @ space# 1035 only. tenant interior alteration (mep work only) architectural plans under pa# 2011/07/13/0113.Details
work @ space# 1035 only. tenant interior alteration (mep work only) architectural plans under pa# 2011/07/13/0113. | $120,000 |
| Jul 14, 2011 | Completed final sign-off Oct 2011 | 825 Market St | C & R Ventures Inc | revision to pa# 2011-0329-3054-relocation of previously permitted condensor for refrigeration system to roof, at the rearDetails
revision to pa# 2011-0329-3054-relocation of previously permitted condensor for refrigeration system to roof, at the rear | |
| Jun 27, 2011 | Completed final sign-off Jul 2012 | 2525 Jones St | A M Rocca Inc. | remodel (e) retail to a walgreen's pharmacy per attached plans & calcs. fire sprinklers, fire alarm separate permits.Details
remodel (e) retail to a walgreen's pharmacy per attached plans & calcs. fire sprinklers, fire alarm separate permits. | $850,000 |
| Jun 16, 2011 | Completed final sign-off Nov 2011 | 865 Market St | Build Group Inc. | space c-10 - t.i. alteration for a 1775 sf mexican restaurant with in the extg s.f. center mall to replace an extg restaurant. new walls,new finishes, new equipment, new lighting, new mep.Details
space c-10 - t.i. alteration for a 1775 sf mexican restaurant with in the extg s.f. center mall to replace an extg restaurant. new walls,new finishes, new equipment, new lighting, new mep. | $360,000 |
| Mar 31, 2011 | Completed final sign-off Oct 2011 | 2550 Taylor St | Camco Construction | tenant improvement to convert (e) retail for ross. new front doors, ndw partitoins, n hvac on roof, structural infill of e openings on 2nd fl ecalator opening to close off by 30% slab, new lighting, restroomsDetails
tenant improvement to convert (e) retail for ross. new front doors, ndw partitoins, n hvac on roof, structural infill of e openings on 2nd fl ecalator opening to close off by 30% slab, new lighting, restrooms | $750,000 |
| Mar 16, 2011 | Completed final sign-off Nov 2011 | 456 Mission St | Walgreen Company | minor remodel of pharmacy, photo, market and general sale areaDetails
minor remodel of pharmacy, photo, market and general sale area | $140,000 |
| Mar 16, 2011 | Completed final sign-off Nov 2011 | 100 Sansome St | Walgreen Company | minor remodel of pharmacy, photo dept, market sales, employee room, and general salesDetails
minor remodel of pharmacy, photo dept, market sales, employee room, and general sales | $105,000 |
| Mar 16, 2011 | Completed final sign-off Oct 2011 | 275 Sacramento St | Walgreen Company | removal of e 1 hr photo, update ceiling and soffit. addition of refrigeration case, new beverage center, new checkout, cosmetic, pharmacy and employee room. new finish throughout. perform work to comply with complaint 201073301. refer by sffdDetails
removal of e 1 hr photo, update ceiling and soffit. addition of refrigeration case, new beverage center, new checkout, cosmetic, pharmacy and employee room. new finish throughout. perform work to comply with complaint 201073301. refer by sffd | $125,000 |
| Mar 16, 2011 | Never finaled issued Mar 2011, no final | 459 Powell St | Walgreen Company | minor remodel, new refrigeration cases, beverage centers, n checkouts, 3 comp sink, finishes, floor, countertop at pharmacy, finishes, restroom, wall finish at back up areasDetails
minor remodel, new refrigeration cases, beverage centers, n checkouts, 3 comp sink, finishes, floor, countertop at pharmacy, finishes, restroom, wall finish at back up areas | $126,765 |
| Nov 30, 2010 | Completed final sign-off Jan 2011 | 730 Market St | Walgreen Company | minor remodel of pharmacy, waiting area, managers office and sales area and existing storage roomDetails
minor remodel of pharmacy, waiting area, managers office and sales area and existing storage room | $75,000 |
| Sep 1, 2010 | Completed final sign-off Oct 2011 | 1333 Castro St | remodel of pharmacy, waiting area, employee area, manager's office & restrooms.Details
remodel of pharmacy, waiting area, employee area, manager's office & restrooms. | $85,000 | |
| Apr 29, 2010 | Completed final sign-off Aug 2010 | 298 King St | Eric F Anderson Incorporated | replacement & relocation of fixtures: replacing shelving, replace refrigator with new ones with doors, new lighting over refrigator, tie in new refrigator to (e) electrical & mechanical systemDetails
replacement & relocation of fixtures: replacing shelving, replace refrigator with new ones with doors, new lighting over refrigator, tie in new refrigator to (e) electrical & mechanical system | $25,000 |
| Mar 3, 2010 | Never finaled issued Sep 2010, no final | 4127 18th St | remodel (e) pharmacy, addition of restroom, infusion/consultion room, exam room & remodel to (e) vanilla shell of remaining space. also change front door at 4127.Details
remodel (e) pharmacy, addition of restroom, infusion/consultion room, exam room & remodel to (e) vanilla shell of remaining space. also change front door at 4127. | $110,000 | |
| Aug 13, 2009 | Expired or cancelled cancelled Jan 2026 | 730 Taraval St | new access ramp from existing parking field to existing elevator entrance on roof parking for customer convenience.Details
new access ramp from existing parking field to existing elevator entrance on roof parking for customer convenience. | $5,000 | |
| Jan 15, 2009 | Completed final sign-off Jun 2009 | 3350 Mission St | Eric F Anderson Incorporated | add a pedestrian path fr 29th st. to entry, change vehicular traffic to one-way on access to 29th st. reseal & restripe parking. ada upgrades to parking, curb cuts & path of travel from mission st. paint exterior.Details
add a pedestrian path fr 29th st. to entry, change vehicular traffic to one-way on access to 29th st. reseal & restripe parking. ada upgrades to parking, curb cuts & path of travel from mission st. paint exterior. | $250,000 |
| Aug 15, 2008 | Completed final sign-off May 2009 | 2112 15th St | Gidel & Kocal Construction Co Inc | revision to pa# 2007-1126-8827-upgrade rear facade of building. cover (e) wood siding with vinyl siding to waterproof buildingDetails
revision to pa# 2007-1126-8827-upgrade rear facade of building. cover (e) wood siding with vinyl siding to waterproof building | $10,000 |
| Aug 6, 2008 | Expired or cancelled expired Dec 2009 | 2552 Taylor St | revision to pa# 2007-04-05-8156-r1. revise storefront at entry lobby and entrance, relocate market place display area, relocate chairwall display area, replace drinking fountain, revise electrical lighting to accomodate display relocation.Details
revision to pa# 2007-04-05-8156-r1. revise storefront at entry lobby and entrance, relocate market place display area, relocate chairwall display area, replace drinking fountain, revise electrical lighting to accomodate display relocation. | $115,000 | |
| May 29, 2008 | Completed final sign-off May 2009 | 2112 15th St | San Jose Construction Co Inc | revise existing pa #200711268827 - revise notes on demolition drawings d101 & d102 to clarify language for removal of attached garage section at rear corner of bldg.Details
revise existing pa #200711268827 - revise notes on demolition drawings d101 & d102 to clarify language for removal of attached garage section at rear corner of bldg. | |
| Mar 27, 2008 | Never finaled issued Jun 2008, no final | 2020 Market St | revision to pa# 2007/08/28/1140. demo existing fixtures and walls. installation of new fixtures, doors, interor and exterior finishes, ceiling, lightings. no exterior bldg work.Details
revision to pa# 2007/08/28/1140. demo existing fixtures and walls. installation of new fixtures, doors, interor and exterior finishes, ceiling, lightings. no exterior bldg work. | ||
| Nov 26, 2007 | Expired or cancelled expired May 2009 | 2112 15th St | Gidel & Kocal Construction Co Inc | shell renovation to a warm shell- exterior modifications. refer to planning #20071241c, seismic upgrade, new parking, sidewalk, new ext stairs, new landscape, new eletric rm w/ roof access, new roof top mechanical unitsDetails
shell renovation to a warm shell- exterior modifications. refer to planning #20071241c, seismic upgrade, new parking, sidewalk, new ext stairs, new landscape, new eletric rm w/ roof access, new roof top mechanical units | $110,000 |
| Aug 28, 2007 | Completed final sign-off Mar 2009 | 2020 Market St | demolition of existing fixtures & walls, interior only. install new fixtures, doors, decor, walls, ceiling, lights, curbs @ freezer etc. no fire sprinkler alterations, (n) floral & (n) nuts kiosk trellises hung from structure above. there is no exterior work under this application.Details
demolition of existing fixtures & walls, interior only. install new fixtures, doors, decor, walls, ceiling, lights, curbs @ freezer etc. no fire sprinkler alterations, (n) floral & (n) nuts kiosk trellises hung from structure above. there is no exterior work under this application. | $1,497,000 | |
| Oct 5, 2006 | Completed final sign-off Oct 2007 | 730 Taraval St | exterior work consists of painting, new finishes on concrete columns along w/replacing signage (to be filed seperately). interior work: new finishes throughtout entire sales floor along w/updating (e) refrigerated cases, lighting, shelving, cooking equipment for bakery/deli-new pharmacy, etc...Details
exterior work consists of painting, new finishes on concrete columns along w/replacing signage (to be filed seperately). interior work: new finishes throughtout entire sales floor along w/updating (e) refrigerated cases, lighting, shelving, cooking equipment for bakery/deli-new pharmacy, etc... | $1,400,000 | |
| Sep 13, 2006 | Completed final sign-off Jun 2007 | 3350 Mission St | Eric F Anderson Incorporated | revised plans submital to existing permitted project 200604179145 da requirement on approved sets 200604179145.Details
revised plans submital to existing permitted project 200604179145 da requirement on approved sets 200604179145. | $91 |
| Jul 25, 2006 | Completed final sign-off Oct 2006 | 1492 Dolores St | unit (a & b)remove and replace damage composition roofing at (e) carport, (unit a)glazing at (e) cover patio, unit b wood rotted and damaged stair tread to upper deck. less than 50% of stairs.Details
unit (a & b)remove and replace damage composition roofing at (e) carport, (unit a)glazing at (e) cover patio, unit b wood rotted and damaged stair tread to upper deck. less than 50% of stairs. | $1,500 | |
| Jun 7, 2006 | Completed final sign-off Mar 2007 | 2300 16th St | suite 230 - interior remodel on an existing safeway food market with minor exterior work consisting of adding a rail in front entry area and fixing a rail next to truck dock bay.Details
suite 230 - interior remodel on an existing safeway food market with minor exterior work consisting of adding a rail in front entry area and fixing a rail next to truck dock bay. | $985,000 | |
| Jan 13, 2006 | Never finaled filed Jan 2006, never issued | 5260 Diamond Heights Bl | Walgreen Company | 200506034089 changes to storefront design and a-3 assembly. enlarged restroom to comply with accessibility codeDetails
200506034089 changes to storefront design and a-3 assembly. enlarged restroom to comply with accessibility code | $20,000 |
| Jan 13, 2006 | Completed final sign-off Feb 2006 | 5260 Diamond Heights Bl | rev.app 200506034089. changes to storefront design and a-3 assembly. enlarged restroom to comply with accessibility codeDetails
rev.app 200506034089. changes to storefront design and a-3 assembly. enlarged restroom to comply with accessibility code | $20,000 | |
| Jan 10, 2005 | Expired or cancelled withdrawn Jun 2005 | 5260 Diamond Heights Bl | expand existing ground floor 810 s.f. by relocating wall at rear of building. replace hvac system w/Details
expand existing ground floor 810 s.f. by relocating wall at rear of building. replace hvac system w/ | $100,000 | |
| Jun 23, 2003 | Expired or cancelled expired Feb 2006 | 350 Rhode Island St | demis (e) vacant space for new tenant add new hvac units for demised space, enclosed (n) hvacunitsDetails
demis (e) vacant space for new tenant add new hvac units for demised space, enclosed (n) hvacunits | $50,000 |