Block 0116, lot 020B
1520 Stockton St
- City’s use
- Commercial Office
- Built
- 1926
- Stories
- 6
- Units
- 1
- Rooms
- 13 bathrooms
- Building
- 46,470 sq ft
- Lot
- 7,895 sq ft
- Zoning
- NBEACH
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
91 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2023 | Completed final sign-off Oct 2024 | 1520 Stockton St | Transworld Construction | 3rd/fl: partial t.i.- selective finishes dcomo to (e) exam rms, new ceiling, lighting, flooring, wall finishes, millwork & refinishes & update core restroom & adding drinking fountainDetails
3rd/fl: partial t.i.- selective finishes dcomo to (e) exam rms, new ceiling, lighting, flooring, wall finishes, millwork & refinishes & update core restroom & adding drinking fountain | $642,882 |
| Oct 18, 2022 | Completed final sign-off Oct 2022 | 1520 Stockton St | Mastec Network Solutions Inc | to obtain final inspection for work approved under permit application no# 9920444. all work is complete.Details
to obtain final inspection for work approved under permit application no# 9920444. all work is complete. | |
| Jul 20, 2022 | Completed final sign-off May 2023 | 1520 Stockton St | Mastec Network Solutions Inc | install two radomes per section - 6 total roof level; remove and replace six (6) antennas; remove (9) (e) radios and replace in (6) new rru radios; install (2) new cabinets; remove existing 100a ppc reaplace w/ new 200a ppcDetails
install two radomes per section - 6 total roof level; remove and replace six (6) antennas; remove (9) (e) radios and replace in (6) new rru radios; install (2) new cabinets; remove existing 100a ppc reaplace w/ new 200a ppc | $35,000 |
| Feb 15, 2022 | Completed final sign-off Nov 2024 | 1520 Stockton St | Metropolitan Electrical Construction | att: install 3 new antennas; install 9 new rrus; remove 2 extg cabinets; install new equipment rack with batteries; no electrical work.Details
att: install 3 new antennas; install 9 new rrus; remove 2 extg cabinets; install new equipment rack with batteries; no electrical work. | $53,000 |
| Oct 22, 2021 | Expired or cancelled withdrawn Jul 2022 | 1520 Stockton St | mod of (e) telecom site to include r/r 6 (e) antennas with 6 (n), r/r 9 (e) radios with 9 (n). install 2 (n) electrical cabinets and ancillary electrical equipment as per plans.Details
mod of (e) telecom site to include r/r 6 (e) antennas with 6 (n), r/r 9 (e) radios with 9 (n). install 2 (n) electrical cabinets and ancillary electrical equipment as per plans. | $25,000 | |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 1520 Stockton St | street space onlyDetails
street space only | ||
| Aug 15, 2019 | Completed final sign-off Oct 2019 | 1520 Stockton St | Walschon Fire Protection Inc | demolish a section of the extg fire supply piping below and above grade due to accommodating new structural footing by others. install new section of fire supply pipe and reroute above grade then reconnect under ground to extg fire supply pipe. ref app#201703272445Details
demolish a section of the extg fire supply piping below and above grade due to accommodating new structural footing by others. install new section of fire supply pipe and reroute above grade then reconnect under ground to extg fire supply pipe. ref app#201703272445 | $12,699 |
| Jun 19, 2019 | Completed final sign-off Sep 2019 | 1520 Stockton St | Pardo Alarm Security Systems | 4th flr. replace duct detector and relay module for global shutdownDetails
4th flr. replace duct detector and relay module for global shutdown | $21,000 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 1520 Stockton St | street spaceDetails
street space | ||
| Aug 20, 2018 | Never finaled issued Aug 2018, no final | 1520 Stockton St | streetspaceDetails
streetspace | ||
| May 31, 2018 | Expired or cancelled cancelled Jul 2023 | 1520 Stockton St | as builts for permit #201712085933.Details
as builts for permit #201712085933. | ||
| Apr 20, 2018 | Completed final sign-off Aug 2019 | 1520 Stockton St | swap 9 antenna, install: 9 rrus near antenna, 3 rrus in equip area, 3 dc-6 near antennas, 2 5216 in equip rm, 1-23" rack w/dc-12, 3 cbc78-df-2x. swap 4 battery strings, install 6 power trunksDetails
swap 9 antenna, install: 9 rrus near antenna, 3 rrus in equip area, 3 dc-6 near antennas, 2 5216 in equip rm, 1-23" rack w/dc-12, 3 cbc78-df-2x. swap 4 battery strings, install 6 power trunks | $15,000 | |
| Feb 12, 2018 | Never finaled issued Feb 2018, no final | 1520 Stockton St | street spaceDetails
street space | ||
| Dec 8, 2017 | Completed final sign-off Sep 2019 | 1520 Stockton St | Pardo Alarm Security Systems | floors 1-4: scope of work is the addition of smoke detectors & relay modules for the elevator modenization. ref pa# 201705025466Details
floors 1-4: scope of work is the addition of smoke detectors & relay modules for the elevator modenization. ref pa# 201705025466 | $20,000 |
| Oct 30, 2017 | Completed final sign-off Nov 2017 | 1520 Stockton St | Project Contractor Inc | 2nd fl - modify of sprinkler system to accommodate new partitioning total relocate 11 and remove 1 sprinklerDetails
2nd fl - modify of sprinkler system to accommodate new partitioning total relocate 11 and remove 1 sprinkler | $5,500 |
| Oct 16, 2017 | Never finaled issued Oct 2017, no final | 1520 Stockton St | Pardo Alarm Security Systems | addition of 2 notification appliances on the 2nd fl due to partial remodelDetails
addition of 2 notification appliances on the 2nd fl due to partial remodel | $8,500 |
| Oct 10, 2017 | Expired or cancelled withdrawn Jul 2018 | 1520 Stockton St | remove 3 (e) radios & install 6 new radio models & install 1 xmu unit inside (e) cabinet.Details
remove 3 (e) radios & install 6 new radio models & install 1 xmu unit inside (e) cabinet. | $15,000 | |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 1520 Stockton St | street spaceDetails
street space | ||
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 1520 Stockton St | street spaceDetails
street space | ||
| May 2, 2017 | Completed final sign-off Jan 2018 | 1520 Stockton St | Amone Corp | interior improvmeent of e vacant space on the 2nd fl includes demo of non struc elements, new walls, doors. new ceilings, new ductwork, new interior finishes, lightingDetails
interior improvmeent of e vacant space on the 2nd fl includes demo of non struc elements, new walls, doors. new ceilings, new ductwork, new interior finishes, lighting | $60,000 |
| Apr 26, 2017 | Completed final sign-off Jul 2017 | 1520 Stockton St | Pardo Alarm Security Systems | elevator modernization fire alarm system devices addition to elevator system and monitor the smoke curtains. added 1 smoke detector and 1 relay in elevator control room.Details
elevator modernization fire alarm system devices addition to elevator system and monitor the smoke curtains. added 1 smoke detector and 1 relay in elevator control room. | $9,500 |
| Apr 21, 2017 | Never finaled issued Apr 2017, no final | 1520 Stockton St | street space permit - renewal of permit # m761847Details
street space permit - renewal of permit # m761847 | ||
| Mar 27, 2017 | Completed final sign-off Feb 2020 | 1520 Stockton St | Hillhouse Construction Company Inc | voluntary seismic upgrade in 6 story commercial building. work limited to front facing facadeDetails
voluntary seismic upgrade in 6 story commercial building. work limited to front facing facade | $1,300,000 |
| Feb 16, 2017 | Never finaled issued Feb 2017, no final | 1520 Stockton St | street spaceDetails
street space | ||
| Dec 16, 2016 | Completed final sign-off Jun 2017 | 1520 Stockton St | Bay Cities Fire Protection | remove (e) sprinkler piping that area running through new elevator and adjust sprinkler piping around new elevator inb the new elevator lobbyDetails
remove (e) sprinkler piping that area running through new elevator and adjust sprinkler piping around new elevator inb the new elevator lobby | $7,500 |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 1520 Stockton St | street space permitDetails
street space permit | ||
| Jul 21, 2016 | Never finaled issued Jul 2016, no final | 1520 Stockton St | street spaceDetails
street space | ||
| May 31, 2016 | Never finaled issued May 2016, no final | 1520 Stockton St | street spaceDetails
street space | ||
| May 25, 2016 | Completed final sign-off Feb 2017 | 1520 Stockton St | Metropolitan Electrical Construction | att modification r and r 3 antennas with 3 n antennas, install 3 n rrus 32, install 3 n dc2, innerduct, n dus41, relocate e pos 1 and e pos 2 antennas in sector c,9 n antenna shrouds, paint antennas,brackets, cabling to match e penthouseDetails
att modification r and r 3 antennas with 3 n antennas, install 3 n rrus 32, install 3 n dc2, innerduct, n dus41, relocate e pos 1 and e pos 2 antennas in sector c,9 n antenna shrouds, paint antennas,brackets, cabling to match e penthouse | $15,000 |
| Feb 23, 2016 | Completed final sign-off Oct 2017 | 1520 Stockton St | Cal - Pacific Constr. Inc. | replacement of (e) elevator & add (1) next to elevatorDetails
replacement of (e) elevator & add (1) next to elevator | $1,300,000 |
| Apr 24, 2015 | Completed final sign-off May 2015 | 1520 Stockton St | D & S Leong Associates | add 3 new sprinkler heads and relocate 6 (e) on 4/f. t.i. pa# 201312305254Details
add 3 new sprinkler heads and relocate 6 (e) on 4/f. t.i. pa# 201312305254 | $2,500 |
| Apr 20, 2015 | Completed final sign-off May 2018 | 1520 Stockton St | Cal - Pacific Constr. Inc. | elevator replacement. interior work only. no exterior work.Details
elevator replacement. interior work only. no exterior work. | $350,000 |
| Mar 25, 2015 | Completed final sign-off Jun 2015 | 1520 Stockton St | San Francisco Fire Protection | add on to existing fire alarm system due to ti on 4th fl 1 horn strobe and 2 strobes installed and tied in to ex c ircuit and exist power supply located on 1st flDetails
add on to existing fire alarm system due to ti on 4th fl 1 horn strobe and 2 strobes installed and tied in to ex c ircuit and exist power supply located on 1st fl | $1,200 |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 1520 Stockton St | Overland Contracting Inc | to obtain final inspection for work approved under pa# 201110197155. all work is complete.Details
to obtain final inspection for work approved under pa# 201110197155. all work is complete. | |
| Jan 29, 2015 | Never finaled issued Jan 2015, no final | 1520 Stockton St | street spaceDetails
street space | ||
| Sep 26, 2014 | Completed final sign-off Jul 2015 | 1520 Stockton St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | sprint: add (3)2.5 panel antenna(1)ea @ sectors a,b&c, add(3)(n)rrh(1)ea @ sectors a,b&c,add(n)2.5 equipmt inside(e)mmbs cabinet,add(n)2.5 batteries inside(e)bbu cabinet,add (n)coax juimper lines from rrhs to(n)antennas, reuse(e)hybrid cables or install(n)as needed, add(n)tripod mounts @ sectorsDetails
sprint: add (3)2.5 panel antenna(1)ea @ sectors a,b&c, add(3)(n)rrh(1)ea @ sectors a,b&c,add(n)2.5 equipmt inside(e)mmbs cabinet,add(n)2.5 batteries inside(e)bbu cabinet,add (n)coax juimper lines from rrhs to(n)antennas, reuse(e)hybrid cables or install(n)as needed, add(n)tripod mounts @ sectors | $20,000 |
| Jun 24, 2014 | Never finaled issued Jul 2014, no final | 1520 Stockton St | Califire Protection | install 3 sprinklers total on 3 different floors , 2nd, 5th, and 4th for new closets. ref # 201404304551Details
install 3 sprinklers total on 3 different floors , 2nd, 5th, and 4th for new closets. ref # 201404304551 | $2,750 |
| Apr 30, 2014 | Completed final sign-off Aug 2014 | 1520 Stockton St | Transworld Construction | install 3 new i.t. closet on 2nd, 4th, 5th floors. core (2) 5" round holes at each. approx 3'x5' size rooms. 15 l.f. total non bearing rated partition.Details
install 3 new i.t. closet on 2nd, 4th, 5th floors. core (2) 5" round holes at each. approx 3'x5' size rooms. 15 l.f. total non bearing rated partition. | $4,500 |
| Jan 31, 2014 | Expired or cancelled withdrawn Aug 2014 | 1520 Stockton St | a modification to an (e) at&t unmanned telecommunicatioin facility consisting of installing (3) (n) rrus-11 units and (3) (n) a2 units & 3 (n) dc-2 surge suppressions.Details
a modification to an (e) at&t unmanned telecommunicatioin facility consisting of installing (3) (n) rrus-11 units and (3) (n) a2 units & 3 (n) dc-2 surge suppressions. | $9,700 | |
| Dec 30, 2013 | Completed final sign-off May 2015 | 1520 Stockton St | Transworld Construction | 4th fl. demolish (e) acoustic tile change approx. 800 sq ft. construct approx 190 lf. of non-bearing partition. (n) atc & lights & add one (n) sink.Details
4th fl. demolish (e) acoustic tile change approx. 800 sq ft. construct approx 190 lf. of non-bearing partition. (n) atc & lights & add one (n) sink. | $112,200 |
| Mar 18, 2013 | Completed final sign-off Apr 2014 | 1520 Stockton St | Triton Tower Inc | modification to an (e) unmanned telecommunication facility consisting of relocating (3) (e) at&t antennas, (2) (e) rruw's, (2) (e) rrh's, (2) (e) dtma's and an (e) surge suppressor.Details
modification to an (e) unmanned telecommunication facility consisting of relocating (3) (e) at&t antennas, (2) (e) rruw's, (2) (e) rrh's, (2) (e) dtma's and an (e) surge suppressor. | $3,000 |
| Dec 23, 2011 | Completed final sign-off Feb 2012 | 1520 Stockton St | San Francisco Fire Protection | 5th floor - remove/strobes from bathroom,and relocate horn/strobe from lab to hallway due to remodel.Details
5th floor - remove/strobes from bathroom,and relocate horn/strobe from lab to hallway due to remodel. | $500 |
| Oct 19, 2011 | Expired or cancelled expired Apr 2015 | 1520 Stockton St | Overland Contracting Inc | wireless facility modification: this proj involves the removal of (6)(e)sprint panel antennas to be replaced w/ (6)(n)sprint panel antennas, wall mounts at the bldg parapet. (3)(e)equipment cabinets to be removed & replaced w/ (2)(n)equipment cabinets. (n) antenna coax cables to be run w/ (e) cableDetails
wireless facility modification: this proj involves the removal of (6)(e)sprint panel antennas to be replaced w/ (6)(n)sprint panel antennas, wall mounts at the bldg parapet. (3)(e)equipment cabinets to be removed & replaced w/ (2)(n)equipment cabinets. (n) antenna coax cables to be run w/ (e) cable | $45,000 |
| May 18, 2011 | Completed final sign-off Jun 2011 | 1520 Stockton St | Perfect Connection Inc. | as builts for pa# 2010-0810-8472-relocate fire sprinkler headsDetails
as builts for pa# 2010-0810-8472-relocate fire sprinkler heads | |
| May 17, 2011 | Completed final sign-off Jun 2011 | 1520 Stockton St | San Francisco Fire Protection | as built 201105055470: remove column from sequence of operation.( shunt down 1st fl fsd)and fire smoke damper control relay from sheet notes. readdress selected point #'s to relfect pt #'s maxed out at 127 points. add signage to show facp located in elevator lobby.Details
as built 201105055470: remove column from sequence of operation.( shunt down 1st fl fsd)and fire smoke damper control relay from sheet notes. readdress selected point #'s to relfect pt #'s maxed out at 127 points. add signage to show facp located in elevator lobby. | |
| May 5, 2011 | Completed final sign-off Jun 2011 | 1520 Stockton St | San Francisco Fire Protection | as built for 201008239398. change pt #'s moved facp to new location added 1 heat detector by fire extg employee restroom. added one strobe.Details
as built for 201008239398. change pt #'s moved facp to new location added 1 heat detector by fire extg employee restroom. added one strobe. | $1,500 |
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 1520 Stockton St | Da Chung Incorporated | revision to 2010-0420-0669. add one unisex toilet room on ground floor. no structural work.Details
revision to 2010-0420-0669. add one unisex toilet room on ground floor. no structural work. | $6,000 |
| Feb 11, 2011 | Completed final sign-off Aug 2011 | 1520 Stockton St | Transworld Construction | 1install new plumbing/lighting fixtures, finishes. barrier removal, full compliance.Details
1install new plumbing/lighting fixtures, finishes. barrier removal, full compliance. | $20,000 |
| Dec 10, 2010 | Completed final sign-off Jun 2011 | 1520 Stockton St | Wai Lam Electric Co | 1st floor (ground)-revisions to electrical - replacement of approved fixtures w/ alternate; existing app no# 2010 0420 0669Details
1st floor (ground)-revisions to electrical - replacement of approved fixtures w/ alternate; existing app no# 2010 0420 0669 | |
| Dec 8, 2010 | Never finaled issued Dec 2010, no final | 1520 Stockton St | street spaceDetails
street space | ||
| Dec 1, 2010 | Expired or cancelled withdrawn Jul 2016 | 1520 Stockton St | modify (e) unmanned telecommunication facility consisting of removing & replace 6(e)antennas w/ 6(n)antennas.adding 6 rru's 6 rruw's. 3 surge suppressors. (n) spuce box. (n) gps antenna. 2 (n) 1-1/2 innerducts for fiber & dc power & adding a (n) 23" equipment rac w/ 3 6601 rbs equint.Details
modify (e) unmanned telecommunication facility consisting of removing & replace 6(e)antennas w/ 6(n)antennas.adding 6 rru's 6 rruw's. 3 surge suppressors. (n) spuce box. (n) gps antenna. 2 (n) 1-1/2 innerducts for fiber & dc power & adding a (n) 23" equipment rac w/ 3 6601 rbs equint. | $44,000 | |
| Aug 23, 2010 | Completed final sign-off Jun 2011 | 1520 Stockton St | San Francisco Fire Protection | ti remodel for 1st floor. relocate (e) fire devices and add on additional devices including 38 smoke detectors, 1 heat detector, 3 manual pulls, 10 horn strobes, 7 strobes and led annunciators.Details
ti remodel for 1st floor. relocate (e) fire devices and add on additional devices including 38 smoke detectors, 1 heat detector, 3 manual pulls, 10 horn strobes, 7 strobes and led annunciators. | $8,000 |
| Aug 10, 2010 | Completed final sign-off Jun 2011 | 1520 Stockton St | Perfect Connection Inc. | relocate fire sprinkler heads per tenant improvements ( 65 relocate)Details
relocate fire sprinkler heads per tenant improvements ( 65 relocate) | $13,000 |
| Jun 28, 2010 | Completed final sign-off Oct 2010 | 1520 Stockton St | Transworld Construction | remove approx 22 lf non bearing partition; patch/repair install work counter 8 outletsDetails
remove approx 22 lf non bearing partition; patch/repair install work counter 8 outlets | $6,000 |
| Jun 10, 2010 | Expired or cancelled expired Jul 2012 | 1520 Stockton St | Cba Site Services Inc. | modification to an (e) unmanned telecommunication facility consisting of adding 1 new 3518 cabinet, 1 new pbc-02, new mcpa & 3 new rru (remote radio unit) cabinets;add 3 new dtma's and 6 new coax cables, also add new 3206 rbs cabinetDetails
modification to an (e) unmanned telecommunication facility consisting of adding 1 new 3518 cabinet, 1 new pbc-02, new mcpa & 3 new rru (remote radio unit) cabinets;add 3 new dtma's and 6 new coax cables, also add new 3206 rbs cabinet | $22,000 |
| Apr 20, 2010 | Completed final sign-off Jun 2011 | 1520 Stockton St | Da Chung Incorporated | demolition of existing paritions, new work involves non structural remodel of entire 1st fl, except: elevators, (e) stair exits, (e)front entranceDetails
demolition of existing paritions, new work involves non structural remodel of entire 1st fl, except: elevators, (e) stair exits, (e)front entrance | $1,200,000 |
| Dec 15, 2009 | Completed final sign-off Jun 2012 | 1520 Stockton St | Transworld Construction | interior renovation, install 6 exam rooms @ 5th floor, modify (e) reception desk to be accessible, upgrade (e) men's & women's multi-accommodation toilet 5th floor, provide accessible drinking fountain @ 5th floor.Details
interior renovation, install 6 exam rooms @ 5th floor, modify (e) reception desk to be accessible, upgrade (e) men's & women's multi-accommodation toilet 5th floor, provide accessible drinking fountain @ 5th floor. | $350,000 |
| Sep 10, 2009 | Never finaled issued Sep 2009, no final | 1520 Stockton St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Aug 18, 2009 | Completed final sign-off Oct 2009 | 1520 Stockton St | San Francisco Fire Protection | as-built drawings to reflect second flr. change. removed 1-clg. mount h/s, removed, 1-smoke detector, relocated 2-smokes and added 2-horn/strobes wall mounts. revision to appl.#2007/0920/3194.Details
as-built drawings to reflect second flr. change. removed 1-clg. mount h/s, removed, 1-smoke detector, relocated 2-smokes and added 2-horn/strobes wall mounts. revision to appl.#2007/0920/3194. | $2,000 |
| Jul 24, 2009 | Expired or cancelled cancelled Nov 2011 | 1520 Stockton St | remodel of the 1st. interior: relocate (e) departments such as pharmacy & member services. add (n) departments areas for health education office & blood draw. relocate & upgrade men's & women's multi accomodation & one unisex toilet room. relocate (e) receptiion area. add patient rm. & cashier rm.Details
remodel of the 1st. interior: relocate (e) departments such as pharmacy & member services. add (n) departments areas for health education office & blood draw. relocate & upgrade men's & women's multi accomodation & one unisex toilet room. relocate (e) receptiion area. add patient rm. & cashier rm. | $750,000 | |
| Jun 16, 2009 | Completed final sign-off Oct 2009 | 1520 Stockton St | D & S Leong Associates | install 44 fire sprinklers at 2nd floor-partialDetails
install 44 fire sprinklers at 2nd floor-partial | $8,800 |
| Jun 12, 2009 | Completed final sign-off Nov 2009 | 1520 Stockton St | Transworld Construction | revision to appl #200903254819 - remodel @ westside of the 2nd floor, provide new ceiling at hall, eliminate closet 217a, clarification - dimension of men's toilet room & details, all interior work.Details
revision to appl #200903254819 - remodel @ westside of the 2nd floor, provide new ceiling at hall, eliminate closet 217a, clarification - dimension of men's toilet room & details, all interior work. | $7,000 |
| Jun 3, 2009 | Never finaled issued Jun 2009, no final | 1520 Stockton St | street space permit only.Details
street space permit only. | ||
| Apr 20, 2009 | Completed final sign-off Oct 2009 | 1520 Stockton St | N S A Wireless Inc | modification to (e) telecom facility consisting of adding 6 new runs of 7/8 coax cable inside (e) cable tray. add 3 new remote electronic tilts to (e) antennas. rets powered by low voltage signal through (e) coax cable.remove tdma equipment. ok to issue after payment of $2400 plus issuance ofDetails
modification to (e) telecom facility consisting of adding 6 new runs of 7/8 coax cable inside (e) cable tray. add 3 new remote electronic tilts to (e) antennas. rets powered by low voltage signal through (e) coax cable.remove tdma equipment. ok to issue after payment of $2400 plus issuance of | $5,000 |
| Mar 25, 2009 | Never finaled issued Mar 2009, no final | 1520 Stockton St | street space permit.Details
street space permit. | ||
| Mar 25, 2009 | Completed final sign-off Nov 2009 | 1520 Stockton St | Transworld Construction | remodel westside of 2nd floor. interior: install10 exams, office, custodian & closet, upgrade existing men's multi-accomodation toilet to be current accessible compliance. fire sprinkler work under separate permit.Details
remodel westside of 2nd floor. interior: install10 exams, office, custodian & closet, upgrade existing men's multi-accomodation toilet to be current accessible compliance. fire sprinkler work under separate permit. | $390,000 |
| Feb 18, 2009 | Completed final sign-off Feb 2009 | 1520 Stockton St | D & S Leong Associates | to obtain final inspection for work approved under pa#200602235215.all work has been completed.Details
to obtain final inspection for work approved under pa#200602235215.all work has been completed. | |
| Jan 13, 2009 | Completed final sign-off Feb 2009 | 1520 Stockton St | revision to pa# 2005-0616-5240 & to show as built for final. re-apportion 4 offices to be 3 offices on south side, remove moveable partitions @ conference room, close off north door @ duplication room & sprint equipment to remain @ north side wallDetails
revision to pa# 2005-0616-5240 & to show as built for final. re-apportion 4 offices to be 3 offices on south side, remove moveable partitions @ conference room, close off north door @ duplication room & sprint equipment to remain @ north side wall | ||
| Nov 18, 2008 | Never finaled issued Nov 2008, no final | 1520 Stockton St | Intelligent Technologies & Services Inc | to obtain final inspection for work approved under pa#2006/03/28/7635. alal work has been completed.Details
to obtain final inspection for work approved under pa#2006/03/28/7635. alal work has been completed. | |
| Oct 16, 2008 | Never finaled issued Oct 2008, no final | 1520 Stockton St | to complete work approved under permit applic. #2005/08/08/9703 - previous permit expired.Details
to complete work approved under permit applic. #2005/08/08/9703 - previous permit expired. | $40,000 | |
| Jul 29, 2008 | Never finaled issued Jul 2008, no final | 1520 Stockton St | street spaceDetails
street space | ||
| May 27, 2008 | Never finaled issued May 2008, no final | 1520 Stockton St | street space permit.Details
street space permit. | ||
| May 16, 2008 | Completed final sign-off Feb 2009 | 1520 Stockton St | renew appl# 200506165240 to complete work.Details
renew appl# 200506165240 to complete work. | $100,000 | |
| Sep 20, 2007 | Completed final sign-off Oct 2009 | 1520 Stockton St | San Francisco Fire Protection | install fire alarm panel for sprinkler monitoring and suprvised notification devices. 66 smoke detectors, 17 manual poles and 50 horn strobesDetails
install fire alarm panel for sprinkler monitoring and suprvised notification devices. 66 smoke detectors, 17 manual poles and 50 horn strobes | $35,000 |
| Nov 22, 2006 | Never finaled issued Oct 2008, no final | 1520 Stockton St | Precision Communication Services | demolition of (e) wireless telecommunication cabinets and equipment inside 6th floor office. and installation of coax cables and conduit up the side of the building to feed (e) rooftop antennas.Details
demolition of (e) wireless telecommunication cabinets and equipment inside 6th floor office. and installation of coax cables and conduit up the side of the building to feed (e) rooftop antennas. | $50,000 |
| Aug 16, 2006 | Expired or cancelled expired Feb 2009 | 1520 Stockton St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | renew pa#200506296377 for final inspectionDetails
renew pa#200506296377 for final inspection | |
| Mar 28, 2006 | Never finaled issued Mar 2006, no final | 1520 Stockton St | Intelligent Technologies & Services Inc | install hfc-125 suppression system in 6/f server room.Details
install hfc-125 suppression system in 6/f server room. | $10,000 |
| Feb 23, 2006 | Expired or cancelled expired Feb 2009 | 1520 Stockton St | D & S Leong Associates | install fire sprinkler system as per plans & nfpa 13. requirement for entire 6th floor. connect to (e) main.Details
install fire sprinkler system as per plans & nfpa 13. requirement for entire 6th floor. connect to (e) main. | $17,000 |
| Nov 29, 2005 | Expired or cancelled expired Feb 2009 | 1520 Stockton St | add 2 exhaust fans on roof.add exhaust grilles & ducts from 3rd floor & 5th floor.add electrical wiring to fans.add airflow indicated &related wiring.relocate supply diffusers.Details
add 2 exhaust fans on roof.add exhaust grilles & ducts from 3rd floor & 5th floor.add electrical wiring to fans.add airflow indicated &related wiring.relocate supply diffusers. | $20,000 | |
| Aug 8, 2005 | Expired or cancelled expired Feb 2009 | 1520 Stockton St | alter 6th flor hvac (mech) duct work to suit rev. arch. layoutDetails
alter 6th flor hvac (mech) duct work to suit rev. arch. layout | $80,000 | |
| Jul 21, 2005 | Expired or cancelled expired Feb 2009 | 1520 Stockton St | electrical work on 6th fl. oti-2 at 6th fl.Details
electrical work on 6th fl. oti-2 at 6th fl. | $20,000 | |
| Jun 29, 2005 | Never finaled issued Sep 2005, no final | 1520 Stockton St | Park Place Contractors | installation of cable tray to (e) location on the roof cable tray to be attached to the back of bldgDetails
installation of cable tray to (e) location on the roof cable tray to be attached to the back of bldg | $25,000 |
| Jun 16, 2005 | Expired or cancelled expired Feb 2009 | 1520 Stockton St | oti-1 at 6th fl, el, me, ls, sp.Details
oti-1 at 6th fl, el, me, ls, sp. | $87,395 | |
| Oct 7, 2003 | Completed final sign-off Dec 2003 | 1520 Stockton St | replace 40 exist front windows -11 exist side window.taking old alum windows out&replacing in kind-Details
replace 40 exist front windows -11 exist side window.taking old alum windows out&replacing in kind- | $42,000 | |
| Oct 6, 2003 | Never finaled issued Oct 2003, no final | 1520 Stockton St | street spaceDetails
street space | ||
| Dec 12, 2002 | Completed final sign-off Jul 2003 | 1520 Stockton St | fire/life safety upgrade to 2nd floor per nfpa-72Details
fire/life safety upgrade to 2nd floor per nfpa-72 | $13,500 | |
| Dec 10, 2002 | Completed final sign-off Jul 2003 | 1520 Stockton St | D & S Leong Associates | install additional fire sprinkler heads at x-ray room & relocate heads at waiting rm; total 28 hdsDetails
install additional fire sprinkler heads at x-ray room & relocate heads at waiting rm; total 28 hds | $4,100 |
| Jul 16, 2002 | Never finaled issued Jul 2002, no final | 1520 Stockton St | side walk repairDetails
side walk repair | ||
| Jan 28, 2002 | Completed final sign-off Jul 2003 | 1520 Stockton St | expand existing x ray suite on 2nd floor. 624 sf to 924 sf sprinklers separate permitDetails
expand existing x ray suite on 2nd floor. 624 sf to 924 sf sprinklers separate permit | $138,000 | |
| Oct 30, 2000 | Expired or cancelled expired Oct 2001 | 1520 Stockton St | Edwards Systems Technology Inc/Est Servi | fire/life safety upgradeDetails
fire/life safety upgrade | |
| Sep 29, 2000 | Completed final sign-off Nov 2000 | 1520 Stockton St | D C Taylor Co | reroofingDetails
reroofing | $33,516 |